List of Water distribution & pipelines, borefields Projects in WA


BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

JUNDEE - GOLD
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Wiluna Council Area of Mine - Borefield Pumps - Installation type. Installation of 7 downhole pumps required for new borefield development. Project involves approximately 22 km of pipework. Click for more details...

FINUCANE ISLAND - IRON ORE
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Port Hedland Council Area of Private ownership. Potable water & dust suppression pipeline replacement required for site. EPA report released late 1995 on overall upgrade of dust management at Finucane Island & Nelson Point. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Civil Services (Water distribution & pipelines, borefields). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

NIFTY COPPER OPERATIONS
Mining - Civil Services (Water distribution & pipelines, borefields) project at 200 km southeast of, Marble Bar, WA 6760 for Addition. Contract to involve site preparation, embankments, liner plus associated pumps & piping. Click for more details...

DUKETON REGIONAL GOLD PROJECT - MOOLART WELL
Resource - Gold project at 100 km North of, Laverton, WA 6440 In The Council Area Of Laverton of Private. The new estimate is 25 095kt at 0.46g/t for 375koz Au. The mining method have been chosen to best suit the style of gold mineralisation and provide the optimal movement rates: excavator and haul trucks. The developer will be manager for the mining-related construction activities (including ROM pad and haul road construction), maintenance during mining operations and the supply of lighting and pumping equipment. The process plant will comprise crushing, crushed ore stockpile and reclaim facility, grinding, gravity separations, leach and CIL adsorption, elution and regeneration and a gold room. The treatment plant is designed for a nominal 300tph milling rate and capacity of 2 000 000 tonnes per year. Run of mine (ROM) ore will be fed to the crushing plant at a design rate of 408tph and stored on the crushed ore stockpile. A maximum capacity of 450 tph has been allowed within the crushing circuit to cater for softer or and increased mill throughput. A gravity separation circuit is included in the design to enhance the recovery of gold that concentrates in the cyclone underflow system. The leach and CIL adsorption circuit design is based on the mill feed grade of 2.0 g/t Au and 20% gravity gold recovery. Tailings will be thickened using a high rate thickener with the underflow being pumped to the tailings storage facility (TSF). Water shall be reclaimed via a central decant and returned to the process facility. gold recovery by electrowinning. Dore and gold bearing product will be stored in the secure goldroom which has electronic surveillance systems installed. Raw water will be supplied from the mine dewatering network or from dedicated bores. Process water will be stored adjacent to the plant in a polyethylene lined process water dam. The following reagents will be required in the process and suitable systems for storage and controlled dosing have been provided in the process design: sodium cyanide, oxygen, quicklime, sodium hydroxide (Caustic Soda) and hydrochloric acid. The process facility will be controlled from PC based HMI systems located in the two control rooms for all other operations. Other infrastructure to include mine access roads (29kms new and approximately 90km upgrade), airstrip (suitable for Dash 8 100 - 36 persons), accommodation camp (140 persons), borefield, earthworks for process plant, accommodation camp, access road and access tracks, mechanical infrastructure for the process plant including potable water supply, sewerage treatment plants (camp and process plant), RO plant (potable water), process plant buildings and workshop, power station and light vehicle fuel storage facility and site communication system, administration offices, workshops and stores, mechanical infrastructure for the mine including fuel storage facility, heavy vehicle workshop and stores, heavy vehicle wash bay, tailings storage facility (TSF), electrical power supply via diesel operated power station (Build/Own/Operate) and light mobile vehicles. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ravensthorpe Council Area of Desalination Plant& Water Treatment Plants type. Seawater will be piped to site via a 48 km long pipeline system and then desalinated on site, producing fresh water for steam production while the waste brine stream will be used in the beneficiation circuit. Water treatment plants for the project include potable water treatment plant and waste water treatment plants. Click for more details...

