State

Categories

Sub Categories

Click Here to Find Current Projects

List of Water distribution & pipelines, borefields Projects in QLD


COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Currently at the Construction stage In Banana Shire is a project estimated to be $ 100000. This project Additional water requirements. Small package. Click for more details...

YABULU NICKEL REFINERY EXTENSION - COOLING WATER TOWER CONTRACT
Mining - Civil Services (Water distribution & pipelines, borefields) project at Refinery site at, Yabulu, QLD 4818 for New. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be augmented by the addition of a new cooling tower to cater for the additional heat loadings. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Includes pipes, crib rooms, escape rooms, ladder ways. Detailed mine plans have been completed for Warrior East and Sunburst laying out access, exploration and production drives, escapeways, drainage and ventilation connections. Click for more details...

WEIPA BAUXITE OPERATIONS - NEWEIPA/ANDOOM
Pipeline - Installation project at From Ely Dam to Andoom, Weipa, QLD 4874 in the Mining - Civil Services (Water distribution & pipelines, borefields). Water pipeline. Click for more details...

CURRAGH NORTH COAL PROJECT - PISCES
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Central Highlands Regional Council Area of Water Pipeline type. The EIS proposes utilising a 100 metre wide corridor 25 km long, including a water pipeline, as part of the haul route running parallel to an existing 66kv transmission line. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

KOGAN CREEK POWER STATION PROJECT - GROUNDWATER SUPPLY
Lagoon Gully Groundwater Supply project at South of, Brigalow, QLD 4412 In The Council Area Of Western Downs Regional of Private. Design and Construct of 26,060m of DN250 DICL Pipe including pipe fittings like Surge tanks 2No Scour valves 15 No and Air valves 22 No. 2 No 45KW pumps & motor (20L/s and 150m head), 2 No 110KW pumps & motor (50L/s and 150m head) and 2 No relift pumps & motor (58L/s and 150m head). 2ML Balancing Storage ( concrete). SCADA control System. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

KOGAN CREEK POWER PLANT
Kogan Creek Power Plant is currently at the Construction stage, valued at about $ 1000000 it is Water Treatment Plant: raw water treatment (gravel filters) capacity 2x95m3/h potable water treatment (activated carbon filters) capacity 150m3/d demineralisation plant (ion exchange with circ. regeneration system) capacity. Click for more details...

SUNWATER - MORANBAH PIPELINE EASTERN EXTENSION
Pumps/Motors/Valves/Switchgear For Pipeline Supply & Install project In The Isaac Regional Council Area. Supply, install, commission: 415 V horizontal multistage centrifugal pumpsets (3) including associated pipework & valves, flowmeters; electrical installation including transformer, switchgear, control equipment & cabling at Pump Station, plus magnetic flowmeters (7) & valves along the proposed pipeline. Click for more details...

MORANBAH PIPELINE EASTERN EXTENSION PROJECT - DUCTILE IRON & SWAB REMOVAL POINTS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1000000. This project The contract includes: manufacture, supply deliver and unload ductile iron pipes, general pipes, swab removal points. & 2,420 metres of polyethelene pipe. Click for more details...

MACARTHUR/BURDEKIN FALLS DAM TO NORTHERN BOWEN BASIN PIPELINE - PUMPS ET AL
A project in the QLD Within Isaac Regional. Supply, install and commission three 3.3KV submersible centrifugal Pumpsets, motors and Six 11KV horizontal double suction centrifugal Pumpsets including associated pipework and valves, control and communications equipment and cabling over four sites along the proposed Burdekin to Moranbah Pipeline. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - PIPES FOR DAMS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. From west dam to process dam Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - INSTALL PIPES FROM PROCESS DAM TO PLANT
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. From process dam to plant Click for more details...

LAKE LINDSAY COAL PROJECT - WATER MANAGEMENT - PILELINE/PUMPS/VALVES TO SUPPORT INITIAL BOX CUT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 25 km north east of, Middlemount, QLD 4746. To support initial box cut. Click for more details...

GOONDICUM PIPELINE PROJECT (MONTO)
Pipeline/Pump Station New project In The North Burnett Regional Council Area. Construction/testing approx 35 km DN300 DI & 355 OD PE pipeline, including pipeline structures, pump station/control building civil works, steel storage & break pressure tanks, using Principal-supplied pipes/fittings/valves. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

KENYA TO CHINCHILLA WEIR WATER PIPELINE (QCLNG WATER TREATMENT PROJECT)
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. 20 km underground pipeline. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Civil Services (Water distribution & pipelines, borefields). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Civil Services (Water distribution & pipelines, borefields) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

CAVAL RIDGE COAL PROJECT - WATER INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at 16km south of, Moranbah, QLD 4744. This type is Water Diverson & Collection/Sewerage Treatment with Private ownership. The mine water management system to include clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if there is surplus water at any time. Sewerage and wastewater treatment by packaged sewerage treatment plant (STP). Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PIT DEWATERING
Currently at the Construction stage In Cloncurry Shire is a project estimated to be $ 2000000. This project Construction of a borefield to ensure pit operations remain dry. Initial installation of 4 production & 15 monitoring bores for draw down testing. Results of this stage to determine the number of extra bores required for overall project. Click for more details...

BMA MORANBAH HDPE PIPELINES CONTRACT
Pipelines - Supply & Install project at Bowen Basin via, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Contract for the supply & installation of high density polyethylene (HDPE) pipelines at 2 BHP Billiton Mitsubishi Alliance (BMA) Bowen Basin sites around Moranbah. Click for more details...

BMA CENTRAL REGION WATER PIPELINE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Between Saraji & Norwich Park mines via, Dysart, QLD 4745. This type is Pipeline with Private ownership. Construction of a 34km long high density polyethylene (HDPE) water pipeline including road & creek crossings. Associated pump station & electrical infrastructure. Click for more details...

MOUNT CARLTON GOLD SILVER & COPPER PROJECT PIPELINE
Pipeline project at 45km north-northwest of, Collinsville, QLD 4804 In The Council Area Of Whitsunday Regional of Private. Proposed construction of 225mm subterranean HDPE pipeline & associated pumping infrastructure to carry river water from the Burdekin River to the main site water dam at Mount Carlton mine for use in processing. The pipeline will be approximately 36km long. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect