State

Categories

Sub Categories

Click Here to Find Current Projects

List of Water distribution & pipelines, borefields Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

YABULU NICKEL REFINERY EXTENSION - COOLING WATER TOWER CONTRACT
Mining - Civil Services (Water distribution & pipelines, borefields) project at Refinery site at, Yabulu, QLD 4818 for New. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be augmented by the addition of a new cooling tower to cater for the additional heat loadings. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

JUNDEE - GOLD
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Wiluna Council Area of Mine - Borefield Pumps - Installation type. Installation of 7 downhole pumps required for new borefield development. Project involves approximately 22 km of pipework. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Civil Services (Water distribution & pipelines, borefields). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Includes pipes, crib rooms, escape rooms, ladder ways. Detailed mine plans have been completed for Warrior East and Sunburst laying out access, exploration and production drives, escapeways, drainage and ventilation connections. Click for more details...

WEIPA BAUXITE OPERATIONS - NEWEIPA/ANDOOM
Pipeline - Installation project at From Ely Dam to Andoom, Weipa, QLD 4874 in the Mining - Civil Services (Water distribution & pipelines, borefields). Water pipeline. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

CURRAGH NORTH COAL PROJECT - PISCES
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Central Highlands Regional Council Area of Water Pipeline type. The EIS proposes utilising a 100 metre wide corridor 25 km long, including a water pipeline, as part of the haul route running parallel to an existing 66kv transmission line. Click for more details...

DUKETON REGIONAL GOLD PROJECT - MOOLART WELL
Resource - Gold project at 100 km North of, Laverton, WA 6440 In The Council Area Of Laverton of Private. The new estimate is 25 095kt at 0.46g/t for 375koz Au. The mining method have been chosen to best suit the style of gold mineralisation and provide the optimal movement rates: excavator and haul trucks. The developer will be manager for the mining-related construction activities (including ROM pad and haul road construction), maintenance during mining operations and the supply of lighting and pumping equipment. The process plant will comprise crushing, crushed ore stockpile and reclaim facility, grinding, gravity separations, leach and CIL adsorption, elution and regeneration and a gold room. The treatment plant is designed for a nominal 300tph milling rate and capacity of 2 000 000 tonnes per year. Run of mine (ROM) ore will be fed to the crushing plant at a design rate of 408tph and stored on the crushed ore stockpile. A maximum capacity of 450 tph has been allowed within the crushing circuit to cater for softer or and increased mill throughput. A gravity separation circuit is included in the design to enhance the recovery of gold that concentrates in the cyclone underflow system. The leach and CIL adsorption circuit design is based on the mill feed grade of 2.0 g/t Au and 20% gravity gold recovery. Tailings will be thickened using a high rate thickener with the underflow being pumped to the tailings storage facility (TSF). Water shall be reclaimed via a central decant and returned to the process facility. gold recovery by electrowinning. Dore and gold bearing product will be stored in the secure goldroom which has electronic surveillance systems installed. Raw water will be supplied from the mine dewatering network or from dedicated bores. Process water will be stored adjacent to the plant in a polyethylene lined process water dam. The following reagents will be required in the process and suitable systems for storage and controlled dosing have been provided in the process design: sodium cyanide, oxygen, quicklime, sodium hydroxide (Caustic Soda) and hydrochloric acid. The process facility will be controlled from PC based HMI systems located in the two control rooms for all other operations. Other infrastructure to include mine access roads (29kms new and approximately 90km upgrade), airstrip (suitable for Dash 8 100 - 36 persons), accommodation camp (140 persons), borefield, earthworks for process plant, accommodation camp, access road and access tracks, mechanical infrastructure for the process plant including potable water supply, sewerage treatment plants (camp and process plant), RO plant (potable water), process plant buildings and workshop, power station and light vehicle fuel storage facility and site communication system, administration offices, workshops and stores, mechanical infrastructure for the mine including fuel storage facility, heavy vehicle workshop and stores, heavy vehicle wash bay, tailings storage facility (TSF), electrical power supply via diesel operated power station (Build/Own/Operate) and light mobile vehicles. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

KOGAN CREEK POWER STATION PROJECT - GROUNDWATER SUPPLY
Lagoon Gully Groundwater Supply project at South of, Brigalow, QLD 4412 In The Council Area Of Western Downs Regional of Private. Design and Construct of 26,060m of DN250 DICL Pipe including pipe fittings like Surge tanks 2No Scour valves 15 No and Air valves 22 No. 2 No 45KW pumps & motor (20L/s and 150m head), 2 No 110KW pumps & motor (50L/s and 150m head) and 2 No relift pumps & motor (58L/s and 150m head). 2ML Balancing Storage ( concrete). SCADA control System. Click for more details...

COWAL GOLD PROJECT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 45 km north east of, West Wyalong, NSW 2671. Includes production bores & pipeline across Lake Cowal. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS
Water Pipeline New project In The Armidale Dumaresq Council Area. A utility pipeline/corridor between Gara dam and the mine. There are 2 options for the route of the pipeline. Polyethylene pipe. Trench installation. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ravensthorpe Council Area of Desalination Plant& Water Treatment Plants type. Seawater will be piped to site via a 48 km long pipeline system and then desalinated on site, producing fresh water for steam production while the waste brine stream will be used in the beneficiation circuit. Water treatment plants for the project include potable water treatment plant and waste water treatment plants. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

HOPE DOWNS IRON ORE PROJECT - DEWATERING
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 75 Km Northwest of, Newman, WA 6753. Mine water usage will be 6.94 Mega litres per day. Work comprises the construction of the dewatering pipeline and discharge facilities for the Hope north pit. Construction will also include collector pipes, main discharge pipeline, 13 buried 152 mm diameter polythene spur lines, access roads and a collector dam of 12 ML. Further development in 2007 and 2008 will be the conversion of the initial 12 production bores to reticulated power, construction of collector pipelines to the collector dam, provision of a pumping station and installation of a telemetry system to relay operating information to a central control/monitor point. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

KOGAN CREEK POWER PLANT
Kogan Creek Power Plant is currently at the Construction stage, valued at about $ 1000000 it is Water Treatment Plant: raw water treatment (gravel filters) capacity 2x95m3/h potable water treatment (activated carbon filters) capacity 150m3/d demineralisation plant (ion exchange with circ. regeneration system) capacity. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY UNDERGROUND - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Laverton Council Area of Underground Mining type. Underground development work and production mining are in progress. Full scale underground mining should commence in 2007. As part of the development work it is proposed to construct a new dewatering system for the mine. Water will be discharged at 250L/scc and a new discharged point will be constructed. This involves the construction of a second Lake Carey outfall with a 3.5 Km pipeline and four discharge outlets, fitted with manual valves. These valves will be fitted over the lake area to the west of the Wallaby waste dump area. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

MACARTHUR/BURDEKIN FALLS DAM TO NORTHERN BOWEN BASIN PIPELINE - PUMPS ET AL
A project in the QLD Within Isaac Regional. Supply, install and commission three 3.3KV submersible centrifugal Pumpsets, motors and Six 11KV horizontal double suction centrifugal Pumpsets including associated pipework and valves, control and communications equipment and cabling over four sites along the proposed Burdekin to Moranbah Pipeline. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - PIPES FOR DAMS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. From west dam to process dam Click for more details...

LAKE LINDSAY COAL PROJECT - WATER MANAGEMENT - PILELINE/PUMPS/VALVES TO SUPPORT INITIAL BOX CUT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 25 km north east of, Middlemount, QLD 4746. To support initial box cut. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

GRANITES GOLD MINE - TAILING STORAGE FACILITY
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Unincorporated North Council Area of Private ownership. The Bunker Hill pit will be use for tailings disposal. A 4km tailings deposition pipeline and a process water return line will be constructed between the processing mill and the pit. Storage dams will also be constructed to contain any accidental spillages. When the pit is filled and has settled, waste rock will be used to cap the pit. Click for more details...

GOONDICUM PIPELINE PROJECT (MONTO)
Pipeline/Pump Station New project In The North Burnett Regional Council Area. Construction/testing approx 35 km DN300 DI & 355 OD PE pipeline, including pipeline structures, pump station/control building civil works, steel storage & break pressure tanks, using Principal-supplied pipes/fittings/valves. Click for more details...

BODDINGTON GOLD MINE EXPANSION - WATER TREATMENT FACILITIES
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Pinjarra - Williams Rd, Boddington, WA 6390. Facilities include Reverse Osmosis Plant, water transmitters and water management telemetry system. Click for more details...

COSMO DEEPS UNDERGROUND GOLD PROJECT - PIT DEWATERING
40 km south east of, Adelaide River, NT 0846 Has Cosmo Deeps Underground Gold Project - Pit Dewatering currently at Construction stage. Detailed design is scheduled for completion late March 2008. The Company will need to hire pumps for the pit dewatering. Click for more details...

YALLOURN JOINT VENTURE COAL OPERATIONS - YALLOURN COAL FIELD REALIGNMENT PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project at Eastern Rd, Yallourn North, VIC 3825 for New. A project to reduce overburden removal in the southeast portion of the coal fields supplying the Yallourn W Power Station by boundary alteration. Relocation further to the east of the Maryvale Coal Field boundary. Coal & overburden systems to be located on this field's western batter with overburden placement at the base of the adjacent, currently producing East Field Mine. Construction activities associated with conveyors to include embankments & formation across the East Field Mine, footing installations as well as mechanical, structural & electrical installation. Associated infrastructure to include roads & ramps, installation of high voltage reticulation & fire services reticulation. Diversion also of the Morwell West Drain as its upper reaches will be subject to mining. Click for more details...

SINO IRON ORE EXTENSION PROJECT - DESALINATION PLANT DOUBLE ENTRY REFER TO PROJECT ID 857138
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Cape Preston 80km southeast of, Karratha, WA 6714. Construction of groundwater bores, a 30 GLpa desalination plant, & the construction of seawater intake & brine disposal outfall. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Lyell Council Area of Private ownership. A 3 year contract commencing 1 October 2010 for the ongoing operations at My Lyell Mine which is expected to produce 2.7million tonnes per annum approx of ore by 250m development per month. To include mine development comprising decline & level development at variable grades (drill, blast, ground support, load, haul & dump or ore/waste); ore production (drill, blast, load, haul & dump of the stope ore); crushing & conveying of the ore from the primary crusher to the skip loading station plus dewatering from underground working areas to the settlers on 1780 level. Click for more details...

PROMINENT HILL COPPER GOLD OPERATIONS - WATER SUPPLY UPGRADE
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 100km southeast of, Coober Pedy, SA 5723. A project to allow the 1200tph mill work in a range of throughput rates by upgrading the existing 15 water production wells & drilling an additional one. Optimisation also of the well field including variable speed drives & upgrading well headworks, electrical controls & the operating system. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Civil Services (Water distribution & pipelines, borefields). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Civil Services (Water distribution & pipelines, borefields) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

CAVAL RIDGE COAL PROJECT - WATER INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at 16km south of, Moranbah, QLD 4744. This type is Water Diverson & Collection/Sewerage Treatment with Private ownership. The mine water management system to include clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if there is surplus water at any time. Sewerage and wastewater treatment by packaged sewerage treatment plant (STP). Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PIT DEWATERING
Currently at the Construction stage In Cloncurry Shire is a project estimated to be $ 2000000. This project Construction of a borefield to ensure pit operations remain dry. Initial installation of 4 production & 15 monitoring bores for draw down testing. Results of this stage to determine the number of extra bores required for overall project. Click for more details...

BMA MORANBAH HDPE PIPELINES CONTRACT
Pipelines - Supply & Install project at Bowen Basin via, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Contract for the supply & installation of high density polyethylene (HDPE) pipelines at 2 BHP Billiton Mitsubishi Alliance (BMA) Bowen Basin sites around Moranbah. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - PROTECTIVE EPOXY COATING
Greater Gorgon Gas Project - Civils & Underground Services - Protective Epoxy Coating is currently at the Construction stage, valued at about $ 2500000 it is For the provision of protective epoxy coating to precast stormwater drainage channels. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - WELDING OF PIPE MATERIALS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Welding Of Pipe Materials currently at Construction stage. For the cutting, bevelling, welding, & provision of supervision for carbon steel pipework. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - RETRACTABLE ROOF
Retractable Roof New project In The Darwin City Council Area. Design, fabrication & delivery of a motorised retractable roof (28m long x 16m wide x 1.5m high) to prevent rainwater entering an evaporation pond. Click for more details...

MOUNT CARLTON GOLD SILVER & COPPER PROJECT PIPELINE
Pipeline project at 45km north-northwest of, Collinsville, QLD 4804 In The Council Area Of Whitsunday Regional of Private. Proposed construction of 225mm subterranean HDPE pipeline & associated pumping infrastructure to carry river water from the Burdekin River to the main site water dam at Mount Carlton mine for use in processing. The pipeline will be approximately 36km long. Click for more details...

PLUTONIC DOME GOLD OPERATIONS RECOMMENCEMENT - K2 DEWATERING
Plutonic Dome Gold Operations Recommencement - K2 Dewatering is currently at the Construction stage, valued at about $ 5000000 it is For the provision of pit dewatering services. Click for more details...

ILLAWARRA ROAD STORMWATER & PAVEMENT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kingborough Council Area of Stormwater Pipes/Pavement - Upgrade type. Upgrade of Illawara Road stormwater pipes & local pavements. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect