List of Underground - including longwall Projects in QLD


FREITAG CREEK
South western corner Bowen Basin, west of, Rolleston, QLD 4702 Has Freitag Creek currently at Exploration, Drilling, Survey & Assessment stage. The tenement covers 350 sq km and is located west of Rolleston in the south western corner of the Bowen Basin. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

GERMAN CREEK COAL OPERATIONS - SOUTHERN COLLIERY
of Mining (Underground - including longwall) project at 15 km south of, Middlemount, QLD 4746. Production is currently 3.5 million tonnes per year of raw coal. Mining is undertaken in-house using Capricorn Coal personnel. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Raise Bore project at Via, Charters Towers, QLD 4820 in the Mining (Underground - including longwall). A 150 metre raisebore, 2 metres approx. Angled. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Charters Towers Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 10000 it is The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Concrete capping up to $10,000. Cubic Metre rate per cap finished. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Equipment Hire project at Not Known, Charters Towers, QLD 4820 in the Mining (Underground - including longwall). The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Equipment Hire includes Backhoes, Skid Steer Loaders, Excavators (30 Tonne Class & 2 Tonne Class), Front End Loaders in 3-5 sq.m. and Motor Graders. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - VENTILATION SHAFT
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 for New. Work comprises the installation of the primary ventilation shaft. This will involve the excavation of the 2.4 metre diameter 110 metre long shaft and the installation of a second exit method from the underground workings. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project for New development. Includes pipes, crib rooms, escape rooms, ladder ways. Detailed mine plans have been completed for Warrior East and Sunburst laying out access, exploration and production drives, escapeways, drainage and ventilation connections. Click for more details...

GYMPIE MINE SHAFT REPAIR PROJECT
Gympie Mine Shaft Repair Project is currently at the Construction stage, valued at about $ 800000 it is Includes backhoes, cranes, loaders, dozers/drotts, graders, trucks (single and tandem drive), excavators, bobcats, compaction equipment, compressors & tools, chain trencher and drilling rigs. Click for more details...

COPPER KNOB PROJECT
Mining (Underground - including longwall) project for New development. The Copper Knob Lease contains a low grade resource of approximately 700,000 tonnes at 1.4g/t gold. Development of a commercial resource will depend on whether the sulphide ore can be processed economically. Sulphide mineralisation currently being appraised from samples from an early May 2003 driling programme. A small number of exploration RC holes will be drilled to further investigate the previously untested subsidiary structures on the Copper Knob lease. Click for more details...

SELWYN CENTRAL PROJECT
Resource - Base Metals project at 100 km south of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. BHP Billiton have identified the tenement as having the potential to host lead-zinc-silver mineralisation as part of an in-house regional targeting initiative. Click for more details...

TEXAS SILVER PROJECT - RESOURCE
Resource - Silver/Gold New project In The Goondiwindi Regional Council Area. Most holes encountered low grade silver, encouraging high grade silver can be encountered with zones of low grade silver mineralisation. Click for more details...

KURIDALA PROJECT - CURRAJONG/WICKED MAIDEN
New project of Mining (Underground - including longwall) project at 80 km S of, Cloncurry, QLD 4824. A regional geochemical survey has identified two new prospects known as Currajong & Wicked Maiden. At Wicked Maiden a malachite-rich quartz vein has since been located & samples of this returned values of up to 0.021 g/t Au & 2,030 ppm Cu. Click for more details...

BURNETT PROJECT - GOLD RESOURCE
Burnett Project - Gold Resource is currently at the Early Planning stage, valued at about $ 1000000 it is Ongoing scoping studies are being conducted over previously reported gold resources within the Yarrol and Mt Steadman tenements. The Company is progressing well in capturing all available data, both historical and modern, into digital format. Click for more details...

TWIN HILLS GOLD MINE - RESOURCE
Mine - Gold project at South of Charters Towers via, Homestead, QLD 4816 in the Mining (Underground - including longwall). Resource estimate is 214,000 tonnes @ 10.9 g/t for 75,000 ounces of gold. Underground Area 1 of the mine has been mined out and Area 2 remains. In 2006, 36,574 tonnes @ 15 g/t has been mined. Click for more details...

LILLEYVALE JOINT VENTURE PROJECT - IOCG RESOURCE
Lilleyvale Joint Venture Project - Iocg Resource is currently at the Early Planning stage, valued at about $ 2000000 it is The Company has identified a large & complex magnetic body that measures 4km x 3.4km & which is located under nearly 600m of cover. Click for more details...

GOONYELLA NO 2 COAL PROJECT
Mining (Underground - including longwall) project for New development. Includes exploration adit & small scale mining prior to commencement of longwall. Click for more details...

CLONCURRY COPPER SULPHIDE PROJECT - PADDOCK/ORPHAN SHEAR
Resource - Base Metals New project In The Cloncurry Shire Council Area. Inferred resource at Paddock is 220,000 t at 2.5% copper. Inferred resource at Orphan Shear is 50,000 t at 1.5% copper. Click for more details...

FORT CONSTANTINE SOUTH COPPER & GOLD PROJECT
Currently at the Early Planning stage In Cloncurry Shire is a project estimated to be $ 5000000. This project The Fort Constantine South Project is located 10 km south of the Ernest Henry Copper-Gold deposit and covers the same sequences and structures that host this deposit. Previous work focusing on magnetic anomalism has intersected strong alteration and anomalous copper mineralisation in drilling at several prospects. Click for more details...

ENTERPRISE COPPER MINE
Private ownership Mining (Underground - including longwall) project In The Mt Isa City Council Area for New development. A 710 m internal shaft from which the copper ore will be hoisted. The internal shaft sinking phase includes pre-project development and mullock removal from the exising Deep copper Mine. The internal shaft contract will include a raisebore, strip and line method, which involves drilling, stripping the shaft hole and concrete lining the 3.5 metre diameter shaft. The contract includes shaft development from 19B sub-level, which is the top of the internal shaft, to 31A sub-level, which is the bottom of the shaft. Skips at 30 level will hoist ore to 20 level, from where it will be transported to the surface using the existing shaft hoisting system. Once on the surface, the ore will undergo concentrating and smelting at the operation's smelting complex. Click for more details...

KESTREL COAL OPERATIONS
New project of Mining (Underground - including longwall) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

MOUNT GORDON COPPER OPERATIONS
Mining (Underground - including longwall) project at 155 km north of, Mount Isa, QLD 4825 of Mine/Infrastructure type of New development. Resource estimate is 495,000 tonnes of contained copper metal. Recent drilling at the Mammoth deposit has increased the resource estimate and the mine life has now been extended to late 2008. Click for more details...

CRACOW GOLD PROJECT - RESOURCE
Operating Mine New project In The Banana Shire Council Area. Resource estimate is 3.6 Mt @ 10 gpt with reserves being 780,000 tonnes @ 12 gpt. Gold production for December Quarter 2006 was 29,000,000 tonnes @ 9.7 g/t for 8,400 ounces of Au. Development expenditure of $23 million for 2006/2007 includes a decline access to the sovereign shoot and towards the Empire and Sterling zones of mineralisation; decline development of the lower portion of Crown shoot and the lifting of the tailings storage facility. The recently discovered Kilkenny structure is located on the western side of this zone. Recent exploration at Cracow has been focused on drilling of Kilkenny, in addition to drilling on the Sovereign, Roses Pride and Empire shoots. Drilling of the Kilkenny structure defined two steeply plunging shoots of epithermal gold mineralisation. Gold is hosted within a lode structure similar to the Crown and Sovereign shoots. At June 2008, Newcrest calculated an Inferred Resource for Kilkenny (based on a cut off grade of 2.3 g/t gold) of 0.9 Mt at 7.1 g/t for 200,000 ounces. Click for more details...

THALANGA COPPER OPERATIONS- MOUNT WINDSOR/REWARD DEEPS - RESOURCE
Resource - Copper/Gold/Silver New project In The Charters Towers Regional Council Area. Production from Reward Deeps in the previous quarter was 17,781 tonnes of copper concentrate containing 27.28% copper and 0.8g/t gold. Click for more details...

HAPPY VALLEY PROJECT- COPPER/GOLD RESOURCE
Mining (Underground - including longwall) project at Approx 32 kms south south east of, Cloncurry, QLD 4824 for New. Includes four copper prospects - Mount Davis, Cut Snake, Sandy Creek and Consternation. Some sampling has ben undertaken. No significant results to date. Click for more details...

