State

Categories

Sub Categories

Click Here to Find Current Projects

List of Water distribution systems, Drainage Projects in TAS


COAL RIVER VALLEY WATER RECYCLING SCHEME
Pipe Supply For Gravity System project at Coal River near, Richmond, TAS 7025 In The Council Area Of Richmond of Local Govt. Supply and delivery of pipes, valves and fittings. Click for more details...

CARRICK SEWERAGE
Rising Main - Stage 4 New project In The Westbury Council Area. Rising main & gravity reticulation sewers includes approx 1200 m of pipework. Click for more details...

COAL RIVER VALLEY WATER RECYCLING SCHEME
Pipeline And Associated Works project at Coal River, near, Richmond, TAS 7025 in the Public Utilities (Water distribution systems, Drainage). Construction of approximately 6300 metres of pressure pipeline and associated works. Click for more details...


Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. The work involves replacement of the watermain from the intersection of Wellington Street & bailey Street along Bailey Street, up Meredith Crescent Lane & along Lawrence Vale Road to Melbourne Street. The main includes substantial lengths of 100 and 150 diam PVC & 630 Od to 180 OD polythene with electrofusion couplings & short lengths of DICL in total approximately 1300 metres of watermain. Click for more details...

PUMP STATION NO 9 BYPASS PIPELINE
New project of Public Utilities (Water distribution systems, Drainage) project at Leven River, Ulverstone, TAS 7315. Construction of approximately one (1) klm of HDPE pipeline under the Leven River from Simplot (Mason Street, Ulverstone) via the Coastal Reserve to the Bass Highway Bridge. Click for more details...

COOEE WASTEWATER TREATMENT PLANT
, Cooee, TAS 7320 Has Cooee Wastewater Treatment Plant currently at Construction stage. Construction of a reinforced concrete sludge digestion tank. Click for more details...

ROSNY WASTEWATER TREATMENT PLANT
Currently at the Construction stage In Clarence is a project estimated to be $ 154000. This project Modification of existing pipework & heating system. Supply, installation & commissioning of a new heat exchanger. Construction of digester bund drainage, pits, pump station & rising main. Installation of digester overflows. Installation of a roof over existing sludge pumps. Regrade scum collection pipework. Installation of a new scum pump & rising main. Click for more details...

INVERESK STORMWATER & ROOF PLUMBING WORKS
Public Utilities (Water distribution systems, Drainage) New project at Inveresk site, Launceston, TAS 7250. This type is Drainage/Roof Plumbing - Package 6 with Local Govt ownership. Drainage & roof plumbing works at selected buildings at the Inveresk site. Click for more details...

PATERSON STREET CENTRAL (PERIMETER) ROAD AND FOOTPATH WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Paterson St, Launceston, TAS 7250. Construction of a road, footpath and relocation of services around the perimeter of Paterson Street Central Carpark. Scope of works include construction of 100m of 225mm diameter sewer main, manholes and gully pits, 85m of 100mm watermain, installing street lighting conduits and posts, building demolition, pavement construction, asphalt sealing and miscellaneous associated works. Click for more details...

BRACKNELL WATER STORAGE FACILITY
Public Utilities (Water distribution systems, Drainage) New project at Site undisclosed, Bracknell, TAS 7302. This type is Water Storage Facility - Design & Construct with Local Govt ownership. Design and construction of a 250,000 litre light weight steel framed water tank adjacent to the existing elevated tank. Click for more details...

INGLEWOOD ROAD WATERMAIN REPLACEMENT
Public Utilities (Water distribution systems, Drainage) project at Inglewood Rd, Hobart, TAS 7000 of Watermain Replacement type of New development. Construction of watermain. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Not known, Longford, TAS 7301. Construction of earthen levees, installation of levee retaining walls, road reconstruction and drainage improvements. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of Local Govt ownership. Supply and delivery of precast concrete levee retaining walls. Click for more details...

FRANKFORD MAIN ROAD WATER MAIN RECONSTRUCTION
Frankford Main Road Water Main Reconstruction is currently at the Construction stage, valued at about $ 60000 it is Installation by trenchless technology of 324 metres of DN200 polyethylene pipe and associated works. Click for more details...

LONGWOOD AVENUE/ NEWSTEAD CRESCENT STORMWATER PIPELINE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. The installation of two sections of new pipeline consisting of 125 metres of either 1050 diameter Class R.R.J. reinforced concrete pipes or 1000 diameter HDPE Flood Poly and 55 metres of 1000 diameter HDPE Flood Poly pipe as well as landscaping and associated works. Both sections of the pipeline are to carry stormwater flows that are currently conveyed by the open drain that runs between Longwood Avenue and Newstead Crescent. This work also involves approximately 10 metres of sewer pipeline works. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
New project of Public Utilities (Water distribution systems, Drainage) project at Council Depot, Tramway Street, Queenstown, TAS 7467. Supply and delivery of pipes, valves and fittings for Queenstown water supply. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Public Utilities (Water distribution systems, Drainage) project for New development. Supply, delivery, supervision of installation and commissioning of two new pumps required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The contract will involve the supply of two vertical turbine pumps complete with motors to meet the scheduled technical and performance requirements, testing of pump sets prior to delivery, delivery of pump sets to site and unloading, supervising the installation of the pump sets by the purchasers personnel and pump testing and commissioning. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Currently at the Construction stage In Devonport is a project estimated to be $ 1400000. This project Construction of a new rising main, a new gravity main and other associated works, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant and to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of a new DN 375 PN 35 DICL rising main (approx 3700m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, modification of the existing pumping station building and pipeline manifold to accommodate the installation of the new rising main, construction of a new reinforced concrete flow meter pit, aerial crossings to carry the pipeline across waterways, scour and air valve pits and property connection(s). The rising main will interface with two new pumps in the Pumping Station Building at the Forth Water Treatment Plant and the new pipe work at the Forthside Hill Reservoir. Construction of a new DN 300stormwater pipeline. Construction of a new DN 450 PN 20 DICL gravity main (approx 5200m) using pipes, valves and fittings issued free by the principal to the contractor. Associated works include, aerial crossings to carry the pipeline across waterways, construction of a new reinforced concrete flow control valve pit, scour, air valve, fore hydrant and property connections, connection to the existing Paloona Trunk main. The Gravity main will interface with new pipe work at the proposed Forthside Hill reservoir (to be constructed under separate contract). Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Public Utilities (Water distribution systems, Drainage) project at Huon Valley Region, Huonville, TAS 7109 for New. Design, construction, installation and commissioning of a potable water treatment plant near the town of Huonville. Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Supply Of Pipes project at Huon Valley Region, Huonville, TAS 7109 In The Council Area Of Huon of Local Govt. Supply of pipes for the construction of approximately 46 kilometres of pipeline. Click for more details...

HEADQUARTERS ROAD DAM
Public Utilities (Water distribution systems, Drainage) project at Headquarters Road, Scottsdale, TAS 7260 of Dam type of New development. The new dam will deliver 2,000 ML p.a. to the community of Scottsdale with an irrigable area of 1,800 ha. Click for more details...

UPPER SOUTH ESK DAM
Public Utilities (Water distribution systems, Drainage) project In The Northern Midlands Council Area of State ownership. The new dam will deliver 10,000 ML p.a. to the communities of Llewellyn, Conara, Cleveland, Powranna and Claredon with an irrigable area of 10,000 ha. Click for more details...

MEADSTONE DAM
From ROYAL GEORGE to, Cleveland, TAS 7211 Has Meadstone Dam currently at Planning stage. The new dam will deliver 30,000 ML to the communities of Royal George, Apslawn, Cranbrook, Llewellyn, Conara and Cleveland with an irrigable area of 8,000 ha. Click for more details...

UPPER AND LOWER JORDAN WATER SCHEME
Currently at the Planning stage In Brighton is a project estimated to be $ 7000000. This project The new water scheme will deliver to the communities of Jericho, Melton Mowbray, Kempton, Pontville, Brighton and Broadmarsh with an irrigable area of 6,500 ha. Click for more details...

KINGS MEADOWS FLOOD MITIGATION PROJECT
Ernest St, Kings Meadows, TAS 7249 Has Kings Meadows Flood Mitigation Project currently at Construction stage. Construction of concrete pits. Click for more details...

ALEXANDER STREET WATER MAIN UPGRADE STAGE 1
Water Main - Upgrade New project In The Break O'Day Council Area. Supply and installation of 335 metres of 100 diameter UPVC Class 16 water main, installation of four fire plugs to be used for scour purposes, installation of 100mm stop valve and other minor associated works. Click for more details...

ALEXANDER STREET WATER MAIN UPGRADE - STAGE 2
Public Utilities (Water distribution systems, Drainage) project In The Break O'Day Council Area of Water Main - Upgrade type. Supply and installation of 335 metre of 100 diameter upvc class 16 water main, installation of four five plugs to be used for scour purposes, installation of 100mm stop valve and other minor associated. Click for more details...

LAUNCESTON COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Launceston Council Periodic Construction Contracts 2012-2014 is currently at the Tenders & Building stage, valued at about $ 800000 it is Works within this tender include *Asphalt works *Road and footpaths *Kerb and channel *Traffic Island *Drainage Works Landscaping *Pipe cracking *Pipe relining *Communication conduit *Line making and *Day works. Click for more details...

SIMMONS PARK DRAINAGE UPGRADE
Simmons Park Drainage Upgrade is currently at the Construction stage, valued at about $ 902000 it is Supply and installation of a gross pollutant trap, footpaths, siteworks and upgrading of associated stormwater. Click for more details...

MAIN ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Installation of approximately 97 metres ribbed poly pipe and 26 metres RCP and 2 side entry pits. Click for more details...

RINGAROOMA VALLEY WATER SCHEME, RINGAROOMA & BRANXHOLM RESERVOIRS
Public Utilities (Water distribution systems, Drainage) project at Branxholm &, Ringarooma, TAS 7263 of Reservoirs (2) - Construction type of New development. Construction of treated water storage reservoirs at the towns of Ringarooma & Branxholm in north east Tasmania. This contract involves the civil, mechanical & electrical engineering works associated. Click for more details...

NORTHERN NRM REGION STORMWATER MANAGEMENT PLAN
Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area of Private ownership. Expressions of interest invited from consultants to develop a Stormwater Management Plan for participating Councils in Tasmania?s Northern NRM Region. Click for more details...

GUY STREET STORMWATER ASSET UPGRADE
Guy St (Bond st to Ryton St), Kings Meadows, TAS 7249 Has Guy Street Stormwater Asset Upgrade currently at Construction stage. The proposed works span a distance of 180 metres from Bond Street to Ryton Street and involve the installation of 180 metres of 450mm diameter pipe, manholes and gully pits. Due to the location of the pipe, there will also be kerb and channel replacement, reinstatement of the existing roadway and nature strip and minor associated works. Click for more details...

GORMANSTON ROAD RISING MAIN 4
Public Utilities (Water distribution systems, Drainage) project for New development. Design, supply, installation and commissioning of rising main 4 between Gormanston Road and Humphreys Rivulet for the Derwent Park Stormwater Harvesting and Industrial Re Use Project. Click for more details...

LACHLAN ROAD STORMWATER
Public Utilities (Water distribution systems, Drainage) project at Lachlan Rd, New Norfolk, TAS 7140 of Stormwater And Associated Works type of New development. Installation of stormwater, kerb and gutter and retaining walls on the left hand side and pavement sealing of Lachlan Road, between Black Hall Gully Road and Fosters Gully Road. Click for more details...

DELORAINE SEWERAGE AND STORMWATER DRAINAGE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Meander Valley Council Area for New development. Construction of new sewerage and stormwater drainage infrastructure to service industrial land at East Goderich Street, Deloraine. Click for more details...

GRONINGEN ROAD RESIDENTIAL SUBDIVISION AND STORMWATER UPRAGE
A project in the TAS Within Kingborough. Residential subdivision of 15 lots and associated civil works including upgrade of existing stormwater infrastructure. Click for more details...

HORSETAIL FALLS TRACK UPGRADE PART A
Public Utilities (Water distribution systems, Drainage) project In The West Coast Council Area of State ownership. Parks and Wildlife Service is seeking tender submissions from suitably qualified and experienced contractors to upgrade the Horsetail Falls Walking track near Queenstown. The upgrade will include the construction of small pedestrian bridges, gravel walking tracks and elevated timber walkways. Click for more details...

WINDSOR PRECINCT OLYMPIC SOCCER FIELD
Public Utilities (Water distribution systems, Drainage) project at Windsor Dr, Riverside, TAS 7250 of Soccer Field Drainage - Design/Construct type of New development. Windsor Precinct - Design & Construct Drainage for Olympic 1 & 2 Soccer Field. Click for more details...

LAUNCESTON WASTE CENTRE
Launceston Waste Centre is currently at the Construction stage, valued at about $ 500000 it is Preparative works for the landfill extension Launceston Waste Centre. Works Include: - Removal of Vegetation - Undertake earthworks to achieve specified sub-grade & sub-soil drain - Supply & install drainage layer - Supply & Construct composite leachate barrier - Supply & install leachate subsoil drains including manholes and inspection shafts and tubes - Supply & installation of a steel shed - Compliance testing & reporting Click for more details...

GRAY STREET STORMWATER UPGRADE STAGE 2
Public Utilities (Water distribution systems, Drainage) project at Gray St, Riverside, TAS 7250 for New. Installation of 3 SEP's, 9 MH's & approximately 250m of DN600 corrugated poly pipe within the road reserve on Gray Street, Riverside. Click for more details...

RIDGLEY RECREATION GROUND IRRIGATION WORKS
Ridgley Recreation Ground Irrigation Works is currently at the Construction stage, valued at about $ 200000 it is Construction of the Ridgley Recreation Ground ? Irrigation Works. Click for more details...

CARLTON BEACH ROAD FOOTPATH/STORMWATER WORKS
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Sorell Council Area for New development. Supply & delivery of footpath, kerb & gutter & stormwater works for Carlton Beach Rd (Rotuli St ? Kuneeamee St), Dodges Ferry. Click for more details...

ATKINSONS ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Construction of the Atkinsons Street Stormwater upgrade. The work includes the following, Supply & installation of 269 m DN 300 Ribbed Polyethylene Pipe. Supply & installation of a 1050 manhole & heavy duty surround. Supply & installation of 245 m sub soil drain type FD. Supply & installation of 6 x Type "GP" pit. Construction of 175 m of concrete lined trapezoidal drain. Construction of 55 m concrete strip drain with heavy duty grate. Construction of 5 asphalt driveways. General reinstatement. Click for more details...

TINDERBOX RESERVE STORMWATER UPGRADE STAGE 1
Tinderbox Reserve Stormwater Upgrade Stage 1 is currently at the Construction stage, valued at about $ 350000 it is Tinderbox Stormwater Upgrade Stage 1 - construct approximately 46 metres of stormwater pipeline, reshaping of open drains & provision of manholes & other miscellaneous civil works & site reinstatement. Click for more details...

PARNELLA DRIVE DRAINAGE UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Parnella Dr, Stieglitz, TAS 7216 for New. Construction of Parnella Drainage Upgrade, Stieglitz. Click for more details...

PEARSALL AVENUE STORMWATER UPGRADE
Pearsall Ave, Blackmans Bay, TAS 7052 Has Pearsall Avenue Stormwater Upgrade currently at Construction stage. Construct approximately 75 metres of DN600 diameter stormwater pipeline, together with associated minor civil works & site reinstatement, at Pearsall Avenue & Sunny Avenue, at Blackmans Bay. Click for more details...

KANGAROO BAY OVAL
Public Utilities (Water distribution systems, Drainage) project at Kangaroo Bay Oval, Rosny Park, TAS 7018 for New. Design and construction of the sub-surface drainage system at Kangaroo Bay Oval, Rosny Park. Click for more details...

CARELLA STREET STORMWATER DRAINAGE
Stormwater Drainage - Upgrade project at Carella St, Howrah, TAS 7018 In The Council Area Of Clarence of Local Govt. Construction of stormwater drainage upgrade at Carella Street, Howrah. Works to include construction of new 20m long box culvert & 160m long DN600 pipelines from 182 Carella Street to 24 Anulka Street, Howrah. Click for more details...

BEACH ROAD STORMWATER UPGRADES
Stormwater - Upgrade project at Beach Rd, Middleton, TAS 7163 in the Public Utilities (Water distribution systems, Drainage). Construction of civil construction & landscaping upgrades along Osborne Esplanade & Beach Road at Kingston Beach. Supply all materials, plant, & labour & any other services, costs & fees necessary to undertake civil construction & landscaping upgrades along Osborne esplanade & Beach Road at Kingston Beach. The works include, but are not limited to the installation of exposed aggregate footpaths, composite timber decking, concreting, planter beds, landscaped areas including irrigation systems & supply & installation of street furniture & signage. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect