List of Water distribution systems, Drainage Projects in TAS


SNUG SEWER & WATER MAINS
Public Utilities (Water distribution systems, Drainage) project In The Kingborough Council Area of Local Govt ownership. The work includes the construction of a 150 mm diameter sewer extension, a 63 mm diameter rising main, a sewerage pumping station & the construction of a 100 mm diameter water main. Click for more details...

COAL RIVER VALLEY WATER RECYCLING SCHEME
Pipeline And Associated Works project at Coal River, near, Richmond, TAS 7025 in the Public Utilities (Water distribution systems, Drainage). Construction of approximately 6300 metres of pressure pipeline and associated works. Click for more details...

HUONVILLE WATER SUPPLY
Huonville Water Supply is currently at the Construction stage, valued at about $ 282000 it is A/ Construction of concrete clarifier. B/ Construction of 700 Kl clearwater storage washwater storage tank. Click for more details...

UNITED MILK TASMANIA LTD
Currently at the Construction stage In Devonport is a project estimated to be $ 500000. This project Roadway, water & fencing. Click for more details...

FRANKLIN SEWERAGE SCHEME
New project of Public Utilities (Water distribution systems, Drainage) project, Franklin, TAS 7113. Supply & construction of a 150 dia rising main from Franklin to Huonville (5,556 m), includes supply of all materials (including pipes, valve, fittings & other miscellaneous items) & excavation, laying, testing & backfilling of 150 dia class 9 UPVC pressure main & sections of 150 cement lined Ductile iron. Alternative tenders will be accepted. Click for more details...

INVERESK STORMWATER & ROOF PLUMBING WORKS
Public Utilities (Water distribution systems, Drainage) New project at Inveresk site, Launceston, TAS 7250. This type is Drainage/Roof Plumbing - Package 6 with Local Govt ownership. Drainage & roof plumbing works at selected buildings at the Inveresk site. Click for more details...

PATERSON STREET CENTRAL (PERIMETER) ROAD AND FOOTPATH WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Paterson St, Launceston, TAS 7250. Construction of a road, footpath and relocation of services around the perimeter of Paterson Street Central Carpark. Scope of works include construction of 100m of 225mm diameter sewer main, manholes and gully pits, 85m of 100mm watermain, installing street lighting conduits and posts, building demolition, pavement construction, asphalt sealing and miscellaneous associated works. Click for more details...

BRACKNELL WATER STORAGE FACILITY
Public Utilities (Water distribution systems, Drainage) New project at Site undisclosed, Bracknell, TAS 7302. This type is Water Storage Facility - Design & Construct with Local Govt ownership. Design and construction of a 250,000 litre light weight steel framed water tank adjacent to the existing elevated tank. Click for more details...

INGLEWOOD ROAD WATERMAIN REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project at Inglewood Rd, Hobart, TAS 7000 of Watermain Replacement type of New development. Construction of watermain. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of Local Govt ownership. Supply and delivery of precast concrete levee retaining walls. Click for more details...

INVERMAY ROAD TRUNK WATERMAIN
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. Supply and delivery of D.I.C.L. pipes and fittings. Click for more details...

SOUTH EAST TASMANIA RECYCLED WATER SCHEME
Public Utilities (Water distribution systems, Drainage) project for New development. Supply of valves and fittings for the extension of the Coal River Valley Reuse Scheme. Supply of DN600mm DICL fittings and valves for the Malcolms Hut Road pipeline extension. Click for more details...

SOUTH EAST TASMANIA RECYCLED WATER SCHEME
A project in the TAS Within Clarence. Supply of approximately 6000 metres of DN630mm polyethylene pressure pipe for construction of a future pipeline. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Various Locations, Queenstown, TAS 7467 of Pipelines type of New development. Construction of pipelines, roadworks, small pump station and miscellaneous earthworks. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

WINNALEAH IRRIGATION SCHEME
Winnaleah Irrigation Scheme is currently at the Planning stage, valued at about $ 12500000 it is The new irrigation scheme will deliver 6,200 ML p.a. to the communities of Derby and Weldborough with an irrigable area of 5,000 ha. Click for more details...

UPPER SOUTH ESK DAM
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of State ownership. The new dam will deliver 10,000 ML p.a. to the communities of Llewellyn, Conara, Cleveland, Powranna and Claredon with an irrigable area of 10,000 ha. Click for more details...

WHITEMORE IRRIGATION SCHEME
New project of Public Utilities (Water distribution systems, Drainage) project at From WHITEMORE to, Westbury, TAS 7303. The new irrigation scheme will deliver 5,500 ML p.a. to the communities of Whitemore, Liffey, Bracknell, Cluan and Westbury with an irrigable area of 10,000 ha. Works include pumping, piping, meters and telemetry. Click for more details...

KINGS MEADOWS FLOOD MITIGATION PROJECT
Public Utilities (Water distribution systems, Drainage) project at Ernest St to Janet St, Kings Meadows, TAS 7249 of Road - Upgrade - Stage 1 type of New development. Construction of a headwall, box culverts, gabion walls, manholes/chambers, open drain reprofiling, kerb and channel replacement and associated minor road works. Click for more details...

KINGS MEADOWS FLOOD MITIGATION PROJECT
Public Utilities (Water distribution systems, Drainage) New project at Ernest St (Janet St to Guy St), Kings Meadows, TAS 7249. This type is Road - Upgrade - Stage 2 with Local Govt ownership. The scope of works involves the supply and installation of approximately 210 metres of 1050mm diameter reinforced concrete pipes, gully pit construction, manhole/access chamber construction and associated road reinstatement. Click for more details...

KINGS MEADOWS FLOOD MITIGATION PROJECT
Ernest St, Kings Meadows, TAS 7249 Has Kings Meadows Flood Mitigation Project currently at Construction stage. Construction of concrete pits. Click for more details...

ALEXANDER STREET WATER MAIN UPGRADE STAGE 1
Water Main - Upgrade New project In The Break O'Day Council Area. Supply and installation of 335 metres of 100 diameter UPVC Class 16 water main, installation of four fire plugs to be used for scour purposes, installation of 100mm stop valve and other minor associated works. Click for more details...

LAUNCESTON COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Launceston Council Periodic Construction Contracts 2012-2014 is currently at the Tenders & Building stage, valued at about $ 800000 it is Works within this tender include *Asphalt works *Road and footpaths *Kerb and channel *Traffic Island *Drainage Works Landscaping *Pipe cracking *Pipe relining *Communication conduit *Line making and *Day works. Click for more details...

BREAK O'DAY COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Public Utilities (Water distribution systems, Drainage) New project at Various Locations with the Municipality of Break O'Day, St Helens, TAS 7216. This type is Civil Construction Works with Local Govt ownership. Civil construction works for Break O'Day Council up to the value of $100,000 (excluding GST) per project for a three year period, between 31 January 2012 and 31 December 2014. Tenderers may submit prices for any of the work categories and may tender for more than one category provided that the company has the experience and capacity to carry out the works. Works under this tender would involves the following *Asphalt works *Road and footpaths *Kerb and Channel *Traffic islands *Drainage works *Landscaping *Pipe Cracking *Pipe Relining *Line Marking *Day Works *Communication conduit. Click for more details...

RINGAROOMA VALLEY WATER SCHEME, RINGAROOMA & BRANXHOLM RESERVOIRS
Public Utilities (Water distribution systems, Drainage) project at Branxholm &, Ringarooma, TAS 7263 of Reservoirs (2) - Construction type of New development. Construction of treated water storage reservoirs at the towns of Ringarooma & Branxholm in north east Tasmania. This contract involves the civil, mechanical & electrical engineering works associated. Click for more details...

KING STREET WATER MAIN UPGRADE
King Street Water Main Upgrade is currently at the Construction stage, valued at about $ 135000 it is Construction of a replacement water main in King Street, Scottsdale. The work includes supply and installation of 667 metres of 200 diameter water main, supply and installation of 20 metres of 250 OD pipe by trenchless methods, installation of 8 fire plugs, installation of 8 stop valves and other associated works. Click for more details...

GROOM STREET STROMWATER LINE
A project in the TAS Within Break O'Day. Upgrading of existing stormwater line. Click for more details...

ANNIE STREET KERB AND STORMWATER WORKS
Public Utilities (Water distribution systems, Drainage) project In The Break O'Day Council Area of Kerb And Stormwater Works type. Installation of new kerb including various levels of road widening and associated work along with the installation of stormwater infrastructure. Click for more details...

KING ISLAND WATER SUPPLY
Water Supply Works project at ., Currie, TAS 7256 in the Public Utilities (Water distribution systems, Drainage). Construction and installation of water supply works on King Island. Click for more details...

LACHLAN ROAD STORMWATER
Public Utilities (Water distribution systems, Drainage) project at Lachlan Rd, New Norfolk, TAS 7140 of Stormwater And Associated Works type of New development. Installation of stormwater, kerb and gutter and retaining walls on the left hand side and pavement sealing of Lachlan Road, between Black Hall Gully Road and Fosters Gully Road. Click for more details...

PIONEER SERVICE REPLACEMENT PROGRAM
Public Utilities (Water distribution systems, Drainage) project at Various locations within the municipality of, Pioneer, TAS 7264 of Water Tanks type of New development. This tender is to supply and install water storage tanks, fire tanks, domestic water pumps and filtration sets to a number of private properties in Pioneer as part of the Service Replacement Program. The number of installations is dependent on resident participation in the Service Replacement Program. Schedule of rates contract. Click for more details...

SOUTHERN HIGHLANDS IRRIGATION SCHEME
Public Utilities (Water distribution systems, Drainage) project at Various locations within the municipality of the Southern Highlands, Hamilton, TAS 7140 for New. The Southern Highlands Irrigation Scheme (SHIS) is one of five schemes which comprises Tasmanian Irrigation?s (TI) second suite of schemes known as ?Tranche Two?. The SHIS will deliver 7,215 ML of high reliability irrigation water from a holding dam approximately 17km north-west of Bothwell to scheme participants via a 58km underground pipeline distribution network. Stripping of the embankment footprint & excavation of the keyway of Southernfield Dam. Construction of Shannon River Pump Station to be located to the south of Waddamana Road on the banks of the Shannon River. Construction of 1MW pump station & construction of the access road. Construction of 58km-long scheme distribution pipeline to run from Waddamana Road, south to Bothwell and on to Hollow Tree. The pipe diameter will range from DN180mm up to DN710mm. Pipeline spurs will provide water to farms along Nant Lane and to the east of Bothwell along Highland Lakes Road. Two small booster pump stations are required in the scheme. One located on the eastern edge of Bothwell and the other along Hollow Tree Road at Montacute. Click for more details...

TOLOSA WATER SUPPLY UPGRADE - TANK CONSTRUCTION
Tolosa Water Supply Upgrade - Tank Construction is currently at the Construction stage, valued at about $ 10000000 it is Construction of 2 x 20 ML tanks & ancillary works for the Tolosa Water Supply Upgrade. Each of these tanks will be 54 metres in diameter & 11 to 12 metres high at their centre point. Click for more details...

PUNCHBOWL ROAD WATER MAIN UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Punchbowl Rd, Punchbowl, TAS 7249 for New. Upgrade of the existing stormwater main which runs along side the fence line between properties in Punchbowl Rd and Arundel Street to increase the drainage capacity by replacing the existing 150mm and 225mm diameter vitrified clay pipe. The works include re-connection of all properties. Directional drilling is the preferred method of installation. Click for more details...

GRONINGEN ROAD RESIDENTIAL SUBDIVISION AND STORMWATER UPRAGE
A project in the TAS Within Kingborough. Residential subdivision of 15 lots and associated civil works including upgrade of existing stormwater infrastructure. Click for more details...

HORSETAIL FALLS TRACK UPGRADE PART A
Public Utilities (Water distribution systems, Drainage) project In The West Coast Council Area of State ownership. Parks and Wildlife Service is seeking tender submissions from suitably qualified and experienced contractors to upgrade the Horsetail Falls Walking track near Queenstown. The upgrade will include the construction of small pedestrian bridges, gravel walking tracks and elevated timber walkways. Click for more details...

WINDSOR PRECINCT OLYMPIC SOCCER FIELD
Public Utilities (Water distribution systems, Drainage) project at Windsor Dr, Riverside, TAS 7250 of Soccer Field Drainage - Design/Construct type of New development. Windsor Precinct - Design & Construct Drainage for Olympic 1 & 2 Soccer Field. Click for more details...

ROSE LANE SUBSOIL INSTALLATION
Subsoil - Installation project at Rose Ln, Launceston, TAS 7250 In The Council Area Of Launceston of Local Govt. Installation of approximately 380 meters of subsoil drainage & approximately 60 meters of stormwater piping at Rose Lane, South Launceston. Project also involves the installation of deep relief wells. Click for more details...

LAUNCESTON WASTE CENTRE
Launceston Waste Centre is currently at the Construction stage, valued at about $ 500000 it is Preparative works for the landfill extension Launceston Waste Centre. Works Include: - Removal of Vegetation - Undertake earthworks to achieve specified sub-grade & sub-soil drain - Supply & install drainage layer - Supply & Construct composite leachate barrier - Supply & install leachate subsoil drains including manholes and inspection shafts and tubes - Supply & installation of a steel shed - Compliance testing & reporting Click for more details...

WILLIAM STREET STORMWATER UPGRADE STAGE 5
Stormwater - Upgrade project at William St, Devonport, TAS 7310 in the Public Utilities (Water distribution systems, Drainage). Stormwater upgrade on William Street, between Eugene Street & North Street. Click for more details...

LADY PENRHYN DRIVE STORMWATER UPGRADE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Kingborough Council Area for New development. Upgrade of existing under capacity stormwater system, Lady Penrhyn Drive, Blackmans Bay. Click for more details...

PROSPECT VALE PARK NATURAL PLAY SPACE
Playspace New project In The Meander Valley Council Area. Construction of Prospect Vale Park Natural Play Space. Work under this contract includes earthworks, landscaping, planting, installation of play equipment & stormwater works. Click for more details...

EAST MAURICE ROAD WATER TANK
Water Tank New project In The Dorset Council Area. Construction of a water tank. Associated civil works & landscaping. Click for more details...

OCEAN VIEW DRIVE STORM WATER IMPROVEMENTS
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Ocean View Drive, Greens Beach - Storm water Improvements. Contract is for the following, Supply & installation of one (1) Side Entry Pit type `Table Drain'. Supply & installation of approximately 175 m DN450 RRJ Profiled Wall Polyethylene' class SN8 pipe. Supply & construction of eight (8) manholes (2 x DN1200, 5 x DN1050). Supply & installation of fourteen (7) DN300 culverts with precast mini headwalls both ends. Supply & installation of four (4) precast rural headwalls (1 x DN450, 3 x DN300). General reinstatement. 6 month maintenance period. Click for more details...

WALKER STREET FOOTPATH/STORMWATER WORKS
Walker Street Footpath/Stormwater Works is currently at the Construction stage, valued at about $ 150000 it is Supply & delivery of footpath, kerb & gutter & stormwater works for Walker Street, Sorell ? Western side. Click for more details...

ATKINSONS ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Construction of the Atkinsons Street Stormwater upgrade. The work includes the following, Supply & installation of 269 m DN 300 Ribbed Polyethylene Pipe. Supply & installation of a 1050 manhole & heavy duty surround. Supply & installation of 245 m sub soil drain type FD. Supply & installation of 6 x Type "GP" pit. Construction of 175 m of concrete lined trapezoidal drain. Construction of 55 m concrete strip drain with heavy duty grate. Construction of 5 asphalt driveways. General reinstatement. Click for more details...

LACHLAN PARADE STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Stormwater - Upgrade type. Stormwater upgrade to 43-59 Lachlan Parade, Riverside. The work of the contract is detailed on the drawings & schedule, & includes the following, Supply & installation of 2 DN1200 precast manholes. Supply & installation of 7 DN1050 precast manholes. Supply & installation of approximately 64 m DN525 corrugated poly pipe. Supply & installation of approximately 54 m DN600 corrugated poly pipe. Supply & installation of approximately 43 m DN900 corrugated poly pipe. Supply & installation of approximately 54 m DN900 corrugated poly pipe. Removal & reinstatement of fencing, vegetation, concrete or any other structures along the stormwater route. Connection of existing stormwater connections into the new stormwater line. General reinstatement. 6 month maintenance period. Click for more details...

TINDERBOX RESERVE STORMWATER UPGRADE STAGE 1
Tinderbox Reserve Stormwater Upgrade Stage 1 is currently at the Construction stage, valued at about $ 350000 it is Tinderbox Stormwater Upgrade Stage 1 - construct approximately 46 metres of stormwater pipeline, reshaping of open drains & provision of manholes & other miscellaneous civil works & site reinstatement. Click for more details...

BARETTA WASTE MANAGEMENT CENTRE
New project of Public Utilities (Water distribution systems, Drainage) project at 1922 Channel Hwy, Margate, TAS 7054. Supply all materials, plant, & labour & any other services to undertake construction of four (4) separate building (roof) project parts. The works includes roof storm water collection & piped disposal system to the existing site storm water system located at the Barretta Waste Management Centre, Margate. Click for more details...

NELUMIE STREET DRAINAGE
Public Utilities (Water distribution systems, Drainage) project at Nelumie St, Lindisfarne, TAS 7015 of Drainage - Upgrade type of New development. Works to include the upgrade of the stormwater drainage on Nelumie Street. Associated civil works. Click for more details...