State

Categories

Sub Categories

Click Here to Find Current Projects

List of Yards, Sidings, Loading docks, Railways, Container terminals. Projects in NSW


WERRIS CREEK GRAIN RECEIVAL CENTRE & STORAGE CENTRE
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Lot 21 Abouds Rd (DP736003), Werris Creek, NSW 2341. Construction of a Grain Receival Centre & Storage facility including - New Rail Line - a twin rail spur line that will cater for the receival & dispatch of up to 48 wagons & up to 75 tonne & 3 locomotives. - 2 x 40,000 tonne capacity ground level bunker storages having a compacted crushed rock base with 2 metre high perimeter walls. - A weighbridge capable of handling 36 & 1/2 metre road train. -Weighbridge office, workshops & sample station. - 4 drive over hoppers for inloading & outloading grain to & from ground level bunker storage. -internal roads & drainage works. Click for more details...

REVESBY RAILWAY STATION - TURNBACK
Currently at the Construction stage In Bankstown is a project estimated to be $ 78000000. This project The project would call for a new track, turnback & crossover & new island platform. Easy access facilities including 3 lifts, new pedestrian footbridge, retaining walls, lighting, CCTV & embankment widening to support the new track & new bridge at the River Road to accommodate the new track Click for more details...

QUAKERS HILL TO VINEYARD DUPLICATION - RAIL CLEARWAYS PROGRAM
Quakers Hill To Vineyard Duplication - Rail Clearways Program is currently at the Construction stage, valued at about $ 236000000 it is The Quakers Hill to Vineyard Duplication Project invovles the design & construction of a 2nd track 10km long between Quakers Hill & Vineyard Stations. Scope of work includes: 10 km of new track between Quakers Hill & Vineyard stations; upgrade of Quakers Hill & Riverstone stations to easy access; possible re-location of Schofields station 600m south with a 500 spot carpark, bus interchange & easy access & associated removal of existing station; upgrade of Vineyard station to include island platform with accessible station facilities, crew change over facilities & a bus interchange with carpark & future incorporation of North West Rail Link; removal of level crossings at Quakers Hills & Schofields stations; removal of the existing turnout & crossover at Riverstone; removal of the maintenance siding at Riverstone; new crossovers for the turnback at Vineyard station & a new maintenance siding; new overhead wiring associated with the new track; upgraded substation at Schofields & Vineyard with new feeders & relocation existing substation at Schofields; modifications to existing signalling infrastructure; upgrade of signalling power supply; new communications systems at Schofields, Riverstone & Vineyard stations; drainage along the corridor; retaining walls & earthworks; noise walls, as required, adjacent to existing residential area & relocation of utilities under track crossings Click for more details...

PORT BOTANY TERMINAL EXPANSION PROJECT
Currently at the Construction stage In Randwick is a project estimated to be $ 580000000. This project Proposed extensions to existing port facilities at Brotherston Dock North. Stage 1 comprises the construction & operation of a container terminal and associated infrastructure described generally as: an additional 550m plus 980m of berth face at approx 51 hectares of land to the west of Brotherson Dock North; provision for an extra 4 nominal berths; dedicated road access to foreshore Road via a bridge across the channel separating the terminal from the existing shoreline; rail access to the new terminal area by means of an extension to the existing Botany Freight Rail Line parallel to Foreshore Road, including a rail bridge & carriageway; 2 new rail sidings; an inter-terminal access road & 2 additional rail storage sidings parallel to the northern boundary of the Patrick Terminal; reclamation adjacent to Foreshore road to create a recreational boat ramp, tug & support vessel facility; restoration & enhancement of Foreshore beach and adjoining landscape area; and ecological habitat relocation and enhancement work within the Penrhyn Estuary. Stage 2 works will comprise the construction and operation of approx 12 hectares of additional terminal area of approx 320m of additional quay line to accommodate a nominal fifth berth. There are 3 different options for Stage 2 fifth berth: Western Option, Eastern Option & Northern Option. Click for more details...

BISHOP AUSTRANS RESEARCH FACILITY
Private ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Penrith Council Area for New development. Development of a testing facility for a new transport system consisting of a 2.5 kilometre twin rail track incorporating return loops at either end, associated buildings include workshop, office & amenities, vehicle maintenance shed, cyclone security fence, acoustic fence. Click for more details...

EASTWOOD RAILWAY STATION
Eastwood Railway Station is currently at the Planning stage, valued at about $ 400000 it is Extension of existing platform. Click for more details...

TOTTENHAM TO BOGAN GATE RAIL LINK
Railway - Upgrade Renovations, Refurbishments etc. project In The Parkes Council Area. Major upgrade of existing 115 kilometre rail line including replacement of Yethera timber bridge with a concrete structure, replacement of various bridge abutments & general bridge renewal. Click for more details...

ARDGLEN RAILWAY TUNNEL
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Main Northern Rail Line, Ardglen, NSW 2338 for New. Proposed upgrading of existing rail track between Muswellbrook and Narrabri and the construction of a 5-8km rail tunnel through the Liverpool Ranges. Click for more details...

THIRD AVE FACTORY/OFFICE
A project in the NSW Within Blacktown. Replace carwash with extension to building no 3 with 720 sq m of high bay factory unit, 160 sq m of lightbay loading area & 256 sq m mezzanine office & an additional 16 car spaces. Click for more details...

NEWCASTLE MULTI-PURPOSE TERMINAL - REFER TO PROJECT ID804998
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Newcastle Council Area of Multi Purpose Terminal type. Construction of a multi-purpose terminal to provide port facilities for containers & general break bulk cargo. The project is a turnkey design, installation, construction & commissioning of a multi-purpose port terminal which will handle 5 million + tonnes of inbound materials (HBI & bulk commodities) & export of 4.5 million tonnes of finished steel products. Click for more details...

TIMBUMBURI ANIMAL BREEDING ESTABLISHMENT
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Lot 60 New England Hwy (DP1033960), Timbumburi, NSW 2340. This type is Animal Breeding Establishment with Private ownership. Construction of an animal (horse) breeding facility. Click for more details...

QTUG BERTH
Qtug Berth is currently at the Tenders & Building stage, valued at about $ 100000 it is Corrosion repair, painting & cathodic protection of approx 213m of steel sheet pile wall & installation of a sea bed scour protection mat at the Tug Berth. Click for more details...

AUSTRALIAN WHEAT BOARD SILO
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Bland Council Area of Private ownership. Construction of a wheat silo with permanent storage capacity of 160,000 tonnes & an additional temporary storage capacity of 40,000 tonnes. Click for more details...

AUSTRALIAN WHEAT BOARD SILO
Silo New project In The Cootamundra Council Area. Construction of a wheat silo with permanent capacity of 80,000 tonnes & an additional temporary capacity of 50,000 tonnes. Click for more details...

CATERAIR DESPATCH DOCK
300 Coward St (Lot 103 DP253766), Mascot, NSW 2020 Has Caterair Despatch Dock currently at Construction stage. Construction of a steel frame metal cladding to enclose loading dock including new stairs, roller doors, air conditioning & lighting. Precast concrete panels. Click for more details...

BIOMASS FERTILISER PLANT
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Earth works & civil works for the construction of a processing plant. Click for more details...

LEONARD ST FACTORY
Factory - 2 Storey project at 15 (Lot 19) Leonard St (Secn 3 DP2669), Hornsby, NSW 2077 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Demolition of existing buildings including the weatherboard house, office and 2 awning workshops. Construction of a 2 storey concrete and masonry factory. Basement level of 466 sq m will be the loading dock, amenities, small office, rooms for storage and also to rebuild test room and fabrication area. 1st floor of 154 sq m is for the showroom and distribution centre and toilets. Associated carparking for 4 cars Click for more details...

BERALA RAILWAY STATION
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. The work comprises of asphalt resurfacing of Platforms 1 & 2. Works include the removal & disposal of existing asphalt & the removal & reinstatement of all platform fixtures. Click for more details...

SYDNEY TO MELBOURNE MAIN SOUTH RAIL LINE-RAIL INFRASTRUCTURE UPGRADE
Rail Line - Upgrade project at Sydney to Melbourne, Sydney, NSW 2000 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Package 1 to comprise 220 kilometres of new rail track proposed to follow existing track, extensive sleeper replacement & track geometry improvement, project includes existing track & construction of new sections. Details of the works program include: The construction of 16 passing lanes consisting of double track sections of around 10km to 15km of a standard configuration at approx 10 minute running time intervals with around 220kms total length of new line construction; New concrete sleepers on selected curves allowing trains to run at faster speeds. This will involve about 290,000 new sleepers & recanting to maximum superelevation to facilitate maximum train speeds; Ballast top-up & tamping of existing concrete sleepers over 130 kms to achieve maximum train speeds; Boosting capacity to the Dynon/Melbourne precinct by increasing to three the number of bi-direction tracks between Tottenham Junction to Dynon; Construction of a direct standart gauge connection between Brooklyn & Sunshine in Melbourne to provide direct access between the North-South & East-West corridors; and Installation of eight sets of facing cross overs to minimise operational delays during upgrading & future renewal projects. Click for more details...

LIDCOMBE TURNBACK PROJECT DOUBLE ENTRY REFER TO PROJECT ID 2212554
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Auburn Council Area of Railway Station - Extns type. Construction of a new turnback platform, extension of overhead concourse to provide new station access, new track crossover & turnout, improvements to railway station streetscape, landscaping, bus shelters & seating. Click for more details...

EAST HILLS RAIL LINE
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hurstville Council Area for New development. Track formation reconstruction (track reconditioning) to be carried out at Beverly Hillson the up main track between 14.505 km to 14.737 km during track possession of all East Hills tracks between Turella & Glenfield. During this time RailCorp will have the electrical overhead 1,500 V DC current isolated. Click for more details...

PORT KEMBLA SILO & WEIGHBRIDGE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Proposed construction of a storage silo, blending plant & weighbridge. Click for more details...

ROADS & TRAFFIC BELLAMBI DEPOT
Lot 3 York Rd (DP209884), Bellambi, NSW 2518 Has Roads & Traffic Bellambi Depot currently at Construction stage. Demolition of buildings 2-6, 8-11 & 14-16 to make way for the Northern Distributor extension. Construction of portal framed garage/store approximately 833sq m building, alterations & relocation of some existing buildings, consolidation of site, and associated works comprising hardstand area approximately 1600sq m, 2 carparking area's 2400 sq m, siteworks, landscaping, fencing & pathways 2200 sq m Click for more details...

P & 0 CONTAINER TERMINAL
Container Terminal - Upgrade project at 42 Friendship Rd, Matraville, NSW 2036 In The Council Area Of Randwick of Private. Upgrade of P&O Ports container terminal at Port Botany. The upgrade includes extension of rail sidings; relocation of truck access and marshalling area; and acquisition of additional plant and equipment that are expected to increase the annual capacity of the terminal to more than 1.3 million TEU's (Twenty-foot Equivalent Unit). Click for more details...

KINGSGROVE TO REVESBY QUADRUPLICATION - RAIL CLEARWAYS PROGRAM
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at East Hills Line between Kingsgrove &, Revesby, NSW 2212. This type is Railway Tracks with State ownership. Proposed construction of 2 additional tracks along the East Hills Line between Kingsgrove Station & Revesby Station to enable the separation of local & express services to create new Up & Down Main tracks. Scope of work includes construction of approximately 7.5 kilometres of new track located either side of the existing twin tracks (15km in total), ancillary trackworks including crossovers, turnouts, catchpoints & minor realignments including connections into the Revesby turnback, civil works including widening of embankments & cuttings, retaining walls, track drainage & culvert extensions, noise walls as & where required. Construction of new underbridges on either side of existing tracks at stormwater canals east of Beverly Hills Station, Broad Arrow Rd, Narwee, underbridge & pedestrian underpass culvert at Narwee Station, Bonds Rd & Webb St Riverwood; modifications to &/or construction of overbridges at Kings Georges Rd at Beverly Hills Station, Belmore Rd at Riverwood Station, Davies Rd, Padstow, Memorial Dr at Padstown Station & Doyle Rd Padstow. Construction of 2 new underbridges over Salt Pan Creek, Riverwood; Revesby Station works including extension of the footbridge (which is under construction), overhead concourse including booking office, station staff amenities & public toilet; a lift, stairs, communications, lighting & power, security & fencing, Blamey St realignment & landscape works & associated infrastructure & rail & station systems/services. Modifications to signalling, traction power supply, overhead wiring including new infrastructure as required; relocation of high voltage 33kV feeders & equipment; installation of 11kV underground line with pad mounted transformers, low voltage supplies/equipment; relocation of existing substations & station supplies. Replacement of the signal maintenance depot at Riverwood with a signal maintenance depot at Revesby; utilities adjustments & protection. Protection of the existing ethane gas pipeline. Commuter carparking adjustments at Beverly Hills, Narwee, Riverwood & Revesby stations & alterations to existing advertising hoardings & landscape works Click for more details...

ETTAMOGAH INTERMODAL HUB
Transport Hub - Stage 1 New project In The Albury Council Area. Stage 1, valued at $9million will include earthworks, siding upgrades, terminal & office facilities. Warehouse facilities will be developed based on demand & as an integral part of Stage 1. Click for more details...

MACARTHUR STATION FOURTH PLATFORM PRECINCT
A project in the NSW Within Campbelltown. Project/Contract management services for Macarthur Fourth Platform Project Click for more details...

PATRICK RAIL YARD RAIL SIDINGS
Rail Sidings project at 1 Beauchamp Rd, Banksmeadow, NSW 2019 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Construction of new rail sidings, reconfiguration of existing rail sidings, construction of a new locomotive inspection pit & wagon maintenance pad & the relocation of the self-bunded refuelling container Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Between Epping, Castle Hill &, Rouse Hill, NSW 2155. This type is Consultancy For Acoustic Technical Advisor - Railway Line/Tunnel with State ownership. The North West Rail Link (NWRL) involves the construction and operation of a twin track passenger railway, approximately 22 km long, between Epping and a proposed stabling facility at Rouse Hill, in the North West of Sydney. The project will be delivered in two stages. The first stage, between Epping and Hills Centre Station, is proposed to be operational by 2015. The second stage, between Hills Centre Station and Rouse Hill, is proposed to be operational by 2017 Click for more details...

SOUTHERN SYDNEY FREIGHT LINE (SSFL)
A project in the NSW Within Bankstown. The following 15 packages include: NSW-T-C1161 SSFL - Sefton Drive Construction earthworks & bridgeworks at Sefton - ARENCO PTY LTD. NSW-T-C1162 SSFL - Formation Construction between Sefton to Cabramatta E & RW1 Woods Rd Sefton & Bareena E & RW1 Street, Cabramatta - ARENCO PTY LTD. NSW-T-C-1163 SSFL - Formation Construction between Liverpool to Glenfield - Bareena St, Cabramatta & E & RW2 Woodbrook Rd, Liverpool. NSW-T-C1164 SSFL - Formation Construction between Liverpool to Glenfield - Woodbrook Rd, Liverpool & E & RW3 Glenfield Junction Sub Station. NSW-T-C-1165 SSFL - Formation Construction Ingelburn to Macarthur Ingelburn & Macarthur E & RW4. NSW-T-C1166 SSFL - Bridgeworks - Sefton to Bridgeworks between Woods Rd, Cabramatta -BR1 Sefton & Bareena St, Cabramatta - ARENCO PTY LTD. NSW-T-C1167 SSFL - Bridgeworks between Bareena to Casula - BR3 St, Cabramatta & Glenfield Creek, Casula - ARENCO PTY LTD. NSW-T-C1168 SSFL - Bridgeworks - Ingleburn to Bridgeworks between Ingleburn & Macarthur - BR3 Macarthur. ARENCO PTY LTD NSW-T-C1169 SSFL - Prospect Creek Bridge - Bridgeworks at Prospect Creek BR4 - ARENCO PTY LTD. NSW-T-C1170 SSFL - Georges River Bridge - Bridgeworks at Georges River, BR5 Liverpool - ARENCO PTY LTD. NSW-T-C1171 SSFL - Glenfield Flyover - BR6 Construction of Glenfield Flyover - GARTNER ROSE PTY LTD NSW-T-C1172 SSFL - Station works - ST1 Building works Sefton, Carramar, Warwick Farm, Leightonfield & Casula - GARTNER ROSE PTY LTD. NSW-T-C1173 SSFL - Station works - Building works at Cabramatta station Cabramatta - ST2 - GARTNER ROSE PTY LTD. NSW-T-C1174 SSFL - Station works - Building works at Minto, Leumeah, Campbelltown & Macarthur Stations - GARTNER ROSE PTY LTD. NSW-T-C1279 SSFL - Sefton Precinct Works - Roadwork & paving stations (8 no)GW1 between Sefton & Campbelltown Click for more details...

SOUTHERN SYDNEY FREIGHT LINE (SSFL)
Currently at the Construction stage In Bankstown is a project estimated to be $ 30000000. This project The following 4 packages include: NSW-T-C1160 - SSFL Enabling Works OH - provision & relocation of high voltage electrical services between Sefton & Macarthur - O'DONNELL GRIFFIN PTY LTD. NSW-T-C1276 - SSFL Specialist Rail Work TC1 - track construction between Sefton & Macarthur - JOHN HOLLAND RAIL. NSW-T-C1277 - SSFL Specialist Rail Work SC1 - Signalling work between Sefton & Macarthur - WRSA. NSW-T-C1280 - SSFL General Works GW2 - Construction of noise walls & fencing between Sefton & Macarthur - ARENCO PTY LTD Click for more details...

MINIMBAH THIRD TRACK PROJECT
Railway Track - Stage 1 project at Main Northern Line, Minimbah, NSW 2312 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Construction & operation of a 3rd track adjacent to the existing Main Northern Railway Line. The major elements of the project include approximately 10.8 km of track & earthworks, 3 new rail under bridges, grade separation of Range Road level crossing, replacement & realignment of the Golden Highway overbridge, services relocation & signalling works Click for more details...

RICHMOND RAIL LINE & STATIONS - PROJECT NOW INCLUDED IN ID1023710
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hawkesbury Council Area of Consultancy For Station Area Planning type. Station area planning for level crossings of the Richmond Rail Line between Quakers Hill & Vineyard as well as the upgrading of Riverstone Station & the design of new stations at the relocated Schofields & Vineyard stations Click for more details...

NORTH WEST GROWTH CENTRES - STATION AREA PLANNING
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hawkesbury Council Area of State ownership. Design of the areas surrounding New Schofields, Riverstone & New Vineyard, Richmond & Quakers Hills stations addressing issues of pedestrian access and connectivity, public transport interchange, urban design & station area planning for level crossings Click for more details...

GRAFTON REGIONAL SALEYARD PENS
A project in the NSW Within Clarence Valley. Design and construction of new pens to replace the existing pens 9 to 15. Click for more details...

SOUTH WEST RAIL LINK
Consultancy For Professional Services Contractors project at from Leppington to, Glenfield, NSW 2167 In The Council Area Of Campbelltown of State. The SWRL involves the design, construction, commissioning & operations of the following key components: Grade-separated flyovers over the Main South Lines to north & south of Glenfield Station & reconfiguration of Glenfield Station. These works are collectively referred to as Glenfield Junction.; A new 13km twin track railway from Glenfield to Rossmore; 2 new railway stations & associated facilities at Edmondson Park & Leppington; A train stabling facility at Rossmore to the west of the new Leppington Station & new carpark at Glenfield. Click for more details...

SHOALHAVEN STARCHES ETHANOL EXPANSION PROJECT
Shoalhaven Starches Ethanol Expansion Project is currently at the Construction stage, valued at about $ 200000000 it is Expansion of ethanol production facility. The project involves increasing the ethanol production rate of the plant up to 300 million litres a year; implementing a range of odour control measures on site; and upgrading, augmenting and using the existing infrastructure on site. The following additions and alterations are proposed to the existing factory site as part of the ethanol upgrade: the provision of an additional dryer for the starch/gluten plant; additional equipment and storage vessels for the ethanol plant including 3 additional fermenters, additional cooling towers and molecular sieves; upgrades to the Stillage Recovery Plant including 6 additional Dried Distillers Grains Syrup (DDGS) dryers; 10 decanters; chemical storage and two evaporators. The proposal also includes the installation of a DDGS Pellet Plant within this part of the site; & the establishment of a new packing plant, container loading area and a rail spur line. The establishment of this facility on the northern side of Bolong Road will require the provision of an overhead bridge structure to allow product and safe pedestrian movement across Bolong Rd. Approx areas are: starch dryer 700 sq m; gas-fired boiler 150sq m; extension to DDG: loadout 500sq m, evaporator 50sq m, bioscrubbers 200sq m, pellet plant 200sq m, DDGS dryers 2,400sq m, MCC room 375sq m; gas-fired co-generator Plant 1000sq m; chemical storage 150sq m; packing plant 3000sq m; fire services 200sq m; total Area 8,925 sq m. Additional carparking for 94 vehicles will be provided. Click for more details...

CBD METRO RAIL PROJECT - CONSULTANCY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Scope of work will include geotechnical & contamination site investigation work for the CBD Metro Rail project Click for more details...

ENFIELD FREIGHT TERMINAL - INTERMODAL LOGISTICS CENTRE
Intermodal Logisticis Centre - Infrastructure Works project at Former Enfield Marshalling Yard, Strathfield, NSW 2135 In The Council Area Of Strathfield of State. Main construction of infrastructure works (civil & rail) will comprise: Stage 1: Associated offsite road, road-bridge & rail connecting infrastructure works. Stage 2: Site earthworks, drainage, services, road works & rail infrastructure. Click for more details...

AUBURN STABLING FACILITY
Stabling Facility project at off Manchester Rd, Auburn, NSW 2144 In The Council Area Of Auburn of State. Construction of a stabling facility to accommodate a minimum of 16 x 8 car suburban trains. Construction of walkways & access roads. Installation of lighting & fencing. Construction of staff amenities & offices. Associated civil & rail systems work. Construction of an access road & bridge for staff vehicles. Construction of a staff carpark Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - NORTH STRATHFIELD
Rail Tracks/Tunnel/Stations project at ., North Strathfield, NSW 2137 In The Council Area Of Canada Bay of State. Overall project comprises: Construction of the North Strathfield rail underpass. Scope of work includes: new track to connect to the existing relief goods loop at North Strathfield. 2.4 km of new track & upgrade of 850m of existing track. A shallow driven tunnel (under operational tracks). Construction of a new aerial concourse, platform works, stairs, lifts, offices & amenities at Concord West Railway Station. Relocation of an existing RailCorp depot at North Strathfield Station. Associated civil & structural works. Provision of new rail systems, including overhead wire, high voltage, low voltage, communications & signalling. Utility relocations/protection Click for more details...

SYDNEY LIGHT RAIL EXTENSION - (SLRE)
Light Rail - Stage 1 project at Lilyfield to Dulwich Hill, ., NSW 2999 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Extension of the Sydney Light Rail project (SLRE). Stage 1 - an Inner West extension of 5.6km along the Rozelle goods line from Lilyfield to Dulwich Hill. The stations from Lilyfield will be Leichhardt North, Hawthorne, Marion, Taverners Hill, Lewisham West, Waratah Mills, Arlington & Dulwich Grove with an interchange at Dulwich Hill. Provision of the GreenWay shared path, a pedestrian and cycle path, from Iron Cove at Dobroyd Point to the northern bank of the Cooks River; as part of the GreenWay, sites for bushcare and vegetation remediation to provide for & increase existing local habitat for fauna. Modifications to the existing space that is used for car parking in Bedford Crescent to accommodate the Dulwich Hill interchange stop. Raising of the existing bridge over Parramatta Road, which would carry the light rail. Provision of pedestrian linkages (access pathways) to surrounding neighbourhoods to enable access to the GreenWay shared path & light rail stops. Modification of the existing road bridge structures to accommodate the GreenWay shared path ? namely at Hercules Street, Old Canterbury Road, Constitution Road, Davis Street & Longport Street. A new pedestrian/cycle bridge at Parramatta Road adjacent to the Parramatta Road underbridge. A new pedestrian/cycle bridge across Hawthorne Canal near Hawthorne stop. New infrastructure to ensure accessibility & connectivity between the GreenWay shared path, local streets and light rail stops. Safety fencing or separation of the GreenWay shared path & light rail operations & the light rail operations and the heavy rail operations on the Bankstown Line, near Dulwich Hill Railway Station. Provision of overhead wiring, substation & utilities infrastructure. Minor modifications to the existing light rail stabling & maintenance facility located at Pyrmont. Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - EPPING TO THORNLEIGH THIRD TRACK (ETTT)
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Hornsby Council Area of Rail Track/Railway Stations/Civil Works type. The proposal involves the construction of an additional track (or third track) on the western side of the existing tracks between Epping & Thornleigh. Scope of work also includes: modifications to 4 stations, including construction of new lifts & footbridges. Modifications to road, rail & pedestrian bridges. Construction of a new rail bridge over the M2 Motorway. Construction of cuttings, embankments, viaducts & retaining walls. Construction of new maintenance access roads adjacent to some lengths of the new track. Modifications to the existing overhead wiring and signalling systems. Associated civil & rail systems works. Track work involves the construction of a third track (approximately 6 km) within the Main North Line corridor on the western side of the existing tracks; the proposal would connect into the Down Suburban line just to the north of Epping Station and the Down Main (via a turnout) to the south of Thornleigh Station; the new track would generally be at the same level as the existing tracks; the alignment would be positioned as close to the existing tracks as possible with the exception of in the vicinity of the M2 Motorway where the alignment is located further to the west due the constraints of constructing a new bridge for the third track across the M2 Motorway. Station works - to accommodate the new third track some works are required at and in the vicinity of the following stations: Cheltenham - new footbridge, lifts & stairs, platform modification and station electrical systems. Reconfigured car parking & footpath; Beecroft ? modifications to existing pedestrian tunnel; reconfigured carparking & footpath; Pennant Hills - extended station concourse (northern footbridge); new lift & stairs; modifications to existing footpath, roadway & southern footbridge; Epping - minor platform adjustments. Bridge works would be required at Works would be required at the following locations: bicycle underpass at Epping; Devlins Creek culvert crossing (underbridge); M2 Motorway underbridge; Cheltenham Road overbridge; Copeland Road overbridge; Chapman Avenue overbridge; Pennant Hills Road overbridge; Pennant Hills Station footbridge. The proposal would also involve construction of & modification to signalling huts, communications facilities & other rail services infrastructure, the construction or modification of cuttings, embankments & retaining walls Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR - GOSFORD PASSING LOOPS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Gosford Council Area of State ownership. Design, construction & commissioning of 2 new tracks for the passing loops (and associated overhead wiring, civil & structural works) between Gosford & Narara stations. The total new track length would be approximately 4 km (approximately 2 km for both the Up & Down Refuges). The new tracks would be constructed on the outside of the existing rail tracks & would generally be accommodated within the existing rail corridor boundary (with the exception of a short section of track between chainages 82.40 km & 82.70 km, which would require the eastern corridor boundary to be widened by up to approximately 3 metres to facilitate the construction of the track & other railway infrastructure. Three new pairs of bridges (six bridges in total) over Bradys Gully, Wingello Creek & Wyoming Creek to accommodate the new tracks. The new bridges would be located adjacent to the existing rail bridges. One new crossover (the connection between 2 tracks allowing trains to cross tracks) on the Up Main (adjacent to Brooks Avenue, Wyoming, between chainages 83.50 km & 83.80 km) & a new turnout (special trackwork that allows trains to pass from one track on a diverging path) on the Down Refuge (adjacent to Brooks Avenue, Wyoming, between chainages 83.60 km & 83.80 km). Maintenance access roads & gates. A combined services route (approximately 2 kilometres long) on the eastern side of the rail corridor between Gosford Station & the Etna Street overbridge (a road bridge that travels over the rail corridor), as well as on the western side of the rail corridor between the Etna Street overbridge & Narara Station. Three underline crossings (buried services route allowing services/utilities to cross beneath the rail tracks) & associated cable routes at proposal chainages 81.54 km, 81.97 km & 84.52 km. Refurbishment of an existing Up Refuge between Gosford Station & the Etna Street overbridge. Removal of 2 existing maintenance sidings (referred to as the Down Loco Sidings 1 & 2) adjacent to Gosford Showground. Removal of 2 existing crossovers & one turnout between Gosford Station & Gosford Showground. Refurbishment of one existing catchpoint adjacent to Gosford Showground. Modifications to the existing signalling system at various locations between Gosford Station & north of Narara Station (proposal chainages 81.00 km to 86.00 km). Adjustment, relocation, protection &/or provision of services & utilities, including overhead wiring, high & low voltage, telecommunications/control & earthing/bonding Click for more details...

NORTH WEST RAIL LINK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The The Hills Shire Council Area of State ownership. This tender is develop cost plans, estimates for project options & pricing schedules for the North West Rail Link. The project will provide 23km of new rail infrastructure from Epping to Rouse Hill Click for more details...

NORTHERN SYDNEY FREIGHT CORRIDOR PROGRAM
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Epping to Thornleigh & Gosford, ., NSW 2999 for New. The Northern Sydney Freight Corridor Program includes a number of infrastructure projects to improve freight services along the 155-kilometre rail corridor between Sydney & Newcastle. This tender is for the role of Acoustic Technical Advisor on the Epping to Thornleigh Third Track and Gosford Passing Loops projects Click for more details...

NORTH WEST RAIL LINK
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at various locations in Sydney, ., NSW 2999. Tender DoT 2011/014 - The Service Provider is responsible for providing specialist advice relating to acoustic assessment, acoustic design and noise and vibration control for the construction and operation of the North West Rail Link. Tender DoT 2011/023 - The Service Provider will complete the survey and spatial data management services such that the Principal will have sufficient information to be able to obtain indefeasible title in fee simple to surface features (station access) and the subsurface features (tunnel) of the various component elements of the Project Click for more details...

PACIFIC NATIONAL TRAIN SUPPORT FACILITY
Train Support Facility - Stage 1 project at Lot 1 Mansfield St (DP112919), Greta, NSW 2334 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Stage 1 comprises 3 elements: Stage 1A ? access road; Stage 1B ? bulk earthworks; Stage 1C ? site facilities including tracks 1, 2 & 3; provisioning facility to service 3 tracks; facility access road & infrastructure; wagon maintenance facility; road base area for wheel sets & bogies; locomotive maintenance facility access track; road vehicles service centre; carpark; turnouts to main line; water quality system including detention basins; fencing; landscaping. Click for more details...

SYDNEY LIGHT RAIL
Sydney Light Rail is currently at the Construction stage, valued at about $ 45000000 it is Construction of limited Early Works, including selected utilities, road & traffic adjustments & other related infrastructure works Click for more details...

CUNNINGAR RAIL SIDING
Cunningar Rail Siding is currently at the Construction stage, valued at about $ 8100000 it is Upgrade of the existing out loading facilities at GrainCorp's grain storage & receival site including: upgrade & extend existing rail siding. Construct new 1,000 tonne grain storage bin. Construct new 1000tph loading shute. Construct grain conveyor system. Culvert extension. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect