State

Categories

Sub Categories

Click Here to Find Current Projects

List of Entertainment Projects in SA


ADELAIDE FESTIVAL CENTRE
Subcontract project of Entertainment (Theatres, Cinemas) project at King William St, Adelaide, SA 5000. PACKAGE 605 - metalwork for Centre upgrade Stage 2/Phase 3. Click for more details...

ALDINGA ARTS ECO VILLAGE
Entertainment (Theatres, Cinemas) project at 105 & 173 Port Rd, Aldinga, SA 5173 for New. Central Facilities to comprise: Art, craft & design Gallery. Performance space & Amphitheatre. Sculpture court. Workshops, studios & tuition rooms. Existing stables to be retrofitted with new structures also required. New community building also proposed with administration offices, dining & bar facilities & commercial kitchen. Click for more details...

THE PRECINCT STAGE 2 (FORMER BALFOURS SITE) - ALTITUDE
Residential Tower - 18 Storey project at 160-184 Franklin cnr Morphett Sts, Adelaide, SA 5000 in the Entertainment (Theatres, Cinemas). Demolition of existing factory buildings & the subsequent construction of an 18 storey residential apartment building containing a total of 147 luxury apartments. To include leisure facilities squash courts, gymnasium, sauna spa, swimming pool, cinema, library bar & lounge. Concrete & glass. Parking for 115 cars & associated landscaping. Click for more details...

ADELAIDE FESTIVAL CENTRE
Entertainment (Theatres, Cinemas) project for Subcontract development. PACKAGE 303 - Ceilings, partitions & doors for Centre upgrade. Click for more details...

ADELAIDE FESTIVAL CENTRE
King William Rd, Adelaide, SA 5000 Has Adelaide Festival Centre currently at Construction stage. PACKAGE 303 - fire protection services for Centre upgrade. Click for more details...

ADELAIDE FESTIVAL CENTRE
A project in the SA Within Adelaide. PACKAGE 303 - painting for Centre upgrade. Click for more details...

ADELAIDE FESTIVAL CENTRE
State ownership Entertainment (Theatres, Cinemas) project In The Adelaide Council Area for Subcontract development. PACKAGE 605 - ceilings/partitions/doors for Centre upgrade Stage 2/Phase 3. Click for more details...

GAWLER NORTHERN MARKETS SHOPPING CENTRE
Shopping Centre/Cinemas project at 55 Murray St, Gawler, SA 5118 in the Entertainment (Theatres, Cinemas). Proposed two levels of retail shops. Undercroft & rooftop parking for approx 1000 cars. Food court & capacity for six-theatre cinema. To include supermarket & discount department store. Approx 100 specialty shops. New train platform on southern side of tracks at Galwer Central Railway Station. Click for more details...

PORT PIRIE SKATE PARK & BMX FACILITY
Skate Park/Bmx Facility New project In The Port Pirie Council Area. Includes fencing, landscaping, lighting & water points. Click for more details...

ADELAIDE FESTIVAL CENTRE
Currently at the Construction stage In Adelaide is a project estimated to be $ 200000. This project PACKAGE 105 - Joinery for Centre - upgrade Stage 2/Phase 3, multi level. Click for more details...

ADELAIDE FESTIVAL CENTRE
Currently at the Construction stage In Adelaide is a project estimated to be $ 10000. This project PACKAGE 105 for Tiling - Centre upgrade Stage 2/Phase 3, multi level. Click for more details...

ADELAIDE FESTIVAL CENTRE
Currently at the Construction stage In Adelaide is a project estimated to be $ 200000. This project PACKAGE 105 - Ceilings/Partitions/Doors for Stage 2/Phase 3 - Centre upgrade, multi storey. Click for more details...

ADELAIDE FESTIVAL CENTRE
Adelaide Festival Centre is currently at the Construction stage, valued at about $ 250000 it is Painting for centre upgrade Stage 2/Phase 3/Package 001. Click for more details...

ADELAIDE FESTIVAL CENTRE
Entertainment (Theatres, Cinemas) project at King William St, Adelaide, SA 5000 of T/Package For Windows & Glazing - Centre - Upgrade - Stage 2/Phase 3 - Multi Lvl type of Subcontract development. PACKAGE 605 - windows & glazing for Centre upgrade Stage 2/Phase 3. Click for more details...

GOODWOOD ORPHANAGE OPEN SPACE STAGES 1 & 2
Park/Playground project at 181 Goodwood Rd (The Orphanage), Millswood, SA 5034 in the Entertainment (Parks, Leisure grounds, Playgrounds). Major redevelopment with improvements to include comprehensively equipped family playground, extensive landscaping, paving, fencing, creek rehabilitation, entrance walling, picnic settings, artworks, shade sails, barbecue equipment, basketball half court, bocce pitch, electrical reticulation, & water irrigation system & associated works. Click for more details...

BELAIR NATIONAL PARK - KARKA PINES
Belair National Park - Karka Pines is currently at the Construction stage, valued at about $ 700000 it is Early works for National Park upgrade. Click for more details...

CITY SKATE PARK
City Skate Park is currently at the Construction stage, valued at about $ 280000 it is Skate bowl & shelter for skate park. Click for more details...

RIDGE PARK
New project of Entertainment (Parks, Leisure grounds, Playgrounds) project at Cnr Glen Osmond Rd & Barr Smith Av, Myrtle Bank, SA 5064. Construct skate park facility. Click for more details...

HOLDFAST SHORES - STAGE 2B
Entertainment (Amusement parks, Zoos) project In The Holdfast Bay Council Area of Private ownership. Demolition of Magic Mountain & construction of fairground entertainment plaza, new headquarters for Glenelg Surf Life Saving Club, 9 storey apartment building comprising 130 apartments, underground parking for 377 cars. Open space areas promenade & plaza space & associated facilities. Click for more details...

ADELAIDE FESTIVAL CENTRE
T/Package For Structural Steel/Metalwork - Centre - Stage 2/Phase 3-Multi Storey project at King William St, Adelaide, SA 5000 In The Council Area Of Adelaide of State. Structural steelwork/metal work for enabling works for Festival Centre. Click for more details...

ADELAIDE FESTIVAL CENTRE
King William St, Adelaide, SA 5000 Has Adelaide Festival Centre currently at Construction stage. Windows, glazing & external works for enabling works for Festival Centre. Click for more details...

ADELAIDE FESTIVAL CENTRE
King William Rd, Adelaide, SA 5000 Has Adelaide Festival Centre currently at Construction stage. Mechanical services for PACKAGE 001 for Centre upgrade. Click for more details...

ESPLANADE VIEWING PUBLIC STEPS
New project of Entertainment (Parks, Leisure grounds, Playgrounds) project at Cliff face adj to existing public carpark near intersection of 588 Esplanade & Nelson St, Port Noarlunga South, SA 5167. Replace existing estuary access public steps. Click for more details...

ST JOHN BAPTIST SCHOOL ADMINISTRATION/STAFF BUILDING/ CAR PARK/PLAYGROUND
St John Baptist School Administration/Staff Building/ Car Park/Playground is currently at the Construction stage, valued at about $ 1300000 it is Demolish two detached dwellings & associated outbuildings to develop car parking/vehicle manoeuvring & construction playground areas with associated landscaping facilities for existing school. Construct new administration/staff building. Floor area: 370 sq m. Click for more details...

DISTRICT COUNCIL OF CEDUNA - CCTV
Entertainment (Parks, Leisure grounds, Playgrounds) project for Supply & Install development. Supply & install CCTV systems for various sites within council area. Click for more details...

ALLIGATOR GORGE TOILET & LOOKOUT
Toilet Block/Lookout project at Alligator Gorge, Mt Remarkable National Park, Mambray Creek, SA 5495 in the Entertainment (Parks, Leisure grounds, Playgrounds). Demolition & construction of new toilet block, lookout & associated services. Click for more details...

ADELAIDE CITY COUNCIL - ELECTRICAL SERVICES
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Various Council Area of Electrical Services type. Periodic supply of electrical services. Click for more details...

PORT AUGUSTA CITY COUNCIL - PARKS GARDENS & FOOTPATH MAINTENANCE
Renovations, Refurbishments etc. project of Entertainment (Parks, Leisure grounds, Playgrounds) project at Various sites within council area of, Port Augusta, SA 5700. 2 year period contract for maintenance & upkeep of council's parks, gardens & footpaths. Click for more details...

REGENCY PARK RESERVE REDEVELOPMENT - DOUBLE ENTRY REFER 843571
Entertainment (Parks, Leisure grounds, Playgrounds) New project at Within, Regency Park, SA 5010. This type is Park - Redevelopment with State ownership. Redevelopment of Regency Park Reserve, including demolition & removal of out dated playground equipment, creation of new play space, recontouring of site to make it more accessible, planting of new lawn & trees & installation of new seating, shelters & barbecues. Click for more details...

SANDERS APEX PARK & LIONS PARK UPGRADE STAGE 1
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Clare & Gilbert Valley Council Area of Park - Upgrade Stage 1 type. Upgrade of Sanders Apex Park & Lions Park including, construction of boardwalk & footbridge providing a safe link between Clare Skate Park(located in Sanders Apex Park), Lions Park & the recreational facilities of Clare Oval, new amenities blocks, flood lighting, barbeques, seating & tables, shade canopies, bike racks, bins, irrigations systems & landscaping. Click for more details...

GLENSIDE CAMPUS ADELAIDE FILM & SCREEN HUB PRECINCT 2
Glenside Campus Adelaide Film & Screen Hub Precinct 2 is currently at the Construction stage, valued at about $ 43000000 it is Creation of a physical film & screen hub. To include: two sound stages - 1400 sqm; set construction workspace - 700 sqm; & small screening theatre & mixing theatre (approx 600 sqm). In addition, the building complex will accommodate other functions such as wardrobe/make-up & post-production editing & mixing etc (approx 600 sqm). In addition to new facilities, the heritage listed main administration building (approx 4800 sqm) within the cultural precinct site will be renovated & made available to film & screen-related tenants & potentially other arts & educational tenants. Click for more details...

MAIN CORNER ARTS PRECINCT
Community Arts Precinct project at 1 Bay Rd & Commercial St West, Mount Gambier, SA 5290 In The Council Area Of Mount Gambier of Local Govt. Development includes the demolition of the RSL building. Proposed construction of vertical element which will feature as part of a new western entrance into the redeveloped Riddoch Art Gallery & King's Theatre space. Development with area for upstairs theatrette for community use. Internal upgrade of Riddoch Art Gallery. Click for more details...

BURTON RESERVE REDEVELOPMENT
Burton Reserve Redevelopment is currently at the Construction stage, valued at about $ 1700000 it is Work to be undertaken at Burton Reserve include: soccer pitches & lighting, community park & car parking. Click for more details...

TONSLEY PARK REDEVELOPMENT ECOLOGICALLY SUSTAINABLE DEVELOPMENT OVERALL ID 1396680
South Rd, Clovelly Park, SA 5042 Has Tonsley Park Redevelopment Ecologically Sustainable Development Overall Id 1396680 currently at Planning stage. The ESD consultant is to advise on all ESD planning aspects of the project, to integrate sustainability performance considerations across all aspects of the project life cycle, & adopt an independent review role within the design & project process to ensure that a high standard of sustainability performance is maintained, without compromising other project objectives. General responsibilities will include: - Prepare a Project Services deliver Plan including design program from inception to commissioning, including the specification of key milestone sign off points. Obtain approval of the Project Services Delivery Plan from the client & Project Director. Establish & maintain ESD standards for all stages of project work. Review DTEI & other relevant sustainability policies & Green Building Council of Australia Education rating tools, & establish a best practice ESD framework. Consider also the possible use of NABERS as a rating tool & advise on the applicability of these tools to suit the SIEC purposes. Consider also the possible use of AGIC as a rating tool & advise on the applicability of these tools to suit the SIEC purposes. Ensure all agreed ESD initiatives are integrated into the proposed design by communication & coordination with the design & construction teams. Maintain quality control systems that ensure all cost information & reports provided are complete, comprehensive, up to date, checked & coordinated. Actively participate in value management workshops as requested by the client & Project Director, & identify areas of design, which should be targeted for value management. Comply with the requirements as specified in facility & design briefs. The consultant is expected to attend regular design team meetings throughout the detailed design & documentation phase. Click for more details...

TONSLEY PARK REDEVELOPMENT LANDSCAPE DESIGN CONSULTANCY
Consultancy For Landscape/Public Realm Design New project In The Marion Council Area. Detailed design for all items of public space including roads, footpaths, verges & medians; hike & bike trails; reserves, parks, play & recreation spaces; entry statements; town square; site boundary treatments & public transport stops. Click for more details...

SIXTH STREET REVITALISATION PROJECT
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Murray Bridge Council Area of Streetscaping/Landscaping type. The Principal invites tenders for provision of reconstruction of Sixth St, incorporating both civil works & hard & soft landscaping. Click for more details...

ADELAIDE FESTIVAL CENTRE REMEDIATION WORKS
Currently at the Construction stage In Adelaide is a project estimated to be $ 2020000. This project Remediation works for roof & plaza to address effects of water infiltration & concrete degradation to the Adelaide Festival Centre & its surrounds. Click for more details...

LOXTON WAIKERIE EAST TERRACE REVITALISATION PROJECT
Entertainment (Parks, Leisure grounds, Playgrounds) project at East Tce, Loxton, SA 5333 for New. East Terrace is the central shopping area for Loxton which attracts local community members and visitors alike. Revitalising the main street will refresh East Terrace by building upon the strengths of Loxtons existing row shops and village style atmosphere. Stage 1 of the Our Hub Our Pride East Terrace Revitalisation project will see the following outcomes: paved road crossings to calm traffic movements promoting pedestrian safety; greater facilities for increased flexibility to conduct major cultural, social and retail events; increased opportunity for artistic expression through the use of the entertainment shell; foster increased community expression; increase amenity and modern infrastructure to attract and retain visitors in the shopping precinct; environmental efficiencies through subsurface irrigation; inclusion of sustainable plantings; internet accessibility throughout the precinct to attract and retain the modern community; increased trade potential through web based business information. Works to include; pavement plan - for the main street entrance/exit and Drabsch Street crossover; urban design plan - of the street furniture, paving, lighting, seating, bollards, PA system, phone charging points, landscaping etc; entertainment wall- detailed drawings of the entertainment wall suitable for Development Application; subsurface plan- for services such as water, electricity, PA system, subsurface irrigation etc. connecting relevant street furniture. Click for more details...

ANZAC CENTENARY MEMORIAL GARDEN WALK CONSULTANCY OVERALL PROJECT ID 2124531
Anzac Centenary Memorial Garden Walk Consultancy Overall Project Id 2124531 is currently at the Planning stage, valued at about $ 1000000 it is Construction of a Memorial Garden Walk from the South Australian National War Memorial down Kintore Avenue to The Torrens Parade Grounds and Pathway of Honour. The proposed project will require change to the boundaries of Government House. Click for more details...

COUNTRY ARTS THEATRES SERVICES UPGRADE MIDDLEBACK THEATRE
Entertainment (Theatres, Cinemas) project at Middleback Theatre, Whyalla, SA 5600 for Renovations, Refurbishments etc.. Mechanical & fire services upgrade. Click for more details...

TEA TREE GULLY BEAUTIFICATION WORKS PROGRAM
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Tea Tree Gully Council Area of Local Govt ownership. The Principal is seeking the services of an appropriately qualified Tenderer to undertake the supply & construction of landscapes, civil & irrigation works for the projects located within the City. All works shall be carried out in accordance with approved design documentation & specifications. The projects comprise the following: 1) Reserves: a) Lake View Reserve, Valley View Drive, Highbury; b) Tasman Reserve, 4-10 Tasman Ave, Gilles Plains; c) Grenache Reserve, 26 Grenache Ave, Modbury; d) O'Bahn Linear Park North Reserve, 804 North East Rd, Holden Hill; e) Gunda Reserve, 7-19 Gunda Rd, Banksia Park; f) Emma Reserve, 13 John Renwick Pl, Modbury Heights. 2) Tree Screens: i) Keithcot Farm Drive, Keithcot Farm Primary School to Hillendale Dr (northern side), Wynn Vale; ii) Hillendale Drive, Keithcot Farm Dr to Endeavour Dr (western side), Wynn Vale; iii) Green Valley Drive, Reordan Dr to Reordan Dr (eastern side), Greenwith; iv) The Golden Way, Polar Ct to Golden Grove Rd (western side), Greenwith; v) The Golden Way, Cobbler Creek to Slate Creek (western side opposite Spring Hill), Golden Grove; vi) Lower North East Road, River Torrens Linear Park to Gaskmore Way to Bus stop 29, Dernancourt. 3) Streetscapes & Roundabouts: A) Elizabeth St, (Steventon Dr to Cottenham Rd), Banksia Park; B) Steventon Dr, (northern side) Elizabeth St to portion of Haines Rd), Banksia Park; C) Hamilton Rd, (Grenfell Rd to golf course entry), Fairview Park. D (a-b) Roundabouts: Da) Green Valley Dr & Reordan Dr (northern), Greenwith; Db) Green Valley Dr, Reordan Dr & Leedham Dr, Greenwith; Dc) Kelly Rd & Milne Rd, Modbury North / Modbury Heights; Dd) Kelly Rd & Wright Rd, Modbury. As part of the Councils sustainability focus, old landscapes that are at the end of their useful life are being replaced with drought tolerant & sustainable landscapes to enhance the streetscape & reserve environment. With a continuing focus on the development of public amenity & both holistic & sustainable design many of the sites included in this scope are seen to be the beginning of a new focus for all City Beautification works throughout the City. Such an approach sees the design engaging directly with their specific surrounding, program & land use thus building a focal point for the community which to identify with. The design of these new landscapes incorporates park furniture & products aiming for a consistent approach to each site with consideration given to: a) Minimising ongoing maintenance; b) Level of Service; c) Quality of finish; d) Assets Management; e) Image identity; f) Community expectations; g) Value for money; & Aesthetic amenity value. Click for more details...

CITY OF PORT ADELAIDE ENFIELD PLAY SPACES
Play Spaces (5) - Design/Supply/Install project at Various locations within the council boundaries of, Port Adelaide, SA 5015 in the Entertainment (Parks, Leisure grounds, Playgrounds). The Principal invites tenders for the design, supply & installation of Play Spaces. Scope of Services to be Performed: Design, supply & install play spaces as specified. Location: The project sites are located in the Council of Port Adelaide Enfield at the following locations: 1) Kenmare St Reserve, Kenmare St, Taperoo; 2) Hartley Gr Reserve, Brecon St, Windsor Gardens; 3) Mariners Park Reserve, South Australia One Dr, North Haven; 4) St Patricks Reserve, Wellington St, Alberton; & 5) Pioneer Park Reserve, William St, Alberton. The works of this tender include construction of all work necessary for the proper completion & testing of works shown or implied. The work included in this specification comprises the provision of all materials, plant, & labour of whatever kind necessary for the complete & proper undertaking of the works described. Where works are continuous with adjacent existing works, the Tenderer is responsible for making the proper junction between two sections & for making good any damages caused by adjoining works. The works in this tender include but are not limited to the following: Hard Landscape Works: 1) Protection of trees to be retained; 2) Protection of adjacent structures; 3) Services; 4) Drainage; 5) Play Equipment; 6) Swing set-one toddler one strap; 7) Play equipment as specified by the Tenderer; 8) No Timber in play space; & 9) Slide must be accessible by all ages. Site Preparation: All areas for play space installation will be prepared by Council prior to site possession. Click for more details...

COBBLER CREEK RECREATIONAL PARK UPGRADE
Off Bridge Rd, Golden Grove, SA 5125 Has Cobbler Creek Recreational Park Upgrade currently at Construction stage. The Principal invites tenders for provision playground & associated facilities at Cobbler Creek Recreation Park. Scope: The works in this contract include but are not limited to the following: Hard Landscape Works: 1) Demolition of existing trail; 2) Removal of signage; 3) Protection of trees to be retained; 4) Temporary & permanent protective fencing; 5) Protection of adjacent environment; 6) Services; 7) Insitu Pavements: a) Rubber Soft fall; b) Rubble pavements; c) Stone pitching; d) Concrete pavements; e) Bitumen pavements. 8) Edging: a) Insitu concrete edging; 9) Furniture, structures & fences; a) Seats; b) Picnic settings; c) Bins; d) BBQs; e) Drinking fountains; f) Timber footbridge; g) Shelters; h) Toilet; i) Bollards; j) Bike racks; k) Wheel stops. 10) Lighting; 11) Pavement marking; 12) Automatic irrigation system; 13) Drainage; 14) Swale; 15) Natural play elements; a) Mounds; b) Swale; c) Stepping logs; d) Water play element; e) Sand pits; f) Stepping stones; g) Log creek crossings; h) Rockwork; 16) Play Equipment; a) Slide (by others); b) Double swing (by others); c) Single point swing (by others); d) Treehouses (by others) e) Cargo station (by others). Soft Landscape Works: 1) Imported topsoil; 2) Imported sand; 3) Imported certified soft fall mulch; 4) Imported soft fall certified sand; 5) Minor grading for swales & landscape mounding works; 6) Preparation & cultivation of grass & garden bed areas; 7) Planting & establishment of tube stock in mass planting beds; 8) Planting & establishment of semi-advanced trees; 9) Mulching of garden beds; 10) Grassing - Instant Turf. Click for more details...

SPENCER DRIVE/TAYLORS AVENUE RESERVE UPGRADE
Landscaping/Playground/Irrigation New project In The Onkaparinga Council Area. The Principal invites tenders for the provision of the following works: Objectives: General: Provide labour, materials, plant & equipment to construct the work. Location: The Reserve is located at Spencer Drive, Morphett Vale. Outline of Works: 1) Concrete works; 2) Supply & install landscape furniture including: a) shelter; b) drink fountain including backflow device (BFD) to comply with OTR requirements; & c) seats & picnic tables. 3) Install play equipment; 4) Supply & install pine chip & rubber softfall; 5) Provide irrigation to new trees; 6) Modify existing irrigation system to include drip irrigation; 7) Planting of trees; & 8) Landscape Maintenance. Click for more details...

PG DAWSON RESERVE NATURAL PLAYGROUND UPGRADE
New project of Entertainment (Parks, Leisure grounds, Playgrounds) project at 44 Main Rd, Mclaren Flat, SA 5171. The Principal invites tenders for provision of the following Works: Objectives: General - Provide labour, materials, plant & equipment to construct the Works. Outline of the Works: 1) Demolition & removal of existing play equipment & park furniture (by Council); 2) Installation of screw piles for Tree Fort & V-net Climber (arranged by Council); 3) Supply & Install; a) Sideways Tree Climber - not part of contract; b) V-net Climber - to be supplied; Cargo Net Climber - to be supplied; d) Tree Fort. 4) Earthworks including excavation, grading & mounding; 5) Minor concrete; 6) Supply & installation of rocks; 7) Supply & install logs, timber seats for: a) Forest settings; b) Obstacle course; c) Sand play & swing areas. 8) Supply & install hand water pump; 9) Supply& install rocks for water play; 10) Supply & install landscape furniture including: a) shelter; b) drink fountain; c) seats & picnic tables. 11) Supply & install play equipment (swings); 12) Supply & install softfall sand; 13) Supply & install pine chip softfall; 14) Supply & install living softfall; 15) Design, supply & install irrigation system; 16) Supply & installation of organic mulch; 17) supply & planting of trees & shrubs; 18) Supply & install instant turf; & 19) Landscape maintenance. Click for more details...

FREMONT PARK UPGRADE - STAGES 1B & 1C
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Playford Council Area of Park - Civil/Landscapings Works - Stages 1b & 1c type. Fremont Park is the City of Playford?s (CoP) premier regional park & an important piece of open space in the future context of the city. This park is located on the corner of Yorketown & Main North Road, Elizabeth. The works of this project include construction of all work necessary for the proper completion & testing of works shown or implied in the drawings & or specification. The works in this project include but are not limited to the following: Hard Landscape Works: 1) Demolition & tree removal; 2) Temporary protective fencing; 3) Services including electrical, water & recycled & potable water; 4) Bulk earthworks; 5) Minor trimming; 6) Insitu pavements: exposed aggregate concrete, asphalt paving; 7) Supply & placements of boulders, stepping stones & timber loges; 8) Edging: Insitu concrete edging, spade edging; 9) Metal Works: handrails & balustrades; 10) Furniture, structure & fences: timber logs, rubbish bins, seating; 11) Lighting; 12) Automatic irrigation systems; 13) Civil works including drop structure, headwalls. Pipe works etc.; Soft Landscape Works: a) Imported topsoil; b) Re-using amelioration of existing site soil; c) Preparation & cultivation of grass & garden bed areas; d) Planting & establishment of 140mm pot & tubestock in mass planting beds; e) Planting & establishment of semi-advanced trees; & f) Mulching of garden beds; The successful Tenderer is responsible for the supply of all materials, supervision, labour & machinery necessary for the demolition, disposal, construction, laying, compaction, finishing & cleaning up of the identified site. Click for more details...

ADELAIDE FESTIVAL CENTRE NORTHERN FACADE & COOLING TOWER WORKS
Northern Promenade Works project at King William Rd Riverbank Promenade, Adelaide, SA 5000 in the Entertainment (Parks, Leisure grounds, Playgrounds). Northern Promenade works to include new entrances to allow further works planned, landscaping, installation of cooling towers, upgrade amphitheatre & bleechers, waterproofing Adelaide Festival Centre roof. Works to include modification to the vehicle drop off/carparking area, demolition of the glazed facade of the Adelaide Theatre Function Room (Lyrics); new acoustic wall; installation of new media screen associated with the functions at the Festival Theatre & events in the Riverbank Precinct. Click for more details...

CITY OF HOLDFAST BAY RESERVES - SHADE SAILS
Entertainment (Parks, Leisure grounds, Playgrounds) project In The Holdfast Bay Council Area of Shade Structure (3) - Design/Supply/Install type. The Principal invites tenders to design, supply & install shade structures over the existing playground equipment. The Council is the owner of a number of reserves, which have a variety of infrastructure for use by the wider community, including playgrounds. Currently shade sails are constructed over playground equipment at Bindarra Reserve, Brighton, Angas Neill Reserve, Seacliff & Wigley Reserve, Glenelg. The existing shade sail structures have a series of triangular sails covering the playground with structural columns outside the infrastructure. The plan is to have similar shade sails constructed over a further three reserves, they are: 1) Wattle Reserve - Esplanade & Wattle Ave, Hove; 2) John Miller Reserve - Esplanade & Repton Rd, Somerton Park; 3) Glenelg Playspace - Moseley Sq, Glenelg. The works requires the contractor to undertake the following: 1) Prepare all design work, investigations, calculations & documentation for the Council Development Approval process; 2) Ensure the proposed shade sail structures comply with all regulations, standards, codes of practice & guidelines; 3) Lodge all required design work, investigations, calculations & documentation for the successful Council Development Approval process; 4) Establish a secure compound on site to store materials, equipment & waste bins for rubbish, scrap or salvage' 5) Provide all services for the successful construction of the proposed shade sails; 6) Supply all materials for the successful construction of the proposed shade sails; & 7) General site clean up & rubbish removal. Click for more details...

UNDERDOWN PARK REDEVELOPMENT
New project of Entertainment (Parks, Leisure grounds, Playgrounds) project at Nangari Rd,, Salisbury North, SA 5108. The Principal invites tenders for the construction works for the Underdown Park Redevelopment. Scope of Work Generally: Without limiting the generality of the General Conditions of Contract & except as the Contract may otherwise expressly provide, the Contractor shall provide all equipment, construction plant, labour, supervision, services, testing, quality control & warehousing necessary for the work under the Contract as detailed. The Contractor shall, unless the Contract otherwise expressly provides, supply at the Contractors cost & expense everything necessary for the proper completion of the Works & proper performance of all the Contractor?s obligations under the Contract. Work under the Contract comprises, but is not limited to the following: 1) Demolition & removal of existing sports field light poles including cable removal & backfilling pole footings; 2) Topsoil stripping, earthworks & drainage to suit 3 pitches in lieu of the existing two; 3) Irrigation supply & installation, matching to existing & commissioning; 4) Loam supply & placement to finished level; 5) Topdressing existing pitch 1; 6) Conduit installation for new sports field lighting; 7) Supply & installation of new lightpoles, footings & light fittings to 100 Lx lighting levels; 8) Supply & installation of cabling from the new DBs on the new clubrooms to the new light poles & terminating at the new light fittings; 9) Instant turf placement & establishment recently installed irrigation & drainage areas; 10) Carpark construction including disabled access ramps to new clubroom paving slabs; 11) Repairs to existing carpark paving; 12) Carpark linemarking throughout; 13) Soft & hard landscaping.; & 14) Playspace & Fitness Loop supply & installation. Work by Others: The following work has been carried out by others: a) New Clubrooms supply & installation including utility & services connections; b) Demolition of existing separate Inter & Florina clubrooms Click for more details...

MONARTO ZOO PREDATOR EXPERIENCE ENCLOSURE
Currently at the Construction stage In Murray Bridge is a project estimated to be $ 800000. This project Construction of Predator Enclosure & new visitor centre. Comprising entry canopy, structural steel & blockwork, suspended roof slab, reinforced concrete retaining wall. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect