State

Categories

Sub Categories

Click Here to Find Current Projects

List of Water distribution systems, Drainage Projects in QLD


GOLD COAST CITY COUNCIL - WATERMAIN
Public Utilities (Water distribution systems, Drainage) project at Darlington Dve, Stanmore Rd to Cuthbert Dve, Yatala, QLD 4207 of Watermain type of New development. The tender involves a Lump Sum Contract for the construction of a water main. Subject to the requirements of the contract this includes: supply and construction of approx 2,080 metres of 3oomm and 45 metres of 225mm dia. pressure pipes, valves, fittings and associated works. the works are split into two separable portions as follows - Separable Portion A being approx. 1,350 metres of 300mm and 45 metres of 225mm dia water mains from Stanmore Rd to Pearson Rd; and Separable Portion B being approx. 730 metres of 300mm dia water mains from Pearson Rd to Cuthbert Dve. Click for more details...

WEIPA WATER MAINS
Currently at the Tenders & Building stage In Weipa Shire is a project estimated to be $ 100000. This project Replacement of 60 mm water mains & house services. Work involves replacement of approx 1.7 km of 60 mm main plus house services, including water meters to approx 350 properties. Click for more details...

BURDEKIN SHIRE COUNCIL
Irrigation System Supply & Install project In The Burdekin Shire Council Area. Supply & installation of irrigation systems. The installations may require bores. Click for more details...

CORBOULD ROAD TRUNK WATER MAIN
Corbould Road Trunk Water Main is currently at the Construction stage, valued at about $ 900000 it is Supply, installation & construction of 310 m x 300 mm dia & 1,702 x 375 mm dia trunk water main. Click for more details...

BRISBANE CITY COUNCIL AQUIFERS (6)
Public Utilities (Water distribution systems, Drainage) project In The Moreton Bay Regional Council Area of Aquifers type. For Consultancy services to assist in developing an Alliance Contract for the delivery of borewater treatment facilities for the Brisbane Aquifer Project. Click for more details...

WATERWAY GARDENS (BURDELL) TRUNK WATER MAIN (CONTRACT T10/07)
Public Utilities (Water distribution systems, Drainage) project In The Townsville City Council Area of Local Govt ownership. Supply and construction of approximately 910m of DN600 DICL K9 trunk water main and ancillary works. Testing and commissioning. Provision of as-constructed drawings for all works. The Contractor shall be required to transport and deliver to and from the Site all materials, equipment, constructional plant and other items to be used in executing the works. Click for more details...

CAIRNS PORT AUTHORITY OPEN CONCRETE DRAIN (CONTRACT CPA 0410)
Public Utilities (Water distribution systems, Drainage) project In The Cairns Regional Council Area of Open Concrete Drain type. Constructing approximately 850 metres of open concrete lined drain and associated earthworks. Click for more details...

NAPRANUM COMMUNITY REPLACEMENT OF WATER SERVICES
Napranum Community Replacement Of Water Services is currently at the Construction stage, valued at about $ 300000 it is Replacement of existing water services to various residences in the community. Click for more details...

BRINSMEAD WATER TRUNK MAINS
New project of Public Utilities (Water distribution systems, Drainage) project at ., Brinsmead, QLD 4870. Design trunk water mains. Click for more details...

SPRINGS DRIVE MASTERPLANNED SUBDIVISION STAGES 1 - 3
Springs Dr (Lot 12 SP189346), Meridan Plains, QLD 4551 Has Springs Drive Masterplanned Subdivision Stages 1 - 3 currently at Construction stage. Reconfiguration of 50 lots. Lots ranging from 400sq m - 600sq m. Construction of drainage channel. Click for more details...

TARA DESALINATION PLANT STAGE 1 PLANT BORE/MAIN PIPELINES
Public Utilities (Water distribution systems, Drainage) New project at ., Tara, QLD 4421. This type is Plant Bore/Main Pipelines - Stage 1 with Local Govt ownership. construction of reject main pipelines. Click for more details...

BURNETT RIVER SEWER MAIN HDD UNDERBORE
Sewer Main - Hdd Underbore project at Burnett River, Gin Gin, QLD 4671 in the Public Utilities (Water distribution systems, Drainage). Burnett River sewer main HDD underbore. Click for more details...

STANTHORPE WASTE MANAGEMENT FACILITY STORMWATER DRAINAGE WORKS
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 75000. This project Stormwater drainage works in relation to the extension of the Stanthorpe Waste Management Facility. Click for more details...

