BHP BILLITON IRON ORE RAPID GROWTH PROJECT - NELSON POINT - PACE
Site facilities via, Port Hedland, WA 6721 Has Bhp Billiton Iron Ore Rapid Growth Project - Nelson Point - Pace currently at Planning stage. The first stage of PACE provided for an increase in capacity to 81 mtpa by 2004. Further stages will provide for capacity levels to exceed 90mtpa. Click for more details...

WORSLEY ALUMINA SHIP LOADING FACILITY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Includes shiploader, berth, tanks and conveyor belts. A dust minimising chute will be installed. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT - EXPANSION
Bhp Billiton Iron Ore Rapid Growth Project - Expansion is currently at the Construction stage, valued at about $ 150000000 it is An expansion of capacity at the Pilbara Iron ore operations from 100 million tonnes per annum to 110 Mtpa by late 2004. Includes additional rail and port capacity. The project will be completed on the back of infrastructure and equipment installed as part of Area C and Pace (Nelson Point) projects. BHP Billtions' Pilbara iron ore operations includes Mount Newman Iron ore Operations as well as Area C and the Nelson Point Ore Handling Facility. Click for more details...

FLINDERS RANGES PROJECT - BELTANA - ZINC RESOURCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Far North Council Area of Resource - Zinc type. Mining operation will be 150-180,000 tonnes per annum. Indicated-Inferred resource is 941,000 tonnes @ 30.6% zinc for 300,000 tonnes of zinc. Beltana deposit resource is 365,200 tonnes @ 31.2% zinc for 57,400 tonnes of zinc. The Beltana deposit will be mined first with the existing pit to be deepened from 65 metres by another 30 metres. Click for more details...

KOOLAN ISLAND PROJECT - JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at On, Koolan Island, WA 6733 for New. The jetty, shiploader and reclaim conveyor is being designed to receive up to and include capsize vessels (200000 tonnes) with a ship loading rate of 4500 tonne per hour. The jetty will be 250 metres in length. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - SHED
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Esperance Council Area for New development. Includes an additional 300,000 tonne capacity shed at the Port of Esperance. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARYWORKS
Civil Works Packages project at At, Gove, NT 0880 In The Council Area Of East Arnhem Shire of Private. Various. Civil works likely to include a wharf. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - PHASE 2/3
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Hay Point Rd, Hay Point, QLD 4740. Terminal expansion to increase capacity to 85 Mtpa. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - PRECOATED STEEL PILES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Supply of precoated steel piles for extension of Berth 5 and Berth 6. Piles of 762 mm and 508 mm diameter. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MOTOR CONTROL CENTRES
Motor Control Centres - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Motor control Centres. 3 No.Fully equiped control centres. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONSTRUCTION OF BERTH 5
Berth 5 New project In The City Of Greater Geraldton Council Area. Construction of Berth 5, with separable allowance for Berth 6 construction Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - RECLAMATION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Reclamation. Core rubble fill with armour rock facing at southern end of Berth 5. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - VSD
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Manufacture VSD's. Click for more details...

COLLIE RIVER MAINTENANCE DREDGING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Mouth of Collie River, as enters Leshenault Estuary, near, Bunbury, WA 6230. This type is Dredging with State ownership. General maintenace dredging at mouth of Collie River, as it enters Leshenaul Estuary, near Bunbury. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONTROL ROOM
Control Room project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Control Room Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SWITCHGEAR
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. This type is Switchgear - Supply with Private ownership. Supply of Switchgear Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - OIL FILLED TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Oil Filled Transformer. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - WEIGHTOMETERS
A project in the WA Within City Of Greater Geraldton. Weightometers Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - THIRD PARTY QUALITY ASSURANCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Third party review of quality assurance for fabrication and construction of the berth 5 ZPMC shiploader. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

ALBANY IRON ORE PROJECT - PORT EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Albany Council Area of Port - Expansion type. Albany Port Authority proposes to dredge within Princess Royal Harbour & King George Sound to facilitate access of cape size vessels. Proposal includes dredged materials being used for land reclamation to create an additional berth adjacent to port to be leased to Grange Resources LTD to accommodate their Port infrastructure. Magnetite mined by Grange will be pumped as slurry approx 100 km from their Southdown Magnetite & Kemaman Pellet Plant to concentrate storage facility at Albany Port before being loaded on to cape size vessels to be shipped to Malaysia. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

RG TANNA COAL TERMINAL EXPANSION PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at ., Gladstone, QLD 4680. Design, Fabrication and erection of an 80m X 10m span open sided awning. Click for more details...

CURTIS ISLAND LNG PLANT (QCLNG) PROJECT - SHIPPING FACILITIES
Curtis Island Lng Plant (Qclng) Project - Shipping Facilities is currently at the Construction stage, valued at about $ 60000000 it is The proposal covers the construction, operation and decommissioning of the LNG Marine Facilities on Curtis Island and the mainland. The facilities include, but are not limited to: a dedicated jetty containing specialised LNG loading facilities and LNG tanker berth(s) to transfer LNG; the jetty consisting of a driven-pile trestle structure, connected a berth(s) with mooring dolphins and breasting dolphins; the jetty will support loading facilities consisting of piping, utilities and loading arms; unloading arms located at the berth to unload imported butane for spiking the LNG; the jetty and berth(s) will be designed to accommodate LNG tankers up to "Q Max" size and will extend out to the 14-15 metre isobath to provide adequate under-keel clearance between the tankers hull and the sea bottom; construction docks to dispatch and receive heavy equipment, including pre-assembled process modules from ships directly or on barge vessels travelling between the mainland and Curtis Island; construction dock design may consist of a causeway or a trestle structure and may be temporary, for the period of construction of all three LNG trains and permanent Ferry Terminals at both the LNG Plant and on the mainland in order to transport construction and operations personnel. Temporary construction docks may remain and be utilised for passenger Ferry Terminal facilities. Due to the benign wave climate, a breakwater is not required. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

USELESS LOOP PORT MAINTENANCE & INFRASTRUCTURE UPGRADE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Shark Bay, Useless Loop, WA 6532 for Addition. The project involves the construction of a new pipeline along an existing T-shaped jetty pylon structure approximately 400 m in length, within Useless Loop Port, located approx 5 km north of the town of Useless Loop. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - P&C MODULE OFFLOADING FACILITIES
Module Offloading Facilities New project In The Darwin City Council Area. The scope of work for this package includes the supply of materials and the installation of the jetty platform and trestle portion of the Module Offloading Facility including fenders, catwalks, mooring and breasting dolphins and navigational aids. Work not included is the engineering and the causeway from the site to the jetty trestle platform. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT - POINT NELSON DREDGING
Dredging/Reclamation/Piling project at Nelson Point & Lumsden Point, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Dredging of 6 million cubic metres of material between Nelson & Burgess Points adjacent BHP Billiton's existing berths in Port Hedland Inner Harbour. To provide 2 new berth pockets & upgrade the existing departure channel & swing basin to accommodate vessels up to 250,000DWT. Spoil removed by a Backacter dredge to be placed offshore near the existing Spoil Ground I. Material removed by a Cutter Suction dredge to be sent by floating, submerged & onshore pipeline for placement in an area of over 200ha between Lumsden Point & the light industrial area of Wedgefield. Construction of a perimeter bund using 250,000cu m of fill for an initial 5m height then dredge material to be used to take it up to 9m. Construction also of a 60m approx wide corridor to carry 2 x 900mm diameter pipelines. Driving of marine piles for future wharf construction. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BOLLARDS
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of HLF & Tugs bollards. 10 units of 50 tons and 4 units of 100 tons. Click for more details...

PORT PIRIE SHIP LOADING FACILITY UPGRADE
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Port Pirie Council Area for Renovations, Refurbishments etc. development. Upgrade to ship loading facility at No. 6 Berth & Techno Shed (lead & zinc ore loading & storage facilities). Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - MARINE WORKS
Access Jetty/Wharf project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Construction of a 920m long access jetty & a 2-berth wharf along with new shiploading facilities. Click for more details...

ANDERSON POINT PORT FACILITIES - BERTH 3
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Anderson Point, Port Hedland, WA 6721. This type is Port Facilities with Private ownership. The expansion will provide an additional 400m of wharf superstructure, 7 berthing dolphins, navigational aids and associated mechanical components. Click for more details...

PORT OF WHYALLA NORTH HARBOUR EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Whyalla Council Area of Rail Facilities/Ship Loading type. Expansion of OneSteel's bulk export operations from 7 million tonnes per annum (Mtpa) approx to 12 Mtpa. To include construction of additional receival & storage facilities (rail infrastructure, tip pocket & storage sheds), ship loading facilities (conveyors, loader, berthing infrastructure) & expansion of transhipping operations. Click for more details...

WIGGINS ISLAND COAL EXPORT TERMINAL (WICET) PROJECT STAGE 1 - OFFSHORE PLANT & INFRASTRUCTURE
Jetty/Wharf/Berth/Conveyors/Towers/Dolphins project at Golding Point, Wiggins Island, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 1.8km long approach jetty & transfer tower platform, wharf, wharf conveyor including the drive & take up tower, berthing & mooring dolphins, ship access platforms, jetty conveyor & transfer tower. Click for more details...

ROY HILL IRON ORE PROJECT - PORT MARINE - QUICK RELEASE HOOKS
A project in the WA Within East Pilbara. For the provision of quick release hooks. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR FINAL EXPANSION
A project in the WA Within Port Hedland. Construction of 2 additional ship berths towards West Australian Iron Ore's (WAIO) throughput allocation of 240 million tonnes per annum (Mtpa). Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR SHIPLOADERS - DEMOLITION WORKS & CONVEYORS UPGRADE
Dismantling Shiploaders/Conveyors Upgrade project at Nelson Point, Port Hedland, WA 6721 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). Upgrade of a 2 conveyors followed by dismantling of a pair of decommissioned shiploaders. Click for more details...