List of Water distribution & pipelines, borefields Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

JUNDEE - GOLD
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Wiluna Council Area of Mine - Borefield Pumps - Installation type. Installation of 7 downhole pumps required for new borefield development. Project involves approximately 22 km of pipework. Click for more details...

FINUCANE ISLAND - IRON ORE
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Port Hedland Council Area of Private ownership. Potable water & dust suppression pipeline replacement required for site. EPA report released late 1995 on overall upgrade of dust management at Finucane Island & Nelson Point. Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

NIFTY COPPER OPERATIONS
Mining - Civil Services (Water distribution & pipelines, borefields) project at 200 km southeast of, Marble Bar, WA 6760 for Addition. Contract to involve site preparation, embankments, liner plus associated pumps & piping. Click for more details...

CURRAGH NORTH COAL PROJECT - PISCES
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Central Highlands Regional Council Area of Water Pipeline type. The EIS proposes utilising a 100 metre wide corridor 25 km long, including a water pipeline, as part of the haul route running parallel to an existing 66kv transmission line. Click for more details...

DUKETON REGIONAL GOLD PROJECT - MOOLART WELL
Resource - Gold project at 100 km North of, Laverton, WA 6440 In The Council Area Of Laverton of Private. The new estimate is 25 095kt at 0.46g/t for 375koz Au. The mining method have been chosen to best suit the style of gold mineralisation and provide the optimal movement rates: excavator and haul trucks. The developer will be manager for the mining-related construction activities (including ROM pad and haul road construction), maintenance during mining operations and the supply of lighting and pumping equipment. The process plant will comprise crushing, crushed ore stockpile and reclaim facility, grinding, gravity separations, leach and CIL adsorption, elution and regeneration and a gold room. The treatment plant is designed for a nominal 300tph milling rate and capacity of 2 000 000 tonnes per year. Run of mine (ROM) ore will be fed to the crushing plant at a design rate of 408tph and stored on the crushed ore stockpile. A maximum capacity of 450 tph has been allowed within the crushing circuit to cater for softer or and increased mill throughput. A gravity separation circuit is included in the design to enhance the recovery of gold that concentrates in the cyclone underflow system. The leach and CIL adsorption circuit design is based on the mill feed grade of 2.0 g/t Au and 20% gravity gold recovery. Tailings will be thickened using a high rate thickener with the underflow being pumped to the tailings storage facility (TSF). Water shall be reclaimed via a central decant and returned to the process facility. gold recovery by electrowinning. Dore and gold bearing product will be stored in the secure goldroom which has electronic surveillance systems installed. Raw water will be supplied from the mine dewatering network or from dedicated bores. Process water will be stored adjacent to the plant in a polyethylene lined process water dam. The following reagents will be required in the process and suitable systems for storage and controlled dosing have been provided in the process design: sodium cyanide, oxygen, quicklime, sodium hydroxide (Caustic Soda) and hydrochloric acid. The process facility will be controlled from PC based HMI systems located in the two control rooms for all other operations. Other infrastructure to include mine access roads (29kms new and approximately 90km upgrade), airstrip (suitable for Dash 8 100 - 36 persons), accommodation camp (140 persons), borefield, earthworks for process plant, accommodation camp, access road and access tracks, mechanical infrastructure for the process plant including potable water supply, sewerage treatment plants (camp and process plant), RO plant (potable water), process plant buildings and workshop, power station and light vehicle fuel storage facility and site communication system, administration offices, workshops and stores, mechanical infrastructure for the mine including fuel storage facility, heavy vehicle workshop and stores, heavy vehicle wash bay, tailings storage facility (TSF), electrical power supply via diesel operated power station (Build/Own/Operate) and light mobile vehicles. Click for more details...

CHALLENGER GOLD OPERATIONS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Roxby Downs Council Area for New development. The first gold bar at the Challenger Gold project was poured on 12 October during the commissioning process with the first shipment of gold bullion, expected to total 750 ounces, scheduled for 24 October. Ramp-up to full production levels is expected by the end of October. The initial open pit will recover 105,000 ounces of gold over a 20 month operating period from the start-up in October 2002 with head grades expected to average 5.9 g/t. Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

KOGAN CREEK POWER STATION PROJECT - GROUNDWATER SUPPLY
Lagoon Gully Groundwater Supply project at South of, Brigalow, QLD 4412 In The Council Area Of Western Downs Regional of Private. Design and Construct of 26,060m of DN250 DICL Pipe including pipe fittings like Surge tanks 2No Scour valves 15 No and Air valves 22 No. 2 No 45KW pumps & motor (20L/s and 150m head), 2 No 110KW pumps & motor (50L/s and 150m head) and 2 No relift pumps & motor (58L/s and 150m head). 2ML Balancing Storage ( concrete). SCADA control System. Click for more details...

COWAL GOLD PROJECT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 45 km north east of, West Wyalong, NSW 2671. Includes production bores & pipeline across Lake Cowal. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS
Water Pipeline New project In The Armidale Dumaresq Council Area. A utility pipeline/corridor between Gara dam and the mine. There are 2 options for the route of the pipeline. Polyethylene pipe. Trench installation. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ravensthorpe Council Area of Desalination Plant& Water Treatment Plants type. Seawater will be piped to site via a 48 km long pipeline system and then desalinated on site, producing fresh water for steam production while the waste brine stream will be used in the beneficiation circuit. Water treatment plants for the project include potable water treatment plant and waste water treatment plants. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BATCHELOR MAGNESIUM PROJECT
Infrastructure project at Rum Jungle district 85 km south of, Darwin, NT 0800 in the Mining - Civil Services (Water distribution & pipelines, borefields). Following completion of the Stage one Feasibility study, locations were selected for each of the facilities necessary for development of the Project. All available technical data relating to each site was compiled and reviewed. Some further exploration drilling was carried out. Based on this review it has been concluded that the sites seem suitable for the assigned purpose. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY UNDERGROUND - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Laverton Council Area of Underground Mining type. Underground development work and production mining are in progress. Full scale underground mining should commence in 2007. As part of the development work it is proposed to construct a new dewatering system for the mine. Water will be discharged at 250L/scc and a new discharged point will be constructed. This involves the construction of a second Lake Carey outfall with a 3.5 Km pipeline and four discharge outlets, fitted with manual valves. These valves will be fitted over the lake area to the west of the Wallaby waste dump area. Click for more details...

HARTS RANGE GARNET/AMH PROJECT - WATER PIPELINE
15 Km Water Pipeline New project In The Alice Springs Town Council Area. Pipeline will now longer be needed as there will now be no wet plant constructed. Click for more details...

MORANBAH PIPELINE EASTERN EXTENSION PROJECT - DUCTILE IRON & SWAB REMOVAL POINTS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1000000. This project The contract includes: manufacture, supply deliver and unload ductile iron pipes, general pipes, swab removal points. & 2,420 metres of polyethelene pipe. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

KWINANA TITANIUM DIOXIDE PIGMENT PLANT - SUPPLY OF PIPING
Piping - Supply project at Mason Rd, Kwinana, WA 6966 in the Mining - Civil Services (Water distribution & pipelines, borefields). For the supply of piping. Click for more details...

LAKE LINDSAY COAL PROJECT - WATER MANAGEMENT - PILELINE/PUMPS/VALVES TO SUPPORT INITIAL BOX CUT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 25 km north east of, Middlemount, QLD 4746. To support initial box cut. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - WATER STORAGE TANK
King Island Scheelite Mine Redevelopment Project Stage 1 - Water Storage Tank is currently at the Planning stage, valued at about $ 1000000 it is For potable water. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

BODDINGTON GOLD MINE EXPANSION - WATER TREATMENT FACILITIES
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Pinjarra - Williams Rd, Boddington, WA 6390. Facilities include Reverse Osmosis Plant, water transmitters and water management telemetry system. Click for more details...

COSMO DEEPS UNDERGROUND GOLD PROJECT - PIT DEWATERING
40 km south east of, Adelaide River, NT 0846 Has Cosmo Deeps Underground Gold Project - Pit Dewatering currently at Construction stage. Detailed design is scheduled for completion late March 2008. The Company will need to hire pumps for the pit dewatering. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

KANMANTOO COPPER & GOLD PROJECT - WATER PIPELINE
Water Pipeline New project In The Mount Barker Council Area. Construction of a 16km buried pipeline from the Mount Barker Brown Dam to the mine site. To supply up to 750ML a year. Click for more details...

YALLOURN JOINT VENTURE COAL OPERATIONS - YALLOURN COAL FIELD REALIGNMENT PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project at Eastern Rd, Yallourn North, VIC 3825 for New. A project to reduce overburden removal in the southeast portion of the coal fields supplying the Yallourn W Power Station by boundary alteration. Relocation further to the east of the Maryvale Coal Field boundary. Coal & overburden systems to be located on this field's western batter with overburden placement at the base of the adjacent, currently producing East Field Mine. Construction activities associated with conveyors to include embankments & formation across the East Field Mine, footing installations as well as mechanical, structural & electrical installation. Associated infrastructure to include roads & ramps, installation of high voltage reticulation & fire services reticulation. Diversion also of the Morwell West Drain as its upper reaches will be subject to mining. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

SINO IRON ORE EXTENSION PROJECT - DESALINATION PLANT DOUBLE ENTRY REFER TO PROJECT ID 857138
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Cape Preston 80km southeast of, Karratha, WA 6714. Construction of groundwater bores, a 30 GLpa desalination plant, & the construction of seawater intake & brine disposal outfall. Click for more details...

SINO IRON ORE PROJECT - SEA WATER DESALINATION UNITS FOR CONSTRUCTION WATER
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Cape Preston 100 km Southwest of, Karratha, WA 6714. This type is Temporary Sea Water Desalination Units - Design/Construct with Private ownership. For the design, manufacture, supply & commission of a 1ML per day temporary desalination plant Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Lyell Council Area of Private ownership. A 3 year contract commencing 1 October 2010 for the ongoing operations at My Lyell Mine which is expected to produce 2.7million tonnes per annum approx of ore by 250m development per month. To include mine development comprising decline & level development at variable grades (drill, blast, ground support, load, haul & dump or ore/waste); ore production (drill, blast, load, haul & dump of the stope ore); crushing & conveying of the ore from the primary crusher to the skip loading station plus dewatering from underground working areas to the settlers on 1780 level. Click for more details...

PROMINENT HILL COPPER GOLD OPERATIONS - WATER SUPPLY UPGRADE
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 100km southeast of, Coober Pedy, SA 5723. A project to allow the 1200tph mill work in a range of throughput rates by upgrading the existing 15 water production wells & drilling an additional one. Optimisation also of the well field including variable speed drives & upgrading well headworks, electrical controls & the operating system. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - DEWATERING SYSTEM
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 30km north of, Newman, WA 6753. Dewatering systems expected to include bores, dewatering pipeline & intrafield pipeline, exchange dam, collector tanks & associated power supply infrastructure. Click for more details...

KENYA TO CHINCHILLA WEIR WATER PIPELINE (QCLNG WATER TREATMENT PROJECT)
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. 20 km underground pipeline. Click for more details...

CAVAL RIDGE COAL PROJECT - WATER INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at 16km south of, Moranbah, QLD 4744. This type is Water Diverson & Collection/Sewerage Treatment with Private ownership. The mine water management system to include clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if there is surplus water at any time. Sewerage and wastewater treatment by packaged sewerage treatment plant (STP). Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PIT DEWATERING
Currently at the Construction stage In Cloncurry Shire is a project estimated to be $ 2000000. This project Construction of a borefield to ensure pit operations remain dry. Initial installation of 4 production & 15 monitoring bores for draw down testing. Results of this stage to determine the number of extra bores required for overall project. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - PROTECTIVE EPOXY COATING
Greater Gorgon Gas Project - Civils & Underground Services - Protective Epoxy Coating is currently at the Construction stage, valued at about $ 2500000 it is For the provision of protective epoxy coating to precast stormwater drainage channels. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - RETRACTABLE ROOF
Retractable Roof New project In The Darwin City Council Area. Design, fabrication & delivery of a motorised retractable roof (28m long x 16m wide x 1.5m high) to prevent rainwater entering an evaporation pond. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...

ILLAWARRA ROAD STORMWATER & PAVEMENT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kingborough Council Area of Stormwater Pipes/Pavement - Upgrade type. Upgrade of Illawara Road stormwater pipes & local pavements. Click for more details...