State

Categories

Sub Categories

Click Here to Find Current Projects

List of Underground mining & crushing Projects in WA


FORRESTANIA NICKEL PROJECT - T ZERO/T1/T4/FLYING FOX - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Yilgarn Council Area of Private ownership. T Zero South indicated resource estimate is 36,500 tonnes @ 3.6% Ni for 1300 tonnes of Ni metal. Click for more details...

BETA HUNT NICKEL PROJECT
Resource - Nickel New project In The Coolgardie Council Area. The project includes a remnant resource at the Hunt nickel mine and the developed but un-mined Beta nickel project. Access to the mine is via a portal situated on the northern shoreline of Lake Lefroy, 5 km by road from the WMC nickel concentrator. The Hunt deposit is accessed by a 4 km decline and has remnant blocks available for mining. The Beta deposit is accessed via a 2 km decline developed from the base of the Hunt decline. The Beta deposit is partially developed but is otherwise unmined and requires only pumping and rehabilitation to recommence production in the first quarter of 2004. The acquisition of the project is via a sub-lease associated with agreements and rights in relation to the mining of nickel. Targets within the project area that have the potential to significantly increase the resource base have been identified. Click for more details...

RADIO HILL NICKEL PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The City Of Karratha Council Area of Resource - Nickel type. A resource estimate of 874,000 tonnes @ 0.7% nickel for 6000 tonnes of Ni, 1% copper for 8200 tonnes of Cu and 0.4% cobalt for 350 tonnes of cobalt. Infrastructure for development is already in existence including a decline, ventilation, dewatering facilities and power facilities. Production is expected to be 58,350 dmt of Ni and 23,830 dmt of Cu. Click for more details...

FORTNUM GOLD PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Resource estimate of 13,100,000 tonnes @ 2.5 g/t for 1,045,300 ounces of gold. Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

PAULSENS GOLD PROJECT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at 180 km west of, Paraburdoo, WA 6754 for New. A high grade shallow underground mine including 250,000 Tpa CIL plant. Gold production was 488,260 tonnes @ 7.94 g/t for 117,266 ounces of gold since June 2005. Production is expected to be 75-80,000 ounces of gold per annum. Measured and Indicated resource is 1,105,000 tonnes @ 10.7 g/t for 379,700 ounces of au and inferred resource is 122,000 tonnes @ 9.3 g/t for 36,300 ounces of au. Click for more details...

MOUNT IDA PROJECT- BALDOCK - GOLD RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Menzies Council Area of Minesite type. Measured resource estimate is 545,000 tonnes @ 32.8 g/t for 57,500 ounces of Au and inferred resource is 5800 tonnes @ 33.8 g/t for 6300 ounces of Au. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

COSMOS NICKEL OPERATIONS - COSMOS DEEPS/ILLIAS
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Ilias decline. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

HIGGINSVILLE GOLD PROJECT - POSEIDON SOUTH
Between St Ives and, Norseman, WA 6443 Has Higginsville Gold Project - Poseidon South currently at Construction stage. Total resources estimate is 199kt @ 7.2 g/t for 46 koz. Click for more details...

LANFRANCHI NICKEL PROJECT - WINNER - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Indicated resource estimate for Winner was 111,551 tonnes @ 6.16% Ni for 6879 tonnes of nickel. The reserve resource is 144,003 tonnes @ 4.26% Ni containing 6139 tonnes of nickel. Click for more details...


LEINSTER NICKEL OPERATIONS - PERSEVERANCE - MINING CONTRACT
Leinster Nickel Operations - Perseverance - Mining Contract is currently at the Construction stage, valued at about $ 90000000 it is Underground mining and maintenace at Perseverance. Sub-level cave mining will average 150,000 tonnes of ore per month and 800 metres of development per month. Underground resource is 43.6 Mt @ 2.2% Ni with reserves at 22.8 Mt @ 1.7% Ni. Click for more details...

JIMBLEBAR IRON ORE OPERATIONS - WHEELARRA HILL - MINING CONTRACT EXTENSION
Mining Contract - Open Cut - Extn project at 40km east of, Newman, WA 6753 in the Mining - Earthworks/Civil Engineering (Underground mining & crushing). Provision of complete surface mining services including drill & blast, mining, crushing & on-site train loading. Conventional mining methods sees ore extracted by drilling & blasting being loaded by hydraulic excavators and/or front end loaders into off-highway rear dump haul trucks for transport to the primary crushing areas or to blending stockpiles. Work on deposits W1, W2, W3 & W5 should allow production to increase from 8 million tonnes per annum (Mtpa) to 12Mtpa. Contract extended by 3 years. Click for more details...

ELLENDALE DIAMOND PROJECT - MINING SERVICES
Mining Services project at Via, Fitzroy Crossing, WA 6765 in the Mining - Earthworks/Civil Engineering (Underground mining & crushing). Services to be provided include drilling and blasting, loading and hauling and crusher feed. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CHEMICAL & ACID RESISTANT COATINGS
Currently at the Construction stage In Ashburton is a project estimated to be $ 5000000. This project For the provision of chemical & acid resistant coatings. Click for more details...

JUNDEE GOLD OPERATIONS - DRILLING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. A 3 year contract extension at the 1.8 million tonnes per annum underground operations. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect