CANNINGTON BASE METALS OPERATIONS - NORTHERN ZONE DEVELOPMENT
Private ownership Mining (Underground - including longwall) project In The Mckinlay Shire Council Area for New development. Includes removal of 650,000 tonnes of rock and tunnel formation. Click for more details...

SNAKE CREEK PROJECT - COPPER & GOLD RESOURCE
Private ownership Mining (Underground - including longwall) project In The Cloncurry Shire Council Area for New development. The soil sampling by Xstrata Copper (previous JV partner) recorded numerous anomalous gold (up to 150ppb) and copper ( up to 757ppb) values. The infill sampling will define targets with potential to meet Glengarry's size parameters. Strongly anomalous uranium (248ppm) was recorded by on the rock ship samples associated with high gold (0.6g/t) and copper (8.6%) values. The Snake Creek Project is in the same geological province that hosts the Mary Kathleen uranium deposit approx 70 km to the west-north-west. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE
Decline Development/ Ventilation Shafts/Mining Contract project at via, Cracow, QLD 4719 in the Mining (Underground - including longwall). Portal has commenced. Click for more details...

FREITAG CREEK
South western corner Bowen Basin, west of, Rolleston, QLD 4702 Has Freitag Creek currently at Exploration, Drilling, Survey & Assessment stage. The tenement covers 350 sq km and is located west of Rolleston in the south western corner of the Bowen Basin. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Charters Towers Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 10000 it is The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Concrete capping up to $10,000. Cubic Metre rate per cap finished. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Equipment Hire project at Not Known, Charters Towers, QLD 4820 in the Mining (Underground - including longwall). The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Equipment Hire includes Backhoes, Skid Steer Loaders, Excavators (30 Tonne Class & 2 Tonne Class), Front End Loaders in 3-5 sq.m. and Motor Graders. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Mining (Underground - including longwall) New project at Not Known, Charters Towers, QLD 4820. This type is Labour Hire with Local Govt ownership. The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. The Labour Hire is for fencing, dust control etc. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - VENTILATION SHAFT
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 for New. Work comprises the installation of the primary ventilation shaft. This will involve the excavation of the 2.4 metre diameter 110 metre long shaft and the installation of a second exit method from the underground workings. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project for New development. Includes pipes, crib rooms, escape rooms, ladder ways. Detailed mine plans have been completed for Warrior East and Sunburst laying out access, exploration and production drives, escapeways, drainage and ventilation connections. Click for more details...

GYMPIE MINE SHAFT REPAIR PROJECT
Gympie Mine Shaft Repair Project is currently at the Construction stage, valued at about $ 800000 it is Includes backhoes, cranes, loaders, dozers/drotts, graders, trucks (single and tandem drive), excavators, bobcats, compaction equipment, compressors & tools, chain trencher and drilling rigs. Click for more details...

COPPER KNOB PROJECT
Mining (Underground - including longwall) project for New development. The Copper Knob Lease contains a low grade resource of approximately 700,000 tonnes at 1.4g/t gold. Development of a commercial resource will depend on whether the sulphide ore can be processed economically. Sulphide mineralisation currently being appraised from samples from an early May 2003 driling programme. A small number of exploration RC holes will be drilled to further investigate the previously untested subsidiary structures on the Copper Knob lease. Click for more details...

TEXAS SILVER PROJECT - RESOURCE
Resource - Silver/Gold New project In The Goondiwindi Regional Council Area. Most holes encountered low grade silver, encouraging high grade silver can be encountered with zones of low grade silver mineralisation. Click for more details...

NYMBOOL GOLD PROJECT - BLACKS CREEK - RESOURCE
Mining (Underground - including longwall) project at 120 km south west of Cairns & north west of, Mount Garnet, QLD 4872 for New. The Nymbool gold-copper prophyry system and associated gold mineralisation is located just north-west of the township of Mount Garnet. A small resource of low-grade gold (2.4 million tonnes grading 0.7g/t gold) has been outlined at the Nymbool Gold prospect but exploration is still at an early stage. Click for more details...

BURNETT PROJECT - GOLD RESOURCE
Burnett Project - Gold Resource is currently at the Early Planning stage, valued at about $ 1000000 it is Ongoing scoping studies are being conducted over previously reported gold resources within the Yarrol and Mt Steadman tenements. The Company is progressing well in capturing all available data, both historical and modern, into digital format. Click for more details...

TWIN HILLS GOLD MINE - RESOURCE
Mine - Gold project at South of Charters Towers via, Homestead, QLD 4816 in the Mining (Underground - including longwall). Resource estimate is 214,000 tonnes @ 10.9 g/t for 75,000 ounces of gold. Underground Area 1 of the mine has been mined out and Area 2 remains. In 2006, 36,574 tonnes @ 15 g/t has been mined. Click for more details...

HORSE CREEK PROJECT
via, Mount Isa, QLD 4825 Has Horse Creek Project currently at Exploration, Drilling, Survey & Assessment stage. BHP Billiton has completed a drilling programme to test seven Cannington style targets. Seven mud/diamond core holes were completed for a total of 2,450.6 metres. No visible mineralisation or alteration indicative of Broken Hill Style lead-zinc-silver mineralisation was intersected. Samples have been despatched for analysis and results should be available shortly. Click for more details...

GOONYELLA NO 2 COAL PROJECT
Mining (Underground - including longwall) project for New development. Includes exploration adit & small scale mining prior to commencement of longwall. Click for more details...

MOUNT GARNET PROJECT - BALCOOMA - BASE METALS RESOURCE
Mining (Underground - including longwall) project at via, Mount Garnet, QLD 4872 of Resource - Base Metals type of New development. Resource estimate is 3,965,000 tonnes of ore @ 3.5% Cu, 15 Ag g/t and 0.36 Au g/t. Ore stockpiled is 43,000 tonnes. Click for more details...

CLONCURRY COPPER SULPHIDE PROJECT - PADDOCK/ORPHAN SHEAR
Resource - Base Metals New project In The Cloncurry Shire Council Area. Inferred resource at Paddock is 220,000 t at 2.5% copper. Inferred resource at Orphan Shear is 50,000 t at 1.5% copper. Click for more details...

PAJINGO GOLD OPERATIONS - VERA SOUTH
Decline Development New project In The Charters Towers Regional Council Area. A two year contract for approx 5 km of decline development. Now included as part of Mining Contract project ID no 4-152234 reported Mining Report issue 23 Cnstn Secn. Click for more details...

TEXAS SILVER PROJECT - SILVER SPUR - BASE METAL RESOURCE
A project in the QLD Within Goondiwindi Regional. Initial production resulted from commissioning of the plant, which saw the passage of mine or through the entire mining and production circuit, including the Electrometals silver extraction electrowinning circuit, to finished product. Production of silver powder will gradually increase over the next three to six months to an annualised rate of 2.5 million ounces of silver. Mining, crushing, stacking, leaching and silver production is continuing. Click for more details...

KESTREL COAL OPERATIONS
New project of Mining (Underground - including longwall) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

OSBORNE COPPER/GOLD OPERATIONS
Underground Development - Phase 2 project at 150 km south of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. Possibly another two stages. Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining (Underground - including longwall) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

LISKEARD PROJECT
New project of Mining (Underground - including longwall) project at North east of, Emerald, QLD 4720. This deposit is north of the existing Gregory coal mine. Click for more details...

NEWLANDS COAL OPERATIONS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 100000. This project Longwall production. 2-3 longwall moves per year. Click for more details...

SARAJI COAL OPERATIONS
Exploration Drilling Programme project at via, Dysart, QLD 4745 in the Mining (Underground - including longwall). The potential longwall mine down-dip of the existing open cuts will not now proceed. The coal is likely to be mined by open cut methods using company personnel. Click for more details...

KINGOWER COAL PROJECT
North of, Emerald, QLD 4720 Has Kingower Coal Project currently at Exploration, Drilling, Survey & Assessment stage. Previously, vitrinite reflectances were measured for coal samples recovered from the open-hole drilling conducted previously on the Kingower tenement. The Corvus Seam gave a range of values from 0.59 to 0.65, which is indicative of a coal of this rank. Only two samples of the German Creek Seam could be measured and these gave values of 0.63 and 0.99 respectively. The high value recorded from drill hole KG 001 is of interest. It indicates that the German Creek Seam may contain coal of higher rank that was previously interpreted and shows that it is possible that coking coal can be found in this tenement. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

BROADMEADOW UNDERGROUND MINE - GOONYELLA
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Private ownership. The mine is to be a new punch longwall operation and will be sited on BMA's (BHP Billiton Mitsubishi Alliance's Goonyella Open cut mining lease. The open cut pit will be used for longwall panel access. For longwall startup a workforce of around ninety will be employed with contractors untilised for panel development work as required. Longwall operations scheduled to commence second half 2005. The mine will utilise existing Gonnyella preparation plant capacity. Click for more details...

CANNINGTON BASE METALS OPERATIONS - NORTHERN ZONE DEVELOPMENT
Mining (Underground - including longwall) project for New development. An increase in production from 2.25 million tones per annum to 2.4 million tonnes per annum. Includes mining into the northern zone, modifications to processing facilities and upgrades in infrastructure. The Northern zone will be accessed "off the decline". Click for more details...

NORTH GOONYELLA COAL OPERATIONS - NORTH GOONYELA/EAGLEHAWK
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Private ownership. A Bowen basin underground longwall mining operation, North Goonyella produces high quality coking coal for export to steel mills in Japan, other parts of Asia and Europe. The underground is owner operated and the nearby Eaglefield open cut is operated by contractor Macmahon. Both are included in the sale. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project at via, Charters Towers, QLD 4820 of Underground Development type of New development. Initial development at Warrior of a 900 metres decline. Click for more details...

OAKY CREEK COAL OPERATIONS - OAKY NO 1
Oaky creek via, Tieri, QLD 4709 Has Oaky Creek Coal Operations - Oaky No 1 currently at Construction stage. A change to thin-seam mining with the south-east extension will necessitate new longwall equipment and an upgrade of the trunk conveyor system. Trunk belt capacity is likely to be expanded from 3,500 tonnes per hour to 4,5000 tonnes per hour. Oaky Creek Coal collectively produces 7 million tonnes a year export coking coal from underground longwall operations. Expressions of Interest were sought for the services of a suitably experienced Contractor to provide the following services and works for the installation of an Underground Conveyor System: civil works; structural steel and fabrication works; installation of structure and belt; project management and supervision; electrical works. Click for more details...

BOMBANDY PROJECT - BOMBANDY EXTENDED
Mining (Underground - including longwall) project at 30 km south of Peak Downs Highway via, Nebo, QLD 4742 for New. Bombandy Extended is approximately 50km south of the Peak Downs Highway. This Permit competes the coverage of the Coxendean syncline feature. Exploration in the December 2001 quarter was designed to quantify a potential resource area on Wilunga and Bombandy stations where three seams, Leichhardt Lower 2 (4m), Leichhardt Lower 3 (2m) and Vermont Upper (4.5m), subcrop around the nose of a local synclinal block. The work is ongoing, but so far, slimcore drilling has defined 38 million tonnes of Inferred Resources between 50 to 100m of cumulative overburden and interburden. Click for more details...

WEST WALKER PROJECT - WEST WALKER EXTENDED/CARBOROUGH CREEK - COAL RESOURCE
Mining (Underground - including longwall) project at Via, Nebo, QLD 4742 of Resource - Coal type of New development. West Walker is west of Kemmis Walker. Westerly dipping Rangal Coal Measures sediments which form part of the Kemmis Walker coal deposit crop out 2 km to the east of EPC 657 and extend beneath the permit. At West Walker Extended it is believed that a further occurrence of Rangal Coal Measures may occur within the area in an upthrown block but this concept has yet to be tested. Click for more details...

WARWICK WEST GOLD PROJECT - LEYBURN/TALGIA/THANES CREEK/CANAL CREEK - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Southern Downs Regional is a project estimated to be $ 1000000. This project The tenement covers six small goldfields within the Warwick Mining District. They are the Leyburn, Talgai, Thanes Creek, Canal Creek, Palgrave and Pikedale Fields. Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

BHP BILLITON MISUBISHI ALLIANCE (BMA) & BHP MITUSI (BMC) COAL OPERATIONS
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. Mines owned by BHP Mitsui include South Walker Creek, Blackwater. BMA owned mines include Goonyella, Saraji, Peak Downs, Norwich Park, Gregory, Crinum, Blackwater. BMA also manages and markets coal for the BHP Mitsui mines. This stage two expansion will involve an increase in production capacity to 59Mtpa by second half 2006. This stage includes acquisition of additonal stripping and mining equipment. Further expansions in capacity are planned with an overall production capacity of around 100 million tonnes per annum by 2010. Click for more details...

MOUNT RAWDON GOLD & SILVER PROJECT - MOUNT SHAMROCK - RESOURCE
New project of Mining (Underground - including longwall) project at West south west of, Bundaberg, QLD 4670. Soil sampling in the area, o a 200 metre by 50 metre grid, has defined two continuous zones of gold and arsenic anomalism at the 50 ppb gold contour. Each of these anomalous zones had dimensions of 900 metres by 150 metres, with a highest value of 8,430 ppb. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining (Underground - including longwall) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

GYMPIE GOLD OPERATIONS - PATRIDGE - RESOURCE
Mining (Underground - including longwall) project at Via, Gympie, QLD 4570 for New. Resource estimate is 21,000 tonnes @ 21.7 g/t for 15,000 ounces of Au. Click for more details...

RED HILL COAL PROJECT
Currently at the Early Planning stage In Isaac Regional is a project estimated to be $ 5000000. This project The current program is targeting the open cut and underground mining potential within the Rangal Coal Measures (Leichardt and Vermont Seams) contained in the project area. JORC Resource Statement (Indicated & Inferred) of 83.4 million tonnes of insitu coal. Coal potential is similar to that being mined at Isaac Plains. Click for more details...

PERCYVALE GOLD PROJECT
Mining (Underground - including longwall) project for New development. Initial inferred gold resource containing 14 000 oz grading 4.1 g/t Au to 40m depth only. Click for more details...

KUNIOON CONSULTANCY FOR COST REVIEWER OF SURFACE MINE INFRASTRUCTURE
Mining (Underground - including longwall) project In The South Burnett Regional Council Area of Consultancy For Surface Mine Infrastructure Cost Reviewer type. To provide services as a Cost Reviewer as to provide an independent review of detailed cost estimates that will be prepared by a third party, to support its business case for the development of a new coal mine at Kunioon in the South Burnett region. The Cost Reviewer will provide independent review and advice to Tarong Energy with regards to the completeness and accuracy of the cost estimates. Click for more details...

VOMACKA BASE METALS PROJECT
Resource - Base Metals project at 35 km s-w of, Charters Towers, QLD 4820 In The Council Area Of Charters Towers Regional of Private. Resource estimate (inferred and indicated) 743 000 tonnes grading 4.7% zinc, 1.8% copper, 1.4% lead, 0.5g/t gold and 46g/t silver. Click for more details...

SILVER VALLEY COPPER-SILVER SULPHIDE PROJECT
32km south-southeast of, Kilkivan, QLD 4600 Has Silver Valley Copper-Silver Sulphide Project currently at Exploration, Drilling, Survey & Assessment stage. High-grade copper-silver sulphides of up to 1.5% Cu & 107 g/t Ag have been intersected in a 5km long, 500m wide soil geochemical anomaly suggests a major mineralised system. Click for more details...

OAKY CREEK COAL OPERATIONS - LABOUR HIRE CONTRACT
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Labour Hire Contract - For Gate Road Development type. A project based on June 2009 reserves of 137.7million tonnes (Mt) of coking coal for an estimated life-of-mine (LoM) of 32 years. Two longwall mining operations yield 11Mt of run-of-mine (ROM) coal annually. After processing through a coal preparation plant, product coal railed to either Dalrymple Bay or Gladstone for export by ship. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining (Underground - including longwall) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining (Underground - including longwall) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

LADY LORETTA BASE METALS OPERATIONS- ACCELERATED DEVELOPMENT
Private ownership Mining (Underground - including longwall) project In The Mt Isa City Council Area for New development. A project to increase ore production at Lady Loretta to 1.6 million tonnes (Mtpa) by developing the upper ore bodies independently of the deeper underground resources. To include larger ore handling facilities, increased mobile & fixed plant equipment with associated expanded ventilation system. Upgraded or expanded infrastructure including concrete batch plant, paste plant, warehouse, fuel farm & power station. Increased village accommodation & utility upgrades. Click for more details...