List of Wharfs, Piers, Port facilities, Piling, Dredging Projects


BHP BILLITON IRON ORE RAPID GROWTH PROJECT - NELSON POINT - PACE
Site facilities via, Port Hedland, WA 6721 Has Bhp Billiton Iron Ore Rapid Growth Project - Nelson Point - Pace currently at Planning stage. The first stage of PACE provided for an increase in capacity to 81 mtpa by 2004. Further stages will provide for capacity levels to exceed 90mtpa. Click for more details...

AUSTEEL IRON & STEEL PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Cape Preston via, Dampier, WA 6713. Scope of work is likely to include design, construction, supply and commissioning of all the onshore civil facilities, materials handling systems and ancillary services and infrastructure, including a desalination system. Click for more details...

FLINDERS RANGES PROJECT - BELTANA - ZINC RESOURCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Far North Council Area of Resource - Zinc type. Mining operation will be 150-180,000 tonnes per annum. Indicated-Inferred resource is 941,000 tonnes @ 30.6% zinc for 300,000 tonnes of zinc. Beltana deposit resource is 365,200 tonnes @ 31.2% zinc for 57,400 tonnes of zinc. The Beltana deposit will be mined first with the existing pit to be deepened from 65 metres by another 30 metres. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

NEWCASTLE SHIP LOADING FACILITY - STORAGE CAPACITY INCREASE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Newcastle Port, Newcastle, NSW 2300 of Increase In Storage Capacity type of New development. An increase in capacity to provide ability to handle project increasing mine concentrate output in NSW. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - JETTY EXPANSION CONTRACT
North West Shelf Lng Train 5 Project - Jetty Expansion Contract is currently at the Construction stage, valued at about $ 100000000 it is Construction of a second LNG loading berth at the Karratha onshore gas plant. Construction activities will be performed from the Interbeton supplied IB909 jack up barge. The extension of the existing marine terminal will provide an additional new berth for LNG tankers with capacities of up to 145,000 m3. Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - OUTLOADING SYSTEM OL3 OFFSHORE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Hay Point Rd, Hay Point, QLD 4740 for New. Outloading Systems OL3 offshore. Work comprises an extension of the existing jetty by 3.8 km to the new shiploader wharf, to be known as berth 4. The dredging work has been completed. Fabrication work for the jetty and wharf will include piles and headstocks. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELTING
Belting - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Belting. Approx.1750m of 900/1350mm wide by 4ply PN800 conveyor belting. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR DRIVES
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area for New development. Supply of 6 No.Conveyor Drives, with capacity ranging from 100kW to 250kW. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MECHANICAL/CIVIL/STRUCTURAL & ELECTRICAL
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area for New development. Provision & Management of Minor Mechanical/Civil/Structural & Electrical works to Brownfield & Greenfield. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SITE LV ELECTRICAL & CONTROL WORKS (LS)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Site Lv Electrical & Control Works (Ls) type of New development. Site LV Electrical & Control Works (LS). Low voltage reticulation, controls and ancillary supply and installation throughout the material handling systems. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONSTRUCTION OF BERTH 5
Berth 5 New project In The City Of Greater Geraldton Council Area. Construction of Berth 5, with separable allowance for Berth 6 construction Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - RECLAMATION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Reclamation. Core rubble fill with armour rock facing at southern end of Berth 5. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - HV CABLE
Geraldton Port Berth 5 Iron Ore Expansion Project - Hv Cable is currently at the Construction stage, valued at about $ 500000 it is Supply of HV Cable. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELT SCRAPERS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Belt Scrapers Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Steel Tube Piling Package - For Berth Facility project at Port Hedland Port, Gilbert St, Port Hedland, WA 6721 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). Provision of steel tube package for construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - SHIP BERTHS
Part of lots 6, 7 & 20 Cormorant Rd (DP 4015754 & 252325), Newcastle, NSW 2300 Has Newcastle Coal Infrastructure Group Coal Terminal 3 - Ship Berths currently at Construction stage. For the provision of 2 new berths for terminal 3. Click for more details...

RG TANNA COAL TERMINAL EXPANSION PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at ., Gladstone, QLD 4680. Design, Fabrication and erection of an 80m X 10m span open sided awning. Click for more details...

CURTIS ISLAND LNG PLANT (QCLNG) PROJECT - SHIPPING FACILITIES
Curtis Island Lng Plant (Qclng) Project - Shipping Facilities is currently at the Construction stage, valued at about $ 60000000 it is The proposal covers the construction, operation and decommissioning of the LNG Marine Facilities on Curtis Island and the mainland. The facilities include, but are not limited to: a dedicated jetty containing specialised LNG loading facilities and LNG tanker berth(s) to transfer LNG; the jetty consisting of a driven-pile trestle structure, connected a berth(s) with mooring dolphins and breasting dolphins; the jetty will support loading facilities consisting of piping, utilities and loading arms; unloading arms located at the berth to unload imported butane for spiking the LNG; the jetty and berth(s) will be designed to accommodate LNG tankers up to "Q Max" size and will extend out to the 14-15 metre isobath to provide adequate under-keel clearance between the tankers hull and the sea bottom; construction docks to dispatch and receive heavy equipment, including pre-assembled process modules from ships directly or on barge vessels travelling between the mainland and Curtis Island; construction dock design may consist of a causeway or a trestle structure and may be temporary, for the period of construction of all three LNG trains and permanent Ferry Terminals at both the LNG Plant and on the mainland in order to transport construction and operations personnel. Temporary construction docks may remain and be utilised for passenger Ferry Terminal facilities. Due to the benign wave climate, a breakwater is not required. Click for more details...

RG TANNA COAL TERMINAL CHUTE FOR SHIPLOADER
Rg Tanna Coal Terminal Chute For Shiploader is currently at the Construction stage, valued at about $ 2000000 it is Refurbishment or Fabrication of Telescopic Chute for Shiploader 1 & 2 RGTCT. Click for more details...

USELESS LOOP PORT MAINTENANCE & INFRASTRUCTURE UPGRADE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Shark Bay, Useless Loop, WA 6532 for Addition. The project involves the construction of a new pipeline along an existing T-shaped jetty pylon structure approximately 400 m in length, within Useless Loop Port, located approx 5 km north of the town of Useless Loop. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - P&C MODULE OFFLOADING FACILITIES
Module Offloading Facilities New project In The Darwin City Council Area. The scope of work for this package includes the supply of materials and the installation of the jetty platform and trestle portion of the Module Offloading Facility including fenders, catwalks, mooring and breasting dolphins and navigational aids. Work not included is the engineering and the causeway from the site to the jetty trestle platform. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BARGE PREPARATION WORKS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng Jetty & Marine Structures - Barge Preparation Works currently at Construction stage. Works for fit-out of construction barges (100 to 330 feet in length). To include: fabrication of fuel cell pods, crane mats, miscellaneous fabrication works, anchor cans, crane boom rests, barge access & general welding for fit-out of construction barges. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - GRE - HANDRAIL & GRATING
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of GRE handrail & grating. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - FENDERS
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of jetty, HLF & Tugs fenders. 8 fenders SCN 2000 & 25 fenders SCN 1100. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - INSTRUMENTATION
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of instrumentation cables. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BOLLARDS
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of HLF & Tugs bollards. 10 units of 50 tons and 4 units of 100 tons. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - MARINE WORKS
Access Jetty/Wharf project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Construction of a 920m long access jetty & a 2-berth wharf along with new shiploading facilities. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - NON DESTRUCTIVE TEST
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the execution of non destructive tests on welded steel structures. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STEEL PLATES
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng Jetty & Marine Structures - Steel Plates currently at Construction stage. For the provision of steel plates. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - PRECAST CONCRETE PANEL
Precast Concrete Panel New project In The Ashburton Council Area. For the provision of a precast concrete panels. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - PAR PIPE TESTING & INTERNAL CLEANING
Par Internal Pipe Cleaning project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For pipe line cleaning, hydrostatic testing, drying, & purging lines with residual positive pressure of nitrogen. Click for more details...

ROY HILL IRON ORE PROJECT - PORT MARINE - QUICK RELEASE HOOKS
A project in the WA Within East Pilbara. For the provision of quick release hooks. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR FINAL EXPANSION
A project in the WA Within Port Hedland. Construction of 2 additional ship berths towards West Australian Iron Ore's (WAIO) throughput allocation of 240 million tonnes per annum (Mtpa). Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - GRVE PIPE JOINING OPERATIONS
Grve Pipe Joining Operations project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of all necessary materials, consumables, labour, plant & equipment for GRVE pipe joining operations. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...