State

Categories

Sub Categories

Click Here to Find Current Projects

List of Yards, Sidings, Loading docks, Railways, Container terminals. Projects


BUNNINGS HARDWARE
A project in the VIC Within Whitehorse. Proposed construction to bring timber-yard into an enclosed area at the rear of the premises and extend the retail component at the front of the site and extend nursery. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
Currently at the Construction stage In Victoria Park is a project estimated to be $ 7927000. This project Construction of Victoria Park to Carlisle track deviation, bridge over railway line at Miller St/Roberts Rd, Lathlain & footbridge over railway line at Howick St near Clydesdale St, Lathlain. Miller/St Roberts Rd bridge to connect both roads over partially lowered railway & comprise two-lane bridge with provision for pedestrians & cyclists. Width of bridge superstructure accommodates 3.5 m lane & 1.5 m shoulder in both directions, 2.6 m wide shared path on western side & 2.1 m path on eastern side. Bridge to consist of six prestressed pre-cast concrete trough-type beams. Substructure to consist of in-situ reinforced concrete abutment wall supporting bridge deck with curved wing walls. Howick St footbridge to be 3.5 m wide dual use pedestrian/cyclist footbridge over railway. Superstructure to comprise single prestressed pre-cast concrete modified trough-type beam. Walkway surface to consist of broom finish concrete topping slab cast on top of pre-cast concrete beam, incorporating kerbs to accommodate steel post support for pedestrian balustrade railing. Click for more details...

DAMPIER PORT BULK LIQUIDS BERTH (BLB) PROJECT
Private ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The City Of Karratha Council Area for Addition development. Additional facilities to be constructed to enable accommodation of increased port traffic to service new fertiliser & gas to liquids projects on Burrup Peninsula. New multi-user bulk cargo export berth is being constructed to service liquids tankers & bulk solid cargo vessels. Dredging work of up to 4.5 million cu m of sediments is also being undertaken. Click for more details...

BGC - BRICKWORKS
Brickworks project at Not yet determined, within Perth Metropolitan Region, ., WA 6999 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). It is proposed to develop brickworks. Click for more details...

HOMEBUSH RAIL TURNBACK PROJECT
Rail Turnback project at Homebush Railway Station, Homebush, NSW 2140 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Proposed construction of a new rail turnback track. The project involves widening the rail corridor, constructing a new platform and track at Homebush Station, and refurbishing an existing building at the station. The development at Homebush Station includes an approx 500m westwards extension to the existing down local track and construction of a new platform (Platform 7) to service the new down local track. The existing local track would be re-configured as a centre track turn back serviced by Platform 6, which would allow all stations City to inner west services to be terminated at Homebush. The project also includes ancillary track work to facilitate connections between the new down local and existing up local tracks plus an extension to the up local track to provide an overun facility that is combined with a new buffer stop. Construction of a new easy access ramp off The Crescent to provide access to the new Platform 7. Extension of Platform 6 by approx 45m at eastern end. Internal modifications to the existing building on Platform 5/6 to provide facilities for RailCorp staff. Removal and construction of approx 100m section of the brick station boundary wall on the Crescent. Pavement repair and service reinstallation works on The Crescent to accommodate up to local 4m widening of the station boundary. Changes to some parking on the northern and southern side of The Crescent. Change to the location of the night bus ride facility, and the provision of a kiss & ride drop off zone. Provision of new lighting and design treatments to the street components around the station entrance to improve the amenity of the station precinct. Minor modifications to utilities and services on the northern side of The Crescent, including underground an existing section of the overhead powerlines. Click for more details...

MELBOURNE WHOLESALE MARKET EPPING
A project in the VIC Within Whittlesea. Relocation of the Melbourne Wholesale Fruit and Vegetable Market and the National Flower Centre. The new development consisting of the core market facility and infrastructure, trading floor and flower centre over 56,500 sqm, the breakdown being 50,000 sqm for the market plus canopies & 6,500 for the flower centre. And will also include warehouses, distribution & logistics facilities. The market site is 45 hectares. Carparking for 2500 cars, hardstand areas and loading bays. Steel portal frame construction. Click for more details...

GEELONG ROAD LOADING DOCK
Loading Dock project at 600 Geelong Rd (LP 154628), Brooklyn, VIC 3012 In The Council Area Of Brimbank of Private. Proposed construction of a loading dock to an existing building. Click for more details...

SYARRUM OSTRICHES ABATTOIR
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Development of abattoir & holding yards to process 500 ostriches per week. Project would include main building, conveyors, wash area & chiller. Click for more details...

ELDERS LTD - WAREHOUSE & SHOWROOM
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Lot 1 of 127/128, 4 of 128/129, 5 of 128/129, 6 of 128/129 & 1 of 124/25 cnr Herald & Fairway Sts, Narrogin, WA 6312. This type is Warehouse/Showroom/Office/Yard with Private ownership. Construction of warehouse, showroom, office & yard to be of concrete floor & metal roof construction. Click for more details...

GRONG GRONG GRAIN FACILITY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Nullong Rd, Grong Grong, NSW 2652 for New. Construction will include a number of bunkers, an unloading & weighbridge facility and a rail loading facility. Click for more details...

CENTRAL PERTH RAILWAY LAND DEVELOPMENT
A project in the WA Within Perth. City of Perth is negotiating partnership with State Government to achieve undergrounding of existing Fremantle & proposed New MetroRail lines west of City Station to Mitchell Fwy & redevelopment of approximately 13 ha of land. Tenders were invited from consultants to undertake triple bottom line assessment of relevant economic, social & environmental factors of alternative development scenarios, to assist in determination of content & management model for project. Click for more details...

THIRD AVE FACTORY/OFFICE
A project in the NSW Within Blacktown. Replace carwash with extension to building no 3 with 720 sq m of high bay factory unit, 160 sq m of lightbay loading area & 256 sq m mezzanine office & an additional 16 car spaces. Click for more details...

AUSTRALIAN WHEAT BOARD SILO
Silo New project In The Cootamundra Council Area. Construction of a wheat silo with permanent capacity of 80,000 tonnes & an additional temporary capacity of 50,000 tonnes. Click for more details...

PERFECTION DAIRIES FACTORY
A project in the NSW Within The Hills Shire. Demolition of existing warehouse & alterations & additions to existing factory including new cool storage room & changes to existing & new loading dock facilities. The office is to be relocated to existing building at the front of the site. The existing labelling facility & crate storage facility are to be enlarged & the plastic bottle storeroom is to be relocated. The conversion of an existing warehouse to undercover carparking for staff & the addition of 12 car parking spaces for visitors use are also included into the plans. Click for more details...

NEW METRORAIL PROJECT - POWER & OVERHEAD
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) Addition project at Btwn Perth & Mandurah, ., WA 6999. This type is Power/Overhead Engineering Services - Engineering Services with State ownership. Provision of power & overhead engineering services. Click for more details...

NEW METRORAIL PROJECT - SOUTH WEST METROPOLITAN RAILWAY
A project in the WA Within Various. South West Metropolitan Railway Package E involves design & construction of civil, structural & drainage works to provide rail corridor within median of Kwinana Fwy between The Narrows & Glen Iris, including The Narrows & Mount Henry Bridge sites. Works include strengthening existing Narrows Bridge & construction of new southbound rail bridge, realignment of carriageways & building railway formation, widening & strengthening Mount Henry Bridge, construction of railway station earthworks at Leach Hwy & South St & realignment & reconstruction of ramps & intersections at Leach Hwy & South St. Click for more details...

KEWDALE FREIGHT TERMINAL
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) Addition project at Abernethy Rd, Kewdale, within City of Belmont & Shire of Kalamunda, ., WA 6999. This type is Freight Terminal - Redevelopment - Stage 2 with Private ownership. Stage 2 includes relocation & construction of new rail tracks, relocation of offices for Fremantle Link Services closer to Abernethy Rd, new 10,000 sq m warehouse for Toll SPD, cross dock facility, container storage & interchange & high-volume rail terminal (intermodal hub). Click for more details...

MARION - OAKLANDS TRANSPORT INTERCHANGE (OAKLANDS TRANSPORT INTERCHANGE)
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Lot 150 Morphett Rd (Vol 5800 Fol 451 FP 218080), Oaklands Park, SA 5046. New train & bus interchange for Oaklands Park, relocation of Oaklands Park train station closer to Marion Shopping Centre & sale of 16,000 sq m of land where existing Oaklands Park railway station is located. Work to include station platforms & shelters, car parking, landscaping, passenger facilities & decommissioning existing station facilities. Click for more details...

DHL DANZAS/MELBOURNE AIRPORT BUSINESS PARK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Cnr Link & South Centre Rd, Melbourne Airport, VIC 3045 of Air & Ocean Freight Facility type of New development. Proposed construction of a purpose built facility for international air and ocean freight to be occupied by DHL Danzas. Stage 1 to include a two storey office - 3599sqm, single level warehouse - 5700sqm, storage mezzanine - 225sqm and perishable goods area - 1725sqm and car parking for 262 car spaces. Click for more details...

BUNBURY PORT AUTHORITY - BERTH 8 WORKS
Bunbury Port, Casuarina Dr, Bunbury, WA 6230 Has Bunbury Port Authority - Berth 8 Works currently at Construction stage. Works to comprise of construction, installation & commissioning of concrete washdown area for Berth 8 at Bunbury Port. Click for more details...

BUNBURY PORT AUTHORITY - BERTH 8 WORKS
Bunbury Port Authority - Berth 8 Works is currently at the Construction stage, valued at about $ 500000 it is Works comprise construction of enclosure of 2 conveyors at Berth 8. Click for more details...

JOONDALUP ARENA - SPECIAL EVENT TRAIN STATION
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Works to comprise of construction of forward works & additions & alterations to Signalling & Communications Systems main cable route. Click for more details...

MUCHEA MULTI SPECIES LIVESTOCK CENTRE
Lot 5 Muchea Rd East, Muchea, WA 6501 Has Muchea Multi Species Livestock Centre currently at Construction stage. Construction of multi species livestock Centre. Works involve nominal 5 ha lightweight steel framed sawtooth roofed structure to be developed on 16 ha flat pad to be created on gently sloping 302.6 ha site. Works will include required site & building services as per specifications. The Muchea property is located 1.6 km east-north-east of the intersection of the Brand Hwy & Great Northern Hwy. The livestock centre is expected to process 110,000 to 120,000 cattle per year & 900,000 to 1,000,000 sheep per year in line with the current throughput at the Midland Livestock Saleyards. The main facility is roofed to deal with the working conditions for staff, animal welfare issues, provide water collection & control of moisture for the soft flooring system. The facility is to be self sufficient for water with collection & treatment of water being a major component of the design. Click for more details...

SIXTH AVENUE RAILWAY CROSSING UPGRADE
A project in the SA Within Marion. Upgrade to railway crossing at Sixth Av/Dunorlan Av. Work to include: demolition & construction of kerbing, kerb ramps, bituminous surfacing, asphalt paths, guardfence, linemarking, signs & traffic/pedestrian maintenance. Work does not include boom gate relocation or new lighting. Click for more details...

RAIL INFRASTRUCTURE PROJECTS - CONSULTANCY SERVICES
Consultancy Services project at Various rail infrastructure, ., WA 6999 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Consultancy services to undertake initial assessment of certain rail infrastructure projects & is required to identify, develop & document justification for projects to satisfy the (DOTARS) Auslink Strategic Merit Test template. Click for more details...

MACARTHUR INTERMODAL SHIPPING TERMINAL (MIST)
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Main Southern Railway & Stonny Batter Rd, Minto, NSW 2566. This type is Railway Sidings with J/V - Private & Govt ownership. Construction of new rail sidings & additional spur lines that would be used to allow an increased number & size of freight trains to access the existing MIST site. The development proposes 2 main areas of work throughout the existing MIST site & along the Main Southern Railway(MSR) alignment. The 1st component relates to work within the existing MIST site. It is proposed to construct an additional siding within the MIST site that would run parallel to the existing siding, between it & the MSR. An additional 2 spur lines & associated points would be constructed on the MIST site to allow for loading, unloading & reconsignment of containers. In total, 4 tracks as well as a turn back area would be located on the MIST site. The 2nd component of the work relates to the construction of the remaining sidings across the neighbouring former timber manufacturing plant & onto the Government owned land adjacent to the MSR. The eastern siding would be an extension of the existing siding presently located at the MIST. A tensioned concrete slab would be constructed adjacent to the points where the rail lines would converge. At the McBarron Creek crossover, a concrete culvert would be constructed to math the existing ground level that would connect with the existing culvert that channels water from the creek under the MSR. The siding would be constructed & finished above the culvert Click for more details...

PERTH RAILWAY STATION
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Perth Council Area of State ownership. Works to comprise of removal, manufacture, supply, installation & making good of signage at Perth Railway Station. Click for more details...

LYNBROOK TRAIN STATION
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Casey Council Area of State ownership. Construction of a new station north of Alymer Road in Lynbrook on the Cranbourne line. The station will be located adjacent to the Alymer Road pedestrian underpass that was opened in 2005. The new station will feature: a bus interchange and taxi rank, long-term car parking on both sides of the railway line plus short term parking. Initially, approximately 250 spaces will be available with scope to expand the car parking as demand increases fencing along the length of the platforms, passenger shelters and seating, ticket machines, timetable and passenger information displays, closed circuit camera surveillance and emergency telephones, covered walkways, ramps and stairs and bicycle facilities. Click for more details...

HOTHAM VALLEY TOURIST RAILWAY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Btwn Pinjarra &, Dwellingup, WA 6213 of Tourist Railway - Restoration type of Renovations, Refurbishments etc. development. Works to comprise reinstatement of 22 km of railway infrastructure between Pinjarra & Dwellingup. Infrastructure was serverely damaged by bushfire & reinstatement works include replacement of railway sleepers, timber bridges, culverts, level crossing & other incidental works including some earthworks. Click for more details...

NORTH WEST GROWTH CENTRES - STATION AREA PLANNING
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hawkesbury Council Area of State ownership. Design of the areas surrounding New Schofields, Riverstone & New Vineyard, Richmond & Quakers Hills stations addressing issues of pedestrian access and connectivity, public transport interchange, urban design & station area planning for level crossings Click for more details...

MURAT ROAD BARGE LOADING FACILITY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Lot 50 Murat Rd, Exmouth, WA 6707 for New. Works may comprise construction of a barge loading facility comprising a 650 m rockfill causeway with a 3 ha reclaimed offshore storage area & load-out wharf, occupying a total seafloor area of 6.9 ha as well as associated site works such as earthworks, ablutions, ancillary infrastructure & completion of the barge loading facility. Click for more details...

AUBURN STABLING FACILITY
Stabling Facility project at off Manchester Rd, Auburn, NSW 2144 In The Council Area Of Auburn of State. Construction of a stabling facility to accommodate a minimum of 16 x 8 car suburban trains. Construction of walkways & access roads. Installation of lighting & fencing. Construction of staff amenities & offices. Associated civil & rail systems work. Construction of an access road & bridge for staff vehicles. Construction of a staff carpark Click for more details...

PERTH PUBLIC TRANSPORT HUB PROJECT - NORTHSIDE RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Fremantle Rail lines above existing Joondalup line & Wellington St Bus Station, Northbridge, WA 6003 for New. Works to comprise Rail Engineering Management services for the Perth Public Transport Hub Project. Works may include the lowering of the Fremantle rail lines above the existing Joondalup line-bored tunnels & also the lowering of the Wellington Street Bus Station. The project involves the sinking of the central section of the Perth to Fremantle railway line & construction of a new rail platform. Click for more details...

REGIONAL RAIL LINK - PACKAGE C
Rail Link New project In The Brimbank Council Area. Construction of Work Package C of the Regional Rail Link from Footscray to Sunshine. Works include 7.5 kilometres of two new dedicated tracks 'at grade', redevelopment of West Footscray Station, modifications to Footscray Station including two new platforms and escalators to all platforms, modifications to Sunshine Station including construction of a new platform and modification to the existing platform, and the provision of a new pedestrian bridges to provide access to all the station platforms and two new grade separations at Anderson Road, Sunshine. Design and construction of train control systems (TCS) for the metropolitan lines. Improvement works to level crossings at Fitzgerald Road, Ardeer and Mt Derrimut Road, Deer Park. Click for more details...

REGIONAL RAIL LINK - PACKAGE G
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Wyndham Council Area for New development. Work Package G is project wide train control, signalling, communications, information communication technology and power supply. The length of Package G is program wide approximately 47 kilometres. Works include modification to existing train control systems and the creation of a new train control system for the Regional Rail Link corridor, creation of a new generation computer based signalling system, installation of approximately 45 kilometres of fibre optic cable to support the new train control systems and installation of new passenger information systems to new stations and upgrade of existing systems at existing stations that are being modified by the project. Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - EPPING TO THORNLEIGH THIRD TRACK (ETTT)
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hornsby Council Area of Rail Track/Railway Stations/Civil Works type. The proposal involves the construction of an additional track (or third track) on the western side of the existing tracks between Epping & Thornleigh. Scope of work also includes: modifications to 4 stations, including construction of new lifts & footbridges. Modifications to road, rail & pedestrian bridges. Construction of a new rail bridge over the M2 Motorway. Construction of cuttings, embankments, viaducts & retaining walls. Construction of new maintenance access roads adjacent to some lengths of the new track. Modifications to the existing overhead wiring and signalling systems. Associated civil & rail systems works. Track work involves the construction of a third track (approximately 6 km) within the Main North Line corridor on the western side of the existing tracks; the proposal would connect into the Down Suburban line just to the north of Epping Station and the Down Main (via a turnout) to the south of Thornleigh Station; the new track would generally be at the same level as the existing tracks; the alignment would be positioned as close to the existing tracks as possible with the exception of in the vicinity of the M2 Motorway where the alignment is located further to the west due the constraints of constructing a new bridge for the third track across the M2 Motorway. Station works - to accommodate the new third track some works are required at and in the vicinity of the following stations: Cheltenham - new footbridge, lifts & stairs, platform modification and station electrical systems. Reconfigured car parking & footpath; Beecroft ? modifications to existing pedestrian tunnel; reconfigured carparking & footpath; Pennant Hills - extended station concourse (northern footbridge); new lift & stairs; modifications to existing footpath, roadway & southern footbridge; Epping - minor platform adjustments. Bridge works would be required at Works would be required at the following locations: bicycle underpass at Epping; Devlins Creek culvert crossing (underbridge); M2 Motorway underbridge; Cheltenham Road overbridge; Copeland Road overbridge; Chapman Avenue overbridge; Pennant Hills Road overbridge; Pennant Hills Station footbridge. The proposal would also involve construction of & modification to signalling huts, communications facilities & other rail services infrastructure, the construction or modification of cuttings, embankments & retaining walls Click for more details...

PERTH TO JOONDALUP RAILWAY STATIONS PACKAGE H
Pit/Pipe/Cable - Upgrade New project In The Various Council Area. Works to include the install of a test pit, pipe & fibre optic cables system at nominated railway stations along the Perth to Joondalup Railway line, also to include scrub cleaning, trenching, under-boring, installation of conduits & pits, backfilling, removal of spoil & the provision of pigtails, racks, termination panels & any other fixtures required. Click for more details...

MARITIME CONTAINER TERMINAL
Maritime Container Terminal is currently at the Construction stage, valued at about $ 1100000 it is Proposed changes to the existing terminal to comprise: Reconfiguration of existing rail sidings. To facilitate controlled washing of containers in washbays. Provide power for refrigerated containers for the short term storage of cold cargo. Demolition of building 13 to improve storage efficiency. Flood lighting to improve site visibility & security. Increasing container stacking height. Internal fencing. Landscaping the Canal Road frontage. Click for more details...

REGIONAL RAIL LINK - PACKAGE A
A project in the VIC Within Melbourne. Construction of Work Package A of the Regional Rail Link from Southern Cross Station to Moonee Ponds Creek. The length of Package A is 2.3 km. Works include track, civil and overhead traction power infrastructure, a new bridge deck over Dudley Street and strengthening of and protection work on existing structures in the area. The contract also incorporates delivery of a new computerised signalling system for the Melbourne stabling yards and bypass tracks west of the new Regional Rail Link tracks into Southern Cross Station. Click for more details...

NORTH WEST RAIL LINK
North West Rail Link is currently at the Early Planning stage, valued at about $ 1460000 it is The Project Definition Services tender is responsible for providing specialist advice and support in preparing the Project Definition Report and supporting documentation for the NWRL project. The Project Definition Report Services will include providing economic and financial appraisals, cost benefit analyses, as well as outline and final business cases. Assessment and documentation of project costs and benefits, including preparation of a sustainability benefits report are required. Development of the major project reports will need to conform with relevant NSW government and treasury guidelines as well as with Federal government/national guidelines; Click for more details...

WESTERN SYDNEY LIGHT RAIL
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at various locations in the Western Sydney area, ., NSW 2999 for New. Construction of the 44km Western Light Rail Network Click for more details...

NORTH WEST RAIL LINK - OPERATIONS, TRAINS & SYSTEMS PACKAGE (OTS)
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Various Council Area of State ownership. The OTS package involves the design, construction & commissioning of rail infrastructure (including depot & stabling), procurement of rolling stock, operation & maintenance & financing of the 23km of new rail network from Cudgegong Road to Epping, as well as the upgrade of the 13km of existing rail network from Epping to Chatswood Click for more details...

GERALDTON PORT AUTHORITY - ELECTRICAL SUPPLY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for Addition development. To include the supply of electricity to the Geraldton Port & will be required to supply retail electricity for the current & future needs of the Geraldton Port, manage all associated wholesale market requirements & network access arrangements for all Geraldton Port Authority sites under the agreement & represent & assist for changes or modifications to network connections or access arrangements as required. Click for more details...

SYDNEY LIGHT RAIL
Sydney Light Rail is currently at the Construction stage, valued at about $ 45000000 it is Construction of limited Early Works, including selected utilities, road & traffic adjustments & other related infrastructure works Click for more details...

MORETON BAY RAIL LINK PROJECT
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at from Petrie to, Kippa-Ring, QLD 4021. For the provision of rail specific plant & equipment supply. Click for more details...

AUSTRALIAN LAMB COLAC EXPANSION
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at 1 Tristania Dr, Colac, VIC 3250. Expansion of the cold storage facilities will include the installation of a 1000 carton plate freezer, freezer storage for 500 pallet spaces and an additional loading dock. This will increase the production capacity to more than 40,000 lambs per week. Click for more details...

PUBLIC TRANSPORT AUTHORITY - MAJOR PROJECTS INDEPENDENT ESTIMATION SERVICES
Public Transport Infrastructure - Consultancy Svcs New project In The Various Council Area. Consultant sought for the provision of Independent Estimation (IE) consultancy svcs for PTA's Major Projects Unit (MPU) work program derived from projects that are planned & costed by the Infrastructure Planning & Land Services (IPLS) Division to effectively manage the transfer of projects from the planning to delivery phases. The emphasis of the work is on public transport infrastructure, civil & building construction, primarily on the new Perth Stadium Transport Infrastructure project & Forrestfield - Airport Link. The tasks could be performed by an experienced construction cost estimator or Quantity Surveyor who has had specific experience in providing estimating svcs & cost advice for Alliance Contracts, Early Contractor Involvement Contracts, Design & Construct Deeds, Construct Only Contracts & Design Only Contracts. Click for more details...

MURGON TO KINGAROY RAIL TRAIL
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Murgon to, Kingaroy, QLD 4610. Construction of approximately 60km long rail trail between Kingaroy & Murgon. Separable Portion A: Murgon to Wooroolin (to occur first) Stages 4, 5 & 6. This portion starts at the intersection of the Rail Corridor & Lamb Street in Murgon & finishes at the intersection of the Rail Corridor & the Bunya Highway in Wooroolin. Separable Portion B: Wooroolin to Kingaroy (to be constructed last) Stages 1, 2 & 3. This portion starts at the intersection of the Rail Corridor & the Bunya Highway at Wooroolin finishes at the old Railway Station at O?Neal Square in Kingaroy. Click for more details...

TONSLEY MAIN ASSEMBLY BUILDING LOADING DOCK REFURBISHMENT
1284 South Rd, Clovelly Park, SA 5042 Has Tonsley Main Assembly Building Loading Dock Refurbishment currently at Construction stage. The Principal invites tenders from qualified contractors to deliver the Refurbishment Works to the Loading Dock for the Main Assembly Building (MAB) at Tonsley. This package comprises: 1) Concrete repairs replacement of sections of the vehicle ramps & loading bay area & associated concrete slabs; 2) Vehicle barriers & guard rails; 3) Metal balustrading; 4) Corrosion protection & painting structural steel & other metal work; 5) Line marking & signage; 6) Electrical lighting & power. Click for more details...

ADELAIDE FESTIVAL PLAZA NEW TRAM STOP
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Adelaide Council Area for New development. New tram stop & track extension north along King William Road (outside Adelaides Festival Plaza). Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect