List of Mining⊂category= Projects in ®ion= in region


GORGON GAS PROJECT - PIPELINE
Mining (Offshore - oil & gas) project at Barrow Island to mainland northeast of, Onslow, WA 6710 for New. 80 km approx. To tie in with the existing mainland pipeline network. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

STAWELL GOLD OPERATIONS
Mine - Underground/Drilling Contract project at Near, Stawell, VIC 3380 in the Mining (Underground - including longwall). Contract extension of six months envisaged to include underground long hole production & sample drilling. Click for more details...

EYRE PENINSULA GYPSUM - BARNA
Mining (Open Cut) New project at Via, Kimba, SA 5641. This type is Resource - Gypsum with Private ownership. Agricultural use. The current god season has increased demand for the product. Further deposits on site likely to be developed. Click for more details...

CHARIOT GOLD PROJECT- MALBEC WEST
Mining (Open Cut) project at Via, Tennant Creek, NT 0860 of Resource - Gold type of New development. Interim resource has enabled an open pit to be designed with the base of the pit above the defined mineralisation. Click for more details...

QUARTZ CIRCLE PROJECT
A project in the WA Within East Pilbara. Drill testing of the large electrical target outlined by the Mimdas geophysical system is planned, subject to access. Click for more details...

MIITEL NICKEL OPERATIONS - REDROSS - RESOURCE
4 km north of, Kambalda, WA 6442 Has Miitel Nickel Operations - Redross - Resource currently at Construction stage. In 2005/06 Redross treated 121,473 tonnes of ore @ 3.76% for 3,999.1 Ni concentrate. Capital costs for the mine were approximately $3.76 million for the year. Resource estimate is 297,000 tonnes of ore @ 4.2% Ni for 12,453 tonnes of Ni. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining (Underground - including longwall) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

MONTI CRISTO GOLD PROJECT
Resource - Gold project at 30 km SE of, Yalgoo, WA 6635 in the Mining (Underground - including longwall). Rab drilling to assess all targets is to follow the initial phase of field exploration. This project complements Thundelarra's other nearby gold projects. Click for more details...

KANOWNA BELLE GOLD OPERATIONS
Addition project of Mining (Underground - including longwall) project at 16 km northeast of, Kalgoorlie, WA 6430. Stage 3A is to involve a portal development & a decline from below the open pit floor (approximately 220m from surface). Mining to a depth of 360m will involve vertical haulage shaft & long-hole open stoping mining methods. The resource below 200m has been divided into two main categories. From 200m to 360m a total of 3.6mt grading 7.2gpt gold is estimated. Between 360m and 800m an inferred resource of 3.85mt at 5.5gpt gold has been estimated. Ore production is due to start in 1998 for a mine life of approximately 16 years at a rate of 1mtpa-1.25mtpa. Drilling to test mineralisation from 650m to 1,000m demonstrated encouraging widths and grades with best results including 27.5m (from 1,008m) grading 10.1gpt gold. Mining & haulage expected to utilise inhouse resources. Ore will be processed through the Joint Venture's refractory plant at Kanowna Belle. The decline is expected to extend to 760m to allow additional exploration & ore definition work to be conducted. This contract will include diamond drilling (28,000m), raise boring (1,400m) & decline (9,000m). Associated electricals to also form part of this tender. Click for more details...

MCARTHUR RIVER BASE METALS MINE - UNDERGROUND OPERATIONS
Near, Borroloola, NT 0854 Has Mcarthur River Base Metals Mine - Underground Operations currently at Construction stage. Up to 1.5 mil. tonnes of ore will be extracted annually from an underground mine to produce 350,000 tonnes of mixed concentrate containing 160,000 tonnes of zinc, 45,000 tonnes of lead and 1.6 million ounces of silver. Click for more details...

PAULSENS GOLD PROJECT
Mining (Underground - including longwall) project at 180 km west of, Paraburdoo, WA 6754 for New. A high grade shallow underground mine including 250,000 Tpa CIL plant. Gold production was 488,260 tonnes @ 7.94 g/t for 117,266 ounces of gold since June 2005. Production is expected to be 75-80,000 ounces of gold per annum. Measured and Indicated resource is 1,105,000 tonnes @ 10.7 g/t for 379,700 ounces of au and inferred resource is 122,000 tonnes @ 9.3 g/t for 36,300 ounces of au. Click for more details...