SOMERSET DAM HYDROELECTRIC PLANT REFURBISHMENT
Somerset Dam Hydroelectric Plant Refurbishment is currently at the Construction stage, valued at about $ 7000000 it is Refurbish, uprate & recommission the Hydroelectric Plant (Hydro) on an engineering, procurement, & construction (EPC) basis, fully adapted to the Site in accordance with best industry practices & safely interconnected with the electricity grid (Project). The Hydro is to be designed for unmanned operation, remotely controlled and monitored with a design operational service life of at least 30 years. Works to include refurbishment of existing facilities, including the dismantling, inspection, testing, refurbishment, painting & resting & re-use & commissioning of the powerhouse hyrdo-electric plant and the building including, inlet valve, turbine inlet pipework, turbine parts including upgrading of the regulating gear, turbine shafts & seals, improvements to the ventilation system & crane access walkway, removal of existing generator, exciter & associated equipment & reconfiguring the machine foundations & floor trenches. Design & construction of new plant including turbine runners, suction cones & draft tubes, generator, exciter, bearings, cooling & braking systems, governor, hydraulic powerpack including actuators & controller, inlet value hydraulic powerpack & actuator, LV power distribution, MV power, installation of monitoring devices, control system hardware & software, switchgear, earthing grid, upgrade of existing 11kV overhead line to 33kV. Click for more details...

RNA SHOWGROUND REDEVELOPMENT KING STREET CONSTRUCTION
Public Utilities (Water distribution systems, Drainage) project for New development. Construction of 300m of new road pavement for King Street Precinct between St Paul's Terrace & Gregory Terrace. To include extensive earthworks, stormwater drainage, sewer connections, culverts, kerb & gutters, footpaths & all associated infrastructure. Demolition works. Associated landscaping. Click for more details...

PRINCESS ALEXANDRA HOSPITAL WATER SUPPLY STAGE 2
Currently at the Construction stage In Brisbane City is a project estimated to be $ 250000. This project Construction of 2 water tanks for the stage 2 uninterruptible water supply at Pump House Building, Princess Alexandra Hospital. Click for more details...

PINE RIVERS PARK AMPHITHEATRE GRADING & DRAINAGE WORKS
125 Gympie Rd, Strathpine, QLD 4500 Has Pine Rivers Park Amphitheatre Grading & Drainage Works currently at Construction stage. Design & construction of grading & drainage works at the Pine Rivers Park ampitheatre. Works to include renovation of the existing turf surface. Supply, delivery & install of a new automated underground irrigation system & laying of turfgrass. Minor earthworks. Associated landscaping. Click for more details...

HIGHFIELDS SPORT PARK CLUBHOUSE & AMENITIES
Clubhouse project at 220 Barracks Rd, Highfields, QLD 4352 In The Council Area Of Toowoomba Regional of Local Govt. Construction of clubhouse/amenities building at the Highfields Sports Park, Toowoomba. Construction of clubhouse building with kitchen, kiosk, first aid & umpires facilities. Construction of two amenities buildings either side of clubhouse building to include toilets, change rooms & equipment storage. Works to include excavation for roads, paving, drains, pits, foundations & slabs. Supply & installation of complete system of sewage drains connected to sewage main. Supply & lay complete system of stormwater drains & culverts. Supply, fabricate & installation of steel roofing. Supply & installation of metal window frames, glass & glazed door. Supply & installation of water storage materials & equipment to include tanks, pumps, filter & pipework for connection. Provision of light & power. Provision of fire protection. Supply & installation of cold room. Landscaping & concrete paths. Click for more details...

TALLEBUDGERA CREEK POTABLE WATER TRUNK MAIN
Public Utilities (Water distribution systems, Drainage) New project at Tallebudgera Connection Rd, Tallebudgera, QLD 4228. This type is Trunk Water Main with Local Govt ownership. Design & construction of a DN600 Potable Water trunk Main across Tallebudgera Creek. Proposed options include Dredging Solution or Pipe Bridge Solution. Click for more details...

DARIEN STREET IRRIGATION
Currently at the Construction stage In Brisbane City is a project estimated to be $ 250000. This project Irrigation works at Darien Street, Bridgeman Downs. Click for more details...

COASTWATCHER PARK YOUTH SPACE UPGRADE
Public Utilities (Water distribution systems, Drainage) project for New development. Upgrade of Coastwatcher Park at Trinity Beach for a youth space precinct. To include earthworks, site drainage, pathways, park signage, landscaping & soft fall. Installation of shelter shade with seating & terraced seating. Construction of skate infrastructure, bouldering, table tennis & parkour elements. Basketball court & informal soccer goals. Associated civil works. Click for more details...

PILBEAM DRIVE NDRRA RECONSTRUCTION WORKS
A project in the QLD Within Somerset Regional. Restoration works at Pilbeam Drive, Mount Archer. To include slope stabilisation, road remediation & culverts. Associated civil & drainage works. Environmental rehabilitation. Click for more details...

CEDAR CREEK ROAD CAUSEWAY UPGRADES
New project of Public Utilities (Water distribution systems, Drainage) project at Cedar Creek Rd, Cedar Creek, Queensland, Australia, Cedar Creek, QLD 4520. Upgrade to two causeways along Cedar Creek Road at Cedar Creek. Removal & disposal of existing culvert system. Installation of new box culverts & wingwalls. Works to include concrete pavement rehabilitation. Associated drainage works. Click for more details...

MEMERAMBI ROAD & DRAINAGE WORKS
Public Utilities (Water distribution systems, Drainage) project In The South Burnett Regional Council Area of Roadworks/Drainage type. Construction of roadworks & stormwater infrastructure in the township of Memerambi, on the Bunya highway north of Kingaroy. Works to include earthworks, road construction & sealing, installation of stormwater drainage including pipelines & swales, construction of a stormwater detention basin, sediment control devices, turfing & rehabilitation. Associated civil works Click for more details...

FITZGIBBON CHASE STAGE 21 CIVIL WORKS
Public Utilities (Water distribution systems, Drainage) project at Cnr Roghan Rd & Warrumbungle Pde, Fitzgibbon Chase,, Fitzgibbon, QLD 4018 of Roadworks/Sewerage/Stormwater - Stage 21 type of New development. Civil works for Stage 21 of Fitzgibbon Chase. To include construction of road, stormwater drainage, potable water supply, recycled water supply & sewerage reticulation. Click for more details...

PALM ISLAND WATER & SEWER TREATMENT PLANTS UPGRADE
Water Treatment & Sewer Treatment Plants - Upgrade project at ., Palm Island, QLD 4816 in the Public Utilities (Water distribution systems, Drainage). Upgrade of water & sewer infrastructure to increase capacity of water & sewer treatment plants to accommodate the increasing population on Palm Island. Click for more details...

DON CAMERON DRIVE WATER MAIN UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Don Cameron Dr, Calliope, QLD 4680 for New. Upgrade of water main at Don Cameron Drive. New main to connect into existing infrastructure in the Vicinity of Herbertson Road & Arcadia Street & extend to Walker Drive for a total length of 568.8m. Click for more details...

MAROOCHYDORE CITY CENTRE CIVIL ELECTRICAL & LANDSCAPE WORKS STAGE 1A
Civil/Electrical/Landscape Works - Stage 1a project at 1 Golf St, Maroochydore, QLD 4558 In The Council Area Of Sunshine Coast Regional of Local Govt. Civil, electrical & landscaping works for Maroochydore City Centre project. To include relocation of 11kv power feed. Pavements both granular & full depth asphalt. Sewerage reticulation. Water reticulation. Electrical reticulation. Smart city conduit installation. Storm water drainage. Underground pneumatic waste collection trunk infrastructure. Traffic Bridges. Signalisation & extension of two existing intersections. Signalised internal intersections. 3,000 sqm town centre park consisting of hard & soft scape & custom steel structures. Re-engineering of a section of the Maud Drain into a Public Corso. Associated landscaping. Click for more details...

PEREGIAN RESERVOIR - SUNCOAST BEACH DRIVE TRUNK WATER MAIN
Private ownership Public Utilities (Water distribution systems, Drainage) project In The Sunshine Coast Regional Council Area for New development. Supply & installation of a 9276m long trunk water main from Peregian Reservoir to Suncoast Beach Drive, Coolum. Click for more details...

MOUNT BRISBANE ROAD CULVERT RECONSTRUCTION
Mount Brisbane Rd, Mount Pleasant, QLD 4521 Has Mount Brisbane Road Culvert Reconstruction currently at Construction stage. Reconstruction of 3 causeways along Mount Brisbane Road, Mount Pleasant. To include 200mm thick concrete slab & 150mm thick concrete batter. Provision of scour protection & earthworks. Provision of traffic control. Associated landscaping. Click for more details...

ROCKHAMPTON REGIONAL COUNCIL NDRRA ROADWORKS & DRAINAGE RESTORATION
Public Utilities (Water distribution systems, Drainage) project for New development. Road & drainage restoration works at various locations within Rockhampton Regional Council under the Natural Disaster Relief & Recovery Arrangements (NDRRA). Rural locations to include Alton Downs, Stanwell, Bajol & Bouldercombe. Urban works to include widening of Deans St. Construction of 160m floodway at Capricorn Street, Gracemere. Reconstruction of 400m of Elphinstone Street, Berserker. Reconstruction of culvert at York Street in Kawana, Frenchville Road in Frenchville, Beasley Street in Frenchville & Rockonia Road in Koongal. Click for more details...

DUTTON STREET DRAIN & SEWER PUMP STATION G
Drain & Sewer Pump Station project at Dutton St, Cairns, QLD 4870 in the Public Utilities (Water distribution systems, Drainage). Construction of drainage structures at Dutton Street & Sewer Pump Station G in 2 separable portions. Separable Portion A to include earthworks, roadworks & stormwater drainage for the construction of the Dutton Street drain culverts & access road. Separable Portion B to include supply & installation of new pump station & associated pits, cover, pumps, pipework, valves & supports. Supply & installation of generator, switchboard, shade structure & platform. Click for more details...

DON BEATTIE PUMP STATION RISING MAIN & BRIDGE PIERS
Public Utilities (Water distribution systems, Drainage) project at Burnett River, Bundaberg, QLD 4670 for New. Construction of Don Beattie Pump Station rising main & bridge piers protection works. Associated civil works. Click for more details...

DIXALEA-DEEFORD ROAD RECONSTRUCTION
New project of Public Utilities (Water distribution systems, Drainage) project at Dixalea Deeford Rd, Wowan, QLD 4702. Proposed shoulder widening, sealing & rehabilitation of 1800m x 6m at chainage 1800. Click for more details...

JETAVANA COMMUITY FACILITY & MONASTERY INFRASTRUCTURE STAGE 1
159 Bagnall St (Lot 106, RP85889), Ellen Grove, QLD 4077 Has Jetavana Commuity Facility & Monastery Infrastructure Stage 1 currently at Construction stage. Infrastructure works for Jatavana Community Facility & Buddhist Monastery. To include sewer line, power supply & water supply. Construction of drainage corridor & public parkland. Click for more details...

WALKER STREET WATER MAIN RENEWAL
Public Utilities (Water distribution systems, Drainage) project for New development. Supply & install approximately 950m of DN150 water main in Walker Street (from Croydon Street to Neptune Street), Maryborough. To include supply of all materials & equipment, installation & commissioning of new water main, replacement of all customer service pipes associated with the water main. Associated civil works. Click for more details...

EMERYS BRIDGE ROAD & NETHERBY ROAD NDRRA FLOODWAYS
Floodways project at Emerys Bridge Rd & Netherby Rd, Gundiah, QLD 4650 In The Council Area Of Fraser Coast Regional of Local Govt. Construction of the Emerys Bridge Road & Netherby Road reinforced concrete floodways & cut off walls. To include provision of earthworks, clearing & grubbing, reno mattresses & landscaping works. Click for more details...

M CREEK
M Creek is currently at the Construction stage, valued at about $ 1044000 it is Installation of culverts & associated concrete works on the Normanton-Burketown Rd at the M Creek crossings Click for more details...

JOORA AVENUE STORMWATER DRAINAGE
New project of Public Utilities (Water distribution systems, Drainage) project at Joora Av, Petrie, QLD 4502. Upgrading the stormwater drainage system at Joora Av & Young St. Scope of work includes: temporary service relocations and protection. Clearing and grubbing of verge and drainage easement. Installation of temporary erosion and sediment control measures. Trenching and excavation for new stormwater system and associated structures. Laying, bedding and backfilling new stormwater pipes & culverts. Construction of new stormwater chambers, manholes, gullies, inlets and outlet structures. Connection of new stormwater pipes to existing stormwater structures. Relocation of existing trunk water main in Young Street (by Unitywater Private Works). Reconstruction of road pavements, kerbs & subsoil drainage impacted by the works. Excavation of drainage channel in drainage easement, ground preparation & finished surface treatment. Demolition of existing driveways & kerb ramps (where extending past the kerb line), preparation of subgrade & construction of replacement driveway & kerb ramps. Placement, compaction & finishing of drainage berm. Offsite disposal of surplus &/or unsuitable materials. Line marking, signage & landscape works (including furniture). Construction of concrete pedestrian pathways Click for more details...

DOMMETT ST WATER MAIN
Public Utilities (Water distribution systems, Drainage) project at Dommett St, Townsville, QLD 4810 for New. Dommett Street water main replacement. Scope of work includes: install new DN250 mPVC water main along Royal St and Stuart Drv in Wulguru from the intersection of Powell & Royal St to the intersection of Dommett St & Stuart Drv. Crossing of Stuart Drv with a DN630 PE enveloper pipe using trenchless construction methods. New cut-in to the existing live DN450 DICL water main at the intersection of Royal & Powell Sts. New cut-in to the existing live DN250 PVC water main at the intersection of Dommett St & Stuart Drv Click for more details...

HUNTER STREET DRAINAGE
Public Utilities (Water distribution systems, Drainage) project In The Fraser Coast Regional Council Area of Drainage type. Supply & installation of new stormwater pipes and the construction of new and augmentation of existing stormwater pits, for approximately 560m. Scope of work consists: stormwater drainage, concrete kerbing, reinstatement of flexible pavement & asphaltic concrete surfacing as well as minor concreting & associated works Click for more details...

ELI CREEK
New project of Public Utilities (Water distribution systems, Drainage) project at Eli Creek, Hervey Bay, QLD 4655. Construction of 2 Gross Pollutant Traps as part of the Eli Creek Catchment Water Quality Improvement Strategy Click for more details...

BEDFORD ROAD
Public Utilities (Water distribution systems, Drainage) project at Bedford Rd, Mackay, QLD 4740 for New. Construction of a water main and associated works located in the vicinity of Bedford Road between Coles Rd & McMahon St, Mackay Click for more details...

GYMPIE REGIONAL COUNCIL TELEMETRY
Public Utilities (Water distribution systems, Drainage) project In The Gympie Regional Council Area of Local Govt ownership. Separable portion A - Mary Valley Telemetry Upgrade. Design, supply, configuration, installation, testing and commissioning of radios, RTU's and associated equipment at the Mary Valley water and sewage sites. Separable portion B - Cooloola to Gympie Telemetry Link. Design, supply, configuration, installation, testing and commissioning of radios, RTU's and associated equipment at the Mount Wolvi repeater site and the Gympie Water Tower site. Click for more details...

BURRUM TOWN EROSION MITIGATION
Burrum Town Erosion Mitigation is currently at the Construction stage, valued at about $ 254000 it is Erosion mitigation works for Burrum, located at the end of Dalkeith St and extending to the Burrum River. Scope of works comprises: Installation of a rock gabion lined open drainage channel. Associated earthworks. Click for more details...

MORT STREET STORMWATER DRAINAGE
Public Utilities (Water distribution systems, Drainage) project for New development. Installation of stormwater drainage systems for the Mort St Upgrade Project, from Jellico St to Black Gully, and from Black Gully to the intersection of Griffiths St and Hogg St. Click for more details...

MARYBOROUGH CBD REVITALISATION
New project of Public Utilities (Water distribution systems, Drainage) project at Lennox St, Maryborough, QLD 4650. Upgrade of stormwater drainage on Lennox St, between Ellena St and Sussex St. Construction works for the Marybrough CBD Beautification Project on Lennox St, between Kent St and Ellena St. Click for more details...

MOURA RAW WATER MAIN
Public Utilities (Water distribution systems, Drainage) New project at between River Rd & Dawson Hwy, Moura, QLD 4718. This type is Water Main - Replacement with Local Govt ownership. Replacement of the Moura Raw water main. The proposed works will be conducted between the Moura Raw Water Pump Station facility located on River Road Moura and the Moura Water Treatment Facility located on Dawson Highway, Moura Click for more details...

LOBSTER CREEK CAUSEWAY
Public Utilities (Water distribution systems, Drainage) project In The Sunshine Coast Regional Council Area of Causeway type. Construction of a causeway crossing at Lobster creek Click for more details...

WINTON SHIRE COUNCIL FLOODWAYS PACKAGE 2
Currently at the Construction stage In Winton Shire is a project estimated to be $ 144000. This project Construction of a 50m long floodway at chainage 104km on Cork Mail Rd. Scope of work includes: establish level control to instate cross-fall & longitudinal fall of carriageway of the existing roadway on the pavement. Earthworks to box out existing pavement & to place 200mm of WQ35 gravel or crusher dust material to provide a sound platform for the concrete floodway. Stockpile excavation of pavement gravel on the northern side of road. Construction of floodway including the supply & placement of all concrete and reinforcing steel. Finishing of concrete slab with broom finish. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect