State

Categories

Sub Categories

Click Here to Find Current Projects

List of Underground - including longwall Projects in QLD


CANNINGTON BASE METALS OPERATIONS - NORTHERN ZONE DEVELOPMENT
Private ownership Mining (Underground - including longwall) project In The Mckinlay Shire Council Area for New development. Includes removal of 650,000 tonnes of rock and tunnel formation. Click for more details...

SNAKE CREEK PROJECT - COPPER & GOLD RESOURCE
Private ownership Mining (Underground - including longwall) project In The Cloncurry Shire Council Area for New development. The soil sampling by Xstrata Copper (previous JV partner) recorded numerous anomalous gold (up to 150ppb) and copper ( up to 757ppb) values. The infill sampling will define targets with potential to meet Glengarry's size parameters. Strongly anomalous uranium (248ppm) was recorded by on the rock ship samples associated with high gold (0.6g/t) and copper (8.6%) values. The Snake Creek Project is in the same geological province that hosts the Mary Kathleen uranium deposit approx 70 km to the west-north-west. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE
Decline Development/ Ventilation Shafts/Mining Contract project at via, Cracow, QLD 4719 in the Mining (Underground - including longwall). Portal has commenced. Click for more details...

FREITAG CREEK
South western corner Bowen Basin, west of, Rolleston, QLD 4702 Has Freitag Creek currently at Exploration, Drilling, Survey & Assessment stage. The tenement covers 350 sq km and is located west of Rolleston in the south western corner of the Bowen Basin. Click for more details...

DRUMMOND PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. Drilling will target the wild horse prospect. The drilling programme will consist of up to six drill holes. Assay results from recent soil sampling survey have indicated a thin hardpan layer just below the surface. Grid based surface soil surface sampling over selected structural targets is planned for the June quarter. Sedimentary rocks intersected below the alluvial cover support the conceptual model. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

CANNINGTON PROJECT - HONEY POT - BASE METAL RESOURCE
Mining (Underground - including longwall) project at Via, Mckinlay, QLD 4823 of Resource - Base Metals type of New development. Target delineation work will be required before drilling can occur. Click for more details...

MOUNT GARNET PROJECT - DRY RIVER SOUTH - BASE METALS RESOURCE
Mount Garnet Project - Dry River South - Base Metals Resource is currently at the Construction stage, valued at about $ 15000000 it is The proven and probale reserve for Dry River South is 1,051,000 tonnes at 8.2% zinc, 2.9% lead, 1.0% copper, 69 g/t silver and 0.65g/t gold . Inferred Resource is 1.559 million tonnes at 7.8% zinc, 2.8% lead, 1.0% copper, 68 g/t silver and 0.67 g/t gold. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Equipment Hire project at Not Known, Charters Towers, QLD 4820 in the Mining (Underground - including longwall). The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Equipment Hire includes Backhoes, Skid Steer Loaders, Excavators (30 Tonne Class & 2 Tonne Class), Front End Loaders in 3-5 sq.m. and Motor Graders. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - VENTILATION SHAFT
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 for New. Work comprises the installation of the primary ventilation shaft. This will involve the excavation of the 2.4 metre diameter 110 metre long shaft and the installation of a second exit method from the underground workings. Click for more details...

GYMPIE MINE SHAFT REPAIR PROJECT
Gympie Mine Shaft Repair Project is currently at the Construction stage, valued at about $ 800000 it is Includes backhoes, cranes, loaders, dozers/drotts, graders, trucks (single and tandem drive), excavators, bobcats, compaction equipment, compressors & tools, chain trencher and drilling rigs. Click for more details...

SELWYN CENTRAL PROJECT
Resource - Base Metals project at 100 km south of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. BHP Billiton have identified the tenement as having the potential to host lead-zinc-silver mineralisation as part of an in-house regional targeting initiative. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - UNDERGROUND MINING
Currently at the Construction stage In Charters Towers Regional is a project estimated to be $ 3400000. This project Company personnel are currently undertaking the preliminary development. Once the decline progresses into the ore zone, company personnel are likely to concentrate on production with assistance in further decline development likely to be undertaken by a contractor (to be repriced at a later date). Click for more details...

NEWLANDS COAL OPERATIONS - NORTHERN UNDERGROUND
Mining (Underground - including longwall) project at Via, Glenden, QLD 4743 for New. A punch longwall mine. The Northern Underground at Newlands is a proposed new longwall mine to replace production from the southern underground at end of the 2005 financial year. A punch longwall with access to longwall panels from the pit floor, eliminating the need to drive mains into the deposit. Peak expected production likely to be 7.5 to 8 million tonnes per year. Click for more details...

BURNETT PROJECT - GOLD RESOURCE
Burnett Project - Gold Resource is currently at the Early Planning stage, valued at about $ 1000000 it is Ongoing scoping studies are being conducted over previously reported gold resources within the Yarrol and Mt Steadman tenements. The Company is progressing well in capturing all available data, both historical and modern, into digital format. Click for more details...

HORSE CREEK PROJECT
via, Mount Isa, QLD 4825 Has Horse Creek Project currently at Exploration, Drilling, Survey & Assessment stage. BHP Billiton has completed a drilling programme to test seven Cannington style targets. Seven mud/diamond core holes were completed for a total of 2,450.6 metres. No visible mineralisation or alteration indicative of Broken Hill Style lead-zinc-silver mineralisation was intersected. Samples have been despatched for analysis and results should be available shortly. Click for more details...

GOONYELLA NO 2 COAL PROJECT
Mining (Underground - including longwall) project for New development. Includes exploration adit & small scale mining prior to commencement of longwall. Click for more details...

MOUNT GORDON COPPER OPERATIONS - MAMMOTH
A project in the QLD Within Mt Isa City. Underground mining operations will be conducted under a 3 year contract by Byrnecut Mining under the supervision of Mt Gordon site personnel. Click for more details...

CLONCURRY COPPER SULPHIDE PROJECT - PADDOCK/ORPHAN SHEAR
Resource - Base Metals New project In The Cloncurry Shire Council Area. Inferred resource at Paddock is 220,000 t at 2.5% copper. Inferred resource at Orphan Shear is 50,000 t at 1.5% copper. Click for more details...

PAJINGO GOLD OPERATIONS - VERA SOUTH
Decline Development New project In The Charters Towers Regional Council Area. A two year contract for approx 5 km of decline development. Now included as part of Mining Contract project ID no 4-152234 reported Mining Report issue 23 Cnstn Secn. Click for more details...

ENTERPRISE COPPER MINE
Private ownership Mining (Underground - including longwall) project In The Mt Isa City Council Area for New development. A 710 m internal shaft from which the copper ore will be hoisted. The internal shaft sinking phase includes pre-project development and mullock removal from the exising Deep copper Mine. The internal shaft contract will include a raisebore, strip and line method, which involves drilling, stripping the shaft hole and concrete lining the 3.5 metre diameter shaft. The contract includes shaft development from 19B sub-level, which is the top of the internal shaft, to 31A sub-level, which is the bottom of the shaft. Skips at 30 level will hoist ore to 20 level, from where it will be transported to the surface using the existing shaft hoisting system. Once on the surface, the ore will undergo concentrating and smelting at the operation's smelting complex. Click for more details...

TEXAS SILVER PROJECT - SILVER SPUR - BASE METAL RESOURCE
A project in the QLD Within Goondiwindi Regional. Initial production resulted from commissioning of the plant, which saw the passage of mine or through the entire mining and production circuit, including the Electrometals silver extraction electrowinning circuit, to finished product. Production of silver powder will gradually increase over the next three to six months to an annualised rate of 2.5 million ounces of silver. Mining, crushing, stacking, leaching and silver production is continuing. Click for more details...

KESTREL COAL OPERATIONS
New project of Mining (Underground - including longwall) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

CRACOW GOLD PROJECT - RESOURCE
Operating Mine New project In The Banana Shire Council Area. Resource estimate is 3.6 Mt @ 10 gpt with reserves being 780,000 tonnes @ 12 gpt. Gold production for December Quarter 2006 was 29,000,000 tonnes @ 9.7 g/t for 8,400 ounces of Au. Development expenditure of $23 million for 2006/2007 includes a decline access to the sovereign shoot and towards the Empire and Sterling zones of mineralisation; decline development of the lower portion of Crown shoot and the lifting of the tailings storage facility. The recently discovered Kilkenny structure is located on the western side of this zone. Recent exploration at Cracow has been focused on drilling of Kilkenny, in addition to drilling on the Sovereign, Roses Pride and Empire shoots. Drilling of the Kilkenny structure defined two steeply plunging shoots of epithermal gold mineralisation. Gold is hosted within a lode structure similar to the Crown and Sovereign shoots. At June 2008, Newcrest calculated an Inferred Resource for Kilkenny (based on a cut off grade of 2.3 g/t gold) of 0.9 Mt at 7.1 g/t for 200,000 ounces. Click for more details...

HAPPY VALLEY PROJECT- COPPER/GOLD RESOURCE
Mining (Underground - including longwall) project at Approx 32 kms south south east of, Cloncurry, QLD 4824 for New. Includes four copper prospects - Mount Davis, Cut Snake, Sandy Creek and Consternation. Some sampling has ben undertaken. No significant results to date. Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining (Underground - including longwall) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

LISKEARD PROJECT
New project of Mining (Underground - including longwall) project at North east of, Emerald, QLD 4720. This deposit is north of the existing Gregory coal mine. Click for more details...

PAJINGO GOLD OPERATIONS - VERA-NANCY
New project of Mining (Underground - including longwall) project, Charters Towers, QLD 4820. A 1 + 1 year contract that is likely to include the decline, drilling access, diamond drilling and ventilation shaft. Click for more details...

SARAJI COAL OPERATIONS
Exploration Drilling Programme project at via, Dysart, QLD 4745 in the Mining (Underground - including longwall). The potential longwall mine down-dip of the existing open cuts will not now proceed. The coal is likely to be mined by open cut methods using company personnel. Click for more details...

KINGOWER COAL PROJECT
North of, Emerald, QLD 4720 Has Kingower Coal Project currently at Exploration, Drilling, Survey & Assessment stage. Previously, vitrinite reflectances were measured for coal samples recovered from the open-hole drilling conducted previously on the Kingower tenement. The Corvus Seam gave a range of values from 0.59 to 0.65, which is indicative of a coal of this rank. Only two samples of the German Creek Seam could be measured and these gave values of 0.63 and 0.99 respectively. The high value recorded from drill hole KG 001 is of interest. It indicates that the German Creek Seam may contain coal of higher rank that was previously interpreted and shows that it is possible that coking coal can be found in this tenement. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

WARDS WELL PROJECT - LANCEWOOD
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Resource - Coal type. Estimated 340 million tonne resource of coking coal suitable for underground mining.; Click for more details...

CANNINGTON BASE METALS OPERATIONS - NORTHERN ZONE DEVELOPMENT
Mining (Underground - including longwall) project for New development. An increase in production from 2.25 million tones per annum to 2.4 million tonnes per annum. Includes mining into the northern zone, modifications to processing facilities and upgrades in infrastructure. The Northern zone will be accessed "off the decline". Click for more details...

NORTH GOONYELLA COAL OPERATIONS - NORTH GOONYELA/EAGLEHAWK
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Private ownership. A Bowen basin underground longwall mining operation, North Goonyella produces high quality coking coal for export to steel mills in Japan, other parts of Asia and Europe. The underground is owner operated and the nearby Eaglefield open cut is operated by contractor Macmahon. Both are included in the sale. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project at via, Charters Towers, QLD 4820 of Underground Development type of New development. Initial development at Warrior of a 900 metres decline. Click for more details...

OAKY CREEK COAL OPERATIONS - OAKY NO 1
Oaky creek via, Tieri, QLD 4709 Has Oaky Creek Coal Operations - Oaky No 1 currently at Construction stage. A change to thin-seam mining with the south-east extension will necessitate new longwall equipment and an upgrade of the trunk conveyor system. Trunk belt capacity is likely to be expanded from 3,500 tonnes per hour to 4,5000 tonnes per hour. Oaky Creek Coal collectively produces 7 million tonnes a year export coking coal from underground longwall operations. Expressions of Interest were sought for the services of a suitably experienced Contractor to provide the following services and works for the installation of an Underground Conveyor System: civil works; structural steel and fabrication works; installation of structure and belt; project management and supervision; electrical works. Click for more details...

WARWICK WEST GOLD PROJECT - LEYBURN/TALGIA/THANES CREEK/CANAL CREEK - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Southern Downs Regional is a project estimated to be $ 1000000. This project The tenement covers six small goldfields within the Warwick Mining District. They are the Leyburn, Talgai, Thanes Creek, Canal Creek, Palgrave and Pikedale Fields. Click for more details...

TEXAS NORTH GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) project In The Goondiwindi Regional Council Area of Resource - Gold/Silver type. The Company is principally targeting silver and gold mineralisation similar to that discovered by Macmin at their Mt Gunyan and Twin Hills sites (Texas Silver Project). Click for more details...

MOUNT RAWDON GOLD & SILVER PROJECT - OUTER RAWDON - RESOURCE
A project in the QLD Within Bundaberg Regional. A total of 1,190 soil samples of 19 rock chips were collected and analysed with encouraging results with a best sample value of 30.85 g/t gold and 5.8 g/t silver. Low order anomalous gold and arsenic results were obtained over several targets south of Mt Rawdon. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining (Underground - including longwall) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

WERRINGTON-OAK PARK JOINT VENTURE PROJECT - BASE METALS RESOURCE
Resource - Base Metals project at 50km South of, Kidston, QLD 4871 In The Council Area Of Etheridge Shire of Private. The tenement covers the Einasleigh Metamorphics that is considered prospective for world class Cannington and Broken Hill type lead-zinc-silver mines because part of the palaeoproterozoic metamorphics in the Georgetown block is correlated with Cannington and Broken Hill mine sequences. Click for more details...

MT RUBY PROJECT - IRON ORE RESOURCE
Private ownership Mining (Underground - including longwall) project In The Tablelands Regional Council Area for New development. The tenement covers an outcropping hill of ironstone and surrounding zone of magnetite-rich float. The iron at the tenement comprises a magnetite skarn and the iron assays up to 69.48% Fe with low phosphorous and silica. On the western side of the hill, zones of higher garnet content (up to 30%) were observed, but the garnet should be easily removed by crushing and magnetic separation producing a high-quality iron concentrate. Click for more details...

RED HILL COAL PROJECT
Currently at the Early Planning stage In Isaac Regional is a project estimated to be $ 5000000. This project The current program is targeting the open cut and underground mining potential within the Rangal Coal Measures (Leichardt and Vermont Seams) contained in the project area. JORC Resource Statement (Indicated & Inferred) of 83.4 million tonnes of insitu coal. Coal potential is similar to that being mined at Isaac Plains. Click for more details...

KUNIOON CONSULTANCY FOR COST REVIEWER OF SURFACE MINE INFRASTRUCTURE
Mining (Underground - including longwall) project In The South Burnett Regional Council Area of Consultancy For Surface Mine Infrastructure Cost Reviewer type. To provide services as a Cost Reviewer as to provide an independent review of detailed cost estimates that will be prepared by a third party, to support its business case for the development of a new coal mine at Kunioon in the South Burnett region. The Cost Reviewer will provide independent review and advice to Tarong Energy with regards to the completeness and accuracy of the cost estimates. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - SURFACE FACILTIES
Mine Access Points (2)/Bath House project at 51 km northeast of, Emerald, QLD 4720 In The Council Area Of Central Highlands Regional of Private. To include 2 mine access points & surface infrastructure. Click for more details...

SILVER VALLEY COPPER-SILVER SULPHIDE PROJECT
32km south-southeast of, Kilkivan, QLD 4600 Has Silver Valley Copper-Silver Sulphide Project currently at Exploration, Drilling, Survey & Assessment stage. High-grade copper-silver sulphides of up to 1.5% Cu & 107 g/t Ag have been intersected in a 5km long, 500m wide soil geochemical anomaly suggests a major mineralised system. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining (Underground - including longwall) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining (Underground - including longwall) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect