State

Categories

Sub Categories

Click Here to Find Current Projects

List of Waste water/sewerage treatment, sew./waste pipes Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

MILDURA PRESSURE MAIN & TRUNK SEWER MAIN
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Mildura, Mildura, VIC 3502. This type is Pressure Main & Trunk Main Construction with Local Govt ownership. Works involve the installation of 4130 metres of 375mm Pressure Main and 1310 metres of 535mm Trunk Sewer Main in Mildura. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

PILBARA PETROCHEMICAL PROJECT%
Infrastructure New project In The City Of Karratha Council Area. Likely to include power station, fresh water availability, roadworks & port facilities. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

KWINANA ALUMINA REFINERY
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

LEFROY GOLD TAILINGS RETREATMENT PROJECT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Dorset Council Area of Private ownership. A project based on tailings on the Lefroy mining lease estimated at 140,000t containing 6000 ounces (oz) of gold. Recovery of material from the tailings dams for transport via local roads & highways to the existing Beaconsfield carbon-in-pulp (CIP) processing plant & subsequent underground disposal. To include construction of access roads, vegetation clearing, construction of new drainage channel/mound & a pond. Removal of tailings by loaders which will fill trucks for transport to Beaconsfield. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

EMILY ANN WORKERS CAMP EXPANSION
Currently at the Planning stage In Dundas is a project estimated to be $ 13000000. This project Proposal comprises an expansion of the existing 240 person accommodation village by 100 rooms, the existing sewerage evaporation pond and the domestic tip. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SEWAGE TREATMENT PLANT
Sewage Treatment Plant Effluent Laborartory Analysis project at 15 Km South east of, Collie, WA 6225 In The Council Area Of Collie of Private. Sewage treatment plant effluent laboratory analysis. Click for more details...

NEW ACLAND COAL STAGE 2 EXPANSION PROJECT - WATER MANAGEMENT INFRASTRUCTURE
Water Management Infrastructure - For Process Water project at 14 km north west of, Oakey, QLD 4401 in the Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes). Contract includes pipes & pumps. Scope of work currently being modified. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

PANNAWONICA TOWN WASTE WATER TREATMENT PLANT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Ashburton Council Area for New development. Replacement of the waste water treatment plant. The old plant is 30 years old. Click for more details...

MOUNT PORTER GOLD PROJECT - SEPTIC SYSTEM INSTALLATION
A project in the NT Within Victoria Daly Shire. For the installation of a septic system. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

KING ISLAND SCHEELITE PROJECT - PIT DEWATERING CONTRACT
Near, Grassy, TAS 7256 Has King Island Scheelite Project - Pit Dewatering Contract currently at Planning stage. For the provision of pit dewatering services. Click for more details...

KING ISLAND SCHEELITE PROJECT - EFFLUENT PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project for New development. For the provision of effluent pipeline. Click for more details...

CAMEBY DOWNS COAL PROJECT - MINING CONTRACT - OPEN CUT
Mining Contract - Open Cut - Stage 1 project at 17km northeast of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. Mining will commence in the northeast corner of the site & progress in a westerly & southwesterly direction using strip mining methods at a rate of 1.8Mtpa. Initial activities to include clearing vegetation, topsoil stripping & stockpiling, overburden removal from the initial area to be mined & storage of the overburden in permanent overburden dumps. Coal extraction using excavators & trucks & progressive rehabilitation of overburden emplacement areas. Construction of surface water management structures to manage the quality and quantity of surface waters on the site including diversions, drains & sediment control dams. Storage of coal rejects & tailings in an appropriately designed & engineered Tailings Dam. Loading of coal product into a dedicated rail loading facility for transport off-site to the Port of Brisbane. McMahon's stage1 contract includes planning, mine development, waste stripping, coal mining, coal preparation & train loading. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