HOPE DOWNS IRON ORE PROJECT - DEWATERING
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 75 Km Northwest of, Newman, WA 6753. Mine water usage will be 6.94 Mega litres per day. Work comprises the construction of the dewatering pipeline and discharge facilities for the Hope north pit. Construction will also include collector pipes, main discharge pipeline, 13 buried 152 mm diameter polythene spur lines, access roads and a collector dam of 12 ML. Further development in 2007 and 2008 will be the conversion of the initial 12 production bores to reticulated power, construction of collector pipelines to the collector dam, provision of a pumping station and installation of a telemetry system to relay operating information to a central control/monitor point. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY UNDERGROUND - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Laverton Council Area of Underground Mining type. Underground development work and production mining are in progress. Full scale underground mining should commence in 2007. As part of the development work it is proposed to construct a new dewatering system for the mine. Water will be discharged at 250L/scc and a new discharged point will be constructed. This involves the construction of a second Lake Carey outfall with a 3.5 Km pipeline and four discharge outlets, fitted with manual valves. These valves will be fitted over the lake area to the west of the Wallaby waste dump area. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

KWINANA TITANIUM DIOXIDE PIGMENT PLANT - SUPPLY OF PIPING
Piping - Supply project at Mason Rd, Kwinana, WA 6966 in the Mining - Civil Services (Water distribution & pipelines, borefields). For the supply of piping. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

BODDINGTON GOLD MINE EXPANSION - WATER TREATMENT FACILITIES
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Pinjarra - Williams Rd, Boddington, WA 6390. Facilities include Reverse Osmosis Plant, water transmitters and water management telemetry system. Click for more details...

SINO IRON ORE EXTENSION PROJECT - DESALINATION PLANT DOUBLE ENTRY REFER TO PROJECT ID 857138
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Cape Preston 80km southeast of, Karratha, WA 6714. Construction of groundwater bores, a 30 GLpa desalination plant, & the construction of seawater intake & brine disposal outfall. Click for more details...

SINO IRON ORE PROJECT - SEA WATER DESALINATION UNITS FOR CONSTRUCTION WATER
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Cape Preston 100 km Southwest of, Karratha, WA 6714. This type is Temporary Sea Water Desalination Units - Design/Construct with Private ownership. For the design, manufacture, supply & commission of a 1ML per day temporary desalination plant Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - DEWATERING SYSTEM
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 30km north of, Newman, WA 6753. Dewatering systems expected to include bores, dewatering pipeline & intrafield pipeline, exchange dam, collector tanks & associated power supply infrastructure. Click for more details...

YANDICOOGINA SOUTH IRON ORE PROJECT EXPANSION - JUNCTION SOUTH WEST & OXBOW
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The East Pilbara Council Area for New development. Replacement upon exhaustion of existing open cut locations at Junction Central (JC) & Junction South East (JSE) with 2 replacement pits at Junction South West (JSW) & another further west at Oxbow. Continuation of drill, blast, load & haul methods to extract 320million tonnes (Mt) over a total of 12 years. New Run-of-Mine (ROM) pads & primary crushing & screening plants at JSW & Oxbow prior to overland conveyors taking ore to the existing processing plants at JC. New wet processing plant. New topsoil & subsoil stockpiles as well as out-of-pit waste dumps until space made in pits for backfilling. Reuse of groundwater from pit dewatering for processing with the surplus to be released to Marillana Creek. Associated infrastructure to include access & haul roads, refuelling facilities, extension of existing power & communications, administration buildings & maintenance workshop. Expansion also expected of existing wastewater treatment plants. Floodway across Marillana Creek. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - PROTECTIVE EPOXY COATING
Greater Gorgon Gas Project - Civils & Underground Services - Protective Epoxy Coating is currently at the Construction stage, valued at about $ 2500000 it is For the provision of protective epoxy coating to precast stormwater drainage channels. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - WELDING OF PIPE MATERIALS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Welding Of Pipe Materials currently at Construction stage. For the cutting, bevelling, welding, & provision of supervision for carbon steel pipework. Click for more details...

PLUTONIC DOME GOLD OPERATIONS RECOMMENCEMENT - K2 DEWATERING
Plutonic Dome Gold Operations Recommencement - K2 Dewatering is currently at the Construction stage, valued at about $ 5000000 it is For the provision of pit dewatering services. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...