List of Yards, Sidings, Loading docks, Railways, Container terminals. Projects


GLEBE ISLAND BULK CEMENT TERMINAL
Glebe Island Bulk Cement Terminal is currently at the Construction stage, valued at about $ 2400000 it is Upgrade & additions to existing bulk handling facility to increase discharge pipes from 2 to 4, electrical installations. Click for more details...

SOUTH MAROOTA RECREATION FACILITY
Horse Riding/Motorcycle Clubs/Tracks - Relocation project at Lots 114, 115 Paulls Rd (Crown Rd Reserve R74343) (DP752039), Maroota, NSW 2756 In The Council Area Of The Hills Shire of Local Govt. Proposal is for the relocation of the Kellyville Horse Riding Club and Baulkham Hills Junior Motorcycle Club to the subject site. The proposal includes horse riding facilities, junior motorcycle riding facilities and tracks, carparking facilities, amenities, storage, & associated facilities. Associated landscaping & fencing. Click for more details...

NEW METRORAIL PROJECT - LEEDERVILLE TRACK SECTIONING CABIN
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Cambridge Council Area for Addition development. Works to comprise refurbishment & installation of Leederville Track Sectioning Cabin for Perth Urban 25 kV ac railway infrastructure. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
A project in the QLD Within Central Highlands Regional. Queensland Rail will construct, own and operate a new 110 km spur to expand their existing rail network in the Blackwater system. The new spur will connect to the existing system near Kinrola. The Rolleston mine will be charged a fee under a 20 year contract to access the line. Click for more details...

GOULBURN VALLEY FREIGHT LOGISTICS CENTRE SUBDIVISION STAGES 2 & 3
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Greater Shepparton Council Area of Industrial Subdivision Stages 2, 3 (9 Lots) And Intermodal Terminal type. Industrial subdivision, stage 2 (5 lots), stage 3 (4 lots) and possible construction of an intermodal terminal providing a link to the Port of Melbourne. The whole development is likely to comprise 6 stages including an intermodal freight terminal which would be likely to include a freight logistics centre, warehousing facilities, manufacturing facilities for fruit and powdered milk products for distribution and export. Click for more details...

NEW METRORAIL PROJECT - SPENCER ROAD LEVEL CROSSINGS
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Spencer Rd, Thornlie, WA 6108. Works comprise construction & installation of temporary level crossing at Spencer Rd, installation of signalling & power cables at Thornlie & communications cable replacement at Thornlie. Click for more details...

WESTNET RAIL - NORTHAM DISTRICT
Rcb Culverts - Installation project at WestNet Rail network within district of, Northam, WA 6401 In The Council Area Of Northam of Private. Works comprise installation of RCB culverts within Northam district. Click for more details...

NEW METRORAIL PROJECT
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Wanneroo Council Area of Rolling Stock Operation - Supervisory Services type. Work was to comprise provision of operations supervisory services for implementation & maintenance of safe operation of rolling stock on Currambine to Nowergup Railway on as-required basis. Click for more details...

GAUGE CIRCUIT GENERAL INDUSTRY/FACTORY, WAREHOUSE, LAY-DOWN AREA & OFFICE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at 20-22 (lot 802) Gauge Cct, Canning Vale, WA 6155 for New. Development of factory & warehouse/distribution facility, along with outdoor lay-down areas & associated office. Click for more details...

SPRINGVALE ROAD/RAIL SEPARATION PROJECT
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Whitehorse Council Area of State ownership. To eliminate the railway crossing at Springvale Road near Whitehorse Road intersection, a rail underpass will be constructed with the railway line to be lowered up to six meters on the western side of Springvale Road and the road to bridge over the railway line. A new railway station will be built on the west side of Springvale Road, replacing the existing Nunawading Station on the east side of Springvale Road. The station will be constructed as a continuous island platform with tracks either side. There will be space for a future third track. The platform will link to stairs and lifts on either side of Springvale Road, at the side of the current level crossing. Upgraded customer facilities will include bicycle storage, taxi rank and new drop-off and parking area at street level. The new station entry and ticket sales will be at street level and stairs and a lift will descend to the platform. Click for more details...

PERTH METROPOLITAN RAILWAY
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Perth Council Area for Renovations, Refurbishments etc. development. Works comprise traction power modifications at East Perth. Click for more details...

SAFEWAY LOADING DOCK ALTERATIONS
Safeway Loading Dock Alterations is currently at the Planning stage, valued at about $ 100000 it is Alterations to existing loading dock to rear of Safeway. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

DEPARTMENT OF DEFENCE - HARDENED & NETWORKED ARMY INITIATIVE - ELECTRICAL & COMMUNICATION INFRASTRUCTURE - PACKAGE 3
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Edinburgh Defence Precinct (EDP), Edinburgh, SA 5111 of Design Consultant - Package 3 type of New development. Design consultant for site wide electrical & communications infrastructure. Click for more details...

VICTORIA PARK RAILWAY STATION
Ruthland Av, East Victoria Park, WA 6101 Has Victoria Park Railway Station currently at Construction stage. Works to comprise of upgrade to Victoria Park Railway Station. Click for more details...

URBAN RAIL NETWORK - BITUMEN REPAIRS SERVICES
Bitumen Repairs Services project at Within Metropolitan area of, Perth, WA 6000 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Bitumen repairs to Urban Rail Network on as required basis. Click for more details...

MACARTHUR STATION FOURTH PLATFORM PRECINCT
A project in the NSW Within Campbelltown. Project/Contract management services for Macarthur Fourth Platform Project Click for more details...

LYNBROOK TRAIN STATION
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Casey Council Area of State ownership. Construction of a new station north of Alymer Road in Lynbrook on the Cranbourne line. The station will be located adjacent to the Alymer Road pedestrian underpass that was opened in 2005. The new station will feature: a bus interchange and taxi rank, long-term car parking on both sides of the railway line plus short term parking. Initially, approximately 250 spaces will be available with scope to expand the car parking as demand increases fencing along the length of the platforms, passenger shelters and seating, ticket machines, timetable and passenger information displays, closed circuit camera surveillance and emergency telephones, covered walkways, ramps and stairs and bicycle facilities. Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Between Epping, Castle Hill &, Rouse Hill, NSW 2155. This type is Consultancy For Acoustic Technical Advisor - Railway Line/Tunnel with State ownership. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

SOUTHERN SYDNEY FREIGHT LINE (SSFL)
Currently at the Construction stage In Bankstown is a project estimated to be $ 30000000. This project The following 4 packages include: NSW-T-C1160 - SSFL Enabling Works OH - provision & relocation of high voltage electrical services between Sefton & Macarthur - O'DONNELL GRIFFIN PTY LTD. NSW-T-C1276 - SSFL Specialist Rail Work TC1 - track construction between Sefton & Macarthur - JOHN HOLLAND RAIL. NSW-T-C1277 - SSFL Specialist Rail Work SC1 - Signalling work between Sefton & Macarthur - WRSA. NSW-T-C1280 - SSFL General Works GW2 - Construction of noise walls & fencing between Sefton & Macarthur - ARENCO PTY LTD Click for more details...

ELATA DRIVE LOADING DOCKS
Loading Docks project at 1-3 Elata Drive, Tullamarine, VIC 3043 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Two additional loading docks, altns to existing loading dock ramps and car parking Click for more details...

RICHMOND RAIL LINE & STATIONS - PROJECT NOW INCLUDED IN ID1023710
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hawkesbury Council Area of Consultancy For Station Area Planning type. Station area planning for level crossings of the Richmond Rail Line between Quakers Hill & Vineyard as well as the upgrading of Riverstone Station & the design of new stations at the relocated Schofields & Vineyard stations Click for more details...

GRAFTON REGIONAL SALEYARD PENS
A project in the NSW Within Clarence Valley. Design and construction of new pens to replace the existing pens 9 to 15. Click for more details...

MURAT ROAD BARGE LOADING FACILITY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Lot 50 Murat Rd, Exmouth, WA 6707 for New. Works may comprise construction of a barge loading facility comprising a 650 m rockfill causeway with a 3 ha reclaimed offshore storage area & load-out wharf, occupying a total seafloor area of 6.9 ha as well as associated site works such as earthworks, ablutions, ancillary infrastructure & completion of the barge loading facility. Click for more details...

COAST TO COAST LIGHT RAIL CITY WEST TO ADELAIDE ENTERTAINMENT CENTRE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at North Tce to Port Rd to Adelaide Entertainment Centre, Adelaide, SA 5000. This type is Tramline with State ownership. Extension of tramline 2.5 km from City West on North Terrace (adjacent Morphett Street Bridge) on to Port Rd, up to Adelaide Entertainment Centre, including a "park & ride" facility using the Adelaide Entertainment Centre carpark. Click for more details...

METROPOLITAN NORTH WEST REGION GUARDRAIL INSTALLATION
Various arterial roads in Metropolitan North West Region, ., VIC 3999 Has Metropolitan North West Region Guardrail Installation currently at Construction stage. Guardrail decommissioning and re-establishment on arterial roads in metropolitan North West region. Click for more details...

NEWPORT STABLING YARD CONSTRUCTION
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Champion Rd, Newport, VIC 3015 for New. The key elements of the work are 19 rail sidings about 200m long and including earthworks civil, overhead traction power and signaling works. Mainline track works under track occupation conditions. Building of an amenities building to accommodate approx 80 to 100 staff including all fit outs and facilities. Polished concrete, Metal fascias, black ridged. Drainage, lighting, power, communication and security and construction of 80 space car park at the amenities building. Click for more details...

WILLIAMS LANDING TRAIN STATION & ROAD OVERPASS
Williams Landing Train Station & Road Overpass is currently at the Construction stage, valued at about $ 65000000 it is Construction of a new train station and associated works. The new station will include a new bus terminal, a large long-term and also short term car park and taxi parking, an island style platform between the existing passenger rail lines and pedestrian and bicycle access. Williams Landing Station will be located between the existing Aircraft and Hoppers Crossing stations on the Werribee line. A road overpass will also be built over Palmers Road from Point Cook to Williams Landing. Click for more details...

NOOJEE HISTORIAL & INDIGENOUS CENTRE PROJECT
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Baw Baw Council Area of Local Govt ownership. Rebuilding of the former Noojee Railway Station to be known as the Noojee Historical & Indigenous Centre Project. The centre would include tourist information and be located on the original Noojee Railway Station site. Click for more details...

TRACTION POWER SYSTEM FOR RAIL REVITALISATION ELECTRIFICATION INFRASTRUCTURE
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Adelaide Council Area for New development. The extent of the works is the design, procurement, construction, testing & commissioning of the Traction Power System (TPS) to support the 25kV electrified Adelaide Metro Passenger Rail Network (AMPRN), which includes the following: (a) Adelaide yard & Adelaide station, including the ¨Northern Car Yard¨ area; (b) Noarlunga Line, including Port Stanvac Stabling yard; (c) Tonsley line; (d) Gawler Line including Dry Creek Rail Car Depot, Dry Creek Stabling Yard & Gawler Stabling yard; (e) Outer Harbour line; (f) grange line; (g) Belair Line between Adelaide Station & Goodwood Junction only; and (h) Seaford Extension. Project Scope - Traction Power System: (a) Two 66kV/25kV railway substations, adjacent to the Noarlunga Centre Line (NCL) & Gawler Centre Line (GCL) respectively, & the option of a third centrally located 66kV/25kV railway substation; (b) Three Track Section Cabins adjacent to the NCL, GCL & Outer Harbor Line (OHL) respectively, & the option of a fourth adjacent the NCL; (c) Four Track Coupling Units; (d) All associated protection systems, switchgear, buswork, surge arrestors, Current Transformers, Voltage transformers, control & interlocking systems. (e) Earthing & bonding of Works; (f) Civil & building works including switching stations' compound & layout, access roadways, security fencing & gates, oil/water separation, containment & treatment, drainage; (g) All associated High Voltage cabling; & (h) All associated Low Voltage cabling including communications cables. Click for more details...

SWANSTON STREET REDEVELOPMENT WORKS - STAGE 1
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Melbourne Council Area of Local Govt ownership. Swanston Street Stage 1 redevelopment works Click for more details...

MARIBYRNONG CITY COUNCIL CIVIL SERVICES PANEL
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Council is seeking to engage suitably qualified and experienced parties to be part of a panel for the provision of a range of different Civil & Transport Services. These services include Geotechnical, Proving Services, Level Survey, Civil Design & Transport. The term of the contract will be 3 years with an option for a further 2 by 1 year extensions at Council's discretion. Click for more details...

SPRINGVALE ROAD RAIL GRADE SEPARATION
Road Rail Grade Separation project at Springvale Rd, Springvale, VIC 3171 In The Council Area Of Greater Dandenong of State. Springvale Road Rail Grade Separation, Springvale. The project will separate the rail line from the road by lowering the rail line at Springvale Road. The new rail line is planned to be built to the north of the existing tracks. The new station will include a new intermodal hub which will facilitate bus, taxi, 'kiss and ride', parking and improved bicycle and pedestrian amenities. Click for more details...

PORT BOTANY CONTAINER TERMINAL 3
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Randwick Council Area for New development. Construction of 5 buildings of different sizes all over the site, two of the larger ones are for the maintenance building & an operations building Click for more details...

WEBB DOCK REDEVELOPMENT MARITIME WORKS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Webb Dock East & Webb Dock West, Port Melbourne, VIC 3207 for New. Delivery of a major maritime design and construct project at Webb Dock East. Dredging of around 2.3 million cubic metres within the dock. Also design and construction of a new 920 metre wharf for the Port's automotive industry which will be consolidated into a new world class facility at Webb Dock West. Click for more details...

TAPPA ROAD TRANSPORT TERMINAL & OFFICE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at 25-31 Tappa Rd, Edinburgh, SA 5111 of Road Transport Terminal/Office type of New development. Construction of road transport terminal including office. Associated carparking & landscaping. Click for more details...

NORTH WEST RAIL LINK - OPERATIONS, TRAINS & SYSTEMS PACKAGE (OTS)
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Various Council Area of State ownership. The OTS package involves the design, construction & commissioning of rail infrastructure (including depot & stabling), procurement of rolling stock, operation & maintenance & financing of the 23km of new rail network from Cudgegong Road to Epping, as well as the upgrade of the 13km of existing rail network from Epping to Chatswood Click for more details...

KEWDALE FREIGHT TERMINAL - OFFICE/WAREHOUSE DEVELOPMENT
Kewdale Freight Terminal - Office/Warehouse Development is currently at the Construction stage, valued at about $ 23000000 it is Construction of warehouses, offices, administration buildings, outdoor storage & car parking to accommodate Linfox FMCG & Australian Linehaul Operations (ALO), which are separate business units of Linfox Logistics & will facilitate the transport of goods from the eastern states & the delivery of containerised products from the eastern states via Pacific National Rail Service. The Perth Freight terminal is operated by Asciano Services Pty Ltd with a lease agreement between Asciano & the State Government acting through the Public Transport Authority. The purpose built industrial freight warehouse & associated offices will comprise of FMCG Ambient & Temperature Controlled warehouse of 24,400 sqm located at the eastern end of the site & is the largest of the buildings, the building will face south with loading & unloading operations on the southern edge of the building under a canopy system ranging from 5-18m in depth, the warehouse will accommodate temporary storage of goods & will provide parking space for forklifts. FMCG Dock Office comprising of a 2 storey lookout structure at the front of the warehouse will monitor & control vehicle movement. Linehaul Storage & Canopy located to the west of the warehouse building will comprise of a hardstand area for the temporary storage of palettes & other goods. Main Office comprising of a 2 storey building constructed on the eastern edge of the warehouse building to accommodate the administration functions of FMCG & Linehaul including logistics, operations management & human resources, the office building will accommodate 6 offices, 41 workstations, 3 meeting rooms, communal meeting area, 2 storage rooms, communications/IT room, staff room, toilets, showers, staff lockers & internal elevator. The Guard House will be located at the eastern entry from Abernethy Rd will accommodate 2 staff to monitor traffic movements & general operations of the site, the building will contain a tea room & toilet facilities. The Tobacco Building will be located at the eastern edge of the development & will be used for refrigerated temporary storage, the building will have higher security due to the nature of the stored goods, the building will also contain a tea room, toilets & staff amenities. Outdoor Storage & Hardstand Area will accommodate outdoor storage of containers awaiting packing/repacking or transportation & will provide layup areas for transport vehicles, the development will also include 182 car parks for staff & visitors located at the rear of the building, re-fueling facilities, fire management services including rainwater tanks & pump facilities, fencing & landscaping. Click for more details...

ALBERT STREET WAREHOUSE
Private ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Darebin Council Area for Addition development. Alterations to a building for the purpose of a warehouse and construction of a loading bay. Precast concrete, metal deck roofing and concrete slab. Click for more details...

PERTH STADIUM STATION/RAILWAY INFRASTRUCTURE (BELMONT PARK STATION) - REDEVELOPMENT
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Victoria Park Dr, Burswood, WA 6100. Works proposed to include the replacement of the Belmont Park Station with the Stadium Station to comprise of: a new train station having 2 concourses accessible from passenger assembly areas, 6 platforms which will feature 3 island platforms to include 2 x 225m length & 1 x 150m length to assist movement of passengers to & from the venue in the most efficient way possible & to be designed around the fan first philosophy, pedestrian concourse/access ways with roof covers, canopies, lifts, passenger & staff facilities & amenities, track & civil works on Burswood Peninsula with the provision to accommodate stowage for up to 117 individual railcars, track & civil works at Victoria Park to accommodate stowage for up to 24 individual railcars, all associated overhead line equipment works signalling construction works, 3 new track side signalling equipment rooms, driver crib facilities on both Burswood Peninsular & Victoria Park, rail system works to include electrical, communications works & infrastructure service interfaces & utility & railway service works. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
Consultancy For Bus Planning & Operations Services New project In The Brisbane City Council Area. Consultancy for bus planning & operations services for the Brisbane Underground Bus & Train Project. Click for more details...

BRISBANE UNDERGROUND BUS & TRAIN PROJECT
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at ., Brisbane, QLD 4000. Consultancy for land use planning, urban design & property development services for the Brisbane Underground Bus & Train Project. Click for more details...

FORRESTFIELD - PERTH AIRPORT RAIL/TUNNEL LINK PROJECT
Currently at the Early Planning stage In Various is a project estimated to be $ 500000. This project Transaction Advisory Consultancy svcs sought to assist with the Forrestfield - Perth Link project's transaction phase & potentially for the provision of continued svcs during the project's delivery phase. Click for more details...

WULKURAKA TRAIN STATION ACCESS UPGRADE
A project in the QLD Within Ipswich City. Upgrade of access to Wulkuraka Station. To include construction of a new pedestrian overpass with lifts & stairs, raising of platforms, station plaza areas with kiss?n?ride zones on Grace Street & Dixon Street & upgrade of existing lighting & CCTV networks. Additional waiting shelter coverage of the platforms, installation of new way-finding signage & de-commissioning of the existing pedestrian rail crossing. Click for more details...

MURGON TO KINGAROY RAIL TRAIL
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Murgon to, Kingaroy, QLD 4610. Construction of approximately 60km long rail trail between Kingaroy & Murgon. Separable Portion A: Murgon to Wooroolin (to occur first) Stages 4, 5 & 6. This portion starts at the intersection of the Rail Corridor & Lamb Street in Murgon & finishes at the intersection of the Rail Corridor & the Bunya Highway in Wooroolin. Separable Portion B: Wooroolin to Kingaroy (to be constructed last) Stages 1, 2 & 3. This portion starts at the intersection of the Rail Corridor & the Bunya Highway at Wooroolin finishes at the old Railway Station at O?Neal Square in Kingaroy. Click for more details...

CROSS RIVER RAIL - ENGINEERING DESIGN
A project in the QLD Within Brisbane City. Engineering Design & Impact Assessment for the Preliminary Evaluation phase of the Cross River Rail Project. The Preliminary Evaluation will include project option analysis & preliminary analysis to identify project options for further detailed analysis of a preferred solution during the Business Case phase. The scope of services required under this engagement will include engineering design, rail civil & systems, underground structures, design & delivery risk, client-side procurement phase support, impact assessment, environmental impact, architectural & urban design, pedestrian modeling & micro-simulation/intersection modeling. Click for more details...

ADELAIDE FESTIVAL PLAZA NEW TRAM STOP
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Adelaide Council Area for New development. New tram stop & track extension north along King William Road (outside Adelaides Festival Plaza). Click for more details...

ADELAIDE METROPOLITAN PASSENGER RAIL NETWORK RAIL HUSBANDRY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Various locations upon the AMPRN Train Network, Adelaide, SA 5000. This type is Railworks - Milling with State ownership. The Principal invites tenders for the provision of rail profiling (milling) services. For the purposes of this tender, rail profiling & rail husbandry are to be considered the same & equivalent. Location of Work/Services The Contractor will be required to undertake up to 40 km of corrective rail profiling (milling) works in the AMPRN train network. The Principal will prioritise the lines & the locations for milling prior to work commencing & issue to the Contractor a schedule of final total kilmotreage, the lines & locations required to be milled. The rail profiling (milling) works will be required on both the up & down tracks of the AMPRN between the provisional kilometerage & turnouts locations. Milling Plant Stabling Written approval is required from the Principal for all stabling proposals. Supply of Materials All materials shall be supplied by the Contractor. Click for more details...

CLONCURRY SALEYARDS PACKAGE A
Currently at the Construction stage In Cloncurry Shire is a project estimated to be $ 338000. This project Replacement of yard fencing at Cloncurry Saleyards. Stage One: Demolition of existing selling pens and construction of new selling pens, gates and troughs. Stage Two: Demolition of existing drafting area, preparation of a base for drafting area, and construction of new drafting fencing and gates. Stage Three: Demolition of the existing dip drafting area and construction of new dip pens, gates and troughs. Click for more details...

MILE END CONTAMINATED SOIL REMEDIATION
145 Railway Tce, Mile End, SA 5031 Has Mile End Contaminated Soil Remediation currently at Construction stage. The Principal invites tenders for the excavations of soils & transport to a licenced waste facility for stabilisation (treatment) & disposal. The soils would be treated at the licenced facility in according with their existing EPA licence & validated to confirm compliance with the facilities disposal criteria. Click for more details...