State

Categories

Sub Categories

Click Here to Find Current Projects

List of Water distribution systems, Drainage Projects in NSW


SYDNEY WATER REVISED STORMWATER ENVIRONMENT IMPROVEMENT PROGRAM
Stormwater Enhancement & Improvement Works project at various, ., NSW 2999 in the Public Utilities (Water distribution systems, Drainage). The Stormwater Environment Improvement Program (SEIP) is a five year works program that Sydney Water is implementing to deliver improvements to stormwater quality in selected catchments across Sydney. The scope of works involves the Define, Design & Construction of stormwater quality improvement solutions to meet the requirements of the Department of Environment & Conservation. Click for more details...

BICENTENNIAL PARK
Public Utilities (Water distribution systems, Drainage) project In The Auburn Council Area of State ownership. Construction of leachate drain extension works & associated landscaping reinstatement works to the existing leachate collection system. There is an existing leachate drain & evaporative pond system in Bicentennial Park & proposes to extend the existing leachate drain system by an estimated 160 metres, construct a waste relocate cell, & undertake soft landscape reinstatement works. Click for more details...

PROSPECT CREEK CATCHMENT
Public Utilities (Water distribution systems, Drainage) project at Widemere Rd, Wetherill Park, NSW 2164 of Drainage type of New development. Earth channel upstream of outlet structure. Click for more details...

WATERLOO TO WAVERLEY WATERMAIN CLAMPS
Public Utilities (Water distribution systems, Drainage) project at from Waterloo to Waverley, ., NSW 2999 of Internal Leak Clamps - Supply & Install type of Supply & Install development. Design, supply & installation of about 670 internal leak prevention clamps on 2.5 km long DN1200 cement lined underground mild steel watermain from Waterloo to Waverley. The larger part of the watermain is located in Centennial Park, Sydney NSW. Click for more details...

MOAMA WATER SUPPLY SYSTEM
A project in the NSW Within Murray. Removal of existing water storage tank, construction of new 14 metre diameter tank & application of protective coating. Click for more details...

VALES POINT 330KV SUBSTATION
Public Utilities (Water distribution systems, Drainage) project at Dorothy St, Vales Point, NSW 2259 for Renovations, Refurbishments etc.. Road reconstruction, construction of new section of road, drainage, fencing. Click for more details...

MYIMBARR COMMUNITY PARK
Public Utilities (Water distribution systems, Drainage) project at cnr Wattle & Shellharbour Rds, Shellharbour, NSW 2529 for New. Construction of sporting facility to cater for Australian Rules, Cricket, Rugby League, Soccer, Hockey. Creation of an environmental wetland comprising 12 ha of salt & freshwater lagoons. Click for more details...

ROSHERVILLE RESERVE
Rosherville Reserve is currently at the Construction stage, valued at about $ 100000 it is Design, supply & installation of a SQID at the end of the catchment area within Rosherville Reserve. Click for more details...

HARRINGTON PARK WATER QUALITY & FLOOD MANAGEMENT
A project in the NSW Within Camden. Modifications to existing lake & construction of 4 additional lakes. Reticulation system, inclusive of pumping facilities & pipelines. Landscaping comprises: grassing; tree planting; aquatic landscaping. Click for more details...

UPPER PROSPECT CREEK CATCHMENT
Trunk Drainage Works New project In The Fairfield Council Area. Trunk drainage works in the Wetherill Park Industrial area. Click for more details...

ENFIELD BRICK PIT SITE
Public Utilities (Water distribution systems, Drainage) project at 1-7 Juno Pde, Greenacre, NSW 2190 of Frog Ponds type of New development. Construction of 2 ponds for preservation of frogs, fencing, roadworks. Click for more details...

WESTERN SYDNEY WATER RECYCLING SCHEME
Currently at the Early Warning stage In Camden is a project estimated to be $ 560000000. This project Proposed construction of a water recycling facility for the land release areas in the north west & south west sectors of the Sydney Basin. Click for more details...

ORPHAN SCHOOL CREEK
Public Utilities (Water distribution systems, Drainage) project at Orphan School Creek, Canley Vale, NSW 2166 of Gross Pollutant Trap/Bank - Stabilisation type of New development. Design & construction of a gross pollutant trap (GPT) & bank stabilisation works. Click for more details...

BELROSE DRAINAGE
Public Utilities (Water distribution systems, Drainage) project In The Warringah Council Area of Local Govt ownership. Construction of drainage improvement works. Click for more details...

TOMAGO TRUNKMAIN UPGRADE OVER ASH ISLAND
Currently at the Construction stage In Newcastle is a project estimated to be $ 7000000. This project The project involves the decommissioning and replacement of an existing underground 900mm water trunkmain (DN 900) with a new 1350mm underground trunkmain (DN 1350) along approximately 3k of Ash Island. The project site is comprised of: construction zone ? a 20 metre corridor along the three km length of the trunkmain, and a site compound area (approximately 13.61 hectares within the City Farm area managed by the Kooragang Wetland Rehabilitation Project). The compound area consists of the ASS remediation and disposal area, a site office and soil stockpiling area; and disturbance zone ? a 15 metre corridor located within the construction zone west from Ramsar Road, which includes the centreline of the proposed route and the proposed vegetation clearance area required for construction. The construction zone would be delineated and temporarily fenced during the construction period so as to confine construction activities within the designated area. The zone does not pass through the Kooragang Nature Reserve (KNR, now known as Hunter Wetlands National Park) but lies 10-15 m from the KNR boundary in the northern section and 20-30 m from the KNR boundary in the southern section of the proposed route. The proposal would involve disturbance of a total area of 18.64 ha (5.03 ha within the disturbance zone and 13.61 ha within the compound area), the majority of which is cleared pasture/grassland. Only one ha of this is SEPP 14 wetland areas. The Proponent proposes to rehabilitate and restore all areas impacted during construction, including areas adjacent to the construction zone. Click for more details...

BOMADERRY COMMUNITY CENTRE CARPARK
Public Utilities (Water distribution systems, Drainage) project at Birriley St, Bomaderry, NSW 2541 for Renovations, Refurbishments etc.. Upgrading & resealing of existing car park to provide 28 car spaces, improved wheelchair access, pathway, improved drainage & lighting. Click for more details...

PASMINCO COCKLE CREEK SMELTER REMEDIATION PROJECT
Site Remediation project at 13a Main Rd, Boolaroo, NSW 2284 In The Council Area Of Lake Macquarie of Private. Remediation of the Pasminco Cockle Creek Smelter lands. Scope of work includes but not limited to: site establishment, running & supervision; preparation of containment cell base areas including reshaping, drainage layers & piping, reworking of any unsuitable fill materials; construciton of upstream drainage trench & pipe works; construciton of downstream leachate collection drain & pond; possible construction of Leachate Treatment Plant; placement of contaminated soil in cell (minimum 3 stages of construction) including conditioning, blending of materials as required; construction of a 2nd containment cell within main cell body for highly contaminated materials; progressive capping of contaminated materials; construction of gas collection system; supply & installation of capping & lining materials, pipe work & drainage materials, pumps & pits; landscaping of final landform & operate & maintain the containment cell for 2 years after practical completion Click for more details...

NORTH WEST GROWTH CENTRE - WATER RELATED SERVICES FOR STAGE 1 PRECINCTS
Public Utilities (Water distribution systems, Drainage) project for New development. The package of works under this Contract includes the Design & Construction of a potable water surface reservoir, trunk potable water inlet and outlet mains, potable water and recycled water distribution mains, reservoir site mains and gravity sewer carriers. Click for more details...

DARLING WALK
Public Utilities (Water distribution systems, Drainage) New project at Darling Walk, Darling Harbour, NSW 2000. This type is Stormwater Diversion with J/V - Private & Govt ownership. Stormwater Diversion. Currently the James St stormwater culvert runs under the existing SEGA building. To allow the excavation & construction of the 4 storey carpark it is proposed to divert the existing stormwater culvert commencing at the western footpath of Harbour Street heading south inside the eastern boundary of the site, crossing under the northern Liverpool St footbridge & then running west up the paved access to Tumbalong Park & reconnecting to the existing culvert within the footprint of the to be demolished lake. Click for more details...

CUDAL SEWERAGE SCHEME
Public Utilities (Water distribution systems, Drainage) project at various locations in Cabonne Council area, Cudal, NSW 2864 for New. Scope of work involves the diversion of existing property gravity sanitary drains which currently discharge into property septic tanks. The existing sanitary drains are to be connected into new pressure sewer pump units recently installed in some 165 residential & 7 commercial/public properties in Cudal Click for more details...

MOORE CREEK RD STORMWATER
New project of Public Utilities (Water distribution systems, Drainage) project at Moore Creek Rd, North, Tamworth, NSW 2340. Stormwater drainage works Click for more details...

SHELL SERVICE STATION - COLES EXPRESS PAGEWOOD
Public Utilities (Water distribution systems, Drainage) project In The Randwick Council Area of Service Station - Altns type. Alterations & additions to an existing service station for the installation of 3 new dual walled fibreglass tanks. The existing tank fill locations will be relocated in line with the existing fuel pumps & the forecourt resealed. Removal & replacement of the canopy over the fuel pump area. Click for more details...

KARUAH LOCAL ABORIGINAL LAND COUNCIL
Public Utilities (Water distribution systems, Drainage) project In The Port Stephens Council Area of Infrastructure - Replacement type. Replacement & installation of water & sewer infrastructure. Click for more details...

SYDNEY OLYMPIC PARK TOWN CENTRE - CONSULTANCY
Public Utilities (Water distribution systems, Drainage) project for New development. The Sydney Olympic Park Authority wishes to engage suitable contractors to review and enhance the water sensitive urban design strategy for the SOP Town Centre and prepare a detailed stormwater plan for one precinct in the SOP Town Centre Click for more details...

HUNTINGWOOD WASTEWATER MAIN
Currently at the Construction stage In Blacktown is a project estimated to be $ 1200000. This project Construction of 724m DN225 & 192m DN300 sewer main works in the Huntingwood area. The pipeline commences corner of Honeman Close/Great Western Highway & traverses along Honeman Close, crossing Reservoir Rd & along Boiler Close. Click for more details...

MAITLAND TRANSPORT INTERCHANGE & ATHEL D'OMBRAIN DR ROADWORKS
Interchange/Roadworks New project In The Maitland Council Area. Construction of the upgrade of Maitland Transport Interchange. Upgrade of Athel D'Ombrain Drive. Scope of works which is expected to be undertaken by 2 contracts but may be a single contract includes: Contract 1 - new roundabout on the corner of Elgin & Railway streets to facilitate traffic flow and create a new entrance to the carpark; realignment of Athel D'Ombrain Dr with Railway St; improvements to the existing stormwater system; upgrade the current carpark & graveled areas to a more formal hub as well as allow for significant interchanges between modes of transport; installation of power & lighting to the carpark & installation of CCTV & connection to Maitland railway station. Possible Contract 2 - upgrade the intersection of Sparke Street & High Street with traffic signals; realign & re build Sparke street; extend Athel D'Ombrain Dr from Abbott St to the end of Spark street parallel to the rail corridor; install drainage facilities; improve intersections alignments with current cross streets; installation of share pathways and improved on road cycleways; lighting installation & utility relocations Click for more details...

THE GARDENS PRECINCT
Public Utilities (Water distribution systems, Drainage) project for New development. The Gardens Precinct, improving visitor amenity, whilst facilitating the site for a range of flexible uses, including community events. Stage 1 works are designed to rationalise the Park entrance from O?Connell Street, creating a formal promenade to Old Government House, whist activating the Murray Gardens Precinct for greater use. Scope of works for Stage 1 - replacement of the existing promenade, including sandstone & decomposed granite surfaces. Existing creek improvement and revegetation. Feature trees & garden beds. Formalising connections to Old Government House through landscape elements. Landscape softworks. Click for more details...

RUKENVALE PUBLIC SCHOOL
Public Utilities (Water distribution systems, Drainage) project In The Kyogle Council Area of State ownership. Upgrade the existing onsite sewerage waste management system Click for more details...

YOUNG CONVEYANCE SEWER MAIN
Currently at the Construction stage In Young is a project estimated to be $ 4614000. This project Upgrade of approximately 2km of conveyance sewer main Click for more details...

CHRISTISON PARK IRRIGATION & STORMWATER HARVESTING PROJECT
Public Utilities (Water distribution systems, Drainage) New project at Old South Head Rd, Vaucluse, NSW 2030. This type is Irrigation/Stormwater with Federal ownership. Installation of irrigation system to 2 sportsfields & the upgrade of a stormwater harvesting system. Scope of work includes: site set out & clearing, modifications to stormwater off take pit, supply & installation of precast items, pipelines, rotorflush submersible pump, treatment shed extension & treatment equipment in shed, backfilling, commissioning of system, reinstatement of turf, carpark, concrete footpath, fences, drainage channel & installation of irrigation system to 2 sportsfields, including connection of all components to relevant power & water supplies. Click for more details...

BOURKE WATER SUPPLY
Public Utilities (Water distribution systems, Drainage) project at ., Bourke, NSW 2840 for New. Construction of a Bore Water Transfer System from Walkdens Bores to the Bourke Water Treatment Plant (WTP). Scope of work includes: Walkdens Bores headwork, cooling system, bore water storage tank, pump/electrical/chlorine building, high lift pumps, chlorine dosing system, connections to Bourke WTP including installation of valves on existing bore water rising main. Click for more details...

CHAPEL RD SOUTH RESURFACING DRAINAGE & CONCRETE WORKS
Public Utilities (Water distribution systems, Drainage) project at Chapel Rd South, Bankstown, NSW 2200 of Drainage/Concrete Works type of New development. Chapel Rd South Resurfacing, drainage & concrete works only between Canterbury & Eldridge Rds. Scope of work includes but is not limited to: reconstruction of sections of footpath & kerb & gutter, vehicular crossings & kerb ramps. Minor stormwater drainage, reconstruction of traffic islands & landscaping. Click for more details...

VALE OF AH SPORTS FIELD
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Bankstown Council Area for Renovations, Refurbishments etc. development. Redevelopment of turf playing fields. Scope of work includes: elimination of existing turf cover (by others), milling of turf mat & using rotary hoe to incorporate dead material into soil. Bulk laser grading shall establish specified design surface levels. Stage 1: sub soil sand slit drainage & drainage collection system coordinated with installation of new irrigation & water tank. Final laser labeling shall occur to obtain design which allows for new turf to be laid. Stage 2: drainage will take place after turf is anchored. Click for more details...

THE IAN POTTER CHILDREN'S WILD PLAY GARDEN
New project of Public Utilities (Water distribution systems, Drainage) project at ., Centennial Park, NSW 2021. Construction of a Children's Wild Play garden, kiosk & amenities building in Centennial Park Click for more details...

MURRAWAL RD GROSS POLLUTANT TRAP
Murrawal Rd, Wyongah, NSW 2259 Has Murrawal Rd Gross Pollutant Trap currently at Construction stage. Supply & construct in-ground gross pollutant trap & associated works Click for more details...

PARSON & ST VINCENT ST ROUNDABOUT
Public Utilities (Water distribution systems, Drainage) project In The Shoalhaven Council Area of Local Govt ownership. Construction of a roundabout. Scope of work involves: site establishment & demobilisation. Removal & disposal of existing, concrete paths & reestablishment by turfing with net free kikuyu. Drainage works, including pits. Supply & installation of rubber roundabout apron. Concrete works including kerb & gutter, kerb ramps, footpath, medians & central Island. Excavation & disposal of existing pavement & replacement with sub base, base & AC. Removal & disposal of obsolete traffic signs & supply & installation of traffic signs. Removal of existing linemarking & application of new linemarking Click for more details...

RACECOURSE RD RECONSTRUCTION
Public Utilities (Water distribution systems, Drainage) project at Racecourse Rd from Hickey Ln to Ceres Dr, Thurgoona, NSW 2640 of Roadworks - Stage 2 type of New development. Road reconstruction. Scope of work includes: 240 lineal metres of reconstructed roadway & associated earthworks. Removal of existing road pavement. Earthworks for pavement widening & pathway construction. Construction of associated drainage. Construction of a new kerbed roadway Click for more details...

HUNTLEE LOCAL WATER CENTRE
Public Utilities (Water distribution systems, Drainage) New project at Cnr Wine Country Dr & Triton Bvd, Branxton, NSW 2335. This type is Sewage Treatment Plant/Water Recycling Facility with Private ownership. Construction of a sewage treatment plant & water recycling facility. The proposed utility installation, referred to as the Huntlee Local Water Centre (LWC), will be operated by Flow Systems Pty Ltd. Concrete & glass walls, with aluminium trim, to colorbond steel for roofs. Landscaping Click for more details...

PARKES SHIRE COUNCIL SEWER PUMPING STATION
Currently at the Construction stage In Parkes is a project estimated to be $ 5000000. This project Construction of Sewage Pumping Station (SPS) and Rising Main (RM). Scope of work includes: sewage pumping station (SPS) - construction of submersible pumping station including: reinforced concrete pump well with cover; reinforced concrete valve pit with cover; access road and gravel hardstand areas; vent shaft; mechanical equipment including pumps, valves and ancillary equipment; all discharge pipework and valves; electrical switchgear & control gear assemblies & provision for emergency generator with manual changeover facility. Sewage Rising Main - construction of sewage rising main; 375mm dia sewage rising main 1,112 m long (from SPS to LOC); installation of air release & scour valves, thrust blocks & other connections & fittings; construction of scour pump-out pits; construction of creek crossing including a vacuum suction outlet & associated pipelines at the creek crossing. Gravity Sewer main - construction of gravity sewer main from the inlet works to SPS including: new sewer connection to existing inlet works; 600mm dia sewer main approximately 80m long from inlet works to new pumping station; flow relief structure with cover, penstocks and 450mm dia overflow line to existing pit. Miscellaneous other work includes: construction of the in creek fishway; testing of structures, pipelines, mechanical and electrical equipment; restoration & landscaping & environmental protection works. Click for more details...

CROSS ST CIVIL WORKS
Public Utilities (Water distribution systems, Drainage) project at Cross St, Campsie, NSW 2194 for New. Civil works in Cross St & Robertson St, Campsie between Scahill St & Messiter St. Scope of work includes: reconstruction of the kerb & gutter on the northern side of Cross St between Scahill St & Messiter St including kerb returns. Reconstruction of sections of kerb and gutter on both sides of the street in Robertson St. Stormwater pipe and pit construction. Vehicular crossing reconstruction. Roof water pipe adjustment. Asphalt road pavement reconstruction. SSM replacement Click for more details...

EAST ORANGE CHANNEL
Public Utilities (Water distribution systems, Drainage) project In The Orange Council Area of Channel - Widening type. Increase the capacity of the East Orange Stormwater channel between Byng & McLachlan Sts to accommodate a channel flow of 55 m3/s. The works will be undertaken as part of a program of floodplain mitigation measures identified in Council's Blackman's Swamp Creek Floodplain Risk Management Study and Plan 2009 Click for more details...

BENSONS CREEK
Currently at the Construction stage In Shellharbour is a project estimated to be $ 647000. This project Drainage stabilisation works to Bensons Creek Click for more details...

WYONGAH DRAINAGE & WATER RELOCATION WORKS
Public Utilities (Water distribution systems, Drainage) project at Murrawal & Kilpa Rds, Wyongah, NSW 2259 of Drainage type of New development. Upgrade the road and drainage system at Murrawal & Kilpa Rds, Wyongah. An upgrade & relocation of the water mains at this location is also required to facilitate the road and drainage works. Scope of work includes: new water mains & stop valves, new kerb and gutter, footpaths, road cushions, medians, a raised intersection at Kilpa & Cottam Rds, upgraded stormwater drainage & road pavement. The proposed measures are intended to provide a safer environment for both residents & road users, as well as restore the dilapidated road pavement & improve the flow of stormwater. Click for more details...

HAY PID MODERNISATION PROJECT
Hay Pid Modernisation Project is currently at the Construction stage, valued at about $ 400000 it is Conversion of its open channel system to a fully-piped, automated water delivery system. Click for more details...

CENTRAL COAST COUNCIL WATER MAINS WORKS - PACKAGE 1
Water Main - Renewals/Extns project at Point Clare, Saratoga &, Gosford West, NSW 2250 in the Public Utilities (Water distribution systems, Drainage). Construction of 4 water mains using either open cut or pipe bursting method. The four water mains are located at: Sunnyside Av & Margaret St, Point Clare; Scott St, Point Clare; Henderson Rd, Saratoga & Racecourse Rd, West Gosford Click for more details...

LYNE PARK TENNIS COURTS
Public Utilities (Water distribution systems, Drainage) New project at New South Head Rd, Rose Bay, NSW 2029. This type is Tennis Court - Repairs with Local Govt ownership. Repairs of Lyne Park Tennis Courts. Scope of work includes: repairs of the asphalt base & removal of tree roots under 6 tennis courts. For courts 1, 2 & 3, a new synthetic grass surface will be installed by others. For courts 4, 5 & 6 the contractor will re-lay existing synthetic grass surface. Once the impacted asphalt base will be removed by the contractor, a Council arborist will instruct on roots to be cut. After cutting roots the contractor will reinstate asphalt base to existing drainage grade. The contractor will remove & replace existing terracotta drainage with new PVC drainage Click for more details...

PORT STEPHENS FISH NURSERY
Fish Nursery Tank Shelter project at Taylors Beach Rd, Taylors Beach, NSW 2316 In The Council Area Of Port Stephens of State. Upgrade the site functionality by provision of an additional fish nursery, with associated electrical services, and provision of civil drainage and stormwater control. Construction of a new shed with a light-steel portal frame, provision of future cladding to be conducted at a later date and roofed in metal sheeting, with reinforced concrete floor and footings. Click for more details...

EAST EGLINTON SEWER CARRIER MAIN
Currently at the Construction stage In Bathurst is a project estimated to be $ 86000. This project Construction and installation of 250m of 300mm UPVC SN8 carrier main & associated infrastructure Click for more details...

RICKARD RD & JACOBS ST STREETSCAPE
New project of Public Utilities (Water distribution systems, Drainage) project at Rickard Rd & Jacobs St, Bankstown, NSW 2200. Upgrade of the existing stormwater system, realignment of kerb & gutter, reconstruction of existing commercial crossing, median islands, kerb ramps & construction of type (1) footpaving. Sign posting. Landscaping. Click for more details...

MOSMAN COUNCIL IRRIGATION WORKS
Currently at the Construction stage In Mosman is a project estimated to be $ 550000. This project Scope of work comprises the installation of irrigation systems to: The turf area south of the amenities building opposite Hunter Park, located at the corner of The Esplanade and Hunter Rd, Balmoral, to the turf area opposite Raglan St, spanning approximately 197 lineal metres. The 15,000 square metre playing field area at Georges Heights Oval, Mosman. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect