MURRAY BASIN MINERAL SANDS EXPLORATION PROJECT
North western Victoria, Ouyen, VIC 3490 Has Murray Basin Mineral Sands Exploration Project currently at Construction stage. Major earthworks and establishment and management of a dewatering system for a mining exploration project in North West Victoria. Click for more details...

EGERTON GOLD PROJECT - RESOURCE
Mining (Open Cut) project at Gaskoyne region, 235 km northwest of, Meekatharra, WA 6642 for New. Resource estimate is 116,400 tonnes @ 6.4 g/t for 23,811 ounces of gold. Metallurgical test reveal that by gravity concentration 42% of the gold can be extracted from the ore and with vat leaching a further 53.5% of gold can be extracted. The total recovery is estimated to be 95.5% of gold from the ore. Test work is continuing. Click for more details...

CURRANS WELL PROJECT - NICKEL/COPPER/PGM REOURCE
A project in the WA Within Murchison. The massive semi massive sulphide mineralisation was located at the contact between talc magnesite and amphibolite rocks and have some of the highest PGE intercepts. Best intersections include 7m @ 0.97% Ni, 1.44 g/t PGE and 0.49Cu including 3m @ 1.42% Ni, 1.82g/t PGE and 0.56% Cu. Click for more details...

SNAKE CREEK PROJECT - COPPER & GOLD RESOURCE
Private ownership Mining (Open Cut) project In The Cloncurry Shire Council Area for New development. The soil sampling by Xstrata Copper (previous JV partner) recorded numerous anomalous gold (up to 150ppb) and copper ( up to 757ppb) values. The infill sampling will define targets with potential to meet Glengarry's size parameters. Strongly anomalous uranium (248ppm) was recorded by on the rock ship samples associated with high gold (0.6g/t) and copper (8.6%) values. The Snake Creek Project is in the same geological province that hosts the Mary Kathleen uranium deposit approx 70 km to the west-north-west. Click for more details...

ATP-691 - MEGAN/RYAN
A project in the QLD Within Not Yet Determined. Coal Core from Ryan 1 is undergoing desorption testing. Click for more details...

MORGAN RANGE PROJECT - HUMPBACK/PILOT
Mining (Open Cut) project at Musgrave region, ., WA 6999 for New. The surface magnetic and EM survey as well as a soil-sampling programme have been completed at Humpback and Pilot. The results of the EM survey confirm the presence of the conductors first identified in the airborne EM survey. Further assessment of the data is underway. Click for more details...

COOPER HILL PROJECT - NICKEL RESOURCE
A project in the SA Within Roxby Downs. The diamond drilling will test a conductive body associated with an intrusive body, which was identified by an electromagnetic survey in 2003 An aircore drilling programme of up to 1,000 metres will be undertaken on several additional geophysical targets. Click for more details...

KAMBALDA OPERATIONS - LONG NICKEL MINE - RESOURCE
Via, Kambalda, WA 6442 Has Kambalda Operations - Long Nickel Mine - Resource currently at Construction stage. Resource estimate is 1,367,000 tonnes @ 5.6% nickel for 76,700 nickel tonnes. Reserves are 1,114,000 tonnes @ 4.2% nickel for 46,800 nickel tonnes. Production for 2005/2006 was 238,551 tonnes @ 3.73% for 8897 nickel tonnes. The developer has budgeted $6 million for exploration decline development, geophysical surveys and drilling for 2006/2007 at Long, Long South and McLeay to increase the reserve base. Click for more details...

SOUTH AUSTRALIAN MAGNESIUM METAL PROJECT (SAMAG) - COLLABY HILL
New project of Mining (Open Cut) project at Via Weerona 8 km north east of, Port Pirie, SA 5540. The Collaby Hill area is approximately 12 km from the smelter site. Mapping was undertaken in the June 2003 quarter and agreement has been reached with Primary Industries and Resources SA to allow commencement of costeaning of potential magnesite bearing areas. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS - BRACKINS SPUR
Resource - Gold/Antimony project at Hillgrove, north east of, Armidale, NSW 2350 in the Mining (Underground - including longwall). Mine output has increased by 30% over the previous quarter. This increase was principally from the Metz operation. Brackins Spur will provide an additional ore source during the September 2001 quarter. The output of this mine will be significantly lower in antimony than the ore currently mined, but will contain a higher gold grade. Click for more details...

MOUNT ELIZABETH PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Wyndham-E Kimberley is a project estimated to be $ 5000000. This project The WA Government has granted EL 80/2459 to Austar for a term of 5 years. A Prospectus for an IPO of Austar (to be re-named Brilliant Diamonds Ltd), is in the coarse of preparation. Click for more details...

EYRE PENINSULA GYPSUM - BARNA
Mining (Open Cut) New project at Via, Kimba, SA 5641. This type is Resource - Gypsum with Private ownership. Agricultural use. The current god season has increased demand for the product. Further deposits on site likely to be developed. Click for more details...

MUNGARI EAST GOLD PROJECT - FROGS LEG
Mining (Open Cut) project In The Kalgoorlie-Boulder Council Area of Resource - Gold type. The laying of the pipeline from the Frog's Leg to the White Foil pit to allow dewatering will commence immediately. Dewatering is scehduled to take up to 3 months during which time on site infrastructure will be established. Initial operation to be open cut. Capital and open pit cost will be $3 million, at the low end of cost for open pit development in Australia. Open pit production is estimated to recover 108,500 ounces from two pits developed over the central and southern zones to a depth of 95 metres and 105 metres respectively. Click for more details...

NORTH WELL - GOLD
New project of Mining (Open Cut) project at Approximately 65 km northwest of, Leonora, WA 6438. Previously advised resources included 475,000t grading 1.5gpt gold (measured) & 115,000t at 1.3gpt gold (indicated) at North Well. This softer ore to be blended with harder ore from Bannockburn. Contract period of 9 months is envisaged, however, drilling to resume in area during April 1996. Click for more details...

GOLDEN SLIPPER - GOLD
Mining (Open Cut) project In The Kalgoorlie-Boulder Council Area of Private ownership. This project contains an indicated oxide resource of 48,000t grading 5.2gpt gold & 26,000t at 5.0gpt gold. An additional 35,000t at 1.2gpt gold (laterite) has also been delineated. An operation extending over at least 6 months (to 60m) with a strip ratio of about 12.5:1 is envisaged. Haulage of ore to company's Mt Dimer plant (2 km distant) also included in this tender. Click for more details...

SHERWOOD - GOLD
Mining (Open Cut) project at Approximately 5 km southwest of, Cue, WA 6640 of Mine - Open Cut type of Addition development. Contract details not yet finalised as drilling & pit design work are continuing. Tender expected to include haulage of ore to company's nearby Tuckabianna gold treatment plant. Work to be completed late February 1996. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

DOBROYDE PROJECT - GOLD RESOURCE
Resource - Gold project at Near, Junee, NSW 2663 In The Council Area Of Junee of Private. Inferred gold resource of 1.2 million tonnes at 2.0g/t. Golden Cross is reviewing data to see if resource can be expanded. It appears that the zone may be open down plunge from a depth of 150 metres and a drill hole has been proposed to test this theory. Click for more details...

COPPER KNOB PROJECT
Mining (Open Cut) project for New development. The Copper Knob Lease contains a low grade resource of approximately 700,000 tonnes at 1.4g/t gold. Development of a commercial resource will depend on whether the sulphide ore can be processed economically. Sulphide mineralisation currently being appraised from samples from an early May 2003 driling programme. A small number of exploration RC holes will be drilled to further investigate the previously untested subsidiary structures on the Copper Knob lease. Click for more details...

WINDARRA NORTH PROJECT - NICKEL RESOURCE
Mining (Underground - including longwall) project for New development. A 13 RC hole programme is proposed to test 5 target areas. Click for more details...

MOUNT GIBSON GOLD PROJECT - WOMBAT
Mount Gibson Gold Project - Wombat is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is The Wombat resource zone is situated 300m south of the plant site and encompasses a former high-grade open pit and underground resource, now largely mined out by previous operators, but which shows potential for structural repeats. Seven Rc drill holes for 838 m were put into the northern and southern flanks of the Wombat pit to resolve structural issues before planning further drill testing. Click for more details...

HORSE CREEK PROJECT
via, Mount Isa, QLD 4825 Has Horse Creek Project currently at Exploration, Drilling, Survey & Assessment stage. BHP Billiton has completed a drilling programme to test seven Cannington style targets. Seven mud/diamond core holes were completed for a total of 2,450.6 metres. No visible mineralisation or alteration indicative of Broken Hill Style lead-zinc-silver mineralisation was intersected. Samples have been despatched for analysis and results should be available shortly. Click for more details...

LOGANS JOINT VENTURE - YILMA
New project of Mining (Underground - including longwall) project at 15 km north of, Widgiemooltha, WA 6443. The project from significant intercepts of 4 m composite samples, were 0.76 gpt/gold from 40 m to 44 m and 0.25 gpt/gold from 56 m to 60 m. Click for more details...

KESTREL COAL OPERATIONS - KESTREL WEST
Private ownership Mining (Open Cut) project In The Central Highlands Regional Council Area for New development. This property has recoverable reserves of 126 million tonnes. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Mining (Open Cut) project at Approx 200 km east of, Daly Waters, NT 0852 for Subcontract. Work on tailings dam expected to be completed within 10 - 11 weeks of commencement. Click for more details...

LATROBE VALLEY COAL- DEPOSIT
A project in the VIC Within La Trobe. The area covered by EL4682 surrounds Flynns Creek. Click for more details...

TELFER GOLD PROJECT - ISP (TELFER DEEPS)
Currently at the Construction stage In East Pilbara is a project estimated to be $ 215000000. This project Underground studies concluded that shaft depth and capacity be set at 1100 metres and5.5Mtpa respectively. An underground study for the development of the Western Flank stockwork is ongoing. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH WEST - RESOURCE
Currently at the Construction stage In Singleton is a project estimated to be $ 30000000. This project The mine will produce coal at the rate of 1.0 to 1.5 million tonnes per year for six years. Development cost of $30 million are expected. The operation will share existing infrastructure and equipment with Ravenswood East. The Ravensworth/Narama complex, located in the Hunter Valley in New South Wales, includes the Ravensworth East operation, Ravensworth West mining tenements and Coal and Allied's share of the Narama operation. Click for more details...

ASHTON COAL PROJECT - RESOURCE
Resource - Coal project at via, Ravensworth, NSW 2330 in the Mining (Underground - including longwall). Open cut operation initially, with underground planned at a later stage. Click for more details...

POWERCOAL COLLIERIES
New project of Mining (Underground - including longwall) project at Various sites Lake Macquarie, Central Coast and Lithgow Regions, Lithgow, NSW 2790. Supply and delivery of various fasteners including mild steel and high-tensile bolts, cap screws, eye bolts, spring washers etc for an initial two year period with "optional" extension periods. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining (Open Cut) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

CHARTERS TOWERS CITY COUNCIL MINE SHAFT REPAIR PROJECT
Charters Towers City Council Mine Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 100000 it is Construction plant including backhoes, skid steer loaders, excavators (Min 30 tonne and 2 tonne), front end loaders in 3-5 cu m minimum, for the period 1/07/02 to 1/06/02. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

MEEKATHARRA GOLD OPERATIONS - MISSING LINK SOUTH/NOA
Resource - Gold project at 50 km south south west of Bluebird plant via, Meekatharra, WA 6642 in the Mining (Underground - including longwall). In-fill drilling at NOA 2 to test the continuity of high grade mineralisation for a potential underground mine was completed in the September 2002 quarter. Preliminary interpretation indicates the presence of high grade pods, but lack of a substative orebody. The plan currently being assessed envisages a winze development and hand held mining. Drilling commenced on NOA 7 & 8 with the aim of estabilshing an orebody critical mass sufficient to economically amortise mine infrastructure establishment costs. Click for more details...

SMITHFIELD PROJECT - TANTALUM RESOURCE
Near, Bridgetown, WA 6255 Has Smithfield Project - Tantalum Resource currently at Exploration, Drilling, Survey & Assessment stage. EM survey will be over two anomalies termed zone O and L. Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

BRAIDWOOD GOLD & SILVER PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Palerang is a project estimated to be $ 1000000. This project Previous drilling outlined inferred gold resource of 1.5 million tonnes at 1.03g/t, with low copper and silver values. Click for more details...

KILKENNY SOUTH - MOUNT KILDARE PROJECT - NICKEL COPPER & ZINC RESOURCE
Mining (Exploration - Drilling) project for New development. As previously reported, significant potential exists to increase the resources base through screening upgrade of the silica rich zones located around existing chrysoprase workings. At both Eucalyptus and to a lesser extent Mount Kilkenny, silica banding has been identified in chrysoprase pits. Sampling of the nickeliferous clays between the silica banding has provided nickel assays from 1.2% to 2.3%. A drill programme within the silica zones at Mount Kilkenny will be undertaken to evaluate the screening concept. Potential exists to unlock substantial tonnages should the screening work prove successful. The Company is still to decide whether the nickel-laterite resources, on the granted mining leases, may to be treated at Murrin Murrin JV Glencore via toll milling, or to be stand alone projects needing a treatment plant. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

PADULLA PROJECT - OIL RESOURCE
A project in the SA Within Far North. Development will comprise one exploratory well and six appraisal and development wells and oilfield facilities. Click for more details...

PROMINENT HILL GOLD/COPPER PROJECT - MINING CONTRACT
100 Km South East of, Coober Pedy, SA 5723 Has Prominent Hill Gold/Copper Project - Mining Contract currently at Construction stage. Work comprises the extraction of approximately 153 million cubic metres of overburden and waste, and 38 million tonnes of treatable ore over six years. The open pit is expected to be 1.2 kms wide, 1.4 kms long on the surface and 500 metres deep. Click for more details...

COPPER RANGE COPPER PROJECT
Mining (Exploration - Drilling) project In The East Pilbara Council Area of Private ownership. The Company controls 9km of strike length of the Copper Range unit - a continuous sequence of felsic volcanic rocks that hosts known disseminated copper occurrences. The geological setting is also considered favourable for volcanogenic massive sulphides deposits (VMS). The strategy is to evaluate the project in terms of a large tonnage low grade open cut project with multiple satellite sources of higher grade ore. Click for more details...

GRAYBRIDGE PROJECT - HEAVY MINERAL SANDS RESOURCE
Graybridge Project - Heavy Mineral Sands Resource is currently at the Early Planning stage, valued at about $ 2000000 it is Indicated and Inferred Resource of 47.6 Mt with 3.42% THM and 15.8% Zircon has been defined. Click for more details...

MARCOLLAT JOINT VENTURE PROJECT - GOLD/BASE METALS RESOURCE
Mining (Underground - including longwall) project at Via, Roxby Downs, SA 5725 for New. The targets consist of a gravity anomaly within a high magnetic area, pwith the potential for base metals and gold within the basement rocks. Click for more details...

HIAWATHA PROJECT - GOLD RESOURCE
Via, West Wyalong, NSW 2671 Has Hiawatha Project - Gold Resource currently at Exploration, Drilling, Survey & Assessment stage. The target is concealed porphyry-related gold similar to Grenfell, or a variant of the nearby Lake Cowral system. Previous surveys have identified low tenor broad chargeable zones which may relate to pyritic alteration adjacent to historical gold workings. Click for more details...

BUSHY PARK JOINT VENTURE PROJECT - ENERGY MINERAL RESOURCE
A project in the NT Within Roper Gulf Shire. The area is potentially prospective for primary, hard-rock uranium, secondary, sandstone hosted and surficial calcrete-styles of mineralisation. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FABRICATION OF DECK RODS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Fabrication Of Deck Rods currently at Construction stage. For the fabrication of suspended deck hanger bars & support clips from free issue materials. Click for more details...

WHITE DAM GOLD OPERATIONS REGIONAL EXPANSION
Operating Mine - Expn project at 85km west of, Broken Hill, NSW 2880 in the Mining (Open Cut). A project in the environs of the operating White Dam gold mine which has a resource estimate of 6 million tonne (Mt) containing 188,000 ounces of gold (White Dam + Vertigo). Exploration amongst historic gold-copper mines to extend White Dam's mine life including at Vertigo & White Dam North. Click for more details...

GOLDEN KING GOLD COPPER PROJECT
Addition project of Mining (Open Cut) project at 32km north of, Broken Hill, NSW 2880. A project located along strike of the historic Golden King Mine. Rock chip sampling preceded reverse circulation drilling to test multiple lodes hosted in a chlorite-altered corridor. A ground magnetic survey to detail lode outlines prior to follow up drilling. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Mining (Onshore - oil & gas) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...