PAJINGO GOLD OPERATIONS - VERA-NANCY
New project of Mining (Underground - including longwall) project, Charters Towers, QLD 4820. A 1 + 1 year contract that is likely to include the decline, drilling access, diamond drilling and ventilation shaft. Click for more details...

SARAJI COAL OPERATIONS
Exploration Drilling Programme project at via, Dysart, QLD 4745 in the Mining (Underground - including longwall). The potential longwall mine down-dip of the existing open cuts will not now proceed. The coal is likely to be mined by open cut methods using company personnel. Click for more details...

KINGOWER COAL PROJECT
North of, Emerald, QLD 4720 Has Kingower Coal Project currently at Exploration, Drilling, Survey & Assessment stage. Previously, vitrinite reflectances were measured for coal samples recovered from the open-hole drilling conducted previously on the Kingower tenement. The Corvus Seam gave a range of values from 0.59 to 0.65, which is indicative of a coal of this rank. Only two samples of the German Creek Seam could be measured and these gave values of 0.63 and 0.99 respectively. The high value recorded from drill hole KG 001 is of interest. It indicates that the German Creek Seam may contain coal of higher rank that was previously interpreted and shows that it is possible that coking coal can be found in this tenement. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

NORTH GOONYELLA COAL OPERATIONS - NORTH GOONYELA/EAGLEHAWK
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Private ownership. A Bowen basin underground longwall mining operation, North Goonyella produces high quality coking coal for export to steel mills in Japan, other parts of Asia and Europe. The underground is owner operated and the nearby Eaglefield open cut is operated by contractor Macmahon. Both are included in the sale. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project at via, Charters Towers, QLD 4820 of Underground Development type of New development. Initial development at Warrior of a 900 metres decline. Click for more details...

BOMBANDY PROJECT - BOMBANDY EXTENDED
Mining (Underground - including longwall) project at 30 km south of Peak Downs Highway via, Nebo, QLD 4742 for New. Bombandy Extended is approximately 50km south of the Peak Downs Highway. This Permit competes the coverage of the Coxendean syncline feature. Exploration in the December 2001 quarter was designed to quantify a potential resource area on Wilunga and Bombandy stations where three seams, Leichhardt Lower 2 (4m), Leichhardt Lower 3 (2m) and Vermont Upper (4.5m), subcrop around the nose of a local synclinal block. The work is ongoing, but so far, slimcore drilling has defined 38 million tonnes of Inferred Resources between 50 to 100m of cumulative overburden and interburden. Click for more details...

WEST WALKER PROJECT - WEST WALKER EXTENDED/CARBOROUGH CREEK - COAL RESOURCE
Mining (Underground - including longwall) project at Via, Nebo, QLD 4742 of Resource - Coal type of New development. West Walker is west of Kemmis Walker. Westerly dipping Rangal Coal Measures sediments which form part of the Kemmis Walker coal deposit crop out 2 km to the east of EPC 657 and extend beneath the permit. At West Walker Extended it is believed that a further occurrence of Rangal Coal Measures may occur within the area in an upthrown block but this concept has yet to be tested. Click for more details...

CHARTERS TOWERS CITY COUNCIL MINE SHAFT REPAIR PROJECT
Charters Towers City Council Mine Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 100000 it is Construction plant including backhoes, skid steer loaders, excavators (Min 30 tonne and 2 tonne), front end loaders in 3-5 cu m minimum, for the period 1/07/02 to 1/06/02. Click for more details...

WARWICK WEST GOLD PROJECT - LEYBURN/TALGIA/THANES CREEK/CANAL CREEK - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Southern Downs Regional is a project estimated to be $ 1000000. This project The tenement covers six small goldfields within the Warwick Mining District. They are the Leyburn, Talgai, Thanes Creek, Canal Creek, Palgrave and Pikedale Fields. Click for more details...

TEXAS NORTH GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) project In The Goondiwindi Regional Council Area of Resource - Gold/Silver type. The Company is principally targeting silver and gold mineralisation similar to that discovered by Macmin at their Mt Gunyan and Twin Hills sites (Texas Silver Project). Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

BHP BILLITON MISUBISHI ALLIANCE (BMA) & BHP MITUSI (BMC) COAL OPERATIONS
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. Mines owned by BHP Mitsui include South Walker Creek, Blackwater. BMA owned mines include Goonyella, Saraji, Peak Downs, Norwich Park, Gregory, Crinum, Blackwater. BMA also manages and markets coal for the BHP Mitsui mines. This stage two expansion will involve an increase in production capacity to 59Mtpa by second half 2006. This stage includes acquisition of additonal stripping and mining equipment. Further expansions in capacity are planned with an overall production capacity of around 100 million tonnes per annum by 2010. Click for more details...

MOUNT RAWDON GOLD & SILVER PROJECT - OUTER RAWDON - RESOURCE
A project in the QLD Within Bundaberg Regional. A total of 1,190 soil samples of 19 rock chips were collected and analysed with encouraging results with a best sample value of 30.85 g/t gold and 5.8 g/t silver. Low order anomalous gold and arsenic results were obtained over several targets south of Mt Rawdon. Click for more details...

STYX BASIN COAL PROJECT
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. 14m aggregate seams outlined during recent coal seam gas exploration, high head values of 34kj/kg swell to 7 1/2, prospective belt is 3km wide 20km long on the west side of the basin. Target is open cut and underground coking coal. Click for more details...

WERRINGTON-OAK PARK JOINT VENTURE PROJECT - BASE METALS RESOURCE
Resource - Base Metals project at 50km South of, Kidston, QLD 4871 In The Council Area Of Etheridge Shire of Private. The tenement covers the Einasleigh Metamorphics that is considered prospective for world class Cannington and Broken Hill type lead-zinc-silver mines because part of the palaeoproterozoic metamorphics in the Georgetown block is correlated with Cannington and Broken Hill mine sequences. Click for more details...

MT RUBY PROJECT - IRON ORE RESOURCE
Private ownership Mining (Underground - including longwall) project In The Tablelands Regional Council Area for New development. The tenement covers an outcropping hill of ironstone and surrounding zone of magnetite-rich float. The iron at the tenement comprises a magnetite skarn and the iron assays up to 69.48% Fe with low phosphorous and silica. On the western side of the hill, zones of higher garnet content (up to 30%) were observed, but the garnet should be easily removed by crushing and magnetic separation producing a high-quality iron concentrate. Click for more details...

GREENVALE EAST GOLD TIN TUNGSTEN PROJECT
New project of Mining (Underground - including longwall) project at 170km west-northwest of Townsville via, Greenvale, QLD 4816. The tenement area contains 14 known mineralised occurrences, including old workings that have produced modest volumes of tin tungsten and gold. Click for more details...

RED HILL COAL PROJECT
Currently at the Early Planning stage In Isaac Regional is a project estimated to be $ 5000000. This project The current program is targeting the open cut and underground mining potential within the Rangal Coal Measures (Leichardt and Vermont Seams) contained in the project area. JORC Resource Statement (Indicated & Inferred) of 83.4 million tonnes of insitu coal. Coal potential is similar to that being mined at Isaac Plains. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - SURFACE FACILTIES
Mine Access Points (2)/Bath House project at 51 km northeast of, Emerald, QLD 4720 In The Council Area Of Central Highlands Regional of Private. To include 2 mine access points & surface infrastructure. Click for more details...

VOMACKA BASE METALS PROJECT
Resource - Base Metals project at 35 km s-w of, Charters Towers, QLD 4820 In The Council Area Of Charters Towers Regional of Private. Resource estimate (inferred and indicated) 743 000 tonnes grading 4.7% zinc, 1.8% copper, 1.4% lead, 0.5g/t gold and 46g/t silver. Click for more details...

BARALABA COAL MINE - MINING CONTRACT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 30000000. This project The contract includes a fully integrated range of mining services including provision of a Senior site Executive, equipment, operators, maintenance, service & support, & drilling & blasting services. Click for more details...

SILVER VALLEY COPPER-SILVER SULPHIDE PROJECT
32km south-southeast of, Kilkivan, QLD 4600 Has Silver Valley Copper-Silver Sulphide Project currently at Exploration, Drilling, Survey & Assessment stage. High-grade copper-silver sulphides of up to 1.5% Cu & 107 g/t Ag have been intersected in a 5km long, 500m wide soil geochemical anomaly suggests a major mineralised system. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining (Underground - including longwall) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining (Underground - including longwall) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...