State

Categories

Sub Categories

Click Here to Find Current Projects

List of Civil Engineering Projects in TAS


GUNNS PLAINS TV TRANSLATOR TOWER
Local Govt ownership Civil Engineering (Lighting, signal towers, transmitting towers, lines, beacons) project In The Central Coast Council Area for New development. Construction of tower, shed & associated facilities. Steel structure, steel shed, concrete floor slab & associated roadworks. Click for more details...

EZ ZINC SMELTER - LOOGANA
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) Renovations, Refurbishments etc. project at Risdon Rd, New Town, TAS 7008. This type is Rehabilitation Work - Stage 1 with Private ownership. Rehabilitation of Loogana & Inshallah, washing. The initial stage requires the removal of jarosite from the site by 31 December 1997. Part of this work requires the washing of around 40,000 cu m of rock and gravel contaminated with jarosite. Click for more details...

BEAUTY POINT EFFLUENT RE-USE SCHEME
New project of Civil Engineering (Dams) project at West Arm Road, Beauty Point, TAS 7270. Construction of a 38 megalitre storage dam and associated pipework and fencing. Click for more details...

PEGGS CREEK BRIDGE REPLACEMENT
Not known, East of, Stanley, TAS 7331 Has Peggs Creek Bridge Replacement currently at Construction stage. Replace existing bridge with precast concrete box culvert. Click for more details...

RIDGLEY MAIN ROAD PAVEMENT REHABILITATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Replacement of pavement on the north & south bound lanes with new base material & asphalt resealing. Click for more details...

PATERSON STREET CENTRAL (PERIMETER) ROAD AND FOOTPATH WORKS
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Paterson St, Launceston, TAS 7250. Construction of a road, footpath and relocation of services around the perimeter of Paterson Street Central Carpark. Scope of works include construction of 100m of 225mm diameter sewer main, manholes and gully pits, 85m of 100mm watermain, installing street lighting conduits and posts, building demolition, pavement construction, asphalt sealing and miscellaneous associated works. Click for more details...

LONGFORD FLOOD PROTECTION WORKS
Civil Engineering (Retaining walls, Seawalls) project In The Northern Midlands Council Area of Local Govt ownership. Works will include the demolition and removal of existing boundary fences, the construction of a low concrete wall and the erection of new boundary fencing on portions of wall. Click for more details...

SISTERS HILLS ROAD REDEVELOPMENT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Bass Hwy (Dallas Hill-Pollards Rd) east of, Rocky Cape, TAS 7321 of Roadworks type of New development. This contract involves providing a new eastbound overtaking lane at Dallas Hill and modifying the existing overtaking lane at Pollards Road. Click for more details...

GUNNS BLEACHED KRAFT PULP MILL
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Vicinity Tamar River, Bell Bay, TAS 7253 of Bulk Earthworks type of New development. The work will include overburden removal excavation in rock including blasting, separation of rock and crushing, construction of temporary access roads, internal roads, hard stand and lay down areas. The design and construction of major drainage structures including building site and access road drainage. The earthworks volume is approximately 2.5m m3 of which a large proportion is expected to be rock. Click for more details...

GRAVELLY BEACH ROAD RECONSTRUCTION
A project in the TAS Within West Tamar. Construction of new road pavement includes sealing, kerb, channel, footpaths and drainage. Click for more details...

QUEENSTOWN/STRAHAN WATER SUPPLY SYSTEMS UPGRADE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Various Locations, Queenstown, TAS 7467 of Pipelines type of New development. Construction of pipelines, roadworks, small pump station and miscellaneous earthworks. Click for more details...

ALBERT HALL
Lift - Installation project at 45 Tamar St (Corner Cimitiere St), Launceston, TAS 7250 in the Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks). Replacement of existing goods lift with a passenger lift, works involve excavation, underpinning, demolition, steel fabrication and all that is required in the construction of a three level passenger lift within an existing building. Click for more details...

CIRCULAR HEAD ASPHALT SURFACING 2011/2012
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various Locations within the Municipality, Smithton, TAS 7330 for New. Supply of Asphalt Surfacing services for the resurfacing operations and the surfacing of new road construction works for 2011/2012. Click for more details...

JENKINS STREET ROAD RECONSTRUCTION
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Jenkins St, Taroona, TAS 7053. Design and construction of road pavement and associated works. Click for more details...

CLARENDON VALE RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project at Bulla Dr and Brogo Wy, Clarendon Vale, TAS 7019 of Residential Subdivision (47) Lots type of New development. Construction of a 47 lot fully serviced residential subdivision. Click for more details...

EAST GAWLER RIVER BRIDGE
Bridge Replacement project at Central Castra Rd, Central Castra, Sprent, TAS 7315 In The Council Area Of Central Coast of Local Govt. Design and construction of a new concrete bridge. Click for more details...

BRIGHTON COUNCIL RE-SEAL TENDERS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Brighton Council Area of Road Re-Sealing And Sealing type. Re-sealing and new sealing of various roads within the Brighton Municipality. Click for more details...

BROOKE STREET FERRY PIER DEVELOPMENT
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Hobart Council Area of Pier Structure type. Construction of the pontoon level of the pier which will sit below water level is 40% complete. The entire concrete structure is likely to be in place at Brooke Street end 2014. The pier is being built at Incats Princes of Wales Dockyards. Click for more details...

LAUNCESTON FLOOD PROTECTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Passive recreation construction of an elevated walkway and pedestrian and cycleway bridges in association with the flood levee. Click for more details...

TASMAN HIGHWAY/EAST DERWENT HIGHWAY INTERCHANGE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Clarence Council Area of Road Works type. The construction of a new on-ramp for traffic from the East Derwent Highway onto the Tasman Highway and a dedicated lane from the East Derwent Highway to access Rosny Hill Road. The proposed contract period is 18 months. Click for more details...

HUON VALLEY COUNCIL ANNUAL PAVEMENT STABILISATION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various locations within the Municipality of Huon Valley, Huonville, TAS 7109 for New. Pavement stabilisation on selected roads within the Municipality Huon Valley. Click for more details...

TASMAN AND SORELL COUNCIL RESEALING TENDER
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. The works involve resealing and new sealing of various roads within the Municipalities of Tasman and Sorell. Click for more details...

MOUNT WELLINGTON PIPELINE TRACK
Civil Engineering (Bridges, Aqueducts, Viaducts) project In The Hobart Council Area of Local Govt ownership. Partial demolition of the existing bridges and construction of the new bridges and provision of pipe supports. Click for more details...

BURNIE WASTE MANAGEMENT CENTRE
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project In The Burnie Council Area of Landfill Rehabilitation Stage 2a type. Capping and associated rehabilitation works at the Burnie Waste Management Centre. Click for more details...

FINGAL TO AVOCA TREATED WATER PIPELINE
Civil Engineering (Pipelines) project at Fingal to, Avoca, TAS 7213 for New. Design, construction & commissioning of a 29 km in length treated water pipeline from the new water treatment plant at Fingal to supply the township of Avoca. Click for more details...

CASCADE ROAD RESIDENTIAL SUBDIVISION
Residential Subdivision (2) Lots project at 173 Cascade Rd, Romaine Heights, TAS 7320 in the Civil Engineering (Residential Subdivision). Residential subdivision of 2 lots with associated civil works. Click for more details...

BLESSINGTON ROAD RESIDENTIAL SUBDIVISION
A project in the TAS Within Launceston. Residential subdivision of 2 lots and associated civil works. Click for more details...

DEVONPORT SPRAYED BITUMINOUS SURFACING
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Supply, delivery and placement of Sprayed Bituminous Surfacing. Click for more details...

BITUMEN SURFACING SERVICES 2015/16
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Circular Head Council Area of Private ownership. Circular Head Council invite suitably qualified contractors to tender for the provision of Bitumen Surfacing Services for 2015/16. Click for more details...

HOBART CITY ANNUAL SUPPLY BITUMINOUS RESEALING OF ROADS 2015/2016
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Various locations within the municipality of Hobart, Hobart, TAS 7000. Standing offer from a panel of providers for the supply only of asphalt products and/or the supply and placement of bituminous surfacing of roads and footpaths and slurry/micro sealing of roads. Click for more details...

WHITELEA COURT RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project at Whitelea Ct, Sorell, TAS 7172 for New. Residential subdivision of 31 lots & associated civil works. Click for more details...

HARROW PLACE RESIDENTIAL SUBDIVISION
A project in the TAS Within Kingborough. Residential subdivision of 2 lots & associated civil works. Click for more details...

RESERVOIR DRIVE RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project at 238 Reservoir Dr, Wynyard, TAS 7325 for New. Residential subdivision of 8 lots and associated civil works. Click for more details...

SIMPSON, FALMOUTH & WRAGG ST RESIDENTIAL SUBDIVISION
Residential Subdivision (17) Lots New project In The Waratah-Wynyard Council Area. Residential subdivision of 17 lots & associated civil works. Click for more details...

LANDSBOROUGH AVENUE RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project at Landsborough Av, Newstead, TAS 7250 for New. Residential subdivision of 2 lots & associated civil works. Click for more details...

MURCHISON HIGHWAY RESIDENTIAL SUBDIVISION
Civil Engineering (Residential Subdivision) project In The Waratah-Wynyard Council Area of Residential Subdivision (3) Lots type. Residential subdivision of 3 lots and associated civil works. Click for more details...

WALDHORN DRIVE KERBING
Waldhorn Dr, Grindelwald, TAS 7277 Has Waldhorn Drive Kerbing currently at Construction stage. Civil contractors are invited to undertake new roadside kerbing & associated stormwater works in the road reserve between Grindelwald Resort & St Albans Court in Grindelwald. Click for more details...

ROAD WIDEN & KERB (BETWEEN REIBEY TO HENN ST) CROWTHER STREET STAGE 2
Roadworks - Widening - Stage 2 New project In The West Tamar Council Area. Construction of roadworks on Crowther Street between Reibey & Henn Streets including road widening & kerbing works. Construction of 217m of concrete kerb & channel. Construction of approximately 360sq m of 300mm full depth road pavement. Construction of two urban asphalt driveways approximately 85sq m. Supply & installation of 65m DN 300 profiled Wall Polyethylene pipe. Supply & installation of six DN1050 manholes. Supply & installation of two side entry pit w/ 1830 lintel & general reinstatement. Click for more details...

LUNE RIVER ROAD BULK EXCAVATION WORKS
Civil Engineering (Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks) project at Lune River Rd, Lune River, TAS 7109 of Excavation Works type of New development. Lune River Road upgrade project. Click for more details...

CIRCULAR HEAD COUNCIL BITUMEN SURFACING SERVICES 2016/17
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project In The Circular Head Council Area of Local Govt ownership. Bitumen Surfacing Services for 2016/17. Click for more details...

TOLLARD DRIVE SAFETY IMPROVEMENT UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Works to include the improvement of Tollard Court south access, provision of intersection turning lanes, channelisation of traffic lanes, removal of parking on western side, removal of kerb bulbs to improve road safett & the provision of cycle ways on both sides of the road. Click for more details...

PARKWOOD GARDENS RESIDENTIAL SUBDIVISION STAGE 2
Civil Engineering (Residential Subdivision) project at 221A Lenah Valley Rd & 2-16 Creek Rd, Lenah Valley, TAS 7008 for New. Construction of stage 2 of a 17 lot residential subdivision. To include associated civil works. Click for more details...

OTAGO LAGOON & COASTAL RESERVES ACTIVITY PLAN
A project in the TAS Within Brighton. Works to include resurfacing the existing track with gravel around Otago Lagoon. Construction of a gravel walking track at the Western End of Otago Bay Coastal Reserve. Installation of signage around the reserve. Installation of new outdoor seating at two locations in the reserves. Installation of play equipment at the grassy point at the Eastern End of Otago Bay Coastal Reserve. Undertake a feasibility study into developing a coastal walking track link between Otago Lagoon Reserve & Woodville Bay. Landscaping around the Reserves. Click for more details...

KING ISLAND SEALING PROGRAM
New project of Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Cape Wickham Rd, King Island, TAS 7256. Proposed works to include sealing the remaining 6.3km of Cape Wickham Road, the final 2km of Old Grassy Road & 2km of South Road. Associated landscaping. Click for more details...

BRINKTOP ROAD RECONSTRUCTION
Roadworks New project In The Sorell Council Area. Reconstruction of Brinktop Road, Penna approximately 500 metres. Click for more details...

EAST TAMAR HIGHWAY NORTH OF FOURTEEN MILE CREEK ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at West Tamar Hwy north of Fourteen Mile Creek, Riverside, TAS 7250 of Roadworks - Embankment Stabilisation type of New development. Construction of roadworks to include stabilisation and re-instatement of a road embankment on the East Tamar Highway. Works to include some road pavement works. Click for more details...

TARONGA ROAD STORMWATER UPGRADE
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Taronga Rd, Bonnet Hill, TAS 7053. This type is Stormwater - Upgrade with Local Govt ownership. Construction of stormwater upgrade works along Taronga Road in Taroona. Works to include supply & installation of pipe & associated anchor blocks, property connections, subsoil drainage, rock pitching, earthworks & surface restoration. Click for more details...

WINEGLASS BAY LOOKOUT
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project at Franklin Wharf, Hobart, TAS 7000 of Beach Track Upgrade type of New development. Works to include recovering rock & other materials from the existing track; Arranging the transport of gravel & supplying other materials; Construction or repair of stone & timber steps; Construction or repair of gravel walking track; Edging & narrowing of sections of overly wide gravel walking track. Click for more details...

ACTON ROAD/SEVEN MILE BEACH ROAD INTERSECTION
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) New project at Acton Rd & Seven Mile Beach Rd, Seven Mile Beach, TAS 7170. This type is Roadworks - Upgrade with Local Govt ownership. Construction of a channelised right turn lane & associated works on the Acton Road/Seven Mile Beach Road Intersection. Click for more details...

PREOLENNA ROAD ROADWORKS
Civil Engineering (Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways) project for New development. Proposed works to include the sealing & resealing of Preolenna Road. Associated civil works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect