State

Categories

Sub Categories

Click Here to Find Current Projects

List of Yards, Sidings, Loading docks, Railways, Container terminals. Projects in NSW


GLEBE ISLAND BULK CEMENT TERMINAL
Glebe Island Bulk Cement Terminal is currently at the Construction stage, valued at about $ 2400000 it is Upgrade & additions to existing bulk handling facility to increase discharge pipes from 2 to 4, electrical installations. Click for more details...

SOUTH MAROOTA RECREATION FACILITY
Horse Riding/Motorcycle Clubs/Tracks - Relocation project at Lots 114, 115 Paulls Rd (Crown Rd Reserve R74343) (DP752039), Maroota, NSW 2756 In The Council Area Of The Hills Shire of Local Govt. Proposal is for the relocation of the Kellyville Horse Riding Club and Baulkham Hills Junior Motorcycle Club to the subject site. The proposal includes horse riding facilities, junior motorcycle riding facilities and tracks, carparking facilities, amenities, storage, & associated facilities. Associated landscaping & fencing. Click for more details...

DUBBO ROAD/RAIL INTERCHANGE
Road/Rail Interchange project at Lot 1 Boothenba Rd (DP358031), Dubbo, NSW 2830 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Proposed multi-user road-rail interchange freight terminal, rail siding & office. Facility will be used to load out-bound trains with fully containerised freight for transport to eastern port facilities. Click for more details...

HOMEBUSH RAIL TURNBACK PROJECT
Rail Turnback project at Homebush Railway Station, Homebush, NSW 2140 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Proposed construction of a new rail turnback track. The project involves widening the rail corridor, constructing a new platform and track at Homebush Station, and refurbishing an existing building at the station. The development at Homebush Station includes an approx 500m westwards extension to the existing down local track and construction of a new platform (Platform 7) to service the new down local track. The existing local track would be re-configured as a centre track turn back serviced by Platform 6, which would allow all stations City to inner west services to be terminated at Homebush. The project also includes ancillary track work to facilitate connections between the new down local and existing up local tracks plus an extension to the up local track to provide an overun facility that is combined with a new buffer stop. Construction of a new easy access ramp off The Crescent to provide access to the new Platform 7. Extension of Platform 6 by approx 45m at eastern end. Internal modifications to the existing building on Platform 5/6 to provide facilities for RailCorp staff. Removal and construction of approx 100m section of the brick station boundary wall on the Crescent. Pavement repair and service reinstallation works on The Crescent to accommodate up to local 4m widening of the station boundary. Changes to some parking on the northern and southern side of The Crescent. Change to the location of the night bus ride facility, and the provision of a kiss & ride drop off zone. Provision of new lighting and design treatments to the street components around the station entrance to improve the amenity of the station precinct. Minor modifications to utilities and services on the northern side of The Crescent, including underground an existing section of the overhead powerlines. Click for more details...

BISHOP AUSTRANS RESEARCH FACILITY
Private ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Penrith Council Area for New development. Development of a testing facility for a new transport system consisting of a 2.5 kilometre twin rail track incorporating return loops at either end, associated buildings include workshop, office & amenities, vehicle maintenance shed, cyclone security fence, acoustic fence. Click for more details...

PORT KEMBLA CARGO HANDLING FACILITY
Cargo Handling Facility project at Part Lot 504 & Lot 2003 Tom Thumb Rd (DP1035674 & DP1030233) (INNER HARBOUR), Port Kembla, NSW 2505 In The Council Area Of Wollongong of Federal. Construction of a cargo handling facility with a capacity to initially accommodate approx 50,000 twenty foot equivalent units (TEUs) (one TEU = one 20 foot container) per year with provision for growth to around 100,000 TEU per year within the next 10 years. Key components of the development would include:: site paving, lighting and security: civil works including fencing, access road/truck receival area, carpark, stormwater drainage system, construction to facilitate access between the Multi-Purpose Berth and the site for general access vehicles; : building works including an administration/amenities block, a gatehouse, a maintenance building, three cargo sheds (for the storage of weather sensitive break-bulk cargo) and two wash bays with one to be used solely by Australian Quarantine Inspection Services and: relocation of the existing rail spur in an easterly direction to align along with the western side of Farrer Rd Click for more details...

GRONG GRONG GRAIN FACILITY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Nullong Rd, Grong Grong, NSW 2652 for New. Construction will include a number of bunkers, an unloading & weighbridge facility and a rail loading facility. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

GLEBE ISLAND BULK GYPSUM UNLOADING TERMINAL
Unloading Terminal project at Berth No 7 (lots 1 & 2 DP879549), Glebe Island, NSW 2039 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Construction & operation of a bulk gypsum unloading & storage terminal, including conveyers & hoppers, for Gypsum Resources of Australia. Construction will consist of a steel profile building with a 30,000 ton storage capacity. Site will be prepared by the Sydney Ports Authority. Click for more details...

AUSTRALIAN INLAND RAIL EXPRESSWAY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Various Council Area of Freight Rail Expressway type. The Australian Inland Expressway is expected to be in three sections from Victoria through NSW and on to Brisbane. Dual standard gauge 4500 km railway line. Click for more details...

THIRD AVE FACTORY/OFFICE
A project in the NSW Within Blacktown. Replace carwash with extension to building no 3 with 720 sq m of high bay factory unit, 160 sq m of lightbay loading area & 256 sq m mezzanine office & an additional 16 car spaces. Click for more details...

TUMBARUMBA GUARDFENCES
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at various roads within Council area, Tumbarumba, NSW 2653 for Supply & Install. 2003-2004 contract for in excess of 1500 m guardfence & terminals. Click for more details...

PARRAMATTA RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Willoughby Council Area of Rail Link - Overall type. Proposed rail link Parramatta to Chatswood via Macquarie Shopping Centre and Macquarie University, 28 km link to carry 12 trains per hour on a dual line the bulk of which is to be underground. 9 new stations &/or new platforms at existing stations, including new underground stations at Delhi Road, Macquarie Park & Macquarie University, upgrade of existing stations at Chatswood & Epping. Extension of line from Parramatta to Westmead. Click for more details...

NEWCASTLE MULTI-PURPOSE TERMINAL - REFER TO PROJECT ID804998
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Newcastle Council Area of Multi Purpose Terminal type. Construction of a multi-purpose terminal to provide port facilities for containers & general break bulk cargo. The project is a turnkey design, installation, construction & commissioning of a multi-purpose port terminal which will handle 5 million + tonnes of inbound materials (HBI & bulk commodities) & export of 4.5 million tonnes of finished steel products. Click for more details...

QTUG BERTH
Qtug Berth is currently at the Tenders & Building stage, valued at about $ 100000 it is Corrosion repair, painting & cathodic protection of approx 213m of steel sheet pile wall & installation of a sea bed scour protection mat at the Tug Berth. Click for more details...

LEONARD ST FACTORY
Factory - 2 Storey project at 15 (Lot 19) Leonard St (Secn 3 DP2669), Hornsby, NSW 2077 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Demolition of existing buildings including the weatherboard house, office and 2 awning workshops. Construction of a 2 storey concrete and masonry factory. Basement level of 466 sq m will be the loading dock, amenities, small office, rooms for storage and also to rebuild test room and fabrication area. 1st floor of 154 sq m is for the showroom and distribution centre and toilets. Associated carparking for 4 cars Click for more details...

KOORAGANG RAIL TERMINAL - HUNTER VALLEY RAIL FREIGHT NETWORK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) Addition project at Heron Rd, Kooragang, NSW 2304. This type is Railway Terminal - Addns with State ownership. Construction of an additional arrival track, improvements to yard layout. Click for more details...

CRONULLA TO SUTHERLAND RAIL LINE
Rail Line - Upgrade/Duplication project at Cronulla to Sutherland Rail Line, Cronulla, NSW 2230 In The Council Area Of Sutherland of State. Duplication of 8km of existing line between Sutherland, Gymea, Caringbah & Cronulla & configuration of Sutherland Junction. New stabling yards at Cronulla. re-signalling, new communications & electrification of the entire line. upgrade of Sutherland. Kirrawee, Woolooware & Cronulla stations, 8 new or modified road & rail bridges. Extensive track possession works & environmental & public domain works. Click for more details...

REGIONAL DISTRIBUTION CENTRE
21 (Lot 5) Kellogg Rd (DP255515), Rooty Hill, NSW 2766 Has Regional Distribution Centre currently at Construction stage. The proposal is for construction & operation of a Regional Distribution Centre (RDC) near the intersection of the Main Western Railway and the M7 Motorway. The proposal comprises: A regional office building & quarry materials and concrete testing laboratory. Rail siding with an aggregate loading facility. Storage bin area and load out facilities. Ground storage & reclaim facilities. Blending plant/pug mill. A conveyor system linking the unloading station to the storage & truck load out facilities. Workshop, stores, site offices and amenities facilities, truck washdown facilities, truck refuelling, weighbridges, truck & carparking. Bridges at 2 locations over Angus Creek. Realignment of North Parade. Twin alley concrete batching plant. Click for more details...

QANTAS FREIGHT TERMINAL
Renovations, Refurbishments etc. project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Sydney Airport, Mascot, NSW 2020. Extension of carpark handstand area, extensions to the loading dock & roof area Click for more details...

EAST HILLS RAIL LINE
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hurstville Council Area for New development. Track formation reconstruction (track reconditioning) to be carried out at Beverly Hillson the up main track between 14.505 km to 14.737 km during track possession of all East Hills tracks between Turella & Glenfield. During this time RailCorp will have the electrical overhead 1,500 V DC current isolated. Click for more details...

P & 0 CONTAINER TERMINAL
Container Terminal - Upgrade project at 42 Friendship Rd, Matraville, NSW 2036 In The Council Area Of Randwick of Private. Upgrade of P&O Ports container terminal at Port Botany. The upgrade includes extension of rail sidings; relocation of truck access and marshalling area; and acquisition of additional plant and equipment that are expected to increase the annual capacity of the terminal to more than 1.3 million TEU's (Twenty-foot Equivalent Unit). Click for more details...

MUNGINDI FEEDLOT
Cleveland Rd, Mungindi, NSW 2406 Has Mungindi Feedlot currently at Planning stage. Proposed feedlot for 5000 SCU. Fencing, dams & pens. Click for more details...

MACARTHUR STATION FOURTH PLATFORM PRECINCT
A project in the NSW Within Campbelltown. Project/Contract management services for Macarthur Fourth Platform Project Click for more details...

CARDIFF (GLENDALE) RAIL MAINTENANCE FACILITY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Lake Macquarie Council Area of Private ownership. Scope of work includes: construction of 16 new tracks, overhead electrification of 2 tracks, construction of access road, demolition of 7 existing buildings, earthworks relocation of approximately 3,000sq m of existing fill, relocation of time capsule & associated plaques, refurbishment of existing workshops (including installation of pits, overhead platforms, roller doors), construction of 1 new high voltage testing shed, refurbishment of existing turntable & construction of 2 new weight stations Click for more details...

NORTH WEST RAIL LINK
A project in the NSW Within The Hills Shire. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Between Epping, Castle Hill &, Rouse Hill, NSW 2155. This type is Consultancy For Acoustic Technical Advisor - Railway Line/Tunnel with State ownership. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

SOUTH WEST RAIL LINK - STAGE B2
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Stage B2 works includes the following: The proposed 10.5km of rail line & associated infrastructure corridor between the Glenfield South Junction & Leppington. Construction of a train stabling facility at Rossmore. Construction of ancillary facilities, including power supply, sectioning huts, signalling structures, overhead wires, access roads & other infrastructure required for the operation & maintenance of rail services & infrastructure. Incorporated in the civil works is the movement of 1,000,000³ of earth, retaining walls, 5 overbridges & 7 underbridges including an underpass beneath the Hume Highway Click for more details...

SOUTHERN SYDNEY FREIGHT LINE (SSFL)
Currently at the Construction stage In Bankstown is a project estimated to be $ 30000000. This project The following 4 packages include: NSW-T-C1160 - SSFL Enabling Works OH - provision & relocation of high voltage electrical services between Sefton & Macarthur - O'DONNELL GRIFFIN PTY LTD. NSW-T-C1276 - SSFL Specialist Rail Work TC1 - track construction between Sefton & Macarthur - JOHN HOLLAND RAIL. NSW-T-C1277 - SSFL Specialist Rail Work SC1 - Signalling work between Sefton & Macarthur - WRSA. NSW-T-C1280 - SSFL General Works GW2 - Construction of noise walls & fencing between Sefton & Macarthur - ARENCO PTY LTD Click for more details...

HEXHAM REDEVELOPMENT PROJECT - TRAIN SUPPORT FACILITY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Newcastle Council Area of Train Support Facility type. Construction and operation of a train support facility comprising service centre/depot for maintenance and provisioning support for coal and freight trains. Construction of new connections to the Great Northern Railway (GNR). Construction of 10 new train lines (tracks) & sidings parallel to the existing main railway line to accommodate QR National trains for provisioning, inspections, servicing & maintenance. A custom designed provisioning building will be constructed over the 2 provisioning tracks, will a total area of 1,390sq m, the building foundations will be piled with a steel portal framed structure, wall cladding will be a combination of corrugated steel sheeting, clear fiberglass sheeting for light entry and a fixed louvre system for ventilation, roof will be corrugated steel sheeting. Bulk fuel storage area with capacity for up to 400,000L of diesel fuel. Construction of an intersection and a new vehicular access road from the Tarro Interchange. Approximately 380,000m³ of earthworks (import to fill) for the construction of the railway formation, access road, drainage & building foundations. Construction of internal vehicular access roads. Protection or diversion of existing utilities. The light provisioning facility will consist of 100,000L self-bunded portable fuel storage tank with attached pumping unit, provision for the storing & distribution of 2000L of new oil; & 27 tonne sand storage, distribution and delivery system. The facility is to be placed on bunded concrete apron slabs with in-ground runoff collection pits, awning. 2 separate servicing & repair buildings: wagon maintenance building; & locomotive maintenance building. The wagon maintenance building (including administration) will have a total area of 2,232sq m with shed, office & store. The proposed wagon maintenance building will be built over the 2 wagon maintenance tracks, foundations will be piled with a steel portal framed structure with flat roof pitch, wall cladding combination of corrugated steel sheeting, clear fiberglass sheeting & fixed louvre system for ventilation, roof will be sheeted in corrugated steel. An overhead travelling crane to lift the wagon bodies from wheel sets will be installed within the building. wheel set storage bay will be constructed, consisting of a hardstand area with rails set in for the storage of wheel sets in rows. The locomotive maintenance building will have a total area of 2,440sq m with shed, office & store, 2 incoming tracks to accommodate 4 locomotives.The foundations will be piled with a steel portal framed structure, flat roof pitch, wall cladding combination of corrugated steel sheeting, clear fiberglass sheeting & fixed louvre system for, roof sheeted in corrugated steel. Locomotive wash bay 551sq m. Prefabricated steel framed & clad building service vehicle garage building 288sq m. Wheel lathe building 480sq m. 3 major components of road infrastructure: intersection with the Tarro Interchange; access road from the Tarro Interchange to the facility; & internal access roads. Stage 1: Civil work; Tarro Interchange, site access road & internal access roads; mainline connections & crossover; bulk fuel storage; provisioning facility; provisioning & UTM tracks; wagon maintenance & administration building; wagon maintenance tracks; carparking; & landscaping. Stage 2: locomotive maintenance building; locomotive wash building; locomotive turntable; & locomotive maintenance tracks; & wheel lathe. Click for more details...

GRAFTON REGIONAL SALEYARD PENS
A project in the NSW Within Clarence Valley. Design and construction of new pens to replace the existing pens 9 to 15. Click for more details...

SOUTH WEST RAIL LINK
Consultancy For Professional Services Contractors project at from Leppington to, Glenfield, NSW 2167 In The Council Area Of Campbelltown of State. The SWRL involves the design, construction, commissioning & operations of the following key components: Grade-separated flyovers over the Main South Lines to north & south of Glenfield Station & reconfiguration of Glenfield Station. These works are collectively referred to as Glenfield Junction.; A new 13km twin track railway from Glenfield to Rossmore; 2 new railway stations & associated facilities at Edmondson Park & Leppington; A train stabling facility at Rossmore to the west of the new Leppington Station & new carpark at Glenfield. Click for more details...

HERONS CREEK RD 69 LOT SUBDIVISION - KEW INDUSTRIAL
Lots 2 & 133 Herons Creek Rd DP1117359 DP754405 & DP712594, Herons Creek, NSW 2443 Has Herons Creek Rd 69 Lot Subdivision - Kew Industrial currently at Planning stage. Industrial subdivision site area 93.5ha. proposed net subdivisible site area 43. 5ha. Lot areas range between 5,000sqm - 64,000sq m. Currently zoned 4(a) general industrial, future zoning upgrade under draft LEP 2009 - IN3 heavy industrial. Click for more details...

ENFIELD FREIGHT TERMINAL - INTERMODAL LOGISTICS CENTRE
Intermodal Logisticis Centre - Infrastructure Works project at Former Enfield Marshalling Yard, Strathfield, NSW 2135 In The Council Area Of Strathfield of State. Main construction of infrastructure works (civil & rail) will comprise: Stage 1: Associated offsite road, road-bridge & rail connecting infrastructure works. Stage 2: Site earthworks, drainage, services, road works & rail infrastructure. Click for more details...

ARTC MAIN NORTHERN RAILWAY - MINIMBAH THIRD TRACK PROJECT - EOI PROJECT WORKS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Singleton Council Area of Railway Track/Road - Stage 2 type. Expressions of Interest for Stage 2 of the project. General supply & subcontract: supply & installation of site buildings; supply of stationery; supply of fuel; supply if safety products & clothing; supply of site vehicles; supply & installation of fencing; supply of traffic barriers steel/concrete; labour hire services; electrical services;plumbing services; surveying services;office cleaning services; earthworks testing services;traffic controller services;supply & installation of roadwork signs;site security services;pot holding services;utilities locator services;hydraulic services;small tools & hardware & saw cutting services. Earthworks & structures supply: Gypsum; Quarry materials; reinforced concrete pipes;culvert; Pits; Fibre Reinforced Concrete pies; supply of Geotextiles & Ag drains; reinforcement & fabric; concrete & testing; Elastomeric Bearings; Expansion Joints; Precast bridge beams; Precast Structure Components; Manufacture & supply of fabricated steel; Formwork supplies; Scaffolding; Void Formers. Earthworks & Structures subcontract works - Clearing & grubbing; landscaping/hydra mulching; Reinforced Soil Walls; Retaining walls; Piling Works; Installation of Drainage;Construction of bridges. Plant Hire - Earthmoving Plant & equipment;minor plant & equipment hire; Crushing & screening;Tub grinder;Crane hire; Concrete pump Click for more details...

AUBURN STABLING FACILITY
Stabling Facility project at off Manchester Rd, Auburn, NSW 2144 In The Council Area Of Auburn of State. Construction of a stabling facility to accommodate a minimum of 16 x 8 car suburban trains. Construction of walkways & access roads. Installation of lighting & fencing. Construction of staff amenities & offices. Associated civil & rail systems work. Construction of an access road & bridge for staff vehicles. Construction of a staff carpark Click for more details...

SOUTHERN REGIONAL LIVESTOCK EXCHANGE
Currently at the Construction stage In Wingecarribee is a project estimated to be $ 2439000. This project Construction of a 12,200sq m steel structure of saw tooth design over the saleyard outdoor complex. The project will have electrical installation; internal lighting, solar panelling, hot water from roof heaters, water harvesting & reticulation. Installation of 4 x 100,000 litre above ground rainwater tanks, 2 adjacent to the south east corner & 2 adjacent to the south west corner of the new roof structure with associated pump & infiltration structure. Installation of new lighting under the proposed roofing structure. Upgrading of the existing truck loading/unloading & parking areas. Click for more details...

NUNDAH BANK THIRD TRACK
Railway/Bridge/Civil Works project at near Rix's Creek, Nundah, NSW 2330 In The Council Area Of Singleton of Private. Proposed third track & ancillary infrastructure at Nundah Bank near Rix's Creek in the Hunter Valley. Approximately 4.26 kilometres of track on the Up side, turnouts, return curves & changes to Camberwell Mine Rail Junction. Approximately 54,000 cubic metres of earthworks including track formation, drainage & minor structures. New vehicular maintenance access tracks adjacent to the proposed third track on both the Up & Down sides. Upgrading the existing signalling system and installing signals on the new track. Bridge modification to existing Rix's Creek mine haul road rail overbridge. Ancillary infrastructure such as temporary construction compounds, haul roads & stockpile sites Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - GOSFORD PASSING LOOPS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Gosford Council Area of State ownership. Design, construction & commissioning of 2 new tracks for the passing loops (and associated overhead wiring, civil & structural works) between Gosford & Narara stations. The total new track length would be approximately 4 km (approximately 2 km for both the Up & Down Refuges). The new tracks would be constructed on the outside of the existing rail tracks & would generally be accommodated within the existing rail corridor boundary (with the exception of a short section of track between chainages 82.40 km & 82.70 km, which would require the eastern corridor boundary to be widened by up to approximately 3 metres to facilitate the construction of the track & other railway infrastructure. Three new pairs of bridges (six bridges in total) over Bradys Gully, Wingello Creek & Wyoming Creek to accommodate the new tracks. The new bridges would be located adjacent to the existing rail bridges. One new crossover (the connection between 2 tracks allowing trains to cross tracks) on the Up Main (adjacent to Brooks Avenue, Wyoming, between chainages 83.50 km & 83.80 km) & a new turnout (special trackwork that allows trains to pass from one track on a diverging path) on the Down Refuge (adjacent to Brooks Avenue, Wyoming, between chainages 83.60 km & 83.80 km). Maintenance access roads & gates. A combined services route (approximately 2 kilometres long) on the eastern side of the rail corridor between Gosford Station & the Etna Street overbridge (a road bridge that travels over the rail corridor), as well as on the western side of the rail corridor between the Etna Street overbridge & Narara Station. Three underline crossings (buried services route allowing services/utilities to cross beneath the rail tracks) & associated cable routes at proposal chainages 81.54 km, 81.97 km & 84.52 km. Refurbishment of an existing Up Refuge between Gosford Station & the Etna Street overbridge. Removal of 2 existing maintenance sidings (referred to as the Down Loco Sidings 1 & 2) adjacent to Gosford Showground. Removal of 2 existing crossovers & one turnout between Gosford Station & Gosford Showground. Refurbishment of one existing catchpoint adjacent to Gosford Showground. Modifications to the existing signalling system at various locations between Gosford Station & north of Narara Station (proposal chainages 81.00 km to 86.00 km). Adjustment, relocation, protection &/or provision of services & utilities, including overhead wiring, high & low voltage, telecommunications/control & earthing/bonding Click for more details...

NORTH WEST RAIL LINK
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at various locations in Sydney, ., NSW 2999. Tender DoT 2011/014 - The Service Provider is responsible for providing specialist advice relating to acoustic assessment, acoustic design and noise and vibration control for the construction and operation of the North West Rail Link. Tender DoT 2011/023 - The Service Provider will complete the survey and spatial data management services such that the Principal will have sufficient information to be able to obtain indefeasible title in fee simple to surface features (station access) and the subsurface features (tunnel) of the various component elements of the Project Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Various Council Area of State ownership. Services are to provide all necessary documentation and advice required to obtain statutory 'Planning Approvals' for the NWRL Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. The Service Provider is responsible for providing specialist management services to support 3 of the projects core functional groups: Customer strategy & planning; Stakeholder & community liaison; Project Controls & Support. The scope of Service includes: Project Management ? Urban Design & Station Precinct Planning, Customer Requirements & Integrated Transport; Community Liaison; Stakeholder Management; Procurement & contracts; Systems & Safety Process Assurance & Mapping & Technical Illustration Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

PORT BOTANY CONTAINER TERMINAL 3
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Randwick Council Area for New development. Construction of 5 buildings of different sizes all over the site, two of the larger ones are for the maintenance building & an operations building Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

CHULLORA FREIGHT TERMINAL
Private ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Bankstown Council Area for New development. Alterations to the existing shed comprising re-cladding & closing of the existing opening access on the southern elevation & creation of a new opening on the western elevation. Relocation of 8 existing light poles. New & upgraded hardstand areas including full pavement reconstruction & enlargement of truck lanes to the south of the railway lines & pavement overlay to the north of the truck lanes. Click for more details...

GUNNEDAH YARD UPGRADE PROJECT HUNTER VALLEY
Rail - Track/Yard - Upgrading project at ., Gunnedah, NSW 2380 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Gunnedah yard upgrade project Hunter Valley. Scope of work includes: upgrade & commissioning of the Gunnedah yard including all civil, track, drainage, structure & signalling works. Click for more details...

DOWNER LOCOMOTIVE FACILITY
Austral St, Parkes, NSW 2870 Has Downer Locomotive Facility currently at Construction stage. Construction of a locomotive maintenance facility. Concrete slab & structural steel. Click for more details...

DOWNER LOCOMOTIVE FACILITY
Downer Locomotive Facility is currently at the Construction stage, valued at about $ 4000000 it is Extension to the existing locomotive maintenance building, services & rail modifications Click for more details...

MT VICTORIA RAIL SYSTEMS
Currently at the Construction stage In Blue Mountains is a project estimated to be $ 495000. This project The scope of the rail systems remodelling works at Mt Victoria includes design, supply & installation, construction & testing/commissioning of a multi-disciplinary range of equipment & facilities. Replacement of the existing life expired signalling system with a new colour light signalling system with remote control capability via a computer based interlocking system (ie, a new signalling system). Civil work. Track work. Overhead wiring. Drainage. Low & high voltage power supply upgrade. Communications Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect