List of Yards, Sidings, Loading docks, Railways, Container terminals. Projects in SA


WATERLOO CORNER ROAD COOLROOM
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for Addition development. Additions to coolroom, canopy & loading dock. Coolroom floor area: 1,770 sq m approx & Canopy floor area: 694 sq m. Click for more details...

SOUTH AUSTRALIAN WEIGH STATIONS
Currently at the Tenders & Building stage In Various is a project estimated to be $ 51000. This project Supply & install changeable messages for weigh stations throughout South Australia. Click for more details...

METCASH TRADING AUSTRALASIAN
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Charles Sturt Council Area of Loading Dock (Warehouse) - Extn type. Extension to warehouse & loading dock. Click for more details...

ABB GRAIN - EARTHWORKS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Outer Harbour terminal, Pelican Point Rd, Outer Harbour, SA 5018. This type is Earthworks Package For Deep Sea Port Facilities with Private ownership. Staged construction of bulk earthworks & pavements for access roads, rail loop, conveyor corridor & building platforms for ABB Grain's new Outer Harbor Terminal site. Includes associated drainage work comprising drainage structures & storm retention basin. Click for more details...

ADELAIDE AIRPORT
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Sir Richard Williams Av, Adelaide Airport, SA 5950 of Combined Passenger Terminal For Airport - Redevelopment - 2 Storey type of Renovations, Refurbishments etc. development. Construction of an industrial shed. Click for more details...

WINDY POINT LOOKOUT STAGE 2
A project in the SA Within Mitcham. Possibly build retainer walls along Belair Rd, signage & landscaping. Click for more details...

MITSUBISHI MOTORS AUSTRALIA
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at 1284-1324 South Rd, Clovelly Park, SA 5042 for Addition. Construct alterations & additions to loading docks including new canopy. Click for more details...

WEST AVENUE & BOLIVAR ROAD RAILWAY SIDING
Railway Siding/Spur New project In The Salisbury Council Area. Construct railway siding & spur railway line. Click for more details...

MARION - OAKLANDS TRANSPORT INTERCHANGE (OAKLANDS TRANSPORT INTERCHANGE)
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Lot 150 Morphett Rd (Vol 5800 Fol 451 FP 218080), Oaklands Park, SA 5046. New train & bus interchange for Oaklands Park, relocation of Oaklands Park train station closer to Marion Shopping Centre & sale of 16,000 sq m of land where existing Oaklands Park railway station is located. Work to include station platforms & shelters, car parking, landscaping, passenger facilities & decommissioning existing station facilities. Click for more details...

MOUNT GAMBIER WEIGHBRIDGE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Within, Mount Gambier, SA 5290 of Weighbridge type of New development. Provision & installation of above ground B-Double weighbridge & driver control station. Click for more details...

ABB GRAIN - RAIL TRACK
Rail Track For Terminal - Design/Contsruct New project In The Port Adelaide Enfield Council Area. Design & construction of standard gauge rail loop for delivery of grain to new storage terminal. Click for more details...

DTEI - TRANSADELAIDE HEAVY RAIL NETWORK CONSULTANTS
Electrical Infrastructure Design Services Consultants New project In The Various Council Area. Provision of design services for investigating electrification of TransAdelaide Heavy Rail network electrical infrastructure. Click for more details...

WINDMILL HILL TRANSFER STATION - WEIGHBRIDGE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Mount Barker Council Area of Weighbridge - Suppy/Installation/Commission type. Supply, install & commission of above ground weighbridge on level capped landfill site closed in 1990. Click for more details...

DEPARTMENT OF DEFENCE - HARDENED & NETWORKED ARMY INITIATIVE - ELECTRICAL & COMMUNICATION INFRASTRUCTURE - PACKAGE 3
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Edinburgh Defence Precinct (EDP), Edinburgh, SA 5111 of Design Consultant - Package 3 type of New development. Design consultant for site wide electrical & communications infrastructure. Click for more details...

SIXTH AVENUE RAILWAY CROSSING UPGRADE
A project in the SA Within Marion. Upgrade to railway crossing at Sixth Av/Dunorlan Av. Work to include: demolition & construction of kerbing, kerb ramps, bituminous surfacing, asphalt paths, guardfence, linemarking, signs & traffic/pedestrian maintenance. Work does not include boom gate relocation or new lighting. Click for more details...

RAIL REVITALISATION PROJECT BELAIR TO LYNTON & NOARLUNGA LINES
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Mitcham Council Area of Consultancy For Geotechnical & Contamination Investigation type. The Rail Revitalisation involves the upgrade of sections of rail track infrastructure to bring the track up to an acceptable technical standard along the Belair and Noarlunga rail lines. The Belair line from Lynton to Belair (the scope of this project) is a bi-directional line containing a number of loops. The Noarlunga line comprises two rail tracks. The RR Project will involve the installation of concrete sleepers and upgrading the condition of the associated infrastructure assets (i.e. formation, drainage, ballast) to increase track stability. The Department for Transport, Energy and Infrastructure (DTEI) invites suitably qualified and experienced companies to submit tenders for undertaking a geotechnical investigation, a concurrent contamination investigation and a drainage audit to determine conceptual remedial design for track formation upgrade. Click for more details...

RAIL REVITALISATION PROJECT FORMATIVE CONSULTANCY BELAIR & NOARLUNGA LINES
Currently at the Planning stage In Mitcham is a project estimated to be $ 40000000. This project Major Track Upgrade: Work involves installing more than 60 km of new track including new base layer, drainage, new long life concrete sleepers & new rail where required, plus other minor works, with works commencing on the Belair & Noarlunga Lines. Adelaide Railcar Depot Relocation: Involes moving & upgrading the storage & maintenance infrastructure plus some minor rail works. Click for more details...

PORT ADELAIDE CONTAINER TERMINAL
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Port Adelaide Enfield Council Area of Private ownership. Demolition of existing structures, and security fencing for transportable office, 72 storage containers & landscaping. Click for more details...

MOUNT GAMBIER & DISTRICT SALEYARDS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Grant Council Area of Covered Cattle Yards type. Demolition of existing cattle yard pens & concrete pavements, construction of new roof structure (approx 3000 sqm); construction of new pens (40) & gates, races associated rubble, concrete & sawdust flooring; construction of roof drainage system; construction of water troughs & feeders; design & installation of water supply system or water troughs & associated works. Click for more details...

RAIL RETIVALISATION BELAIR PASSENGER RAILWAY LINE UPGRADE
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Between Millswood & Belair, ., SA 5999. 15.5 km of single line broad gauge rail track, including two tunnels & 4 passing loops. Click for more details...

COAST TO COAST LIGHT RAIL CITY WEST TO ADELAIDE ENTERTAINMENT CENTRE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at North Tce to Port Rd to Adelaide Entertainment Centre, Adelaide, SA 5000. This type is Tramline with State ownership. Extension of tramline 2.5 km from City West on North Terrace (adjacent Morphett Street Bridge) on to Port Rd, up to Adelaide Entertainment Centre, including a "park & ride" facility using the Adelaide Entertainment Centre carpark. Click for more details...

RAILWAY ELECTRIFICATION INFRASTRUCTURE ADELAIDE METROPOLITAN PASSENGER RAIL NETWORK
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Various rail networks, ., SA 5999. This type is Overhead Wiring System with State ownership. (a) The design, construction, testing and commissioning of Traction Overhead Wiring System (OHWS), Signals, Communications, & Earthing & Bonding for a 25kV AC traction system, including Depots & Stabling facilities, & all associated works. and (b) operation and maintenance of the electrified rail infrastructure - OWHS, traction SCADA (including Control Room) and communications infrastructure (Fibre Optic & Data Acquisition networks) only, for a minimum period of approximately five (5) years after handover to the Principal, with optional extension(s) of up to two (2) similar periods at the Principal's discretion. Operation and Maintenance of Traction Power infrastructure also may be included in this component. Click for more details...

RAILWAY SIGNALLING CONSULTANCY INCORPORATED INTO ID 1106706
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Various rail networks, ., SA 5999 of Concept Consultancy For Railway Signalling type of New development. The aim of this study is to provide sufficient benchmark information to a concept level relating to the future design of the signalling & communication systems to enable the Department for Transport Energy & Infrastructure to understand and assess industry submissions relating to the signalling & communication works associated with the network electrification, including an assessment that it can be delivered within the budget constraints of the Future Public Transport Network. The aims of these advisory services are to: Identify & assess the viable options for the upgrading of the signalling & communications systems; identify & validate the differing technology options that may be available; investigate a system design that maximises train running efficiency, optimises train speed, approach to crossings, headways, etc; prepare concept level drawings for a future signalling & communication system; prepare concept cost estimates; develop upgrade program; document findings. Click for more details...

ARTC EAST WEST CORRIDOR RAIL SIGNALLING
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Various Council Area of Rail Signalling type. Signal design and signal construction field works from installation through to testing and commissioning of the completed works for a period of approximately 2 years. Click for more details...

RAIL REVITALISATION ADELAIDE METROPOLITAN PASSENGER RAIL TRACKWORKS
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project for New development. Rail track upgrade works. Click for more details...

RAILWAY ELECTRIFICATION ADELAIDE METROPOLITAN PASSENGER RAIL NETWORK OVERALL ID 1106706
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at ., Adelaide, SA 5000 for New. Consultant shall provide the following, but not limited to, services: (a) Independent Witnessing, (b) Preparation of specification documents, (c) Project Management Support Services, and (d) Correlation of signalling wiring & the removal of redundant wiring. Click for more details...

TRACTION POWER SYSTEM FOR RAIL REVITALISATION ELECTRIFICATION INFRASTRUCTURE
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Adelaide Council Area for New development. The extent of the works is the design, procurement, construction, testing & commissioning of the Traction Power System (TPS) to support the 25kV electrified Adelaide Metro Passenger Rail Network (AMPRN), which includes the following: (a) Adelaide yard & Adelaide station, including the ¨Northern Car Yard¨ area; (b) Noarlunga Line, including Port Stanvac Stabling yard; (c) Tonsley line; (d) Gawler Line including Dry Creek Rail Car Depot, Dry Creek Stabling Yard & Gawler Stabling yard; (e) Outer Harbour line; (f) grange line; (g) Belair Line between Adelaide Station & Goodwood Junction only; and (h) Seaford Extension. Project Scope - Traction Power System: (a) Two 66kV/25kV railway substations, adjacent to the Noarlunga Centre Line (NCL) & Gawler Centre Line (GCL) respectively, & the option of a third centrally located 66kV/25kV railway substation; (b) Three Track Section Cabins adjacent to the NCL, GCL & Outer Harbor Line (OHL) respectively, & the option of a fourth adjacent the NCL; (c) Four Track Coupling Units; (d) All associated protection systems, switchgear, buswork, surge arrestors, Current Transformers, Voltage transformers, control & interlocking systems. (e) Earthing & bonding of Works; (f) Civil & building works including switching stations' compound & layout, access roadways, security fencing & gates, oil/water separation, containment & treatment, drainage; (g) All associated High Voltage cabling; & (h) All associated Low Voltage cabling including communications cables. Click for more details...

RAIL REVITALISATION ADELAIDE METROPOLITAN PASSENGER RAIL TRACKWORKS
Trackworks - Upgrade project at Gawler Line (Mawson Lakes to Gawler Central), Gawler, SA 5118 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). Rail track upgrade works. Click for more details...

RAIL REVITALISATION ADELAIDE METROPOLITAN PASSENGER RAIL TRACKWORKS
Noarlunga Line (Jetty Rd Brighton to Adelaide Railyards), Adelaide, SA 5000 Has Rail Revitalisation Adelaide Metropolitan Passenger Rail Trackworks currently at Construction stage. Upgrading of track by installing gauge convertible concrete sleepers, new ballast & new & refurbished rail. Upgrading several level crossings & improving drainage. Click for more details...

AMBLESIDE RAIL CROSSING LOOP
Rail Crossing Loop New project In The Adelaide Hills Council Area. New 2 km rail crossing loop at Ambleside between Beaumont Road bridge & Spoehr Road level crossing on the Adelaide-Melbourne rail corridor. To include: New second track long enough for 1500 m trains & eventually 1800 m trains to pass. Associated earthworks involving cut & fill. Additional single-track bridge over the Onkaparinga River. Some alignment alterations to the mainline track within the corridor. Drainage & culvert extension work. Signalling works for the loop. Retention of the existing access track provisions in the corridor. Click for more details...

NARACOORTE LUCINDALE COUNCIL REGIONAL LIVESTOCK EXCHANGE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at Cnr Wimmera Hwy & Carters Rd, Naracoorte, SA 5271 of Regional Livestock Exchange type of New development. Design & construction of the following upgrades: Cattle Yard Roofing; Water Catchment & Reuse Facilities; Amenities. Click for more details...

TAPPA ROAD TRANSPORT TERMINAL & OFFICE
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at 25-31 Tappa Rd, Edinburgh, SA 5111 of Road Transport Terminal/Office type of New development. Construction of road transport terminal including office. Associated carparking & landscaping. Click for more details...

GOODWOOD JUNCTION RAIL SEPARATION UPGRADE
Bridgeworks/Roadworks project at Between Goodwood Train Station Fairfax Ave & Arundel Ave, Goodwood, SA 5034 In The Council Area Of Unley of State. Creation of a grade separation between the Noarlunga Passenger Rail line from the Belair Passenger Rail line & ARTC freight line (involving the construction of an underpass). The development components of the project include: (a) earthworks & associated structures for the excavation of the underpass trench; (b) new bridge structures over the underpass trench; (c) tree damaging activities in relation to regulated & significant trees; & (d) associated site & civil works. Click for more details...

JERVOIS STREET ROAD TRANSPORT TERMINAL
Jervois Street Road Transport Terminal is currently at the Construction stage, valued at about $ 1800000 it is Construction of road transport terminal with ancillary offices & ancillary carparking. Click for more details...

FLINDERS PORT TRANSHIPMENT HARDSTAND AREA
Private ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Port Adelaide Enfield Council Area for New development. Construction of intermodal transhipment facility in the form of a new 2.5 ha hardstand area adjacent to Berth 29 (suitable for the marshalling & storage of containerised minerals & bulk commodities. Associated stormwater, fire safety, lighting, civil & earthworks (comprising the excavation & filling of coastal land). Click for more details...

GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities. Click for more details...

ADELAIDE FREIGHT TERMINAL INFRASTRUCTURE UPGRADE PHASE ONE
New project of Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project at ., Kilburn, SA 5084. Upgrade, phase one, of Adelaide Freight Terminal. The site is an operational locomotive freight terminal with significant wearing course & services upgrade requirements. Click for more details...

ADELAIDE METROPOLITAN PASSENGER RAIL NETWORK RAIL PROFILING
Civil Works - Rail Profiling project at Railway lines for Gawler &, Seaford, SA 5169 in the Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.). The Principal is responsible for operating & maintaining the Adelaide Metropolitan Rail Network (AMPRN). DPTI has on time running targets & ride quality standards for the AMPRN. This tender is for the provision of profiling services to assist in meeting these targets. Location of Work: The Tenderer will be required to undertake a total of 40km of corrective profiling works which are to occur on the Gawler & Seaford Railway lines. Profiling Requirements: The prospective Tenderer shall provide typical production rates in m/hr for: a) Installation of rail profile with a minimum metal removal of 0.2mm; b) Corrective rail profiling as specified with a metal removal of 100m2. Further, the Tenderer shall provide: 1) The distance (in m) that is required for the ramping into or out for accommodating infrastructure such as level crossings; 2) Time taken to set up & re start machine following stopping; 3) Time required during a typical shift for replacement of cutting/grinding consumables. The works shall be undertaken between first & last train. Click for more details...

GLENGOWRIE TRAM DEPOT ELECTRICAL WORKS
Glengowrie Tram Depot Electrical Works is currently at the Construction stage, valued at about $ 300000 it is Background: The overhead system in Glengowrie depot is divided into electrical sections. To facilitate the maintenance of trams these electrical sections can be turned off individually, whilst the power to the remainder of the depot is maintained. To improve the flexibility of the depot, it is proposed to introduce additional electrical sectioning. Purpose: For the purposes of this tender, Design & Construct includes design, supply, installation, construction, testing, commissioning & handover. Existing Arrangement: The current switching arrangements allow for the following scenarios: (a) Open switches on Pole GD2, removes power to the whole depot. (b) Open switch on Pole GD22, removes power to the south end of the depot. (c) Open switch (with Earthed Position) on Pole GD16, removes power & earths Road 4 in the Tram Barn. (d) Open switch (with Earthed Position) on Pole GD10, removes power & earths Road 1 in the Tram Barn. (e) Open switch (with Earthed Position) on Pole GD10, removes power & earths Road 2 in the Tram Barn. Proposed Arrangement: Supplied Drawing TP2-DRG-000076 schematically demonstrates the required modifications, which are: (a) The Tenderer is to design & install a new earthed position switch around the existing section insulator to be mounted on GD18. (b) The new switch on GD18 needs position detection to operate the existing traffic lights for South Yard. (c) Redundant switch & position detection on GD22 needs to be removed. Inside the Tram Barn: (a) Install two new section insulators on Road 1 & Road 2 in the centre of the Tram Barn. (b) Install 2 new earthed switches to feed the new subsections created to the south end of Road 1 & 2 in the Tram Barn. (c) Switches to be located in convenient locations for maintenance staff. (d) Feeding from switches to newly created sections is to be via suitably insulated cables routed through roof of the Tram Barn. (e) Four new traffic lights to be installed in the roof of the Tram Barn to provide staff indications on the state of the trolley wire. (f) Interlocking system to be fitted to new switches to interface with the existing interlocking system to allow access to associated overhead platforms. (g) Switches to be fitted with detection to operate relevant traffic lights to show status of overhead trolley wire. (h) All earthed switches to be suitably bonded to the rail. (i) Modifications necessary to interface switches with the current interlocking system should not require a change in the current interlocking process. (j) The lens on traffic lights (existing & new) should have the road number & section on it (e.g. 1C). NOTE: The feeding of the South Yard is through cables with 400mm2 cross sections. The tenderer is to confirm that 107 mm2 Overhead Wires would not be overloaded if used on their own to feed the south yard. No changes to current track layout are permitted. Click for more details...

MOSELEY SQUARE & GLENGOWRIE TURNOUT REPLACEMENT WORKS
Moseley Square & Glengowrie Tram Depots, Adelaide, SA 5000 Has Moseley Square & Glengowrie Turnout Replacement Works currently at Construction stage. The Department of Planning, Transport & Infrastructure (DPTI) is responsible for operating & maintaining the Adelaide Metropolitan Tram Network. DPTI has on time running targets & ride quality standards for the AMPRN. This tender is for the installation of new turnouts & points to assist in meeting the above targets. Location of Work/Services: The turnout & points upgrades are to occur at Moseley Square & Glengowrie Tram depots. General: The works are divided into Separable Portions to allow for separate funding of these portions over 2015/16 & 2016/17 financial years. The Principal may choose to award separate contracts for either portion, both portions or neither portion. Prior to Acceptance of Tender the Principal will confirm the works to be awarded. Separable Portion A: Separable Portion A consists of the construction of Moseley Square Turnout Replacement works. Separable Portion B: Separable Portion B consists of the construction of the Glengowrie Tram Depot Replacement Works. Principally Supplied: The Principal shall supply the following: 1) Track Protection; 2) Track Access; & 3) Design documentation for the turnout replacement portion of the works. Points Machine Design: Glengowrie Tram Depot Points Machine The current 9A points machine at the Glengowrie Tram Depot is a 300V DC Westinghouse Mark 3 point machine which is to be upgraded to a Hanning &Kahl (H&K) HW61.1 AW-ZW, 600V DC points machine. The contractor will be responsible for the design & installation requirements of the H&K points machine. To enable this to occur the Tenderer will need to consider the following; a) Installation of a 600V DC supply from the overhead fused & terminated to a separate location case due to the Glengowrie relay room having no space to accommodate further infrastructure. b) The connection to the OLE should be on the main line side of the Section Insulator on pole GD02, so the supply is not lost every time the depot is isolated. The interface between the current relay interlocking system & the H&K relay interlocking system is to be designed, but not limited to the following options; a) The current signalling system is relay based & the design needs to interface between the interlocking & the H&K point machine, controls & indication needs to be incorporated into the current system OR b) Supply a new H&K location case that will contain the controller unit, point card, contactors for driving the machine and interface the detection circuits via proximity detectors back into the existing detection circuits for signal routes. An interface cable will be required between the two locations for the transmission of control & indications. c) Surge protection is necessary & shall be incorporated into the design. Moseley Square Points Machine The current MS1 points machine at Moseley Square shall be replaced with a H&K, HWU40D-Z points machine without detection. Click for more details...

TONSLEY MAIN ASSEMBLY BUILDING LOADING DOCK REFURBISHMENT
1284 South Rd, Clovelly Park, SA 5042 Has Tonsley Main Assembly Building Loading Dock Refurbishment currently at Construction stage. The Principal invites tenders from qualified contractors to deliver the Refurbishment Works to the Loading Dock for the Main Assembly Building (MAB) at Tonsley. This package comprises: 1) Concrete repairs replacement of sections of the vehicle ramps & loading bay area & associated concrete slabs; 2) Vehicle barriers & guard rails; 3) Metal balustrading; 4) Corrosion protection & painting structural steel & other metal work; 5) Line marking & signage; 6) Electrical lighting & power. Click for more details...

ADELAIDE FESTIVAL PLAZA NEW TRAM STOP
State ownership Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) project In The Adelaide Council Area for New development. New tram stop & track extension north along King William Road (outside Adelaides Festival Plaza). Click for more details...

ADELAIDE METROPOLITAN PASSENGER RAIL NETWORK RAIL HUSBANDRY
Civil Engineering (Yards, Sidings, Loading docks, Railways, Container terminals.) New project at Various locations upon the AMPRN Train Network, Adelaide, SA 5000. This type is Railworks - Milling with State ownership. The Principal invites tenders for the provision of rail profiling (milling) services. For the purposes of this tender, rail profiling & rail husbandry are to be considered the same & equivalent. Location of Work/Services The Contractor will be required to undertake up to 40 km of corrective rail profiling (milling) works in the AMPRN train network. The Principal will prioritise the lines & the locations for milling prior to work commencing & issue to the Contractor a schedule of final total kilmotreage, the lines & locations required to be milled. The rail profiling (milling) works will be required on both the up & down tracks of the AMPRN between the provisional kilometerage & turnouts locations. Milling Plant Stabling Written approval is required from the Principal for all stabling proposals. Supply of Materials All materials shall be supplied by the Contractor. Click for more details...

ADELAIDE METROPOLITAN PASSENGER RAIL NETWORK TRACK SURFACING
Railway Works - Tamping New project In The Adelaide Council Area. The Principal invites tenders for provision of the following: Location of Works / Services The Contractor will be required to undertake up to 425 km of train line tamping & up to 22 turnouts in the AMPRN train network. The Principal will prioritise the lines & the locations for tamping prior to work commencing & issue to the Contractor a schedule of final total kilometreage, the final turnouts, the lines & locations required to be tamped. The track surfacing (tamping) works will be required on both the up & down tracks of the AMPRN between the provisional kilometerage & turnouts locations. Tamping Machine & Regulator Stabling Written approval is required from the Principal for all stabling proposals. Supply of Materials All materials to be supplied by the Contractor. Click for more details...

MILE END CONTAMINATED SOIL REMEDIATION
145 Railway Tce, Mile End, SA 5031 Has Mile End Contaminated Soil Remediation currently at Construction stage. The Principal invites tenders for the excavations of soils & transport to a licenced waste facility for stabilisation (treatment) & disposal. The soils would be treated at the licenced facility in according with their existing EPA licence & validated to confirm compliance with the facilities disposal criteria. Click for more details...

SALISBURY STATION
Electronic Ticket Validation Gates/Cctv/Fencing - Supply/Install New project In The Salisbury Council Area. The Principal invites tenders for provision of the following: Description of Work: This tender is for the construction, supply & installation of infrastructure to facilitate the installation of ticket validation gates at Salisbury Station on the Gawler Line. The works include: 1) Supply & Installation of new motorised sliding & swing auxiliary access gates; 2) Supply & Installation of new fencing & removal of redundant fencing; 3) Supply of new CCTV cameras, lighting, electrical services & comms systems; 4) Integration of new equipment into existing operation & controls systems; & 5) Construction of new footings & pavement for the installation of the ticket validation gates. The railway right of way is a nominate specialised work location & safety of railway operations is of paramount importance. The Contractor shall undertake the works so as not to impede, obstruct or interfere in any manner whatsoever with Railway Infrastructure. Location: The location of the works is Salisbury Interchange Railway Station, Platform 2, on the Gawler Line. The station is accessed from Park Terrace, Paternoster Road or via Gawler Street. Platform 2 is the Up (Adelaide) Platform & is adjacent to the bus interchange on the eastern side of the station. Click for more details...