State

Categories

Sub Categories

Click Here to Find Current Projects

List of Wharfs, Piers, Port facilities, Piling, Dredging Projects


BHP BILLITON IRON ORE RAPID GROWTH PROJECT - EXPANSION
Bhp Billiton Iron Ore Rapid Growth Project - Expansion is currently at the Construction stage, valued at about $ 150000000 it is An expansion of capacity at the Pilbara Iron ore operations from 100 million tonnes per annum to 110 Mtpa by late 2004. Includes additional rail and port capacity. The project will be completed on the back of infrastructure and equipment installed as part of Area C and Pace (Nelson Point) projects. BHP Billtions' Pilbara iron ore operations includes Mount Newman Iron ore Operations as well as Area C and the Nelson Point Ore Handling Facility. Click for more details...

PORT OF BROOME
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Broome Council Area of Southern Wharf - Extn type. Proposed to extend wharf south of access jetty by 148 m to increase number of berths by 80%. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Port Facilities - Upgrades New project In The Port Hedland Council Area. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - SHIPLOADERS/STACKERS/RECLAIMERS
Pilbara Iron Ore & Infrastructure Project - Shiploaders/Stackers/Reclaimers is currently at the Construction stage, valued at about $ 62500000 it is The design, manufacture and construction of a shiploader, stacker and reclaimer. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

NEWCASTLE SHIP LOADING FACILITY - STORAGE CAPACITY INCREASE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Newcastle Port, Newcastle, NSW 2300 of Increase In Storage Capacity type of New development. An increase in capacity to provide ability to handle project increasing mine concentrate output in NSW. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARYWORKS
Civil Works Packages project at At, Gove, NT 0880 In The Council Area Of East Arnhem Shire of Private. Various. Civil works likely to include a wharf. Click for more details...

DARWIN EAST ARM WHARF - FIRE PROTECTION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at East Arm Wharf, Darwin, NT 0800. This type is Fire Protection-Design/Supply/Install/Commission Fire Fighting Equipment with Private ownership. Design, supply, install and commissioning of a fully operational wharf-based fire protection system for bulk liquid vessel loading and unloading operations. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

DAMPIER IRON ORE PORT UPGRADE PROJECT
Port Expansion Phase B New project In The City Of Karratha Council Area. Expansion of port capacity from 116 Mtpa to 140 Mtpa of iron ore. Presently construction works for the previous expansion to 95 Mtpa will be completed by December 2005. A proposal to expand to 120 Mtpa is before State Government authorities at present but does not involve any new construction, only utilising existing infrastructure at Parker Point. Expansion to 140 Mtpa will involve significant new construction work. Development options include upgrading the Parker Point and East Intercourse Island operations and the development of a new greenfields site. Infrastructure required for the expansion includes new car dumpers, screen house replacement, stackers and reclaimers, stockpiles, conveyors, ship loaders and berth works. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - BULK EARTHWORKS
Bulk Earthworks - Phase 2 project at On, Finucane Island, WA 6721 In The Council Area Of Port Hedland of Private. Finucane Island Bulk Earthworks Phase 2. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - OUTLOADING SYSTEM OL3 OFFSHORE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Hay Point Rd, Hay Point, QLD 4740 for New. Outloading Systems OL3 offshore. Work comprises an extension of the existing jetty by 3.8 km to the new shiploader wharf, to be known as berth 4. The dredging work has been completed. Fabrication work for the jetty and wharf will include piles and headstocks. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - PRECOATED STEEL PILES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Supply of precoated steel piles for extension of Berth 5 and Berth 6. Piles of 762 mm and 508 mm diameter. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELTING
Belting - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Belting. Approx.1750m of 900/1350mm wide by 4ply PN800 conveyor belting. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR PULLEYS & IDLERS
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 500000. This project Supply of Conveyor Pulleys & Idlers. Approx.650 carriers idlers, 306 vee return idlers plus miscellaneous items. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SITE LV ELECTRICAL & CONTROL WORKS (LS)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Site Lv Electrical & Control Works (Ls) type of New development. Site LV Electrical & Control Works (LS). Low voltage reticulation, controls and ancillary supply and installation throughout the material handling systems. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONSTRUCTION OF BERTH 5
Berth 5 New project In The City Of Greater Geraldton Council Area. Construction of Berth 5, with separable allowance for Berth 6 construction Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BOLLARDS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area of Bollards - Design/Construct type. Design and construct Bollards & Quick Release Hooks. Click for more details...

EAST ARM PORT WHARF - REFERENCE ELECTRODE WELLS/SENSE CONNECTORS - STAGE 1
East Arm Port Wharf - Reference Electrode Wells/Sense Connectors - Stage 1 is currently at the Tenders & Building stage, valued at about $ 150000 it is Provision of (12) Reference Electrode Wells & Sense Connectors to Stage 1 Wharf, East Arm Port. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONTROL ROOM
Control Room project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Control Room Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - HV CABLE
Geraldton Port Berth 5 Iron Ore Expansion Project - Hv Cable is currently at the Construction stage, valued at about $ 500000 it is Supply of HV Cable. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - OIL FILLED TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Oil Filled Transformer. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELT SCRAPERS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Belt Scrapers Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - THIRD PARTY QUALITY ASSURANCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Third party review of quality assurance for fabrication and construction of the berth 5 ZPMC shiploader. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

ALBANY IRON ORE PROJECT - PORT EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Albany Council Area of Port - Expansion type. Albany Port Authority proposes to dredge within Princess Royal Harbour & King George Sound to facilitate access of cape size vessels. Proposal includes dredged materials being used for land reclamation to create an additional berth adjacent to port to be leased to Grange Resources LTD to accommodate their Port infrastructure. Magnetite mined by Grange will be pumped as slurry approx 100 km from their Southdown Magnetite & Kemaman Pellet Plant to concentrate storage facility at Albany Port before being loaded on to cape size vessels to be shipped to Malaysia. Click for more details...

RG TANNA COAL TERMINAL EXPANSION PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at ., Gladstone, QLD 4680. Design, Fabrication and erection of an 80m X 10m span open sided awning. Click for more details...

CURTIS ISLAND LNG PLANT (QCLNG) PROJECT - SHIPPING FACILITIES
Curtis Island Lng Plant (Qclng) Project - Shipping Facilities is currently at the Construction stage, valued at about $ 60000000 it is The proposal covers the construction, operation and decommissioning of the LNG Marine Facilities on Curtis Island and the mainland. The facilities include, but are not limited to: a dedicated jetty containing specialised LNG loading facilities and LNG tanker berth(s) to transfer LNG; the jetty consisting of a driven-pile trestle structure, connected a berth(s) with mooring dolphins and breasting dolphins; the jetty will support loading facilities consisting of piping, utilities and loading arms; unloading arms located at the berth to unload imported butane for spiking the LNG; the jetty and berth(s) will be designed to accommodate LNG tankers up to "Q Max" size and will extend out to the 14-15 metre isobath to provide adequate under-keel clearance between the tankers hull and the sea bottom; construction docks to dispatch and receive heavy equipment, including pre-assembled process modules from ships directly or on barge vessels travelling between the mainland and Curtis Island; construction dock design may consist of a causeway or a trestle structure and may be temporary, for the period of construction of all three LNG trains and permanent Ferry Terminals at both the LNG Plant and on the mainland in order to transport construction and operations personnel. Temporary construction docks may remain and be utilised for passenger Ferry Terminal facilities. Due to the benign wave climate, a breakwater is not required. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

SOUTHERN CROSS/IMPEL LNG PROJECT
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Gladstone Regional Council Area for New development. Proposed staged construction of a liquefied natural gas (LNG) plant with up to 3 trains ranging from 0.07-1.3million tonnes per annum (Mtpa) capacity. Associated facilities expected to include a construction jetty; an LNG dock & jetty to handle vessels up to 200,000cu m; cryogenic pipelines; LNG storage tanks up to 210,000cu m capacity & 400km approx pipeline with spur lines. The project is expected to generate 300-350 jobs during construction & 80-90 when fully operational. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - TRANSHIPMENT STORAGE PORT FACILITY
At Berth 7, Port Pirie, SA 5540 Has Peculiar Knob Iron Ore Project - Transhipment Storage Port Facility currently at Construction stage. Contract for the design, procurement, construction & commissioning of an ore receival, storage & out-load facility at Port Pirie. To include train unloading, enclosed stockpiling in a storage shed (10,500 sqm), reclaiming/shiploading overland conveyors. Associated infrastructure/siteworks. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - MARINE WORKS
Access Jetty/Wharf project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Construction of a 920m long access jetty & a 2-berth wharf along with new shiploading facilities. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

WIGGINS ISLAND COAL EXPORT TERMINAL (WICET) PROJECT STAGE 1 - OFFSHORE PLANT & INFRASTRUCTURE
Jetty/Wharf/Berth/Conveyors/Towers/Dolphins project at Golding Point, Wiggins Island, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 1.8km long approach jetty & transfer tower platform, wharf, wharf conveyor including the drive & take up tower, berthing & mooring dolphins, ship access platforms, jetty conveyor & transfer tower. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STORAGE CONTAINERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area of Private ownership. For the provision of storage containers. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR SHIPLOADERS - DEMOLITION WORKS & CONVEYORS UPGRADE
Dismantling Shiploaders/Conveyors Upgrade project at Nelson Point, Port Hedland, WA 6721 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). Upgrade of a 2 conveyors followed by dismantling of a pair of decommissioned shiploaders. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - PRODUCT LOADING FACILITIES & TUG BERTH - ON SITE PIPE WELDING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Vicinity of, Onslow, WA 6710 of Pipe Welding - On Site type of New development. Conduct all pipe welding on Site at Ashburton North (12 kilometres west of Onslow). Tasks to be performed include but are not limited to weld out of module to module pipework incl. works over water. Weld out of platform pipework including fit up to associated mechanical equipment; TIG welding of stainless 316 & carbon steel piping & all other pipe welding tasks as required. Click for more details...

BP ONSHORE LOGISTICS FACILITY
Currently at the Construction stage In Port Adelaide Enfield is a project estimated to be $ 7000000. This project Change in the use of a portion of land to accommodate an on-shore logistics facility (associated with off-shore drilling operations) including a liquid mud plant; the piping, storage, loading & unloading of associated materials and equipment; and associated building work including new silos and portable buildings. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect