State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining⊂category= Projects in QLD®ion= in region


SNAKE CREEK PROJECT - COPPER & GOLD RESOURCE
Private ownership Mining (Underground - including longwall) project In The Cloncurry Shire Council Area for New development. The soil sampling by Xstrata Copper (previous JV partner) recorded numerous anomalous gold (up to 150ppb) and copper ( up to 757ppb) values. The infill sampling will define targets with potential to meet Glengarry's size parameters. Strongly anomalous uranium (248ppm) was recorded by on the rock ship samples associated with high gold (0.6g/t) and copper (8.6%) values. The Snake Creek Project is in the same geological province that hosts the Mary Kathleen uranium deposit approx 70 km to the west-north-west. Click for more details...

BONNIE DOON COAL PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Central Highlands Regional is a project estimated to be $ 1000000. This project Bonniedoon covers an area of 378 sq km in the central part of the Bowen Basin and lies in an area underlain by the Rangal Coal Measures. Exploration drilling by the Queensland Department of Mines has verified that at least four coal seam are present, dipping gently to the west and are variable in distribution and thickness. The Aries II seam appears to be the most persistent. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

KOGAN NORTH PROJECT - COAL METHANE RESOURCE
Mining (Onshore - oil & gas) project at 40 km West of, Dalby, QLD 4405 of Gas Field type of New development. A 24 month, 5 well pilot has yielded rates up to 550 MMcf/d and has let to the certification of gas reserves of 83 PJ probable and 157 PJ possible at Kogan North. The development of this 35-35 well project will be for the purpose of supplying 4 PJ of gas per annum for 15 years to CS Energy's Swanbank 'E' power plant, located near Ipswich in Southeast Queensland. Click for more details...

FREITAG CREEK
South western corner Bowen Basin, west of, Rolleston, QLD 4702 Has Freitag Creek currently at Exploration, Drilling, Survey & Assessment stage. The tenement covers 350 sq km and is located west of Rolleston in the south western corner of the Bowen Basin. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

GERMAN CREEK EAST PROJECT
Deposit - Coal project at South East of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. Situated between two operating coal mines. It lies down dip and east of Anglo's German Creek opencuts and west of Foxleigh opencut mine. Both mines are developed on coal deposits in the Middlemount seam similar to the coals underlying the Aquila tenement. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

BURTON COAL OPERATIONS EXPANSION
Mining (Open Cut) project for New development. A terrace mining, truck & shovel open cut operation based on the Broadmeadows, Plumtree & Wallanbah pits. A project to increase production to over 2.5million tonnes per annum (Mtpa) through reopening of the original Burton pit including its deepening to 240m. Processing to continue through the existing central coal handling & preparation plant (CHPP) with 2 x 400tonnes per hour modules. Product coal trucked 36km south along the Mallawa haul road to a train loadout facility for export through the Dalrymple Bay Coal Terminal. Life-of-Mine (LoM) to be extended until 2016 while employing more than 500 people. Click for more details...

MOUNT GARNET PROJECT - DRY RIVER SOUTH - BASE METALS RESOURCE
Mount Garnet Project - Dry River South - Base Metals Resource is currently at the Construction stage, valued at about $ 15000000 it is The proven and probale reserve for Dry River South is 1,051,000 tonnes at 8.2% zinc, 2.9% lead, 1.0% copper, 69 g/t silver and 0.65g/t gold . Inferred Resource is 1.559 million tonnes at 7.8% zinc, 2.8% lead, 1.0% copper, 68 g/t silver and 0.67 g/t gold. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - VENTILATION SHAFT
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 for New. Work comprises the installation of the primary ventilation shaft. This will involve the excavation of the 2.4 metre diameter 110 metre long shaft and the installation of a second exit method from the underground workings. Click for more details...

WEIPA BAUXITE OPERATIONS - ANDOOM/NEWEIPA PROJECT
Bauxite Mine - Expansion New project In The Weipa Shire Council Area. Expansion of Weipa bauxite production to 16.5 million tonnes, and a move to a two mine operation. Click for more details...

GYMPIE MINE SHAFT REPAIR PROJECT
Gympie Mine Shaft Repair Project is currently at the Construction stage, valued at about $ 800000 it is Includes backhoes, cranes, loaders, dozers/drotts, graders, trucks (single and tandem drive), excavators, bobcats, compaction equipment, compressors & tools, chain trencher and drilling rigs. Click for more details...

ROLLESTON COAL PROJECT
Resource - Coal project at 16 km west of, Rolleston, QLD 4702 in the Mining (Open Cut). A large low ash thermal coal deposit. Coal does not require washing. Initial production of 1 million tpa expected in late 2005, with pmpta export and 2 mtpa domestic production expected in 2008. the project has further expansion potential to 12 mtpa approx with minor additional capital. A low strip ratio, high productivity dragline will be used. Coal to be railed to the port of Gladstone. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - UNDERGROUND MINING
Currently at the Construction stage In Charters Towers Regional is a project estimated to be $ 3400000. This project Company personnel are currently undertaking the preliminary development. Once the decline progresses into the ore zone, company personnel are likely to concentrate on production with assistance in further decline development likely to be undertaken by a contractor (to be repriced at a later date). Click for more details...

TEXAS SILVER PROJECT - RESOURCE
Resource - Silver/Gold New project In The Goondiwindi Regional Council Area. Most holes encountered low grade silver, encouraging high grade silver can be encountered with zones of low grade silver mineralisation. Click for more details...

BURNETT PROJECT - GOLD RESOURCE
Burnett Project - Gold Resource is currently at the Early Planning stage, valued at about $ 1000000 it is Ongoing scoping studies are being conducted over previously reported gold resources within the Yarrol and Mt Steadman tenements. The Company is progressing well in capturing all available data, both historical and modern, into digital format. Click for more details...

LILLEYVALE JOINT VENTURE PROJECT - IOCG RESOURCE
Lilleyvale Joint Venture Project - Iocg Resource is currently at the Early Planning stage, valued at about $ 2000000 it is The Company has identified a large & complex magnetic body that measures 4km x 3.4km & which is located under nearly 600m of cover. Click for more details...

ATP-613 - GREGORY CREEK/SUSAN RIVER
Currently at the Exploration, Drilling, Survey & Assessment stage In Fraser Coast Regional is a project estimated to be $ 20000000. This project Gregory-3 was scheduled to spud 24 March 2003 approx and has a proposed total depth of 3200 metres, and will be drilled with air to minimize potential gas flow. Click for more details...

FORT CONSTANTINE SOUTH COPPER & GOLD PROJECT
Currently at the Early Planning stage In Cloncurry Shire is a project estimated to be $ 5000000. This project The Fort Constantine South Project is located 10 km south of the Ernest Henry Copper-Gold deposit and covers the same sequences and structures that host this deposit. Previous work focusing on magnetic anomalism has intersected strong alteration and anomalous copper mineralisation in drilling at several prospects. Click for more details...

KESTREL COAL OPERATIONS
New project of Mining (Underground - including longwall) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

HAPPY VALLEY PROJECT- COPPER/GOLD RESOURCE
Mining (Open Cut) project at Approx 32 kms south south east of, Cloncurry, QLD 4824 for New. Includes four copper prospects - Mount Davis, Cut Snake, Sandy Creek and Consternation. Some sampling has ben undertaken. No significant results to date. Click for more details...

KINGOWER COAL PROJECT
North of, Emerald, QLD 4720 Has Kingower Coal Project currently at Exploration, Drilling, Survey & Assessment stage. Previously, vitrinite reflectances were measured for coal samples recovered from the open-hole drilling conducted previously on the Kingower tenement. The Corvus Seam gave a range of values from 0.59 to 0.65, which is indicative of a coal of this rank. Only two samples of the German Creek Seam could be measured and these gave values of 0.63 and 0.99 respectively. The high value recorded from drill hole KG 001 is of interest. It indicates that the German Creek Seam may contain coal of higher rank that was previously interpreted and shows that it is possible that coking coal can be found in this tenement. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

CANNINGTON BASE METALS OPERATIONS - NORTHERN ZONE DEVELOPMENT
Mining (Underground - including longwall) project for New development. An increase in production from 2.25 million tones per annum to 2.4 million tonnes per annum. Includes mining into the northern zone, modifications to processing facilities and upgrades in infrastructure. The Northern zone will be accessed "off the decline". Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Exploration - Drilling) project at via, Charters Towers, QLD 4820 of Underground Development type of New development. Initial development at Warrior of a 900 metres decline. Click for more details...

NEWLANDS WOLLOMBI NO2 COAL OPERATIONS EXPANSION PROJECT
13 km west of, Glenden, QLD 4743 Has Newlands Wollombi No2 Coal Operations Expansion Project currently at Construction stage. Development into the western portion (77ha approx) of Wollombi Open Cut Mine mining lease (ML4761). Production is expected to be up to 2.5 million tonnes of coking coal per annum of Run of Mine (ROM) coal for nominal annual average of 1.9 Mtpa product coal. It is proposed to use an excavator and truck fleet combined with a dragline to produce high grade, medium volatile steaming coal & premium coking coal for the export market. Development to involve open cut mining, clearing of vegetation, topsoil removal and replacement, overburden stockpiling, coal extraction and final rehabilitation of disturbed areas. Coal is to be processed at the existing Newland's Coal Handling and Preparation plant and transported 200km via rail to the Abbot Point Bulkcoal Terminal for export. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Mining (Open Cut) project at Via, Texas, QLD 4385 for New. Mobile Crushing Plant comprising jaw crusher, screens and core crusher and will be on site early April 2005. Click for more details...

WARWICK WEST GOLD PROJECT - LEYBURN/TALGIA/THANES CREEK/CANAL CREEK - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Southern Downs Regional is a project estimated to be $ 1000000. This project The tenement covers six small goldfields within the Warwick Mining District. They are the Leyburn, Talgai, Thanes Creek, Canal Creek, Palgrave and Pikedale Fields. Click for more details...

TEXAS NORTH GOLD PROJECT - RESOURCE
Mining (Open Cut) project In The Goondiwindi Regional Council Area of Resource - Gold/Silver type. The Company is principally targeting silver and gold mineralisation similar to that discovered by Macmin at their Mt Gunyan and Twin Hills sites (Texas Silver Project). Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

ANERINNA HILLS PROJECT - GOLD RESOURCE
Mining (Open Cut) project In The Richmond Shire Council Area of Resource - Gold type. A further 12 months of exploration is planned, including deeper drilling to the hard rock. Click for more details...

MOUNT RAWDON GOLD & SILVER PROJECT - OUTER RAWDON - RESOURCE
A project in the QLD Within Bundaberg Regional. A total of 1,190 soil samples of 19 rock chips were collected and analysed with encouraging results with a best sample value of 30.85 g/t gold and 5.8 g/t silver. Low order anomalous gold and arsenic results were obtained over several targets south of Mt Rawdon. Click for more details...

DAANDINE GAS PROJECT - ATP790P/PLA230 - RESOURCE
Mining (Onshore - oil & gas) project at 40 Km West of, Dalby, QLD 4405 of Gas Field type of New development. Development comprises drilling targeting Walloon coal seams. Daandine-1 and 2 have successfully tapped into the coal seams. Daandine-3 will further drill to establish water production rates, pressure communications and aerial extent. The field is expected to supply the Power generation Plant 2.2 petajoules per annum. Click for more details...

CARBOROUGH DOWNS COAL MINE EXPANSION PROJECT
Mining (Underground - including longwall) project at 15km East of, Moranbah, QLD 4744 of Mine - Expansion type of New development. A project increasing the annual production capacity from 1.9 million tonnes (Mt) to approximately 5Mt per annum. The existing underground longwall operations expanded including application for 2 new mining leases. Coal from the expanded operations processed in a second 500tonne per hour capacity coal handling and processing plant. Coal transported via train to the Dalrymple Bay Coal Terminal for export. The project also including ventilation upgrades, electrical works, civil infrastructure, a new switchroom & conveyor installations including a 4.2km overland conveyor system. Click for more details...

ALPHA COAL PROJECT
A project in the QLD Within Blackall Tambo Regional. Coal occurs in 5 seams A to E, 17% ash, with a 190km strike length and the potential for large tonnage of export Thermal coal. Click for more details...

CLONCURRY PROJECT - URANIUM RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Cloncurry Shire is a project estimated to be $ 2000000. This project Assay results from approximately 100 samples consisting of Toolebuc limestone has delineated several coherent, northwest-trending linear uranium anomalies each up to 2km in length. The prospective area for near-surface uranium mineralisation now covers approximately 10sqkm. The two largest of the four defined anomalies returned results generally in teh 50-200ppm U range up to a maximum of 230 ppm U. Most of the samples are also mineralised in molybdenum, up to 335 ppm MoO3. Click for more details...

STEAM ENGINE PROJECT - GOLD/URANIUM RESOURCE
Resource - Gold/Uranium project at Approximately 140km North of, Richmond, QLD 4822 in the Mining (Exploration - airborne surveys etc.). The epithermal veins at the project have geological similarities to the high-greade epithermal gold vein systems at Pajingo. It is believed that this project porvides evidence of similar epithermal type gold mineralisation. Previous investigations by others have delineated widespread uranium mineralisation in the region hosted by hydrothermally altered granite and quartz muscovite schists in close proximity to features of geological unconformity. It is believed that the project has the potential to host this style of mineralisation. Five extensive, seond and third order uranium anomalies have been identified within the project area, they remain untested and provide targets for more detailed investigation. Click for more details...

KING EAGLE PROJECT - URANIUM/COPPER/GOLD RESOURCE
King Eagle Project - Uranium/Copper/Gold Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 2000000 it is The tenements cover potentially uranium-bearing Cambrian phosphatic units within the Georgina Basin. Large phosphorite deposits have excellent potential to contain depositional trap sites for uranium sourced from the Mt Isa Inlier. Click for more details...

WERRINGTON-OAK PARK JOINT VENTURE PROJECT - BASE METALS RESOURCE
Resource - Base Metals project at 50km South of, Kidston, QLD 4871 In The Council Area Of Etheridge Shire of Private. The tenement covers the Einasleigh Metamorphics that is considered prospective for world class Cannington and Broken Hill type lead-zinc-silver mines because part of the palaeoproterozoic metamorphics in the Georgetown block is correlated with Cannington and Broken Hill mine sequences. Click for more details...

THE RETURN GOLD & BASE METALS PROJECT
Resource - Gold/Base Metals New project In The Etheridge Shire Council Area. A number of historical workings have produced significant amounts of gold, silver, lead and copper. Click for more details...

GREENVALE EAST GOLD TIN TUNGSTEN PROJECT
New project of Mining (Open Cut) project at 170km west-northwest of Townsville via, Greenvale, QLD 4816. The tenement area contains 14 known mineralised occurrences, including old workings that have produced modest volumes of tin tungsten and gold. Click for more details...

MOUNT GARNET TIN & IRON PROJECT
Private ownership Mining (Open Cut) project In The Tablelands Regional Council Area for New development. A project covering the Gillian, Pinnacles & Windermere localities on the historic Herberton tin field. A tin resource estimate of 7.3million tonnes (Mt) with iron estimates of 3Mt @ 30.8% at Gillian, 1.87Mt at Pinnacles (Wafer) & 400,000t at Deadmans Gully (Windermere). A fluorite estimate also for Pinnacles (Hartog, Llashram, Sniska, Wafer) of 0.96Mt @ 15%. A scoping study envisaged 7.5years life-of-mine (LoM) for operations in the project area at a rate of 700,000tpa producing 236,600tpa of magnetite concentrate grading 65%. Click for more details...

MOUNT MCDONALD NORTH COKING COAL PROJECT
Mining (Exploration - Drilling) New project at Approximatley 22km North-northeast of, Emerald, QLD 4720. This type is Resource - Coal with Private ownership. The tenement is known to contain semi-soft coking coal. The tenement is also near both road and rail facilities, and the Gregory Coal Mine. Only two drill holes within the tenement have been completed to a suitable depth to intersect the German Creek Coal Seam. Both these drill holes contain coal with excellent yields at low ash, moderate sulphur, very low phosphorus, and high specific energy. Based on the rank this coal would be suitable as a blend coking coal. Click for more details...

TALINGA DEVELOPMENT PROJECT STAGE 1 - CIVIL WORKS
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. Stage 1 - Civil Works involves earthmoving, hydraulic & civil works up to the completion of the slab & sub-structure. The pipe-laying & superstructure of the facility will be further stages with the pipework to be completed by a specialist company. Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

OAKY CREEK COAL OPERATIONS - LABOUR HIRE CONTRACT
Mining (Underground - including longwall) project In The Isaac Regional Council Area of Labour Hire Contract - For Gate Road Development type. A project based on June 2009 reserves of 137.7million tonnes (Mt) of coking coal for an estimated life-of-mine (LoM) of 32 years. Two longwall mining operations yield 11Mt of run-of-mine (ROM) coal annually. After processing through a coal preparation plant, product coal railed to either Dalrymple Bay or Gladstone for export by ship. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

ISAAC PLAINS COAL OPERATIONS - MINING SERVICES CONTRACT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 249000000. This project A 3 year mining services contract at a rate of 2.7 million tonnes (Mt) of run-of-mine (ROM) coal. To include dragline operations & supply & maintenance of mobile plant & equipment. Click for more details...

QCLNG OPERATIONS - INSTRUMENTATION MAINTENANCE
Mining (Exploration - airborne surveys etc.) New project at Bowen & Surat Basins, ., QLD 4999. This type is Instrumentation Maintenance with Private ownership. A service agreement for the provision of maintenance services for gas field instrumentation assets. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect