State

Categories

Sub Categories

Click Here to Find Current Projects

List of Wharfs, Piers, Port facilities, Piling, Dredging Projects


BHP BILLITON IRON ORE RAPID GROWTH PROJECT - NELSON POINT - PACE
Site facilities via, Port Hedland, WA 6721 Has Bhp Billiton Iron Ore Rapid Growth Project - Nelson Point - Pace currently at Planning stage. The first stage of PACE provided for an increase in capacity to 81 mtpa by 2004. Further stages will provide for capacity levels to exceed 90mtpa. Click for more details...

AUSTEEL IRON & STEEL PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Cape Preston via, Dampier, WA 6713. Scope of work is likely to include design, construction, supply and commissioning of all the onshore civil facilities, materials handling systems and ancillary services and infrastructure, including a desalination system. Click for more details...

WORSLEY ALUMINA SHIP LOADING FACILITY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Includes shiploader, berth, tanks and conveyor belts. A dust minimising chute will be installed. Click for more details...

PORT OF BROOME
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Broome Council Area of Southern Wharf - Extn type. Proposed to extend wharf south of access jetty by 148 m to increase number of berths by 80%. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Port Facilities - Upgrades New project In The Port Hedland Council Area. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

BHP BILLTION RAPID GROWTH PROJECT 2 - PORT ADDITIONS
Via, Port Hedland, WA 6721 Has Bhp Billtion Rapid Growth Project 2 - Port Additions currently at Planning stage. Includes construction of a new car dumper and ancillary works. Initial capacity fo car dumper 8Mtpa. Ultimate capacity of 40Mtpa, following future expanison projects. Additional car dumping capacity will allow upgrades to existing dumpers to be undertaken ready for future market growth. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CREEK MANGANESE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Includes co-ordinating a number of design and construction contracts for various components of the bulk loading infrastructure and for the co-ordination and resolution of any associated issues. Includes a rail bottom dump, road bottom dump, bulk materials storage area, shiploader and associated conveyor and internal road systems. Includes review of reports by Bootu Creek Resources and KBR. The facility will initially be used for Bootu Creek Manganese Project. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

DAMPIER IRON ORE PORT UPGRADE PROJECT
Port Expansion Phase B New project In The City Of Karratha Council Area. Expansion of port capacity from 116 Mtpa to 140 Mtpa of iron ore. Presently construction works for the previous expansion to 95 Mtpa will be completed by December 2005. A proposal to expand to 120 Mtpa is before State Government authorities at present but does not involve any new construction, only utilising existing infrastructure at Parker Point. Expansion to 140 Mtpa will involve significant new construction work. Development options include upgrading the Parker Point and East Intercourse Island operations and the development of a new greenfields site. Infrastructure required for the expansion includes new car dumpers, screen house replacement, stackers and reclaimers, stockpiles, conveyors, ship loaders and berth works. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - JETTY EXPANSION CONTRACT
North West Shelf Lng Train 5 Project - Jetty Expansion Contract is currently at the Construction stage, valued at about $ 100000000 it is Construction of a second LNG loading berth at the Karratha onshore gas plant. Construction activities will be performed from the Interbeton supplied IB909 jack up barge. The extension of the existing marine terminal will provide an additional new berth for LNG tankers with capacities of up to 145,000 m3. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR PULLEYS & IDLERS
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 500000. This project Supply of Conveyor Pulleys & Idlers. Approx.650 carriers idlers, 306 vee return idlers plus miscellaneous items. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MOTOR CONTROL CENTRES
Motor Control Centres - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Motor control Centres. 3 No.Fully equiped control centres. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONSTRUCTION OF BERTH 5
Berth 5 New project In The City Of Greater Geraldton Council Area. Construction of Berth 5, with separable allowance for Berth 6 construction Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

EAST ARM PORT WHARF - REFERENCE ELECTRODE WELLS/SENSE CONNECTORS - STAGE 1
East Arm Port Wharf - Reference Electrode Wells/Sense Connectors - Stage 1 is currently at the Tenders & Building stage, valued at about $ 150000 it is Provision of (12) Reference Electrode Wells & Sense Connectors to Stage 1 Wharf, East Arm Port. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONTROL ROOM
Control Room project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Control Room Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SWITCHGEAR
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. This type is Switchgear - Supply with Private ownership. Supply of Switchgear Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - HV CABLE
Geraldton Port Berth 5 Iron Ore Expansion Project - Hv Cable is currently at the Construction stage, valued at about $ 500000 it is Supply of HV Cable. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - OIL FILLED TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Oil Filled Transformer. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - THIRD PARTY QUALITY ASSURANCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Third party review of quality assurance for fabrication and construction of the berth 5 ZPMC shiploader. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

ALBANY IRON ORE PROJECT - PORT EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Albany Council Area of Port - Expansion type. Albany Port Authority proposes to dredge within Princess Royal Harbour & King George Sound to facilitate access of cape size vessels. Proposal includes dredged materials being used for land reclamation to create an additional berth adjacent to port to be leased to Grange Resources LTD to accommodate their Port infrastructure. Magnetite mined by Grange will be pumped as slurry approx 100 km from their Southdown Magnetite & Kemaman Pellet Plant to concentrate storage facility at Albany Port before being loaded on to cape size vessels to be shipped to Malaysia. Click for more details...

RG TANNA COAL TERMINAL EXPANSION PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at ., Gladstone, QLD 4680. Design, Fabrication and erection of an 80m X 10m span open sided awning. Click for more details...

PLUTO LNG PROJECT - JETTY BERTH
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Karratha Council Area of Jetty Berth type. For the construction of a 300m long approach jetty. The LNG jetty berth will include a 38m x 50m platform, four breasting dolphins, six mooring dolphins and navigational aids. Click for more details...

CURTIS ISLAND LNG PLANT (QCLNG) PROJECT - SHIPPING FACILITIES
Curtis Island Lng Plant (Qclng) Project - Shipping Facilities is currently at the Construction stage, valued at about $ 60000000 it is The proposal covers the construction, operation and decommissioning of the LNG Marine Facilities on Curtis Island and the mainland. The facilities include, but are not limited to: a dedicated jetty containing specialised LNG loading facilities and LNG tanker berth(s) to transfer LNG; the jetty consisting of a driven-pile trestle structure, connected a berth(s) with mooring dolphins and breasting dolphins; the jetty will support loading facilities consisting of piping, utilities and loading arms; unloading arms located at the berth to unload imported butane for spiking the LNG; the jetty and berth(s) will be designed to accommodate LNG tankers up to "Q Max" size and will extend out to the 14-15 metre isobath to provide adequate under-keel clearance between the tankers hull and the sea bottom; construction docks to dispatch and receive heavy equipment, including pre-assembled process modules from ships directly or on barge vessels travelling between the mainland and Curtis Island; construction dock design may consist of a causeway or a trestle structure and may be temporary, for the period of construction of all three LNG trains and permanent Ferry Terminals at both the LNG Plant and on the mainland in order to transport construction and operations personnel. Temporary construction docks may remain and be utilised for passenger Ferry Terminal facilities. Due to the benign wave climate, a breakwater is not required. Click for more details...

USELESS LOOP PORT MAINTENANCE & INFRASTRUCTURE UPGRADE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Shark Bay, Useless Loop, WA 6532 for Addition. The project involves the construction of a new pipeline along an existing T-shaped jetty pylon structure approximately 400 m in length, within Useless Loop Port, located approx 5 km north of the town of Useless Loop. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - P&C MODULE OFFLOADING FACILITIES
Module Offloading Facilities New project In The Darwin City Council Area. The scope of work for this package includes the supply of materials and the installation of the jetty platform and trestle portion of the Module Offloading Facility including fenders, catwalks, mooring and breasting dolphins and navigational aids. Work not included is the engineering and the causeway from the site to the jetty trestle platform. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - FENDERS
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of jetty, HLF & Tugs fenders. 8 fenders SCN 2000 & 25 fenders SCN 1100. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - ELECTRICAL
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at On, Barrow Island, WA 6712 for New. For the provision of lighting & earthing material (including cables & junction boxes). Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - INSTRUMENTATION
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of instrumentation cables. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT UPGRADE
A project in the WA Within City Of Karratha. A project which is part of Rio Tinto's Growth Program to increase its Pilbara ore handling capacity to 330million tonnes per annum (Mtpa). Upgrade of its Parker Point facility at Dampier Port by 5Mtpa to give an overall 230Mtpa capacity. To include 2 new conyeyors including transfer stations with shuttle heads as well as 2 new surge bins with hydraulically driven belt feeders. During a pause to change a ship's hatch, fine ore to be continuously fed by an existing conveyor to a surge bin & then loaded rapidly afterwards. Existing reclaimers also used to maximum extent by loading via the new surge bins & the top up belt. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - NON DESTRUCTIVE TEST
Currently at the Construction stage In Ashburton is a project estimated to be $ 500000. This project For the execution of non destructive tests on welded steel structures. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STEEL PLATES
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng Jetty & Marine Structures - Steel Plates currently at Construction stage. For the provision of steel plates. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - SUPPLY OF ELASTOMERIC PADS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area of Elastomeric Pads - Supply type. For the supply of elastomeric pads. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STEEL STRUCTURES
Steel Structures New project In The Ashburton Council Area. For the provision of steel structures. Click for more details...

ROY HILL IRON ORE PROJECT - PORT MARINE - QUICK RELEASE HOOKS
A project in the WA Within East Pilbara. For the provision of quick release hooks. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - SHIPPING CONTAINERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at On, Barrow Island, WA 6712 of Shipping Containers type of New development. For the provision shipping containers. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STORAGE CONTAINERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area of Private ownership. For the provision of storage containers. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - PRODUCT LOADING FACILITIES & TUG BERTH - ON SITE PIPE WELDING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Vicinity of, Onslow, WA 6710 of Pipe Welding - On Site type of New development. Conduct all pipe welding on Site at Ashburton North (12 kilometres west of Onslow). Tasks to be performed include but are not limited to weld out of module to module pipework incl. works over water. Weld out of platform pipework including fit up to associated mechanical equipment; TIG welding of stainless 316 & carbon steel piping & all other pipe welding tasks as required. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect