TRITTON COPPER MINE EXPANSION
Mining (Underground - including longwall) project In The Bogan Council Area of Minesite type. A high grade copper zone has been confirmed under the eastern pit wall and ramp at Larsens. Recent drilling at Murrawombie has confirmed an extension of the sulphide ore body. Click for more details...

MAGUIRES CROSSING PROJECT
Currently at the Early Planning stage In Kempsey is a project estimated to be $ 10000000. This project Located about 3 hours trucking distance north of the company's dry processing plant at Hawks Nest in which spare capacity exists. The project contains a measured/inferred resources estimate of 26 million tonnes grading 0.53% HM. Click for more details...

HILL END PROJECT - GOLD RESOURCE
Mining (Open Cut) project at 2 km northwest of, Hill End, NSW 2850 for New. The plant is processing material from the test drive on the M2 vein set, which has averaged over two ounces per tonne recovered grade with some material producing over four ounces per down. About 80 tonnes of M2 material have been stockpiled from the high grade north end of the test drive, which face sampling indicated would contain up to four ounces per tonne. An additional 200 tonne M2 stockpile of various grades is ready to be processed and narrow driving on the high grade M2 is continuing to the north and south of the test drive to produce plant feed material. Click for more details...

BURRA JOINT VENTURE ZINC LEAD PROJECT
Currently at the Early Planning stage In Queanbeyan is a project estimated to be $ 5000000. This project Results included 25 metres at 5.05% zinc, 0.44% lead, 18.2gpt silver from 33 metres, including 6 metres at 9.5% zinc, 0.82% lead, 6.2gpt silverfrom 34 metres and 1 metre at 6.86% zinc, .047% lead, 2 gpt silver from 64 metres. Mineralisation remains open to the south. Click for more details...

FIFIELD PROJECT
Magnetic Survey - High Resolution project at 60 km north west of, Parkes, NSW 2870 In The Council Area Of Parkes of Private. A high resolution magnetic survey over 24 sq km to further assist in drill targeting. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS - BRACKINS SPUR
Resource - Gold/Antimony project at Hillgrove, north east of, Armidale, NSW 2350 in the Mining (Underground - including longwall). Mine output has increased by 30% over the previous quarter. This increase was principally from the Metz operation. Brackins Spur will provide an additional ore source during the September 2001 quarter. The output of this mine will be significantly lower in antimony than the ore currently mined, but will contain a higher gold grade. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining (Open Cut) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

BOONOO BOONOO PROJECT - SPECIMEN GULLY/STAR OF HOPE
Mining (Open Cut) New project at 20 km northeast of, Tenterfield, NSW 2372. This type is Resource - Silver/Gold with Private ownership. Boonoo Boonoo is near the road which accesses Malachites Rivertree project. Previous sampling by the Company of dumps at old working in the Boonoo Boonoo area had shown that many were anomalous in gold and silver. As previously reported, the best result from drilling was obtained for one of the holes drilled at the Star of Hope (formerly called Browns) Lode, with a 1m intercept of 6.25 g/t gold and 285 g/t gold. Other intercepts obtained were generally of low tenor, although the intercepts in the Demonstration and Golden Crown Lodes show some promise. The more intensively worked central part of the Specimen Gully lode was not accessible for the recent program, as some track construction could be required. Click for more details...

BOONOO BOONOO PROJECT - SPECIMEN GULLY/STAR OF HOPE
Mining (Underground - including longwall) New project at 20 km northeast of, Tenterfield, NSW 2372. This type is Resource - Silver/Gold with Private ownership. Boonoo Boonoo is near the road which accesses Malachites Rivertree project. Previous sampling by the Company of dumps at old working in the Boonoo Boonoo area had shown that many were anomalous in gold and silver. As previously reported, the best result from drilling was obtained for one of the holes drilled at the Star of Hope (formerly called Browns) Lode, with a 1m intercept of 6.25 g/t gold and 285 g/t gold. Other intercepts obtained were generally of low tenor, although the intercepts in the Demonstration and Golden Crown Lodes show some promise. The more intensively worked central part of the Specimen Gully lode was not accessible for the recent program, as some track construction could be required. Click for more details...

MOONEE COLLIERY
Moonee Colliery is currently at the Construction stage, valued at about $ 30000000 it is Includes clean up work and the re-establishment of the colliery. Click for more details...

TRITTON COPPER PROJECT
Mining (Underground - including longwall) project for New development. Development and first three years of mining. A 48 month contract. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining (Underground - including longwall) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

WERRIS CREEK COAL MINE - RESOURCE
Deposit - Coal project at "Narrawolga" property approx 4 km south of, Werris Creek, NSW 2341 In The Council Area Of Tamworth of Private. Open cut mining operation over an area of approx 80 ha. Construction and operation will include coal screening, crushing equipment, rail load out facility. Coal will be transported from the processing area on private haul road to the rail loadout facility. A mine access road, various support services, structures and transportable building will be installed. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining (Open Cut) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

MUNDI MUNDI COPPER/GOLD PROJECT - K1/POLYGONUM - RESOURCE
New project of Mining (Exploration - Drilling) project at Approx 50 kms north west of, Broken Hill, NSW 2880. A further three 500 metre core holes following the completion of further Moving Loop Electromagnetic surveys are planned to be drilled to assist in target definition. Click for more details...

BROKEN HILL PORPHYRY PROJECT
Mining (Open Cut) project at via, Broken Hill, NSW 2880 of Resource - Copper/Gold type of New development. Newcrest expects to commence drilling at the Broken Hill Porphyry Project in late June/early July 2002. Drilling will be conducted on two target areas considered to have potential for porphyry style copper-gold mineralisation. Click for more details...

BROKEN HILL PORPHYRY PROJECT
Mining (Underground - including longwall) project at via, Broken Hill, NSW 2880 of Resource - Copper/Gold type of New development. Newcrest expects to commence drilling at the Broken Hill Porphyry Project in late June/early July 2002. Drilling will be conducted on two target areas considered to have potential for porphyry style copper-gold mineralisation. Click for more details...

MURRAY BASIN MINERAL SANDS PROJECT - MAZAR/MAGIC/KIMBERLY/BUDGEREE
Currently at the Exploration, Drilling, Survey & Assessment stage In Broken Hill is a project estimated to be $ 1000000. This project Recent drilling on three drill lines has confirmed a minimum seven kilometre strike length to the Mazar Prospect strand line. Click for more details...

OAKLANDS COAL PROJECT - RESOURCE
Approx 100 kms north west of Albury, Oaklands, NSW 2646 Has Oaklands Coal Project - Resource currently at Early Planning stage. Thermal coal suitable as feedstock of domestic power station. 1250 mt measured in-situ resource containing 1120 mt recoverable reserves of which 880 mt was marketable. Click for more details...

TOOLOOM PROJECT - FRASERS/EAGLE HAWK - GOLD RESOURCE
Resource - Gold project at South west of, Tooloom, NSW 2475 In The Council Area Of Tenterfield of Private. Nine Mile, Back Creek and Pine Gully are all key targets for the drilling programme. Eight Mile, Frasers, Doctors Gully, Deep Lead and Eagle Hawk are likely to be drilled in 2004. Click for more details...

HILLVIEW VERMICULITE PROJECT - RESOURCE
Mining (Open Cut) project In The Lachlan Council Area of Private ownership. A 40 tonne bulk sample of vermiculite has been processed through a pilot plant by Mintek in South Africa. The aim of the work was to test a new dry method of beneficiation which includes air tabling as well as more classical winnowing. The test work was very successful and showed that recoveries of approximately 50% of the vermiculite could be expected across most of the size ranges. These results are seen as a major step forward for the project and studies are underway to determine the economics of developing a small 5,000 to 10,000 tpa plant on the Hillview site. Click for more details...

HEBBURN NO 2 COLLIERY - MINING & RECOVERY OF WASTE MATERIALS
Mining/Recovery Of Waste Materials project at Via, Cessnock, NSW 2325 In The Council Area Of Cessnock of Private. This tender includes the rehabilitation of the site. Click for more details...

LAKE INNES PROJECT - HURLLS HILL/PACIFIC HIGHWAY
via, Port Macquarie, NSW 2444 Has Lake Innes Project - Hurlls Hill/Pacific Highway currently at Early Planning stage. In order to standardise with the Young and Beaconsfield Laterite resources, the resources at Hurl's Hill, the largest deposit at Lake Innes, have been calculated in lithological categories. Hurll's Hill has a resource of 10.6 million tonnes of which 68% fall in the Saprolite and Weathered Serpentine lithologies - the most favourable for the atmospheric pressure leach metallurgical process. Click for more details...

PIPELINE PROJECT
Mining (Open Cut) project at South east of, Cobar, NSW 2835 of Resource - Gold type of New development. Golden Cross recently completed a programme of RAB drilling, auger drilling and rock chip sampling at Canbelego. Encouraging results were returned from the South Mount Boppy and Birthday prospects. Click for more details...

STEPHENS -CENTENNIAL JV PROJECT - BASE METALS RESOURCE
Mining (Exploration - Drilling) project In The Broken Hill Council Area of Resource - Base Metals type. A 500 metre deep drill hole and geological sampling program is planned. Click for more details...

SOUTH LAKE COWAL PROJECT - PHOENIX
South Lake Cowal Project - Phoenix is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is Infill aircore drilling on 200 m centres at the Phoenix prospect produced a coherent anomalous gold zone with four adjacent holes containing intercepts of over 0.5 g/t gold from monzodiorite and andesite units. The best result was 2 m at 1.6 g/t gold plus 780 ppm copper. from a regional aircore programme, one hole returned 2 m at 1.6 g/t gold plus 1000 ppm copper. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS - E22
Mining Contract - Open-Cut project at 30 km north west of, Parkes, NSW 2870 In The Council Area Of Parkes of Private. Northparkes Mines is a copper-gold producer near Parkes in central western NSW. Northparkes produces 1.1 mtpa of ore from open pits and 4.1 mtpa from underground block cave mine for processing through the sulphide flotation plant. Safety and environmental standards of the highest order are expected from all contractors. The Northparkes culture is an open and cooperative environment with a strong customer focus. Currently two opencut mines exist each around 100 metres in depth, with a further 40 metres to be mined for completion. In addition one opencut will be cutback 40 metres to allow mining to proceed to a final depth of 150 metres to meet stockpile ore and mill feed requirements. The terms of the contract will be to provide the required mining services for two years, with the possibility of extension options, at the discretion of the company. The contract scope will include bulk ore and waste mining with approximate quantities of 3M cubic metres per annum and drilling and blasting activities for the same. A second schedule at lower production rates is currently under review and may be included as part of the tender. Additional on site works to be tendered during this time may include tailings dam wall lift construction and ore rehandling activities, the inclusion of grade control drilling is optional and may be considered during the tender phase. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Mining (Underground - including longwall) project at South west of, Morisset, NSW 2264 for New. Underground conveyor Mandalong to Vales Point; Mandalong to Cooranbong; conveyor supporting longwall (trunk road belts etc). total package with three separable elements. Click for more details...

CHARBON COAL OPERATIONS - OPERATING MINE
Charbon Coal Operations - Operating Mine is currently at the Construction stage, valued at about $ 20000000 it is Developer is proposing to expand the open cut operations into stage 2 area of the mine. It will involve the production of 600,000 tonnes of coal per annum. The existing infrastructure at the mine will not be altered. Existing infrastructure includes a Coal Preperation Plant, stockpiles and transport infrastructure. Resource estimate is 7.1 Mt measured in-situ, 18.7 Mt indicated, 25.8 Mt recoverable, 5.8 Mt marketable. Click for more details...

INVINCIBLE COAL OPERATIONS - RESOURCE
Private ownership Mining (Open Cut) project In The Lithgow Council Area for New development. The company has an existing power station supply contract. The company has additional reserves. Click for more details...

CUMNOCK NO 1 COLLIERY
Consultancy For Environmental Impact Study New project In The Singleton Council Area. The environmental impact study is being undertaken in order to convert the exploration licence to a mining lease so that production can be increased to 4,500 million tonnes per annum. Click for more details...

BULGA/WALLERAWANG COAL OPERATIONS
New project of Mining (Open Cut) project at South of, Singleton, NSW 2330. Part of contract let for whole of Oceanic coal operations. Various sites, hunter Valley area. Click for more details...

COWRA COPPER GOLD PROJECT
Resource - Copper/Gold New project In The Cowra Council Area. Exploration for porphyry related copper & gold mineralisations & volcanic massive sulphides within the southern extension of Ordovician strata that host the Cadia-Ridgeway copper-gold deposit. A 960km airborne electromagnetic (VTEM) survey covering 205sq km indicated a significant number of bedrock anomalies. Follow up drilling of targets investigated through ground electromagnetic & magnetic surveys. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining (Underground - including longwall) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

EURIOWE PROJECT - GOLD/COPPER RESOURCE
Mining (Open Cut) project for New development. RAB drilling program will focus on Fairy Hill copper prospect and then at Smith Well and Yalcowinna Creek. Click for more details...

EURIOWE PROJECT - GOLD/COPPER RESOURCE
Mining (Underground - including longwall) project for New development. RAB drilling program will focus on Fairy Hill copper prospect and then at Smith Well and Yalcowinna Creek. Click for more details...

BRAIDWOOD GOLD & SILVER PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Palerang is a project estimated to be $ 1000000. This project Previous drilling outlined inferred gold resource of 1.5 million tonnes at 1.03g/t, with low copper and silver values. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining (Open Cut) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

NYMBOIDA PROJECT - COAL RESOURCE
Mining (Sample analysis, Laboratory testing) project In The Guyra Council Area of Private ownership. The potential for a resource at Nymboida, covering an area of 59 km² centred on the old Nymboida Colliery, of around 10 million tonnes of hard coking coal. Waratah will look to expedite the project if drilling confirms a suitable resource. In the event of the definition of a feasible project, Nymboida could enter development and production ahead of the Company?s Galilee Basin project. The Farquhar Seam, which will be the second-phase drilling program at Nymboida, will be cored for coking analysis. The establishment of geotechnical parameters for underground equipment and mining method studies will be achieved from the testing of the Roof and floor core samples. The previously intersected Bardool seam which has shown to have excellent coking properties, will also be targeted in some deeper holes. Click for more details...

GOLDEN CRYSTAL PROJECT - GOLD BASE METALS & PGE RESOURCE
Resource - Gold/Base Metals/Pge's New project In The Gwydir Council Area. The target is for 'mother lode' style gold mineralisation related to deep crustal structures, and associated ultramafic-hosted nickel and platinum group metals. The tenements are considered prospective for gold, base metals and PGEs along the regionally significant Peel Fault Structure. Click for more details...

UNITED COLLIERY - OVERHAUL & FABRICATION OF LONGWALL EQUIPMENT
Mining (Underground - including longwall) project at 15 km west of, Singleton, NSW 2330 of Overhaul/Fabrication - Longwall Equipment type of New development. For the overhaul of longwall equipment including some fabrication. Click for more details...

AWABA COAL OPERATIONS - POLLUTION CONTROL DAM
Awaba Coal Operations - Pollution Control Dam is currently at the Tenders & Building stage, valued at about $ 1000000 it is Construction of a pollution control dam as part of a project to extend the Life-of-Mine (LoM) by expanding underground operations. Click for more details...

GLEN ISLA GOLD PROJECT
Mining (Underground - including longwall) New project at 50km southeast of, Dubbo, NSW 2830. This type is Resource - Gold with Private ownership. Drill results from the northern-most hole completed at Glen Isla returned a strongly anomalous gold intersection, which indicates the potential for a near surface mineralized system extending north of current drilling. Click for more details...

TIA RIVER GOLD PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Walcha is a project estimated to be $ 2000000. This project Several basalt-filled palaeochannels appear to have shed alluvial gold into the catchment of the Tia river in the vicinity of the Company's main Holocene alluvial target. The current exploration program is contingent on access agreements with relevant landholders in the licence area. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

WHITE DAM GOLD OPERATIONS REGIONAL EXPANSION
Operating Mine - Expn project at 85km west of, Broken Hill, NSW 2880 in the Mining (Open Cut). A project in the environs of the operating White Dam gold mine which has a resource estimate of 6 million tonne (Mt) containing 188,000 ounces of gold (White Dam + Vertigo). Exploration amongst historic gold-copper mines to extend White Dam's mine life including at Vertigo & White Dam North. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

GOLDEN KING GOLD COPPER PROJECT
Addition project of Mining (Exploration - Drilling) project at 32km north of, Broken Hill, NSW 2880. A project located along strike of the historic Golden King Mine. Rock chip sampling preceded reverse circulation drilling to test multiple lodes hosted in a chlorite-altered corridor. A ground magnetic survey to detail lode outlines prior to follow up drilling. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining (Open Cut) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...