MOUNT MORGAN MINE - SECOND TRAIN LIME DOSING WATER TREATMENT PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Rockhampton Regional Council Area of Lime Dosing Water Treatment Plant type. Upgrade of the existing water treatment plant at the former Mount Morgan mine site by design, construction & commissioning of a second train lime dosing treatment component. To increase overall water treatment capacity from 2ml per day to 3 ml/d which will enable complete dewatering of the abandoned open-cut pit over the next decade. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - KENYA WATER TREATMENT PLANT
Water Treatment Plant - For Coal Seam Gas Water project at 20km southwest of, Chinchilla, QLD 4413 In The Council Area Of Western Downs Regional of Private. Construction near the Kenya coal seam gas processing plant of a 100megalitres a day capacity water treatment plant to process water coming to the surface from gas extraction. Associated infrastructure to include a 33MW gas fired power plant to run the reverse osmosis process, ponds & pipelines. Initial operations from October 2011 to be at 72MW. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

DAUNIA COAL PROJECT - SEWERAGE PUMPS
Sewerage Pumps project at 25km southeast of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Supply of submersible, grinder type, sewerage pumps including couplings & guide rails. Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

RANGER URANIUM OPERATIONS - BRINE CONCENTRATORS
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Arnhem Hwy 11km east of, Jabiru, NT 0866. This type is Brine Concentrators with Private ownership. Installation of brine concentrators with a capacity to treat up to 1.8 gigalitres a year to produce clean distillate able to be returned to a wetlands for filtering. Installation of 3 units in a row with the first two processing water from the tailings storage facility & the third one returning brine to that facility. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

CAVAL RIDGE COAL PROJECT - WATER INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at 16km south of, Moranbah, QLD 4744. This type is Water Diverson & Collection/Sewerage Treatment with Private ownership. The mine water management system to include clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if there is surplus water at any time. Sewerage and wastewater treatment by packaged sewerage treatment plant (STP). Click for more details...

MOUNT OXIDE MINE SITE SOLAR PUMPS
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at via Gunpowder Rd at Mount Gordon Mine 100km northwest of, Mount Isa, QLD 4825 for New. Supply of submersible solar pumps for up to 3 locations (mine pit, sump area, southeast catch dam) to be used to separate clean water flows from contaminated water flows & to evaporate water from a historic mine pit. To include controllers & tracking array. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

MORANBAH GAS FIELD DEVELOPMENT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Between COPPABELLA &, Moranbah, QLD 4744. This type is Operating Gas Field - Expansion with Private ownership. A project to develop the existing Moranbah gas field which comprises over 500 production wells & mostly buried gas/water flowlines with compressors leading to water facilities (15 dams, a water treatment facility under construction) & the Moranbah Gas Processing Facility (PL191). Further development to include drilling of 5 exploration wells & 6 appraisal wells with associated water handling systems including flowlines & 5 small (10ML) aggregation dams to store well head water. Drilling also of over 100 fenced, steel & concrete cased production wells each comprising a wellhead, electric drive rotating screw pump, wellhead gas/water separator & control valve as well as monitoring, metering & communications equipment. Typically the wells will be chevron style with surface-to-in-seam horizontal/lateral wells requiring up to 3 pads each but some will be multi-branch lateral wells linked from 2 separate pads. Gathering lines to be buried 53-500mm diameter high density polyethylene (HDPE) pipe. Associated infrastructure to include access tracks, overhead powerlines (for wellhead & compressor facilities), borrow pits, quarries & storage areas. Construction also of up to 4 large (400-600ML) dams for treated water, up to 3 brine storages & groundwater monitoring bores. Any accommodation camps to be developed over the project to include canteen facilities, communications, vehicle maintenance & parking areas, fuel handling & storage areas sewerage treatment. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

ROY HILL IRON ORE PROJECT - MINE PROCESS PLANT - WATER TREATMENT PACKAGE
Water Treatment New project In The East Pilbara Council Area. For the supply of a water treatment package. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - WASTE WATER TREATMENT
Roy Hill Iron Ore Project - Infrastructure - Rail Non Process - Waste Water Treatment is currently at the Construction stage, valued at about $ 10000000 it is For the provision of waste water treatment. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at ., Curtis Island, QLD 4680 of Septic Pump Out type of New development. For the provision of Septic Pump Out Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - WASTE DUMP
Pilgangoora Lithium-Tantalum Project - Waste Dump is currently at the Construction stage, valued at about $ 1000000 it is For the provision of a waste dump for the mine site. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SEWAGE TREATMENT PLANT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Mapoon Shire Council Area for New development. For the provision of a sewage treatment plant for effluent & sludge waste streams. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect