State

Categories

Sub Categories

Click Here to Find Current Projects

List of Wharfs, Piers, Port facilities, Piling, Dredging Projects in NSW


NEWCASTLE SHIP LOADING FACILITY - STORAGE CAPACITY INCREASE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Newcastle Port, Newcastle, NSW 2300 of Increase In Storage Capacity type of New development. An increase in capacity to provide ability to handle project increasing mine concentrate output in NSW. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - SHIP BERTHS
Part of lots 6, 7 & 20 Cormorant Rd (DP 4015754 & 252325), Newcastle, NSW 2300 Has Newcastle Coal Infrastructure Group Coal Terminal 3 - Ship Berths currently at Construction stage. For the provision of 2 new berths for terminal 3. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - OUTBOUND SYSTEM CIVIL STRUCTURAL MECHANICAL WORKS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Part of lots 6, 7, 20 Cormorant Rd DP 4015754 & 252325, Newcastle, NSW 2300. Design, Supply & Installation of Piled Foundations, Supply & Installation of Concrete Foundations, Shop Detailing, Supply, Fabrication, Painting, Off Site Pre-Assembly & Site Erection of Structural Steel and part supply & complete Mechanical Installation for the Outbound System comprising a 2000t Buffer Bin, two Belt Feeders, Sample Plant, two Transfer Houses, three Conveyors and two substation slabs for a 30Mtpa Coal Export Terminal. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect