List of Water distribution systems, Drainage Projects in TAS


CARRICK SEWERAGE
Rising Main - Stage 4 New project In The Westbury Council Area. Rising main & gravity reticulation sewers includes approx 1200 m of pipework. Click for more details...

COAL RIVER VALLEY WATER RECYCLING SCHEME
Pipeline And Associated Works project at Coal River, near, Richmond, TAS 7025 in the Public Utilities (Water distribution systems, Drainage). Construction of approximately 6300 metres of pressure pipeline and associated works. Click for more details...

EXETER EFFLUENT RE-USE SCHEME
Currently at the Construction stage In West Tamar is a project estimated to be $ 356000. This project Supply & installation of an irrigation system. The works relate to irrigating treated effluent from the Exeter WWTP onto the Exeter Golf Course. Click for more details...

PUMP STATION NO 9 BYPASS PIPELINE
New project of Public Utilities (Water distribution systems, Drainage) project at Leven River, Ulverstone, TAS 7315. Construction of approximately one (1) klm of HDPE pipeline under the Leven River from Simplot (Mason Street, Ulverstone) via the Coastal Reserve to the Bass Highway Bridge. Click for more details...

ROSNY WASTEWATER TREATMENT PLANT
Public Utilities (Water distribution systems, Drainage) project, Rosny, TAS 7018 for New. Equalisation tank aeration, ducting no 1 odour tower to scrubber, modifications to sludge thickener inlet pipework, ducting exhaust from RAS pits & associated control work. Click for more details...

UNITED MILK TASMANIA LTD
Currently at the Construction stage In Devonport is a project estimated to be $ 500000. This project Roadway, water & fencing. Click for more details...

FRANKLIN SEWERAGE SCHEME
New project of Public Utilities (Water distribution systems, Drainage) project, Franklin, TAS 7113. Supply & construction of a 150 dia rising main from Franklin to Huonville (5,556 m), includes supply of all materials (including pipes, valve, fittings & other miscellaneous items) & excavation, laying, testing & backfilling of 150 dia class 9 UPVC pressure main & sections of 150 cement lined Ductile iron. Alternative tenders will be accepted. Click for more details...

INVERESK STORMWATER & ROOF PLUMBING WORKS
Public Utilities (Water distribution systems, Drainage) New project at Inveresk site, Launceston, TAS 7250. This type is Drainage/Roof Plumbing - Package 6 with Local Govt ownership. Drainage & roof plumbing works at selected buildings at the Inveresk site. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
New project of Public Utilities (Water distribution systems, Drainage) project at Not known, Longford, TAS 7301. Construction of earthen levees, installation of levee retaining walls, road reconstruction and drainage improvements. Click for more details...

INVERMAY ROAD TRUNK WATERMAIN
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. Supply and delivery of D.I.C.L. pipes and fittings. Click for more details...

FRANKFORD MAIN ROAD WATER MAIN RECONSTRUCTION
Frankford Main Road Water Main Reconstruction is currently at the Construction stage, valued at about $ 60000 it is Installation by trenchless technology of 324 metres of DN200 polyethylene pipe and associated works. Click for more details...

KINGSTON CENTRAL AREA (KCA) STORMWATER - STAGE 2
A project in the TAS Within Kingborough. Supply of approximately 200 metres of 1500mm diameter reinforced concrete pipe and approximately 58 metres of 1800mm wide by 1200 high reinforced concrete box culverts. The works include the supply of pipes and culverts including delivery to site. Click for more details...

GLENORCHY PIPE RELINING/BURSTING
Pipe Relining/Bursting New project In The Glenorchy Council Area. Rehabilitation of various sized sewer and stormwater mains using trenchless construction techniques at approximately ten locations within the municipality of Glenorchy. Click for more details...

LONGWOOD AVENUE/ NEWSTEAD CRESCENT STORMWATER PIPELINE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. The installation of two sections of new pipeline consisting of 125 metres of either 1050 diameter Class R.R.J. reinforced concrete pipes or 1000 diameter HDPE Flood Poly and 55 metres of 1000 diameter HDPE Flood Poly pipe as well as landscaping and associated works. Both sections of the pipeline are to carry stormwater flows that are currently conveyed by the open drain that runs between Longwood Avenue and Newstead Crescent. This work also involves approximately 10 metres of sewer pipeline works. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The Lyell Council Area of Local Govt ownership. Supply, installation, commissioning and construction of a 2.5 ml/day package water treatment plant including control and amenities building and associated works. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Various Locations, Queenstown, TAS 7467 of Pipelines type of New development. Construction of pipelines, roadworks, small pump station and miscellaneous earthworks. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
New project of Public Utilities (Water distribution systems, Drainage) project at Council Depot, Tramway Street, Queenstown, TAS 7467. Supply and delivery of pipes, valves and fittings for Queenstown water supply. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Public Utilities (Water distribution systems, Drainage) project for New development. Supply, delivery, supervision of installation and commissioning of two new pumps required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The contract will involve the supply of two vertical turbine pumps complete with motors to meet the scheduled technical and performance requirements, testing of pump sets prior to delivery, delivery of pump sets to site and unloading, supervising the installation of the pump sets by the purchasers personnel and pump testing and commissioning. Click for more details...

FORTH-PALOONA TREATED WATER SUPPLY
Reservoir project at Forthside, Forth, TAS 7310 In The Council Area Of Devonport of State. Construction of a new concrete, aluminium roofed reservoir, required as part of the construction of a new bulk water supply system that will supply potable water from the Forth Water Treatment Plant to the Paloona Water Supply System. The works include but are not necessarily limited to the following, construction of an access road to the reservoir site, clearing, grubbing and excavation works, importation of structural fill, construction of a 1ML (approx) reinforced concrete water storage reservoir, construction of an aluminium clad roof, inlet, outlet, overflow and scour and drainage pipelines, platforms and ladders, hardstand/access track and open drain around the reservoir, installation of a stock proof fence, miscellaneous civil works and provision of shop and as-executed drawings. Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Huon Valley Regional Water Scheme Project is currently at the Tenders & Building stage, valued at about $ 2000000 it is Construction of approximately 46 kilometres of pipeline using pipes supplied by others. Click for more details...

HUON VALLEY REGIONAL WATER SCHEME PROJECT
Supply Of Pipes project at Huon Valley Region, Huonville, TAS 7109 In The Council Area Of Huon of Local Govt. Supply of pipes for the construction of approximately 46 kilometres of pipeline. Click for more details...

NORTH EAST DAMS
North East Dams is currently at the Planning stage, valued at about $ 75000000 it is The new dam will have a volume of 70,000 ML and will benefit the communities of Scottsdale, Bridport and Ringarooma with an irrigable area of 40,000 ha. Click for more details...

HEADQUARTERS ROAD DAM
Public Utilities (Water distribution systems, Drainage) project at Headquarters Road, Scottsdale, TAS 7260 of Dam type of New development. The new dam will deliver 2,000 ML p.a. to the community of Scottsdale with an irrigable area of 1,800 ha. Click for more details...

UPPER AND LOWER JORDAN WATER SCHEME
Currently at the Planning stage In Brighton is a project estimated to be $ 7000000. This project The new water scheme will deliver to the communities of Jericho, Melton Mowbray, Kempton, Pontville, Brighton and Broadmarsh with an irrigable area of 6,500 ha. Click for more details...

KINGS MEADOWS FLOOD MITIGATION PROJECT
Ernest St, Kings Meadows, TAS 7249 Has Kings Meadows Flood Mitigation Project currently at Construction stage. Construction of concrete pits. Click for more details...

OGILVIE HIGH SCHOOL
Fire Hydrant Water Main - Upgrade New project In The Hobart Council Area. Supply and installation of approximately 450 metres of new fire hydrant water main. Click for more details...

NORTHERN TASMANIA CRICKET ASSOCIATION (NTCA) SPORTS COMPLEX
Public Utilities (Water distribution systems, Drainage) project at 55 Racecourse Cr, Launceston, TAS 7250 for New. Design and construction of the redevelopment works to include the extension of the existing playing field, drainage and irrigation at the number two ground at the NTCA Sports Complex. Click for more details...

BREAK O'DAY COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Public Utilities (Water distribution systems, Drainage) New project at Various Locations with the Municipality of Break O'Day, St Helens, TAS 7216. This type is Civil Construction Works with Local Govt ownership. Civil construction works for Break O'Day Council up to the value of $100,000 (excluding GST) per project for a three year period, between 31 January 2012 and 31 December 2014. Tenderers may submit prices for any of the work categories and may tender for more than one category provided that the company has the experience and capacity to carry out the works. Works under this tender would involves the following *Asphalt works *Road and footpaths *Kerb and Channel *Traffic islands *Drainage works *Landscaping *Pipe Cracking *Pipe Relining *Line Marking *Day Works *Communication conduit. Click for more details...

LAUNCESTON CITY COUNCIL WATER QUALITY IMPROVEMENT
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Launceston Council Area for New development. Expressions of Interest (EOI) invited for the development of water quality plans including the following services *Framework to deliver stormwater quality improvements *A template of catchment water quality improvement plans *Water quality improvement plans for the Kings Meadows Rivulet and Newnham Creek. Click for more details...

SIMMONS PARK DRAINAGE UPGRADE
Simmons Park Drainage Upgrade is currently at the Construction stage, valued at about $ 902000 it is Supply and installation of a gross pollutant trap, footpaths, siteworks and upgrading of associated stormwater. Click for more details...

MAIN ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Installation of approximately 97 metres ribbed poly pipe and 26 metres RCP and 2 side entry pits. Click for more details...

KING STREET WATER MAIN UPGRADE
King Street Water Main Upgrade is currently at the Construction stage, valued at about $ 135000 it is Construction of a replacement water main in King Street, Scottsdale. The work includes supply and installation of 667 metres of 200 diameter water main, supply and installation of 20 metres of 250 OD pipe by trenchless methods, installation of 8 fire plugs, installation of 8 stop valves and other associated works. Click for more details...

KING ISLAND WATER SUPPLY
Water Supply Works project at ., Currie, TAS 7256 in the Public Utilities (Water distribution systems, Drainage). Construction and installation of water supply works on King Island. Click for more details...

LACHLAN ROAD STORMWATER
Public Utilities (Water distribution systems, Drainage) project at Lachlan Rd, New Norfolk, TAS 7140 of Stormwater And Associated Works type of New development. Installation of stormwater, kerb and gutter and retaining walls on the left hand side and pavement sealing of Lachlan Road, between Black Hall Gully Road and Fosters Gully Road. Click for more details...

SPENCER STREET STORMWATER MAINS EXTENSIONS
Stormwater Mains Extensions New project In The Burnie Council Area. Construction of stormwater mains in Spencer Street. The work included directional drilling, supply and installation of HDPE pipe, including poly welding and excavation for entry and exit pits. Click for more details...

HILLCREST SEWERAGE STAGE 1
Public Utilities (Water distribution systems, Drainage) project In The Burnie Council Area of Removal Of Stormwater Infiltration type. Plumbing works to remove stormwater infiltration from the sewerage at properties in the Hillcrest area of Burnie. Click for more details...

SANDOWN PARK DRAINAGE AND IRRIGATION UPGRADE
Sandown Park Drainage And Irrigation Upgrade is currently at the Construction stage, valued at about $ 250000 it is Drainage and Irrigation Upgrade of Sandown Park No.1 Click for more details...

SOUTHERN HIGHLANDS IRRIGATION SCHEME
Public Utilities (Water distribution systems, Drainage) project at Various locations within the municipality of the Southern Highlands, Hamilton, TAS 7140 for New. The Southern Highlands Irrigation Scheme (SHIS) is one of five schemes which comprises Tasmanian Irrigation?s (TI) second suite of schemes known as ?Tranche Two?. The SHIS will deliver 7,215 ML of high reliability irrigation water from a holding dam approximately 17km north-west of Bothwell to scheme participants via a 58km underground pipeline distribution network. Stripping of the embankment footprint & excavation of the keyway of Southernfield Dam. Construction of Shannon River Pump Station to be located to the south of Waddamana Road on the banks of the Shannon River. Construction of 1MW pump station & construction of the access road. Construction of 58km-long scheme distribution pipeline to run from Waddamana Road, south to Bothwell and on to Hollow Tree. The pipe diameter will range from DN180mm up to DN710mm. Pipeline spurs will provide water to farms along Nant Lane and to the east of Bothwell along Highland Lakes Road. Two small booster pump stations are required in the scheme. One located on the eastern edge of Bothwell and the other along Hollow Tree Road at Montacute. Click for more details...

PUNCHBOWL ROAD WATER MAIN UPGRADE
Public Utilities (Water distribution systems, Drainage) project at Punchbowl Rd, Punchbowl, TAS 7249 for New. Upgrade of the existing stormwater main which runs along side the fence line between properties in Punchbowl Rd and Arundel Street to increase the drainage capacity by replacing the existing 150mm and 225mm diameter vitrified clay pipe. The works include re-connection of all properties. Directional drilling is the preferred method of installation. Click for more details...

SORELL COUNCIL FOOTPATH, KERB & CHANNEL & STORMWATER WORKS
Public Utilities (Water distribution systems, Drainage) project In The Sorell Council Area of Footpath/Kerb/Channel/Stormwater Works type. Footpath, Kerb & Channel & Stormwater Works - Midway Point, Dodges Ferry & Sorell. Click for more details...

PITT AVENUE STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Stormwater Upgrade - Pitt Avenue (Snake Gully) Riverside Work includes: - Supply and installation of 4 side entry pits - Supply and installation of 4 DN1200 precast manholes - Supply and installation of 4 DN1800 precast manholes - Supply and installation of 1 Gully Pit - Construction of 1 Headwall to outlet DN1350, DN900 & DN450 - Supply and installation of approximately 24 m DN300 corrugated poly pipe - Supply and installation of approximately 26 m DN450 corrugated poly pipe - Supply and installation of approximately 17 m DN750 corrugated poly pipe - Supply and installation of approximately 54 m DN900 corrugated poly pipe - Supply and installation of approximately 20 m DN900 FJ RCP Class 2 - Supply and installation of approximately 11 m DN1050 FJ RCP Class 2 - Supply and installation of approximately 100 m DN1350 FJ RCP Class 2 - Bulk earthworks - General reinstatement Click for more details...

ROSE LANE SUBSOIL INSTALLATION
Subsoil - Installation project at Rose Ln, Launceston, TAS 7250 In The Council Area Of Launceston of Local Govt. Installation of approximately 380 meters of subsoil drainage & approximately 60 meters of stormwater piping at Rose Lane, South Launceston. Project also involves the installation of deep relief wells. Click for more details...

LADY PENRHYN DRIVE STORMWATER UPGRADE
Local Govt ownership Public Utilities (Water distribution systems, Drainage) project In The Kingborough Council Area for New development. Upgrade of existing under capacity stormwater system, Lady Penrhyn Drive, Blackmans Bay. Click for more details...

TAROONA PRIMARY SCHOOL STORM WATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project for New development. Supply & Installation of new storm water pipe & associated infrastructure in the vicinity at Taroona Primary School. Work includes but not limited to the installation of approximately 40 metres of new piped drainage, including provision of 1 new manhole, rock pitched outfall basin & swale drain & vegetation removal. Click for more details...

ATKINSONS ROAD STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Local Govt ownership. Construction of the Atkinsons Street Stormwater upgrade. The work includes the following, Supply & installation of 269 m DN 300 Ribbed Polyethylene Pipe. Supply & installation of a 1050 manhole & heavy duty surround. Supply & installation of 245 m sub soil drain type FD. Supply & installation of 6 x Type "GP" pit. Construction of 175 m of concrete lined trapezoidal drain. Construction of 55 m concrete strip drain with heavy duty grate. Construction of 5 asphalt driveways. General reinstatement. Click for more details...

LACHLAN PARADE STORMWATER UPGRADE
Public Utilities (Water distribution systems, Drainage) project In The West Tamar Council Area of Stormwater - Upgrade type. Stormwater upgrade to 43-59 Lachlan Parade, Riverside. The work of the contract is detailed on the drawings & schedule, & includes the following, Supply & installation of 2 DN1200 precast manholes. Supply & installation of 7 DN1050 precast manholes. Supply & installation of approximately 64 m DN525 corrugated poly pipe. Supply & installation of approximately 54 m DN600 corrugated poly pipe. Supply & installation of approximately 43 m DN900 corrugated poly pipe. Supply & installation of approximately 54 m DN900 corrugated poly pipe. Removal & reinstatement of fencing, vegetation, concrete or any other structures along the stormwater route. Connection of existing stormwater connections into the new stormwater line. General reinstatement. 6 month maintenance period. Click for more details...

TINDERBOX RESERVE STORMWATER UPGRADE STAGE 1
Tinderbox Reserve Stormwater Upgrade Stage 1 is currently at the Construction stage, valued at about $ 350000 it is Tinderbox Stormwater Upgrade Stage 1 - construct approximately 46 metres of stormwater pipeline, reshaping of open drains & provision of manholes & other miscellaneous civil works & site reinstatement. Click for more details...

BARETTA WASTE MANAGEMENT CENTRE
New project of Public Utilities (Water distribution systems, Drainage) project at 1922 Channel Hwy, Margate, TAS 7054. Supply all materials, plant, & labour & any other services to undertake construction of four (4) separate building (roof) project parts. The works includes roof storm water collection & piped disposal system to the existing site storm water system located at the Barretta Waste Management Centre, Margate. Click for more details...

CARELLA STREET STORMWATER DRAINAGE
Stormwater Drainage - Upgrade project at Carella St, Howrah, TAS 7018 In The Council Area Of Clarence of Local Govt. Construction of stormwater drainage upgrade at Carella Street, Howrah. Works to include construction of new 20m long box culvert & 160m long DN600 pipelines from 182 Carella Street to 24 Anulka Street, Howrah. Click for more details...

KANGAROO BAY DRIVE DRAINAGE
Public Utilities (Water distribution systems, Drainage) project In The Clarence Council Area of Drainage - Upgrade type. Works to include the upgrade of the Kangaroo Bay Drive Sports Ground drainage. Associated civil works. Click for more details...