WALHALLA WOODS POINT PROJECT - COHENS REEF/PINNACLE
Mining (Open Cut) New project at via, Woods Point, VIC 3723. This type is Resource - Gold/Nickel/Cobalt/Pgm with Private ownership. Computer modelling of historical data and more recent development work continued with the objective of estimating the remaining stockwork resource and defining mineralisation controls to assist in further exploration targeting. Click for more details...

GLENVIEW PROJECT - IRON ORE/GOLD/COPPER/ZINC RESOURCE
Mining (Exploration - Drilling) project at 60 Km North west of, Cue, WA 6640 of Resource -Gold/Copper/Zinc/Iron Ore type of New development. A 16.4 line km ground based transient survey has been completed during the December 2003 quarter and a review of all past geophysical surveys was carried out. The review identified weak but distinct geophysical anomalies suggesting that significant base metal mineralisation may occur down dip or lateral to a previous drill hole intersection which returned 3.5 metres of 8.7% copper. Click for more details...

MOUNT GARNET PROJECT - BALCOOMA - BASE METALS RESOURCE
Mining (Open Cut) project at via, Mount Garnet, QLD 4872 of Resource - Base Metals type of New development. Resource estimate is 3,965,000 tonnes of ore @ 3.5% Cu, 15 Ag g/t and 0.36 Au g/t. Ore stockpiled is 43,000 tonnes. Click for more details...

BURBANKS GOLD PROJECT - RESOURCE
Mining (Open Cut) project In The Coolgardie Council Area of Private ownership. Indicated and inferred resource estimate is 517,000 tonnes at 4.5 grams per tonne gold for a total of 74,000 ounces. Underground diamond drilling will focus on extensions to the Wahloo Shoot and to upgrade the resource estimate to indicated category. Click for more details...

GULLEWA PROJECT
Private ownership Mining (Exploration - Drilling) project In The City Of Greater Geraldton Council Area for New development. RAB drilling was completed with 103 holes for 5,681 metres. This drilling tested part of the Chulaar and Thundelarra Shear Zone as defined from aeromagnetic and surface geochem interpretation. Despite the geological environment showing considerable promise gold values were subeconomic. Click for more details...

NEWLANDS COAL OPERATIONS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 100000. This project Longwall production. 2-3 longwall moves per year. Click for more details...

CAROSUE DAM GOLD OPERATIONS - PROCESSING PLANT UPGRADE STAGE 2
Mining (Open Cut) project at 80 km south of, Laverton, WA 6440 for New. Expansion involving staged upgrade of the processing facility. Stage 1 expansion from 2.4 million tonnes per annum (Mtpa) to 3.2 Mtpa by installing 2 x 5HP crushers for a 3rd crushing circuit, a new screenhouse & additional tankage. Stage 2 increase to 4Mtpa through an additional ball mill running in series or parallel with the existing 4.5MW mill. Initial feed from a cut back at Whirling Dervish pit involving removal of 7 million cubic metres overburden. Other sources to be ore blended from the Whirling Dervish, Wallbrook & Million Dollar pits along with ore blended from the Red October, Deep South & Whirling Dervish underground mines. Click for more details...

ROTHSAY GOLD & COPPER PROJECT - RESOURCE
New project of Mining (Underground - including longwall) project at 60 km northeast of, Perenjori, WA 6620. Feasibility to follow drilling, subject to results. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS - MRM EXPANSION PROJECT
Mining (Underground - including longwall) project for New development. Looking at options from a feasability study. Click for more details...

BEACONSFIELD GOLD MINE JV - RESOURCE
5 West St, Beaconsfield, TAS 7270 Has Beaconsfield Gold Mine Jv - Resource currently at Exploration, Drilling, Survey & Assessment stage. An extensive RC drilling program is to target the North Please Creek tenements. UP to 20 RC holes to a depth of 200 metres will be drilled. Exploration is being undertaken in the area surrounding Beaconsfield mine. Two recent RC holes cut 0.8g/t gold over 35 metres, including 5.3g/t gold over 2 metres from 52 metres (hole BFRC17), and anomalous gold within the Johnsons Creek fault (hole BFRC18). Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining (Underground - including longwall) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

REWARD GOLD PROJECT
Mining (Exploration - Drilling) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

L1/L2/EP413 - DENISON
Mining (Onshore - oil & gas) New project at Perth Basin near, Dongara, WA 6525. This type is Resource - Oil/Gas with Private ownership. The Denison D Seismic Survey will be conducted over petroleum tenements L1, L2, EP413 in the Perth Basin near Dongara. Click for more details...

TEXAS SILVER PROJECT - SILVER SPUR SLAG DUMP
Private ownership Mining (Open Cut) project In The Goondiwindi Regional Council Area for New development. The slag heap at Silver Spur is a potentially valuable resource. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - MINING CONTRACT
New project of Mining (Open Cut) project at North of Poitrel via, Moranbah, QLD 4744. Includes infrastructure, administration facilities, workshops etc. Click for more details...

BHP BILLITON MISUBISHI ALLIANCE (BMA) & BHP MITUSI (BMC) COAL OPERATIONS
Mining (Open Cut) project In The Mackay Regional Council Area of Private ownership. Mines owned by BHP Mitsui include South Walker Creek, Blackwater. BMA owned mines include Goonyella, Saraji, Peak Downs, Norwich Park, Gregory, Crinum, Blackwater. BMA also manages and markets coal for the BHP Mitsui mines. This stage two expansion will involve an increase in production capacity to 59Mtpa by second half 2006. This stage includes acquisition of additonal stripping and mining equipment. Further expansions in capacity are planned with an overall production capacity of around 100 million tonnes per annum by 2010. Click for more details...

MURCHISON GOLD PROJECT - RESOURCE - WESTERN QUEEN/DALGARANGA JV
Resource - Gold project at Approx 80 km northwest of, Mount Magnet, WA 6638 In The Council Area Of Mount Magnet of Private. The Western Queen joint venture is part of AXG's 100% owned tenements in the Murchison project area. Click for more details...

MURCHISON GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) project for New development. AXG has a large holding of 100% owned tenements surrounding Western Queen and Western Queen South. The Western Queen and Dalgaranga areas of the Murchison project area are the subject of a joint venture with Equigold. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

KILKENNY SOUTH - MOUNT KILDARE PROJECT - NICKEL COPPER & ZINC RESOURCE
Mining (Underground - including longwall) project for New development. As previously reported, significant potential exists to increase the resources base through screening upgrade of the silica rich zones located around existing chrysoprase workings. At both Eucalyptus and to a lesser extent Mount Kilkenny, silica banding has been identified in chrysoprase pits. Sampling of the nickeliferous clays between the silica banding has provided nickel assays from 1.2% to 2.3%. A drill programme within the silica zones at Mount Kilkenny will be undertaken to evaluate the screening concept. Potential exists to unlock substantial tonnages should the screening work prove successful. The Company is still to decide whether the nickel-laterite resources, on the granted mining leases, may to be treated at Murrin Murrin JV Glencore via toll milling, or to be stand alone projects needing a treatment plant. Click for more details...

MANDILLA GOLD PROJECT - OPERATING MINE
Resource - Gold project at 20 km south west of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. Resource estimate is based on the recent RC & AC drilling programme that has been completed. Probable ore reserve is 70,100 tonnes @ 7.52 g/t Au for 16,960 ounces gold. Ore will be custom treated at the nearby Higginsville Mill. Click for more details...

WOLFRAM CAMP PROJECT - TUNGSTEN MOLYBDENUM & BISMUTH RESOURCE
Private ownership Mining (Sample analysis, Laboratory testing) project In The Tablelands Regional Council Area for New development. Total resources in Wolfram Camp were increased by some 45% to 876,500 tonnes measured plus indicated @ 0.41% WO3 and 0.20%MoS2 and inferred is 211,500 tonnes @ 0.4%WO3 and 0.3%MoS2. Infrastructure to include processing plant, pipeline and electrical. Click for more details...

PILBARA LNG PROCESSING FACILITY
New project of Mining (Offshore - oil & gas) project at Reserve 19291, 4.5 Km South West of, Onslow, WA 6710. To construct a 6 Mt LNG Plant. A materials offloading facilities site is being investigated along Beadon Creek. The facility will comprise a new wharf and hard stand area for the unloading of equipment and plant modules. Click for more details...

MOUNT RAWDON GOLD & SILVER PROJECT - OUTER RAWDON - RESOURCE
A project in the QLD Within Bundaberg Regional. A total of 1,190 soil samples of 19 rock chips were collected and analysed with encouraging results with a best sample value of 30.85 g/t gold and 5.8 g/t silver. Low order anomalous gold and arsenic results were obtained over several targets south of Mt Rawdon. Click for more details...

KIMBA GOLD & BASE METALS PROJECT - RESOURCE
Mining (Underground - including longwall) project for New development. The Kimba Project contains interpreted Hutchinson Group metasediments, which host mineralisation at Minninnie Dam and these will be targeted for similar style base metal deposits. The exploration work will centre on the search for Tanami Style Orogenic Gold and Broken Hill style stratiform lead-zinc-silver deposits. Click for more details...

SALT DAM/YALINGA BORE PROJECT - URANIUM RESOURCE
35km NNW of, Menzies, WA 6436 Has Salt Dam/Yalinga Bore Project - Uranium Resource currently at Exploration, Drilling, Survey & Assessment stage. The project covers predominantly saline lake sediments and evaporites considered prospective for uranium mineralisation due to elevated levels of uranium in regional surface geochemical sampling. Uranium anomalism is most likely sourced from adjacent granitoid areas and deposited in saline lake sediments. Click for more details...

HANDLEBAR HILL ZINC & LEAD PROJECT
Mining (Open Cut) project In The Mt Isa City Council Area of Private ownership. Recent drilling, metallurgical testing and design has confirmed a 3.4 million tonne open pit reserve in an area south of the George Fisher underground mine. Ore will be mined at a rate of up to 1.75 million tonnes per annum, crushed at George Fisher and trucked to the Mount Isa zinc-lead concetrator from mid 2008. The concentrator is currently being expanded from 6.5mtpa to 8mtpa. The open cut mine has an expected life time of two and a half years with the potential for underground mining operations into the future. Click for more details...

BAULOORA PROJECT - BASE METAL RESOURCE
Mining (Exploration - airborne surveys etc.) project at 10km Northwest of, Cootamundra, NSW 2590 of Resource - Base Metals type of New development. The area contains a number of base metal prospects including the previously worked Bauloora Mine. The Mine's main lode extended for 250m on the surface and approximately 60m below the surface. Defining drill targets should delineate narrow vein type targets at depth, and may lead to the generation of deep bonanza-style base-precious metal targets. Apart from the mineralised vein, the widespread presence of epithermal vein float, and soil anomalies points to additional undiscovered veins. Also, the main vein is quite continuous and open in depth. Click for more details...

TEMMA PROJECT - GOLD/BASE METAL RESOURCE
Private ownership Mining (Exploration - airborne surveys etc.) project In The Circular Head Council Area for New development. A number of strong, discrete anomalies have been found, and genetic models for mineralisation would include: structurally controlled copper mineralisation within the Proterozoic sediments, structurally controlled iron-oxide hosted copper-gold mineralisation within the Proterozoic sediments and stataform base metal mineralisation within Proterozoic sediments. Click for more details...

BUSHY PARK JOINT VENTURE PROJECT - ENERGY MINERAL RESOURCE
A project in the NT Within Roper Gulf Shire. The area is potentially prospective for primary, hard-rock uranium, secondary, sandstone hosted and surficial calcrete-styles of mineralisation. Click for more details...

MOUNT MCDONALD NORTH COKING COAL PROJECT
Mining (Exploration - Drilling) New project at Approximatley 22km North-northeast of, Emerald, QLD 4720. This type is Resource - Coal with Private ownership. The tenement is known to contain semi-soft coking coal. The tenement is also near both road and rail facilities, and the Gregory Coal Mine. Only two drill holes within the tenement have been completed to a suitable depth to intersect the German Creek Coal Seam. Both these drill holes contain coal with excellent yields at low ash, moderate sulphur, very low phosphorus, and high specific energy. Based on the rank this coal would be suitable as a blend coking coal. Click for more details...

MORANBAH GAS PROJECT - WELL DRILLING CONTRACT
A project in the QLD Within Isaac Regional. A project to expand what is already one of the largest operating coal seam gas (CSG) project in Australia. 12 month contract with 1 year option for drilling vertical production wells. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining (Open Cut). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

ROY HILL IRON ORE PROJECT - PACKAGE 1 MINE PROCESS PLANT - TRAIN LOAD OUT
Train Load Out project at 110km north of, Newman, WA 6753 in the Mining (Open Cut). For the supply of a train load out system. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

ROPER BAR IRON ORE PROJECT - MINING CONTRACT
Mining Contract project at Via St Vidgeon pastoral lease, 80km Southeast of Roper Bar via, Ngukurr, NT 0852 in the Mining (Open Cut). For the provision of mining services. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (WA-1-1 PERSEPHONE LNG) - PRODUCTION HYDRAULIC POWER UNITS
Production Hydraulic Power Units - Supply project at 135km North/NW of, Karratha, WA 6714 in the Mining (Offshore - oil & gas). For the provision of production hydraulic power units. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - SUPPLY OF SUBSEA MANIFOLDS
Mining (Offshore - oil & gas) New project at Within the, Carnarvon Basin, WA 6999. This type is Subsea Manifolds - Supply with Private ownership. For the supply of Subsea Manifolds. Click for more details...