List of Underground - including longwall Projects in WA


WACKALINA PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project for New development. Drilling to test previously identified conceptual magnetic targets. Click for more details...

VIVIEN GOLD OPERATIONS RECOMMENCEMENT
Mine - Recommencement project at Straddling Agnew Sandstone Rd 10km SW of, Leinster, WA 6437 in the Mining (Underground - including longwall). A project located on the site of former underground & open cut operations based on an upgraded resource estimate of 451 000 tonnes at 7.6 g/t gold for 109 000 ounces gold. Click for more details...

CURRANS WELL PROJECT - NICKEL/COPPER/PGM REOURCE
A project in the WA Within Murchison. The massive semi massive sulphide mineralisation was located at the contact between talc magnesite and amphibolite rocks and have some of the highest PGE intercepts. Best intersections include 7m @ 0.97% Ni, 1.44 g/t PGE and 0.49Cu including 3m @ 1.42% Ni, 1.82g/t PGE and 0.56% Cu. Click for more details...

FORRESTANIA NICKEL PROJECT - T ZERO/T1/T4/FLYING FOX - RESOURCE
Mining (Underground - including longwall) project In The Yilgarn Council Area of Private ownership. T Zero South indicated resource estimate is 36,500 tonnes @ 3.6% Ni for 1300 tonnes of Ni metal. Click for more details...

DULCIE GOLD PROJECT
Mining (Underground - including longwall) New project at 40km south of Marvel Loch near, Southern Cross, WA 6426. This type is Resource - Gold with Private ownership. The Dulcie gold project located within the Parker Range Project Group, around 40km south of the regional mining centre of Marvel Loch. The project comprised a gold laterite resource of 1.12 Mt at 0.68 g/t Au for 24,600 oz of contained gold, which was amenable to extraction using heap leach methods. Click for more details...

MORGAN RANGE PROJECT - HUMPBACK/PILOT
Mining (Underground - including longwall) project at Musgrave region, ., WA 6999 for New. The surface magnetic and EM survey as well as a soil-sampling programme have been completed at Humpback and Pilot. The results of the EM survey confirm the presence of the conductors first identified in the airborne EM survey. Further assessment of the data is underway. Click for more details...

BETA HUNT NICKEL PROJECT
Resource - Nickel New project In The Coolgardie Council Area. The project includes a remnant resource at the Hunt nickel mine and the developed but un-mined Beta nickel project. Access to the mine is via a portal situated on the northern shoreline of Lake Lefroy, 5 km by road from the WMC nickel concentrator. The Hunt deposit is accessed by a 4 km decline and has remnant blocks available for mining. The Beta deposit is accessed via a 2 km decline developed from the base of the Hunt decline. The Beta deposit is partially developed but is otherwise unmined and requires only pumping and rehabilitation to recommence production in the first quarter of 2004. The acquisition of the project is via a sub-lease associated with agreements and rights in relation to the mining of nickel. Targets within the project area that have the potential to significantly increase the resource base have been identified. Click for more details...

EAST ALPHA DEVELOPMENT PROJECT - NICKEL RESOURCE
Via, Kambalda, WA 6442 Has East Alpha Development Project - Nickel Resource currently at Construction stage. Development will be undertaken in two stages. The first stage will involve the development of twin exploration declines separated by 300 metres vertically, a ventilation raise bore to surface and underground drilling to the southern limit of the current Beta Hunt and East Alpha resource blocks. The second stage would involve a further extension to the twin exploration declines 3 km's to the south. Click for more details...

RUBY QUEEN GOLD MINE PROJECT
Mining (Underground - including longwall) New project at 25 km from, Halls Creek, WA 6770. This type is Dewatering with Private ownership. The former Ruby queen mine was abandoned in the early 1900s after the shaft was repeatedly burnt out and workings became inaccessible. Access to the mine will be made safe enough to allow a complete underground survey of the previously unrecorded and unmined sublevels. A Feasibility Study on dewatering the lower levels will also be undertaken. Click for more details...

RADIO HILL NICKEL PROJECT - RESOURCE
Mining (Underground - including longwall) project In The City Of Karratha Council Area of Resource - Nickel type. A resource estimate of 874,000 tonnes @ 0.7% nickel for 6000 tonnes of Ni, 1% copper for 8200 tonnes of Cu and 0.4% cobalt for 350 tonnes of cobalt. Infrastructure for development is already in existence including a decline, ventilation, dewatering facilities and power facilities. Production is expected to be 58,350 dmt of Ni and 23,830 dmt of Cu. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - BULLEN DECLINE - MINESITE EXPLORATION
Currently at the Early Planning stage In Dundas is a project estimated to be $ 10000000. This project Feasibility study is ongoing to develop O'Briens reef. A conceptual mine study to utilise the existing Bullen decline has been completed. The ore reserve for O'Briens's reef is 104,000 tonnes at 11.1 g/t gold for 36,000 ounces. Total mineral resource is 142,000 tonnes at 16.0 g/t gold for 73,000 ounces gold. Drilling will contine to to permit completion of the feasibility study. Scotia area is being driiled and is considered for open pit mining. Resource estimate for Scotia is 109,500 tonnes at 7.9 g/t for 28,000 ounces gold. Click for more details...

LAKE WAY WILLIAMSON PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) New project at 11 km south of Wiluna Gold Mine via, Wiluna, WA 6646. This type is Resource - Gold with Private ownership. The Lake Way oxide resource is 15 km from the Wiluna plant. Prospects include Zenith, Zentih South, Red Lady, Red Lady South, Island Tyrrel, Vail, Williamson, Carroll and Prior. It is envisaged that lower cost oxide ores initially from Lake Way will in time supplement the underground ores currently being mined. Click for more details...

MATTS BORE PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Laverton Council Area of Resource - Gold type. A 4.500 metre bedrock aircore drilling programme designed to follow up a coincident 2.4 km geochemical and geophysical anomaly. Click for more details...

BLAIR NICKEL MINE - AREA 57 - RESOURCE
Currently at the Construction stage In Coolgardie is a project estimated to be $ 10000000. This project Recent mining at the southern end of the Area 57 shoot has highlighted the possibility of remnant ore remaining south of the upper developed levels. Click for more details...

MOUNT ELIZABETH PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Wyndham-E Kimberley is a project estimated to be $ 5000000. This project The WA Government has granted EL 80/2459 to Austar for a term of 5 years. A Prospectus for an IPO of Austar (to be re-named Brilliant Diamonds Ltd), is in the coarse of preparation. Click for more details...

WHISTLER PROJECT
Mining (Underground - including longwall) New project at South of, Meekatharra, WA 6642. This type is Underground Development with Private ownership. Inferred resource of 159,000 tonnes at 5.3g/t gold below the mined open pit. Click for more details...

WACKILINA PROJECT
Resource - Gold project at 20km northwest of, Tom Price, WA 6751 In The Council Area Of Ashburton of Private. A 2.5k x 3.5k (10ppb gold cut-off) has been defined in the Wackalinga project area. The anomaly occurs in a granted exploration licence. Click for more details...

MOUNT CELIA PROJECT
New project of Mining (Underground - including longwall) project at Via, Laverton, WA 6440. Results to date from RC drilling included 10 metres at 2.61g/t gold from 181 metre, including 4 metres at 5.23g/t gold from 187 metres. Results from a RABdrilling programme of 92 holes aor 4608 metres are also pending. Click for more details...

MAXWELLS - GOLD
Mine/S - Open Cut project at Approximately 50 km southeast of Kalgoorlie, Boulder, WA 6432 in the Mining (Underground - including longwall). Total resource estimated at 1.11mt grading 3.92gpt gold including a reserve of 713,000t at 4.33gpt gold. A large open pit to 80m is planned. The mineralised structure delineated over a strike length of 1,400m. Work to date indicates area also has potential to support a future underground operation with open cut mining to 100m envisaged. Reverse circulation drilling results include 2m from 62m) grading 60.5gpt gold with high grades encountered to a depth of 128m. A 2 year excavation, drilling & blasting contract involving approximately 5 million cu m of material is envisaged for this deposit with an estimated strip ratio of 12:1. Recent drilling has extended known mineralisation at least 300m north & south & the deposit is still open below 250m. Click for more details...

WOMBAT DEEPS - GOLD
Mining (Underground - including longwall) project at 60 km northeast of, Dalwallinu, WA 6609 for New. Best intercepts to date include 19m (from 105m) at 4.73gpt gold & 3m grading (from 151m) 22.0gpt gold. 30,000t parcel of ore to be processed. Treatment of low grade stockpiles considered economically viable following recent trials. This option may bypass secondary & tertiary crushers & screening to provide mill feed & oversize dump leachable material. Mineralisation extends at least 120m below planned pit floor (188m). Additional results include 4m grading 97.2gpt gold. Preliminary probable reserve currently estimated at 148,000t grading 8.09gpt gold. Decline to start at 295RL extending over 860m to 214RL where mining will commence. Stoping expected to begin in April 1996 & development will include at least five ore drives. Work scheduled to commence mid/late January 1996. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

SKELETON FLAT PROJECT - DIAMOND RESOURCE
Resource - Diamonds project at 50 km north of, Halls Creek, WA 6770 in the Mining (Underground - including longwall). Main dyke identified from 0.8 to 1.8 metres, averaging about 1.2 metres. Five trenches identified green-blue-grey kimberlite facies material. Representative samples from trenches 1, 3, 4, 7, 8 are currently undergoing micro diamond testing. Click for more details...

LANFRANCHI MINE - NICKEL
Mining Contract -Underground project at 42 km south of, Kambalda, WA 6442 in the Mining (Underground - including longwall). Contract comprises production mining Click for more details...

ANTRIM NICKEL PROJECT - RESOURCE
Mining (Underground - including longwall) project at Kalkarindji region NT and East Kimberley, ., WA 6999 of Resource - Nickel type of New development. Reconnaissance ground electromagnetic surveys. Click for more details...

LONDONDERRY PROJECT
Mining (Underground - including longwall) project for New development. Approx 10 sq km. The area is prospective for Nepean style mineralisation. Click for more details...

KARONIC PROJECT - MAIN ZONE
Mining (Underground - including longwall) project at Approx 110 km east of, Kalgoorlie, WA 6430 of Trial Mining type of New development. The Maine Zone north shoot contains 35,700 tonnes at 10.10 g/t gold & remains open to the north. Continuity of the shoot will be tested by diamond drilling from underground during the course of the decline development. Re-assessment of Main Zone south mineralisation has also commenced with detailed manual sectional & plan view studies of drill hole data. Significant high grade mineralisation occurs within a south plunging zone below the open pit. This target is rated as a high priority for further testing by drilling & has the potential to add a significant tonnage of high grade ore to the mineable reserves. Click for more details...

TENT HILL PROJECT
Mining (Underground - including longwall) project In The Halls Creek Council Area of Private ownership. Lag sampling programmes have returned anomalous gold-arsenic values from subcrop and shallow cover areas within the tenement. At Tent Hill North, gold values ranging from 2 to 5 ppb gold outline an area of subcrop covering approximately 5 square km, on a 200 x 200 metre sampling grid. At Tent Hill South, regional lag sampling has returned a zone of gold-arsenic-bismuth anomalism through shallow sand cover (approx 1 metre). Infill lag sampling is in progress and RAB/vacuum drilling will target the anomalous zones. The Tent Hill anomalies occur within interpreted Kookaburra-Larranganni stratigraphy. Click for more details...

BRANDY HILL GOLD & BASE METALS PROJECT - SHAW WELL/PIPELINE BORE
Mining (Underground - including longwall) project for New development. In light of the fact that a substantial Banded Iron Formation (BIF) structure runs across the Company?s tenement holding at Gullewa, the geophysical review outlined above was expanded to evaluate the potential for iron deposits in the area. Three significant aeromagnetic anomalies indicative of magnetite in BIF were identified in the Brandy Hill area. Specifically, anomalies of amplitude 10,000 nT, 26,000 nT and 29,000 nT were observed. Key recommendations in relation to these anomalies were to conduct geological mapping as well as ground-based magnetic and gravity surveys to further evaluate their potential. Batavia intends to carry out this work at Gullewa in the Brandy Hill area during the March 2006 quarter. Click for more details...

NEW CELEBRATION GOLD OPERATIONS - MOUNT MARION
A project in the WA Within Kalgoorlie-Boulder. 500,000 tonnes per annum at 4.7 g/t gold. Click for more details...

BIG BEN PROJECT
A project in the WA Within Halls Creek. The faulted western extension of the Panton Sill. Click for more details...

NIFTY COPPER OPERATIONS - WARRABARTY/RAINBOW
A project in the WA Within East Pilbara. Decline development and initial mining. Click for more details...

LENNARD SHELF ZINC/LEAD OPERATIONS - OPERATING MINE
Mining (Underground - including longwall) project In The Derby-W Kimberley Council Area of Mine type. Underground mining operation. Resource estimate is 21.54 Mt @ 7.7% zinc and 3.6% lead with total reserves of 13.92 Mt @ 7.6% zinc and 2.8% lead. Click for more details...

GOLDEN GROVE ZINC/COPPER OPERATIONS - RESOURCE
A project in the WA Within Yalgoo. Golden grove operations comprises the Gossan Hill copper, zinc, gold and silver underground mine, the Scuddles zinc and copper underground mine, a 1.3 million tpa treatment plant and a surrounding tenement package. Resource base totals 17 mt@5.9% zinc, 1.9% copper, 0.9% lead, 64g/t silver and 1.3g/t gold. Metal contained is 1,000,000 tonnes of zinc, 314,000 tonnes of copper, 155,000 tonnes of lead, 35 Moz of silver and 0.7 Moz of gold. Reserves are 4.8 Mt at 6.9% zinc, 2.1 copper, 0.9% lead, 75 g/t silver and 1.3 g/t gold. Click for more details...

LAKE JOHNSTON PROJECT - MOUNT DAY - RESOURCE
Resource - Gold New project In The Dundas Council Area. Three deep RC holes are planned to test for extensions of mineralisation identified by previous exploration. Click for more details...

WAITE KAURI PROJECT - NICKEL RESOURCE
Resource - Nickel New project In The Leonora Council Area. Nickel laterite. Click for more details...

MOUNT ELVIRIE GOLD/BASE METALS/PGE PROJECT - RESOURCE
Mount Elvirie Gold/Base Metals/Pge Project - Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is The follow up sampling produced results of 8.48g/t AU and 9.28g/t AU at E77/1044. At E29/496 moderately anomalous nickel and copper values of up to 2400ppm and 900ppm were found. Click for more details...

MURCHISON GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) project for New development. AXG has a large holding of 100% owned tenements surrounding Western Queen and Western Queen South. The Western Queen and Dalgaranga areas of the Murchison project area are the subject of a joint venture with Equigold. Click for more details...

SAND GEORGE JV GOLD PROJECT - MINING CONTRACT
Mining (Underground - including longwall) project In The Kalgoorlie-Boulder Council Area of Private ownership. Mining is not expected to begin until early 2006. Click for more details...

SUNRISE DAM GOLD OPERATIONS EXPANSION - RESOURCE
Sunrise Dam Gold Operations Expansion - Resource is currently at the Construction stage, valued at about $ 87000000 it is Feasibility study into underground development began in late 2004 after an encouraging scoping study. Three year underground feasibilty study will involve the development of two declines and 125,000 metres of drilling from the surface and underground. Barminco will undertake trial mining in May 2005. The two declines are the Daniel decline and the Western Shear decline. Inferred resource estimate for the Daniel decline is 345,000 ounces of gold. Click for more details...

NEW WATTLE DAM GOLD PROJECT
Mining (Underground - including longwall) project for New development. The Western Zone is characteristically lower grade (1.8 to 2.5 g/t Au) and displays less alteration and shearing than the Eastern Zone. The two zones appear to coalesce to the north and south of the pit. Resource estimate of 226 500 tonnes at 18.0 g/t gold for 130 900 ounces gold. Click for more details...

ELLENDALE DIAMOND PROJECT - CENTRAL RECONNAISSANCE PROJECT - DIAMOND RESOURCE
Mining (Underground - including longwall) New project at Approx 130 km south east of, Derby, WA 6728. This type is Resource - Diamonds with Private ownership. Re-evaluation fo the central areas of the Ellendale lamproite field is a cornerstone of the exploration programme. Most of the area was previously explored with older technology. There has been significant technological advances to assist in attaining more accurate results. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...


CARNILYA HILL PROJECT - NICKEL RESOURCE
Minesite project at 25 Km North east of, Kambalda, WA 6442 in the Mining (Underground - including longwall). Production is expected to ramp up over the next six months to an average rate of approximately 15 000 tonnes of ore per month, or 5 000 tonnes of nickel per annum. Current Ore Reserves are 483 500 tonnes @ 2.9% Ni for 14 000 tonnes of contained nickel metals and the mineralised system remains entirely open at depth. Click for more details...

LINDSAYS GOLD PROJECT
Resource - Gold project at Approx 50km North Northeast of, Kalgoorlie, WA 6430 in the Mining (Underground - including longwall). Upgraded indicated and inferred resource estimate of 5.141 Mt at 2g/t gold for 323 600 ounces gold. A binding term agreement for an initial two-year Ore Processing Agreement has been signed for KalNorth to have ore processed at Saracen's Carosue Dam Processing Plant located 72km from the Lindsay's Field via Saracen's private access road. Click for more details...

WANBANNA JOINT VENTURE NICKEL PROJECT
Mining (Underground - including longwall) project at East of, Leonora, WA 6438 of Resource - Nickel type of New development. The project area contains a significant inferred nickel laterite resource and is considered to be highly strategic as it abuts the Company's Murrin North project and provides a material increase in the overall resources held in the NiWest Nickel Laterite Project. The resource estimate is 14.9 million tonnes @ 1.00% Ni and 0.07% Co for a 0.70% cut off grade. Click for more details...

NORTH DARLING RANGE JOINT VENTURE BAUXITE PROJECT
Mining (Underground - including longwall) project In The Gingin Council Area of Resource - Bauxite type. Inferred resource of 18.2 million tonnes @ 43.1% Total AI2O3, 31.6% Available AI2O3 and 3.2% Reactive SiO2. Field verification by the Company confirms extensive bauxite laterites within its tenements. The bauxite laterites are largely preserved on plateaus and form outcropping ridges. The historical drilling has identified bauxite mineralisation from surface to a maximum depth of 12 metres. The bauxite laterites are commonly 2 to 3 metres in thickness and overlie a distinguishable saprolite weathered zone. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining (Underground - including longwall) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

WODGINA DSO PROJECT STAGE 3
Currently at the Construction stage In Port Hedland is a project estimated to be $ 10000000. This project A project to mine the Hercules deposit under the Wodgina DSO Project - Stage 3 which will include two pits, Hercules North & Hercules South along an approximate 1.5km strike length.. Hercules lies to immediate north-west of the existing Project & is located adjacent to the existing Wodgina Tantalum mine, operated by Global Advanced Metals Wodgina Pty Ltd (GAM), within tenements owned by GAM. The site lies within the Kangam pastoral Lease. An Infrastructure Sharing Agreement between Atlas Iron Limited (the Proponent) & GAM provides for use of the crushing & screen plant, as well as a 10 megawatt (MW) gas-fired power plant, a 300-person accommodation camp & associated mine administration facilities. Approximately 7.4Mt of ore will mined from the Hercules deposit at a production rate of 3 Mtpa. Click for more details...

NORTH KAMBALDA NICKEL OPERATIONS - OTTER JUAN/MACMAHON CLOSURE
Mine - Closure project at via, Kambalda, WA 6442 in the Mining (Underground - including longwall). Closure of the mines at resource exhaustion. Click for more details...