State

Categories

Sub Categories

Click Here to Find Current Projects

List of Waste water/sewerage treatment, sew./waste pipes Projects in WA


INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

PILBARA PETROCHEMICAL PROJECT%
Infrastructure New project In The City Of Karratha Council Area. Likely to include power station, fresh water availability, roadworks & port facilities. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

KWINANA ALUMINA REFINERY
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

EMILY ANN WORKERS CAMP EXPANSION
Currently at the Planning stage In Dundas is a project estimated to be $ 13000000. This project Proposal comprises an expansion of the existing 240 person accommodation village by 100 rooms, the existing sewerage evaporation pond and the domestic tip. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SEWAGE TREATMENT PLANT
Sewage Treatment Plant Effluent Laborartory Analysis project at 15 Km South east of, Collie, WA 6225 In The Council Area Of Collie of Private. Sewage treatment plant effluent laboratory analysis. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

BODDINGTON GOLD MINE EXPANSION - SEWAGE TREATMENT PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Boddington Council Area of Sewage Treatment Plant type. Sewage Treatment Plant will comprise an Aeration tank, Sludge Storage tank, Chlorination tank, Chlorine Dosing System and associated pipe and pumps. Production capacity will be 65 cubic metres per day. Click for more details...

PANNAWONICA TOWN WASTE WATER TREATMENT PLANT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Ashburton Council Area for New development. Replacement of the waste water treatment plant. The old plant is 30 years old. Click for more details...

SINO IRON ORE EXTENSION PROJECT - WASTE DISPOSAL FACILITY UPGRADE
Sino Iron Ore Extension Project - Waste Disposal Facility Upgrade is currently at the Construction stage, valued at about $ 20000000 it is For a 25% increase in capacity for the Package Treatment Plant. Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

LAMBOO/NICOLSONS GOLD PROJECT - ACCOMMODATION VILLAGE UPGRADE
Accommodation Village New project In The Halls Creek Council Area. Already existing 8 accommodation units with 31 ensuited rooms & 2 laundry buildings requiring some refurbishment. Potential purchase of additional new accommodation units, kitchen, mess & the installation of services including power & sewerage. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

ROY HILL IRON ORE PROJECT - MINE PROCESS PLANT - WATER TREATMENT PACKAGE
Water Treatment New project In The East Pilbara Council Area. For the supply of a water treatment package. Click for more details...

MULGA DOWNS IRON ORE PROJECT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Ashburton Council Area for New development. A direct shipping ore (DSO) project based on the 14 million tonnes (Mt) Murray Hill bedded & detrital ore deposit at the Mulga Downs pastoral station. A single, above watertable open pit (2.5km x 1.8km) worked at a rate of 5 million tonnes per annum (Mtpa) for a life-of-mine (LoM) of 5 years. Conventional drill & blast, excavators & loader methods with ore trucked to a run-of-mine (ROM) stockpile prior to crushing & screening (mobile or modular/skid-mounted plant). Product ore to be trucked along the upgraded, 30km long Fenceline Rd to the Great Northern Highway for haulage 60km to join the proposed Roy Hill Infrastructure Railway by either the Coonarie or Two Camel roads. Associated infrastructure to include waste rock dumps, explosives store, generator power supply with associated double-skinned diesel storage tanks (18 x 110kL) & lined refuelling pads, potable water borefield & turkeys nest storage dam, access roads. A mines operation centre of transportable buildings plus contractor's facilities (offices, amenities, ablutions, fuel storage, refuelling area, heavy & light vehicle workshops, washdown area, laydown areas, parking). Permanent on site accommodation for up to 400 workers fly-in fly-out via Newman. Packaged wastewater treatment plant. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - WASTE WATER TREATMENT
Roy Hill Iron Ore Project - Infrastructure - Rail Non Process - Waste Water Treatment is currently at the Construction stage, valued at about $ 10000000 it is For the provision of waste water treatment. Click for more details...

LAMBOO/NICOLSONS GOLD JOINT VENTURE PROJECT - PIT DEWATERING
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Halls Creek Council Area of Private ownership. For the provision of dewatering. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - CONSTRUCTION GENERAL SERVICES NO 4
New project of Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at Vicinity of, Onslow, WA 6710. For the provision of Construction General Services No 4 including Construction & maintenance of road structures, Dewatering & drainage, Dust control, Erection & relocation of portable facilities & ablutions, Site traffic control, Transport of potable water, Install & maintain temporary construction electrical power distribution system, Install, maintain & operate sewage & water treatment facilities, Fuel management, General housekeeping & waste cleanup, Support personnel, Equipment support, Construction & maintenance of temporary facilities, Install & pressure test underground piping systems, Underground duct bank & cabling, Miscellaneous concrete works, Management of acid sulfate soils (ASS) encountered during work activities, Weather protection & clean up, Environmental maintenance, Information services & technology support, & other services as required. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - WASTE DUMP
Pilgangoora Lithium-Tantalum Project - Waste Dump is currently at the Construction stage, valued at about $ 1000000 it is For the provision of a waste dump for the mine site. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect