State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining⊂category= Projects in TAS®ion= in region


OONAH PROJECT
Mining (Open Cut) project In The West Coast Council Area of Resource - Base Metals type. The licence embraces the old Oonah tin-copper-silver mine, which produced relatively small tonneages of ore in the period 1890-1918. Mineralisation comprised vein quartz-siderite-sulphides in the northerly trending Galena and Stannite Lodes worked to a depth of almost 200 m in brecciated black shale and basic volcanics. Metallurgical testing has indicated it is feasible to produce a concentrate, but its saleability needs to be established. Click for more details...

OONAH PROJECT
Mining (Underground - including longwall) project In The West Coast Council Area of Resource - Base Metals type. The licence embraces the old Oonah tin-copper-silver mine, which produced relatively small tonneages of ore in the period 1890-1918. Mineralisation comprised vein quartz-siderite-sulphides in the northerly trending Galena and Stannite Lodes worked to a depth of almost 200 m in brecciated black shale and basic volcanics. Metallurgical testing has indicated it is feasible to produce a concentrate, but its saleability needs to be established. Click for more details...

MOUNT READ PROJECT - GOLD/BASE METALS PROJECT
A project in the TAS Within West Coast. Resource estimate is 180,000 tonnes grading 11.0% Pb, 4.0% Zn, 0.2% Cu and 11.0 oz/ton Ag. The estimate has beeen calculated from studies of old mine production and drilling records. Click for more details...

ZEEHAN SLAG DUMP BASE METALS RESOURCE
Mining (Open Cut) New project at Near, Zeehan, TAS 7469. This type is Resource - Base Metals with Private ownership. The Zeehan slag dump contains residue material from lead smelting over 100 years ago. It includes 450,000 tonnes of material grading 13.4% zinc, 1.7% lead, 54g/t silver and 50g/t iridium. It is located approx 90 km southwest of the Hellyer metals project by road. Click for more details...

YOLANDE RIVER GOLD PROJECT - DIAMOND HILL/MADAM HOWARDS - RESOURCES
Prospect - Gold/Base Metals project at 4 km north west of, Queenstown, TAS 7467 in the Mining (Exploration - airborne surveys etc.). This project is less than 3 km from the giant Mt Lyell copper/gold ore body currently being mined by Copper Mines of Tasmania. The Yolande River area is underlain by lithologies belonging to the Mt Read Volcanics which host several world class base metal/gold deposits in western Tasmania. The tenement covers the intersection of the NNE trending South Henty Fault and the east/west trending Firewood Siding Fault. Click for more details...

YOLANDE RIVER GOLD PROJECT - DIAMOND HILL/MADAM HOWARDS - RESOURCES
Prospect - Gold/Base Metals project at 4 km north west of, Queenstown, TAS 7467 in the Mining (Exploration - Drilling). This project is less than 3 km from the giant Mt Lyell copper/gold ore body currently being mined by Copper Mines of Tasmania. The Yolande River area is underlain by lithologies belonging to the Mt Read Volcanics which host several world class base metal/gold deposits in western Tasmania. The tenement covers the intersection of the NNE trending South Henty Fault and the east/west trending Firewood Siding Fault. Click for more details...

LISLE PROJECT - GOLCONDA/PANAMA/ENTERPRISE/GOLD CREST/POTOROO
Lisle Project - Golconda/Panama/Enterprise/Gold Crest/Potoroo is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 2000000 it is Long gold intersection, including a high grade gold intersection of 6.9metres at 1.8g/t gold. Click for more details...

BEACONSFIELD GOLD OPERATIONS
Mining (Underground - including longwall) project In The West Tamar Council Area of Private ownership. Contract to involve fabrication & mechanical work. Structural sections envisaged for this tender which may include associated service (e.g. electricals). Click for more details...

MOUNT LYELL COPPER/GOLD OPERATIONS
Private ownership Mining (Open Cut) project In The Lyell Council Area for New development. A four-year contract to include transportation of concentrate from the mine site to the railhead at Melba Flats and subsequently to the wharves at Burnie. Click for more details...

TASMANIA MINE DECOMMISSIONING
5 West St, Beaconsfield, TAS 7270 Has Tasmania Mine Decommissioning currently at Construction stage. A project for the decommissioning & rehabilitation of the Tasmania (formerly Beaconsfield) Mine. To include depositing of tailings in underground shafts to prior to their closure. Closure of tailings dams. Clean up of the Wetlands water filtration area. Ongoing monitoring for several years. Click for more details...

AVEBURY NICKEL PROJECT
Mining (Underground - including longwall) project at West of, Zeehan, TAS 7469 of Decline Development type of New development. The decline tunnel has a length in excess of 1,200metres and will access the upper sections of the Viking deposit. Detailed drilling will be carried out from the decline to evaluate the nickel mineralisation. The decline will also provide access to the higher grade upper sections for any early production. Click for more details...

RENISON BELL TIN OPERATIONS
A project in the TAS Within Burnie. 2 year mining contract. Click for more details...

HENTY GOLD OPERATIONS - MOUNT JULIA
Exploration Decline/Ramp Decline New project In The Zeehan Council Area. 15,000 -16,000 metres. It is anticipated that it will take 12 months approx to reach Mount Julia. Click for more details...

BEACONSFIELD GOLD MINE JV - RESOURCE
5 West St, Beaconsfield, TAS 7270 Has Beaconsfield Gold Mine Jv - Resource currently at Exploration, Drilling, Survey & Assessment stage. An extensive RC drilling program is to target the North Please Creek tenements. UP to 20 RC holes to a depth of 200 metres will be drilled. Exploration is being undertaken in the area surrounding Beaconsfield mine. Two recent RC holes cut 0.8g/t gold over 35 metres, including 5.3g/t gold over 2 metres from 52 metres (hole BFRC17), and anomalous gold within the Johnsons Creek fault (hole BFRC18). Click for more details...

BEACONSFIELD NICKEL/CHROMITE PROJECT - RESOURCE
Private ownership Mining (Exploration - Drilling) project In The West Tamar Council Area for New development. This licence covers 34 square kilometres and covers defined nickel and cobalt laterite deposits and extensive chromite occurrences. Click for more details...

BEACONSFIELD NICKEL/CHROMITE PROJECT - RESOURCE
Private ownership Mining (Open Cut) project In The West Tamar Council Area for New development. This licence covers 34 square kilometres and covers defined nickel and cobalt laterite deposits and extensive chromite occurrences. Click for more details...

DEPARTMENT OF MINERAL RESOURCES - TASMANIA
Airborne Aeromagnetic And Radiometric And Airborne Electromagnetic Surveys project at Various sites west and north west Tasmania, ., TAS 7999 In The Council Area Of Various of State. Project is in conjunction with the Commonwealth government. Aeromagnetic and radiomagnetic surveys are to be flown over Western and North Western Tasmania and King Island. Airborne electromagnetic surveys are to be flown over the Mount Reed volcanics and shallow granites. Click for more details...

T/18P - BASS STRAIT OIL/GAS RESOURCE - TREFOIL
Mining (Offshore - oil & gas) New project at 114 km southwest of Wilsons Promontory, ., TAS 7999. This type is Resource - Oil/Gas with Private ownership. A project located 40 km west of the Yolla production platform whcih is connected to the BassGas pipeline. Post-well interpretation of the Trefoil-2 & Rockhopper-1 wells & processing of 3D seismic survey data to contribute to assessment of the commercial potential of the project. Click for more details...

AVEBURY NICKEL PROJECT - TRIAL MINING CONTRACT
New project of Mining (Underground - including longwall) project at 8 Km West of, Zeehan, TAS 7469. Trial mining of 5000 tonnes of ore. Click for more details...

T/40P - SORRELL BASIN - OIL/GAS RESOURCE
Mining (Offshore - oil & gas) project for New development. A 2D and 3D sesmic survey and drilling is planned for to be undertaken between October 2005 and May 2006. Click for more details...

SULPHIDE CREEK GOLD PROJECT - RESOURCE
Sulphide Creek Gold Project - Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is A three hole drill program in progress. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Exploration - Drilling). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Open Cut). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Underground - including longwall). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

CATAMARAN COAL PROJECT - RESOURCE
Near, Dover, TAS 7117 Has Catamaran Coal Project - Resource currently at Exploration, Drilling, Survey & Assessment stage. Previous developer stated that in situ resource of 5.5 million tonnes of open cutable coal and a further 11.5 million tonnes of shallow underground coal is also available to the south of the open cut resource. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining (Open Cut) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINE DEVELOPMENT & ORE PRODUCTION WORK
Currently at the Construction stage In Lyell is a project estimated to be $ 10000000. This project Mine development to include decline & level of development at variable grades. This includes drill, blast, ground support, load, haul and dump of ore/waste. Ore production including drill, blast, load, haul and dump of stope ore. Crushing and conveying of the ore from the primary crusher to the skip loading station. The Developer intends to produce 2.85Mt of ore pre annum (+/- 10%) and 250 metres of development per month (+/-10%) for three years in underground development. Click for more details...

SAVAGE RIVER IRON ORE - NORTH PIT EXPANSION PROJECT
A project in the TAS Within Waratah-Wynyard. The Company currently have 150 tonne trucks. Subject to funding, the Company will need a larger New Mining Fleet, including 200 tonne trucks and associated mining equipment. Click for more details...

PROFESSOR ZINC PROJECT - RESOURCE
Near, Zeehan, TAS 7469 Has Professor Zinc Project - Resource currently at Early Planning stage. Inferred resource estimate of 350,000 tonnes @ 4% Zn. Scoping study will look at establishing a flow sheet to economically recover zinc from the surface zinc sulphide deposit at Grieves. Other work will be drilling to upgrade the resource, examining options for the treatment of underlying zinc oxide mineralisation and optimising the mining rate initially planned to be 200,000 tonnes per annum of ore @ 4% Zn for 6000 tonnes of contained zinc per annum. Click for more details...

SAVAGE RIVER - LONG PLAINS IRON ORE PROJECT
New project of Mining (Open Cut) project at 68 km south of Burnie, Savage River, TAS 7321. This will be a stand alone project as it is too far away from the Savage River Mine for haulage to processing facility. Click for more details...

SAVAGE RIVER - LONG PLAINS IRON ORE PROJECT
New project of Mining (Underground - including longwall) project at 68 km south of Burnie, Savage River, TAS 7321. This will be a stand alone project as it is too far away from the Savage River Mine for haulage to processing facility. Click for more details...

FLINDERS/BARREN ISLAND HEAVY MINERAL SANDS PROJECT - RESOURCE
A project in the TAS Within Flinders. Previous minor exploration has identified good zircon and gold potential in the extensive strandline systems. The areas cover a 70km strike length of fossil shore strandlines overlying mineralised rocks. Click for more details...

GAWLER JOINT VENTURE PROJECT - IRON ORE RESOURCE
Mining (Exploration - Drilling) New project at Via, Launceston South, TAS 7249. This type is Resource - Iron Ore with Private ownership. The project contains two linear magnetic anomalies that are parallel to and delineate the strike length of the hematite potential. Hematite iron float (locally transported surface samples) have been identified over a potential 3-5km strike length adjacent to the magnetic anomalies. Average assay results for the surface rock samples are 63% Iron, 0.01% phosphorous and 8% silica. Click for more details...

TEMMA PROJECT - GOLD/BASE METAL RESOURCE
Private ownership Mining (Exploration - airborne surveys etc.) project In The Circular Head Council Area for New development. A number of strong, discrete anomalies have been found, and genetic models for mineralisation would include: structurally controlled copper mineralisation within the Proterozoic sediments, structurally controlled iron-oxide hosted copper-gold mineralisation within the Proterozoic sediments and stataform base metal mineralisation within Proterozoic sediments. Click for more details...

TASMANIA GOLD MINE JOINT VENTURE EXPANSION - INFILL MINING CONTRACT
Tasmania Gold Mine Joint Venture Expansion - Infill Mining Contract is currently at the Tenders & Building stage, valued at about $ 5000000 it is Contract mining of high grade remnants in the crown pillar area between the historic & post-1999 workings. Inferred resource of 57,000t @ 17.3g/t gold for 32,000oz. Reserve calculations expected late 2009 after completion of detailed mine designs. Click for more details...

BASSGAS OPERATIONS - YOLLA MID-LIFE ENHANCEMENT PROJECT STAGE 1
Tasmanian waters 147km off the Victorian coast, Bass Basin, TAS 7999 Has Bassgas Operations - Yolla Mid-Life Enhancement Project Stage 1 currently at Construction stage. A project to maximise gas recovery from the operating Yolla field which provides gas, condensate & LPG through the Lang Lang processing facility. Conversion of the currently unmanned 8000t, 50m x 50m x 120m high Yolla A platform by installation of living quarters along with safety related systems & equipment. Installation also of pumping & compression equipment. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining (Open Cut) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining Contract - Underground project at 2km northeast of, Queenstown, TAS 7467 In The Council Area Of West Coast of Private. Three year development & production mining contract. To include advancing decline development 3600m per annum & producing 2.47 million tonnes per annum (Mtpa) of ore. Click for more details...

ROSEBERY POLYMETALLIC OPERATIONS DRILLING CONTRACT
A project in the TAS Within West Coast. A 3 year contract for diamond coring at the polymetallic (copper, gold, lead, silver, zinc) underground mine. Additional 2 x 1 year contract extension options. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect