STAWELL GOLD OPERATIONS
Mine - Underground/Drilling Contract project at Near, Stawell, VIC 3380 in the Mining (Underground - including longwall). Contract extension of six months envisaged to include underground long hole production & sample drilling. Click for more details...

FOSTERVILLE GOLD OPERATIONS - UNDERGROUND MINING
Mining (Underground - including longwall) project at Near Fosterville 20 km east northeast of, Bendigo, VIC 3550 for New. Decline development will begin in the southern end of the Falcon Pit to facilitate early access to underground ore, in the high-grade Phoenix shoot. A underground work shop and dewatering dam will also be constructed. Long lead items for underground development have been ordered and will arrive first quarter 2006. At present surface mining is being undertaken by Roche. Click for more details...

FOSTERVILLE EAST JV GOLD PROJECT - RESOURCE
A project in the VIC Within Greater Bendigo. Infill drilling of the anomalous gold to 176ppb has intersected further anomalous gold (to 0.47g/t) and arsenic and antimony. Drilling approximately 7 km to the north also returned anomalous gold including 6 metres averaging 0.21g/t. Silver assays to 168g/t (5.4 ounces per tonne) have been reported from AC drilling at Muskerry East Prospect. Click for more details...

RUTHERGLEN PROJECT
Via, Rutherglen, VIC 3685 Has Rutherglen Project currently at Exploration, Drilling, Survey & Assessment stage. Previous detailed evaluations have highlighted the need for better geophysical data. Click for more details...

STAWELL GOLD OPERATIONS
Currently at the Construction stage In Northern Grampians is a project estimated to be $ 400000. This project To blind sink a raise bore for a new ventilation shaft. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Mining (Underground - including longwall) project at Near Fosterville 20 km east northeast of, Bendigo, VIC 3550 of Sulphides Development -Open Cut & Underground type of Addition development. The feasibility study proposeD an integrated surface and underground mine and treatment plant capable of extracting and processing 800,000 tonnes of refractory ore annually. The project has an initial mine life of 7.5 years approx. Click for more details...

WALHALLA WOODS POINT PROJECT - COHENS REEF/PINNACLE
Mining (Underground - including longwall) New project at via, Woods Point, VIC 3723. This type is Resource - Gold/Nickel/Cobalt/Pgm with Private ownership. Computer modelling of historical data and more recent development work continued with the objective of estimating the remaining stockwork resource and defining mineralisation controls to assist in further exploration targeting. Click for more details...

BENAMBRA BASE METALS PROJECT
18 km northeast from, Benambra, VIC 3900 Has Benambra Base Metals Project currently at Early Planning stage. The Benambra Mine Reopening Study is substantially complete; the principal outstanding matters relate to the Victorian Department of Natural Resources & Environment (DNRE) approval of the Company's Workplan & the level of environmental bonding. Click for more details...

SALT CREEK PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Northern Grampians is a project estimated to be $ 500000. This project Based on a lineament analysis the geology of the area shows striking similarities with the Stawell gold deposit. Click for more details...

NORTH BIRDS PROJECT
Mining (Underground - including longwall) project In The Greater Bendigo Council Area of Private ownership. A diamond drill hole was targeted through the known mineralisation to help confirm the geological interpretation form the original RC drilling. The structure was intercepted at 46m down hold and was 10m wide. Half core assays over this interval averaged 4.4 g/t gold. Three RC drillholes located 100m south of the known mineralisation intersected old stopes. This downgrades the potential to the south. Click for more details...

BALLARAT GOLD PROJECT
A project in the VIC Within Ballarat. Construction of a 300,000tpa plant for a minimum of 80,000oz of gold per year expected to include a gravity circuit & carbon-in-pulp module. Contract to involve all associated services & power distribution. Click for more details...

BALLARAT GOLD PROJECT
Decline Development - Underground Extension project at Via, Ballarat, VIC 3350 In The Council Area Of Ballarat of Private. The current decline extends for 900 metres to a vertical depth of 140 metres. Drilling in the upper zones of the siting holes has established competent ground conditions through which the existing decline can be extended to access ore from the Sulieman and first Chance lines. Click for more details...

KINGSTON PROJECT - MONTEGO BAY
Mining (Underground - including longwall) project at via, Stawell, VIC 3380 of Resource - Gold type of New development. RC drilling to test the Montego Bay prospect has been completed. This prospect was defined by soil, stream sediment and rock chip sampling and extends east-northeast from the historic Kingston mine. The surface gold anomaly is associated with a conspicuous east-northeast striking quartz-breccia ridge with a strike extent of about 500 m. The drilling programme comprised 1,706 m in 16 holes which tested approx 400 m of the strike extent of the surface anomaly. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining (Underground - including longwall) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

STAWELL GOLD OPERATIONS - OPERATING MINE
Mining (Underground - including longwall) project In The Northern Grampians Council Area of Private ownership. GG1 and GG2 blocks have been accessed to date. Click for more details...

BALLARAT EAST GOLD PROJECT - WOOLSHED GULLY DECLINE
Mining (Underground - including longwall) project In The Ballarat Council Area of Decline Development type. Includes development, ground support and services works. Click for more details...

NEW BENDIGO GOLD PROJECT
Mining (Underground - including longwall) project at Via, Bendigo, VIC 3550 of Mining Equipment - Supply type of New development. Includes 2 Boom Jumbos, 1 Boom JUMBO, Rodbolter, Longhole Drill and 7 cubic metre loader. Click for more details...

BALLARAT EAST GOLD PROJECT - UNDERGROUND MINE VENTILATION SYSTEM UPGRADE
Mining (Underground - including longwall) project for New development. Work comprises the refurbishment of the Southern Woah Hawp decline ventilation system and the internal extension of the New Princes extended ventilation shaft. Click for more details...

INGLEWOOD GOLDFIELD PROJECT - PLANT RECOMMENCEMENT
Private ownership Mining (Underground - including longwall) project In The Greater Bendigo Council Area for New development. A project on the historic Central Victorian Inglewood goldfield. Based on a resource estimate of 235,000 ounces (oz) from historic open pit & underground deposits. Recommissioning of the 90,000tpa CIP/CIL gold processing plant with associated equipment upgrades. Click for more details...

GRAYBRIDGE PROJECT - HEAVY MINERAL SANDS RESOURCE
Graybridge Project - Heavy Mineral Sands Resource is currently at the Early Planning stage, valued at about $ 2000000 it is Indicated and Inferred Resource of 47.6 Mt with 3.42% THM and 15.8% Zircon has been defined. Click for more details...

WOODS POINT GOLD PROJECT - MORNING STAR MINE
A project in the VIC Within Mansfield Shire. 2008 drilling at the former Morning Star Mine intersected 2 new highly mineralised zones (Kenny & Maxwell) around 250m from the surface. The resulting maiden total resource estimate (measured + indicated + inferred) came in at 4.6 million tonnes (Mt) for 910,000oz contained gold including 2Mt @11.2g/t underground resource for 726,000oz contained gold & 2.6Mt @ 2.1g/t of surface resource for 184,000oz. In 2009 a pilot mining program of the Maxwell Reef (average 12g/t gold) was underway to extract 3000t of ore. Access to the 217m deep reef to be via an exploration decline to be constructed from the existing Morning Star Mine main shaft between levels 8 & 9. An initial production rate of at least 50t per day anticipated. Other 2009 activity included refurbishment of Plats between levels 3 & 9, installing air & water services to Level 6 (Burn's Reef), laying of rail to level 4 (Dickenson's Stope) as well as power, pumping & mine communications upgrades. Further underground exploration included sampling at Level 6 (Dickenson's & Burn's Reefs) & the Morning Star adit (Age of Progress/Stackpoole Reef). Investigation underway on the main shaft winding mechanism to ensure it can cope with increasing production. Click for more details...