AUSTEEL IRON & STEEL PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Cape Preston via, Dampier, WA 6713. Scope of work is likely to include design, construction, supply and commissioning of all the onshore civil facilities, materials handling systems and ancillary services and infrastructure, including a desalination system. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT - EXPANSION
Bhp Billiton Iron Ore Rapid Growth Project - Expansion is currently at the Construction stage, valued at about $ 150000000 it is An expansion of capacity at the Pilbara Iron ore operations from 100 million tonnes per annum to 110 Mtpa by late 2004. Includes additional rail and port capacity. The project will be completed on the back of infrastructure and equipment installed as part of Area C and Pace (Nelson Point) projects. BHP Billtions' Pilbara iron ore operations includes Mount Newman Iron ore Operations as well as Area C and the Nelson Point Ore Handling Facility. Click for more details...

PORT OF BROOME
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Broome Council Area of Southern Wharf - Extn type. Proposed to extend wharf south of access jetty by 148 m to increase number of berths by 80%. Click for more details...

KOOLAN ISLAND PROJECT - JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at On, Koolan Island, WA 6733 for New. The jetty, shiploader and reclaim conveyor is being designed to receive up to and include capsize vessels (200000 tonnes) with a ship loading rate of 4500 tonne per hour. The jetty will be 250 metres in length. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Port Facilities - Upgrades New project In The Port Hedland Council Area. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - SHIPLOADERS/STACKERS/RECLAIMERS
Pilbara Iron Ore & Infrastructure Project - Shiploaders/Stackers/Reclaimers is currently at the Construction stage, valued at about $ 62500000 it is The design, manufacture and construction of a shiploader, stacker and reclaimer. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - JETTY EXPANSION CONTRACT
North West Shelf Lng Train 5 Project - Jetty Expansion Contract is currently at the Construction stage, valued at about $ 100000000 it is Construction of a second LNG loading berth at the Karratha onshore gas plant. Construction activities will be performed from the Interbeton supplied IB909 jack up barge. The extension of the existing marine terminal will provide an additional new berth for LNG tankers with capacities of up to 145,000 m3. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR DRIVES
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area for New development. Supply of 6 No.Conveyor Drives, with capacity ranging from 100kW to 250kW. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MECHANICAL/CIVIL/STRUCTURAL & ELECTRICAL
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area for New development. Provision & Management of Minor Mechanical/Civil/Structural & Electrical works to Brownfield & Greenfield. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SITE LV ELECTRICAL & CONTROL WORKS (LS)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Site Lv Electrical & Control Works (Ls) type of New development. Site LV Electrical & Control Works (LS). Low voltage reticulation, controls and ancillary supply and installation throughout the material handling systems. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONSTRUCTION OF BERTH 5
Berth 5 New project In The City Of Greater Geraldton Council Area. Construction of Berth 5, with separable allowance for Berth 6 construction Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BOLLARDS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area of Bollards - Design/Construct type. Design and construct Bollards & Quick Release Hooks. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - VSD
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Manufacture VSD's. Click for more details...

COLLIE RIVER MAINTENANCE DREDGING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Mouth of Collie River, as enters Leshenault Estuary, near, Bunbury, WA 6230. This type is Dredging with State ownership. General maintenace dredging at mouth of Collie River, as it enters Leshenaul Estuary, near Bunbury. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SWITCHGEAR
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. This type is Switchgear - Supply with Private ownership. Supply of Switchgear Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - HV CABLE
Geraldton Port Berth 5 Iron Ore Expansion Project - Hv Cable is currently at the Construction stage, valued at about $ 500000 it is Supply of HV Cable. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELT SCRAPERS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Belt Scrapers Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - WEIGHTOMETERS
A project in the WA Within City Of Greater Geraldton. Weightometers Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - THIRD PARTY QUALITY ASSURANCE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Third party review of quality assurance for fabrication and construction of the berth 5 ZPMC shiploader. Click for more details...

ALBANY IRON ORE PROJECT - PORT EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Albany Council Area of Port - Expansion type. Albany Port Authority proposes to dredge within Princess Royal Harbour & King George Sound to facilitate access of cape size vessels. Proposal includes dredged materials being used for land reclamation to create an additional berth adjacent to port to be leased to Grange Resources LTD to accommodate their Port infrastructure. Magnetite mined by Grange will be pumped as slurry approx 100 km from their Southdown Magnetite & Kemaman Pellet Plant to concentrate storage facility at Albany Port before being loaded on to cape size vessels to be shipped to Malaysia. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

PLUTO LNG PROJECT - JETTY BERTH
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Karratha Council Area of Jetty Berth type. For the construction of a 300m long approach jetty. The LNG jetty berth will include a 38m x 50m platform, four breasting dolphins, six mooring dolphins and navigational aids. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BARGE PREPARATION WORKS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng Jetty & Marine Structures - Barge Preparation Works currently at Construction stage. Works for fit-out of construction barges (100 to 330 feet in length). To include: fabrication of fuel cell pods, crane mats, miscellaneous fabrication works, anchor cans, crane boom rests, barge access & general welding for fit-out of construction barges. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT - POINT NELSON DREDGING
Dredging/Reclamation/Piling project at Nelson Point & Lumsden Point, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Dredging of 6 million cubic metres of material between Nelson & Burgess Points adjacent BHP Billiton's existing berths in Port Hedland Inner Harbour. To provide 2 new berth pockets & upgrade the existing departure channel & swing basin to accommodate vessels up to 250,000DWT. Spoil removed by a Backacter dredge to be placed offshore near the existing Spoil Ground I. Material removed by a Cutter Suction dredge to be sent by floating, submerged & onshore pipeline for placement in an area of over 200ha between Lumsden Point & the light industrial area of Wedgefield. Construction of a perimeter bund using 250,000cu m of fill for an initial 5m height then dredge material to be used to take it up to 9m. Construction also of a 60m approx wide corridor to carry 2 x 900mm diameter pipelines. Driving of marine piles for future wharf construction. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - FENDERS
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of jetty, HLF & Tugs fenders. 8 fenders SCN 2000 & 25 fenders SCN 1100. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - ELECTRICAL
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at On, Barrow Island, WA 6712 for New. For the provision of lighting & earthing material (including cables & junction boxes). Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - INSTRUMENTATION
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of instrumentation cables. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT UPGRADE
A project in the WA Within City Of Karratha. A project which is part of Rio Tinto's Growth Program to increase its Pilbara ore handling capacity to 330million tonnes per annum (Mtpa). Upgrade of its Parker Point facility at Dampier Port by 5Mtpa to give an overall 230Mtpa capacity. To include 2 new conyeyors including transfer stations with shuttle heads as well as 2 new surge bins with hydraulically driven belt feeders. During a pause to change a ship's hatch, fine ore to be continuously fed by an existing conveyor to a surge bin & then loaded rapidly afterwards. Existing reclaimers also used to maximum extent by loading via the new surge bins & the top up belt. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - MARINE WORKS
Access Jetty/Wharf project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Construction of a 920m long access jetty & a 2-berth wharf along with new shiploading facilities. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STEEL PLATES
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng Jetty & Marine Structures - Steel Plates currently at Construction stage. For the provision of steel plates. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STEEL STRUCTURES
Steel Structures New project In The Ashburton Council Area. For the provision of steel structures. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - PRE ASSEMBLED RACKS - PAINTING
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng Jetty & Marine Structures - Pre Assembled Racks - Painting currently at Construction stage. For the provision of labour & materials to touch up painting of metal pipework & fittings. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

ANDERSON POINT PORT FACILITIES - BERTH 3
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at Anderson Point, Port Hedland, WA 6721. This type is Port Facilities with Private ownership. The expansion will provide an additional 400m of wharf superstructure, 7 berthing dolphins, navigational aids and associated mechanical components. Click for more details...

ROY HILL IRON ORE PROJECT - PORT MARINE - QUICK RELEASE HOOKS
A project in the WA Within East Pilbara. For the provision of quick release hooks. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - SHIPPING CONTAINERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at On, Barrow Island, WA 6712 of Shipping Containers type of New development. For the provision shipping containers. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STORAGE CONTAINERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area of Private ownership. For the provision of storage containers. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - PRODUCT LOADING FACILITIES & TUG BERTH - ON SITE PIPE WELDING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Vicinity of, Onslow, WA 6710 of Pipe Welding - On Site type of New development. Conduct all pipe welding on Site at Ashburton North (12 kilometres west of Onslow). Tasks to be performed include but are not limited to weld out of module to module pipework incl. works over water. Weld out of platform pipework including fit up to associated mechanical equipment; TIG welding of stainless 316 & carbon steel piping & all other pipe welding tasks as required. Click for more details...