State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining Projects


KINTORE JOINT VENTURE PROJECT - GOLD RESOURCE
Mining (Exploration - Drilling) project In The Alice Springs Town Council Area of Resource - Gold type. Geochemical surveys over the Worman Rocks area in the Kintore Joint Venture detected only scattered low level gold anomalism. The survey has significantly downgraded the project's prospectivity. Click for more details...

TL-2 - MOSMAN
New project of Mining (Offshore - oil & gas) project at Lower Barrow Group north of, Onslow, WA 6710. Mosman was found to be not commercially producible , following analysis of shows results and was plugged and abandoned. Click for more details...

TELFER GOLD PROJECT
New project of Mining (Underground - including longwall) project at Via, Telfer, WA 6762. Includes mechanical & electrical. A friction type hoist with a pulley diameter of 4.7 metres and driven by a synchronous motor with a drive system ACS 600SD with direct torque control. The hoist will initially be equipped with a 5,600 kW synchronous motor, four head ropes and double skips with a payload of 34.5 tonnes. The hoist will be able to raise 970t/h of ore from 1,100 metres at a 16.25 metre/second hoisting speed. The hoist will be deigned and manufactured for possible future duty from a depth of 1,450 metres. Six head ropes will then be fitted together with skips with a payload of 45 tonnes. Another 5,600 kW motor will also be installed and the hoisting speed increased to 19m/s. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
Moranbah Coal Seam Methane Gas Project is currently at the Construction stage, valued at about $ 20000000 it is Now over 200 petajoules. Click for more details...

KAMBALDA OPERATIONS - LONG NICKEL MINE - RESOURCE
Via, Kambalda, WA 6442 Has Kambalda Operations - Long Nickel Mine - Resource currently at Construction stage. Resource estimate is 1,367,000 tonnes @ 5.6% nickel for 76,700 nickel tonnes. Reserves are 1,114,000 tonnes @ 4.2% nickel for 46,800 nickel tonnes. Production for 2005/2006 was 238,551 tonnes @ 3.73% for 8897 nickel tonnes. The developer has budgeted $6 million for exploration decline development, geophysical surveys and drilling for 2006/2007 at Long, Long South and McLeay to increase the reserve base. Click for more details...

VIC P-47 JUDITH 1/GRAHAM 1
New project of Mining (Offshore - oil & gas) project at Gippsland Basin, 5km offshore from, Orbost, VIC 3888. Judith-1, with a gross gas column of 290m & an indicated resource estimate of 135.5m of net gas pay, is considered to have resource volume potential to underpin a commercial development. Click for more details...

MIDDLEBACK RANGE IRON ORE OPERATIONS - IRON DUKE/IRON KNOB
Mining Contract New project In The Flinders Ranges Council Area. Five year mining contract. Click for more details...

DINGO RANGE PROJECT - BUNGARRA/RED CLOUD/BOUNDARY/STIRLING
New project of Mining (Open Cut) project at Approximately 180 km northeast of, Leonora, WA 6438. 1,200 metres of drilling, 8-12 holes. The programme is to provide information relating to depth potential & potential for mining of the resources Click for more details...

JUNDEE - GOLD
Mining (Open Cut) project at Approximately 40 km east southeast of, Wiluna, WA 6646 for New. Mineral resource currently estimated at 13mt grading 2.4gpt gold including a proven & probable reserve of 6.9mt at 2.4gpt gold. Bulk mining methods are expected to be used with an estimated strip ratio of 10:1. Oxide ore continues to a depth of 60m & ore is anticipated to be free digging to 30m. Transitional material extends between 60m & 80m for this area where 4 initial pits are planned. These deposits are expected to form one large pit as mining progresses (1.8 km x 500m to a depth of 100m). Surveys, tailings dam/plant & waste dumps sterilisation drilling undertaken. Contract extending over 3 years expected to involve 45 million bank cu m of material. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining (Exploration - Drilling) project at 80 Km South of, Kambalda, WA 6442 of Resource - Gold type of New development. A 6000 metre RC and DC drilling program is planned for both this project and the adjacent Chalice Gold mine project. Drilling will commence April 2006 and target Poseidon Footwall, Mitchell Basement North and South prospects. Click for more details...

LARRANGANNI PROJECT - GOLD RESOURCE
Private ownership Mining (Underground - including longwall) project In The Halls Creek Council Area for New development. 35km north of Coyote. Drilling to maximise open pittable resources. The recent intercepts will add to resource for treatment at Coyote. Click for more details...

COPPER KNOB PROJECT
Mining (Open Cut) project for New development. The Copper Knob Lease contains a low grade resource of approximately 700,000 tonnes at 1.4g/t gold. Development of a commercial resource will depend on whether the sulphide ore can be processed economically. Sulphide mineralisation currently being appraised from samples from an early May 2003 driling programme. A small number of exploration RC holes will be drilled to further investigate the previously untested subsidiary structures on the Copper Knob lease. Click for more details...

COPPER KNOB PROJECT
Mining (Underground - including longwall) project for New development. The Copper Knob Lease contains a low grade resource of approximately 700,000 tonnes at 1.4g/t gold. Development of a commercial resource will depend on whether the sulphide ore can be processed economically. Sulphide mineralisation currently being appraised from samples from an early May 2003 driling programme. A small number of exploration RC holes will be drilled to further investigate the previously untested subsidiary structures on the Copper Knob lease. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

BRANDY HILL GOLD & BASE METALS PROJECT - SHAW WELL/PIPELINE BORE
Mining (Open Cut) project for New development. In light of the fact that a substantial Banded Iron Formation (BIF) structure runs across the Company?s tenement holding at Gullewa, the geophysical review outlined above was expanded to evaluate the potential for iron deposits in the area. Three significant aeromagnetic anomalies indicative of magnetite in BIF were identified in the Brandy Hill area. Specifically, anomalies of amplitude 10,000 nT, 26,000 nT and 29,000 nT were observed. Key recommendations in relation to these anomalies were to conduct geological mapping as well as ground-based magnetic and gravity surveys to further evaluate their potential. Batavia intends to carry out this work at Gullewa in the Brandy Hill area during the March 2006 quarter. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining (Open Cut) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

BURBANKS GOLD PROJECT - RESOURCE
Mining (Open Cut) project In The Coolgardie Council Area of Private ownership. Indicated and inferred resource estimate is 517,000 tonnes at 4.5 grams per tonne gold for a total of 74,000 ounces. Underground diamond drilling will focus on extensions to the Wahloo Shoot and to upgrade the resource estimate to indicated category. Click for more details...

MOUNT DIMER EXPLORATION PROJECT - GOLDEN SLIPPER/FRODO/LIGHTNING/SILVERWING
Resource - Gold project at 150 km northwest of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Two exploration drill programmes and a review of goechemical and geophysical data were completed over the mine leases during the quarter. In total, 7 underground exploration diamond drill holes for 1,177.9 m were undertaken on lode extensions on Lo3 and to follow up a near surface intercept on 9 metres at 21.2 g/t gold on the Silverwing prospect. A drill programme comprising 38 angled holes and totalling 2,587 m was completed on the Anomaly 2, EMI, Lo5, Ultramafic Contact and Silverwing prospects. This drill programme was designed to further evaluate prospect areas known to have the potential to host economic open pit mineralisation within a 600 metre radius of the Lo2 open pit. This drilling mainly confirmed narrow Mt Dimer lode structures. The current exploration activities on the Mount Dimer mine leases are directed toward the generation of new supergene exploration targets in the Frodo, Golden Slipper and Karli West regions. Reprocessing of existing Mt Dimer aeromagnetic survey data resulted in the delineation of several targets coincident with areas of high soil geochemical response and in keeping with the revised geological model. Click for more details...

BALLARAT GOLD PROJECT
Decline Development - Underground Extension project at Via, Ballarat, VIC 3350 In The Council Area Of Ballarat of Private. The current decline extends for 900 metres to a vertical depth of 140 metres. Drilling in the upper zones of the siting holes has established competent ground conditions through which the existing decline can be extended to access ore from the Sulieman and first Chance lines. Click for more details...

NIFTY COPPER OPERATIONS - WARRABARTY/RAINBOW
A project in the WA Within East Pilbara. Decline development and initial mining. Click for more details...

CHARIOT GOLD PROJECT
Mining (Open Cut) project at 9 km west of, Tennant Creek, NT 0860 for New. Underground mine plan includes establishment of a decline portal towards the base of the Chariot open pit. decline to be developed to a depth of 300 metres below the surface with the first ore development level at 120 metres below the surface. Flat back cut and fill stoping. production rates 10,000 to 12,000 tonnes per month. Click for more details...

AC-RL3 - MONTARA OIL & GAS PROJECT
A project in the WA Within Offshore. The Company proposes to develop the oilfields, which are located within Permit Area AC/L7 & 8 in the Australian Commonwealth Territory of Ashmore and Cartier islands, approximately 690 km west of Darwin. Click for more details...

NIQUEST NICKEL/GOLD PROJECT - RESOURCE
Niquest Nickel/Gold Project - Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is RAB drilling is designed to geochemically test the favourable basalt ultramafic contact at Hugo Nickel prospect. RAB drilling will also attempt to test the down plunge extent of the gold mineralisation at Lawsons. Follow up RC or Diamond drilling may follow. Click for more details...

WAITE KAURI PROJECT - NICKEL RESOURCE
Resource - Nickel New project In The Leonora Council Area. Nickel laterite. Click for more details...

PARKER RANGE PROJECT - NICKEL/COPPER RESOURCE
Mining (Exploration - Drilling) project at Via, Southern Cross, WA 6426 for New. Soil sampling has confirmed a large coincident nickel-copper-cobalt anomaly. Click for more details...

BALLARAT EAST GOLD PROJECT
Via, Ballarat, VIC 3350 Has Ballarat East Gold Project currently at Construction stage. Includes geotechnical drilling of ventilation shaft, drilling from surface to define resource cross sections on Sulieman and first chance lines, drilling targets from surface on Yarrowee Creek anticline. Click for more details...

EURIOWE PROJECT - GOLD/COPPER RESOURCE
Mining (Underground - including longwall) project for New development. RAB drilling program will focus on Fairy Hill copper prospect and then at Smith Well and Yalcowinna Creek. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

GINGIN MINERAL SANDS PROJECT - RESOURCE
Mining (Sand mining - suction dredging) project In The Gingin Council Area of Resource - Mineral Sands type. Proved Ore Reserve of 8.3Mt at 16% contained Heavy Mineral. Click for more details...

DEPARTMENT OF THE CHIEF MINISTER GAS INDUSTRY CONSULTANCY
Gas Industry Attraction And Development - Consultancy Contract project at Various location in the Timor Sea, ., NT 8999 In The Council Area Of Offshore of Private. Gas Industry attraction and development consultancy for various locations in the Timor Sea. The consultancy involves providing the Office of Territory Development with specific information, analysis and advice in order for the government to promote the development of offshore gas reserves. Click for more details...

STYBARROW PROJECT - SUBSEA UMBILICALS
Mining (Offshore - oil & gas) project In The Exmouth Council Area of Private ownership. Transport, installation and precommissioning of approxiamtely 16 km's of dynamic and static umbilicals and associated electrical and hydraulic flying leads. Click for more details...

MONGOLATA GOLD PROJECT
New project of Mining (Underground - including longwall) project at 30km East of, Burra, SA 5417. Drilling has commenced, and a total of six holes are planned to depths of 350m for a total of 2100m to test coincident geochemical and geophysical anomalies for intrusion related gold-copper mineralisation derived from the White Dam layered granitoid. Click for more details...

PROSPERO/TALPINOS PROJECT - NICKEL RESOURCE
A project in the WA Within Leonora. Total Resource estimate is 1,330,000 tonnes @ 5.95% for 79,200 Ni. This comprises measured resources of 416,000 tonnes @ 6.39% for 26,600 tonnes of Ni, Indicated resources of 470,000 tonnes @ 6.42% for 30,200 tonnes of Ni and Inferred resources of 445,000 tonnes @ 5.03% for 22,400 tonnes of Ni. Talpinos has a resource estimate of 142,000 tonnes @ 7.4% for 10,500 Ni. Feasibility study on the development of the deposit includes geotechnical drilling, hydrogeological investigations, infill drilling to upgrade the resource estimate to a reserve. Mine development will include box cut excavation and associated waste dump, laydown area and decline development. A new haul road and service corridor linking the development to the exisiting Cosmo mine and concentrator will be constructed. A tailings storage facility, evaporation ponds, ventilation rises and secondary egress shafts will also be constructed. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

CENTURY MINE EARTHWORKS/WASTE STRIPPING PROJECT
Mining (Open Cut) project In The Carpentaria Shire Council Area of Private ownership. Waste stripping of 36 million cubic metres of overburden to be removed over three years to support the stability of the pit walls. Click for more details...

TALGA GOLD & BASE METALS PROJECT
23 east north east of, Marble Bar, WA 6760 Has Talga Gold & Base Metals Project currently at Exploration, Drilling, Survey & Assessment stage. The target area is prospective for gold and VMS style mineralisation, and in particular is interpreted to contain the strike extension of recently discovered, potentially economic gold mineralisation to the immediate east of the tenement by Mining Projects Group. Click for more details...

LEINSTER NICKEL OPERATIONS - PERSEVERANCE - MINING CONTRACT
Leinster Nickel Operations - Perseverance - Mining Contract is currently at the Construction stage, valued at about $ 90000000 it is Underground mining and maintenace at Perseverance. Sub-level cave mining will average 150,000 tonnes of ore per month and 800 metres of development per month. Underground resource is 43.6 Mt @ 2.2% Ni with reserves at 22.8 Mt @ 1.7% Ni. Click for more details...

TANK WELL URANIUM PROJECT
New project of Mining (Exploration - Drilling) project at Near Willaraddie Creek via, Menzies, WA 6436. The ground contains several major radiometric anomalies grading in excess of 65ppm uranium over large areas. The largest anomaly is 5km long by 1.5km wide. The second anomaly is 4km long and 1km wide. The third is 2km long by .8km wide. The tenements also contain a large number of smaller anomalies around 300-500m across. Click for more details...

FRANKLIN RESOURCES JOINT VENTURE GOLD PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In La Trobe is a project estimated to be $ 2000000. This project The tenement covers the interpreted north-eastern extension of the strategically important Ross Creek Line of Mineralisation. Click for more details...

GRAYBRIDGE PROJECT - HEAVY MINERAL SANDS RESOURCE
Graybridge Project - Heavy Mineral Sands Resource is currently at the Early Planning stage, valued at about $ 2000000 it is Indicated and Inferred Resource of 47.6 Mt with 3.42% THM and 15.8% Zircon has been defined. Click for more details...

MOUNT TODD MINE
Consultancy For Materials Source Assessment project at ., Darwin, NT 0800 In The Council Area Of Darwin City of State. Consultancy for Materials Source Assessment Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining (Underground - including longwall) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

GOLDEN KING GOLD COPPER PROJECT
Addition project of Mining (Open Cut) project at 32km north of, Broken Hill, NSW 2880. A project located along strike of the historic Golden King Mine. Rock chip sampling preceded reverse circulation drilling to test multiple lodes hosted in a chlorite-altered corridor. A ground magnetic survey to detail lode outlines prior to follow up drilling. Click for more details...

BALNAVES GAS CONDENSATE PROJECT
48km NW of Monetebello Islands via, Dampier, WA 6713 Has Balnaves Gas Condensate Project currently at Construction stage. The field consists of a small light condensate accumulation with a large gas cap. Condensate reserves will be extracted using two subsea production wells connected to a single subsea production manifold with flowlines tied back to a double hull floating production, storage & offtake vessel (FPSO). Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - SUPPLY PUMPS SPARES
A project in the WA Within Ashburton. For the supply of pumps spares & sparing parts. Type of pumps included controlled volume pumps, cryogenic pumps, progressive cavity pumps & sea water pumps. Click for more details...

MULGA DOWNS IRON ORE PROJECT
Private ownership Mining (Open Cut) project In The Ashburton Council Area for New development. A direct shipping ore (DSO) project based on the 14 million tonnes (Mt) Murray Hill bedded & detrital ore deposit at the Mulga Downs pastoral station. A single, above watertable open pit (2.5km x 1.8km) worked at a rate of 5 million tonnes per annum (Mtpa) for a life-of-mine (LoM) of 5 years. Conventional drill & blast, excavators & loader methods with ore trucked to a run-of-mine (ROM) stockpile prior to crushing & screening (mobile or modular/skid-mounted plant). Product ore to be trucked along the upgraded, 30km long Fenceline Rd to the Great Northern Highway for haulage 60km to join the proposed Roy Hill Infrastructure Railway by either the Coonarie or Two Camel roads. Associated infrastructure to include waste rock dumps, explosives store, generator power supply with associated double-skinned diesel storage tanks (18 x 110kL) & lined refuelling pads, potable water borefield & turkeys nest storage dam, access roads. A mines operation centre of transportable buildings plus contractor's facilities (offices, amenities, ablutions, fuel storage, refuelling area, heavy & light vehicle workshops, washdown area, laydown areas, parking). Permanent on site accommodation for up to 400 workers fly-in fly-out via Newman. Packaged wastewater treatment plant. Click for more details...

BAYU-UNDAN GAS PROJECT - OPERATIONS & MAINTENANCE SERVICES EXTENSION
Private ownership Mining (Offshore - oil & gas) project In The Offshore Council Area for New development. For the provision of operations & maintenance services for a floating storage & offloading facility & three fixed platforms, a remote wellhead platform & a compression, utilities & quarters platform which is bridge-linked to a drilling, production & processing platform. Click for more details...

ROSEBERY POLYMETALLIC OPERATIONS DRILLING CONTRACT
A project in the TAS Within West Coast. A 3 year contract for diamond coring at the polymetallic (copper, gold, lead, silver, zinc) underground mine. Additional 2 x 1 year contract extension options. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining (Underground - including longwall) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

TARCOOLA GOLD PROJECT - MINING MOBILISATION & ESTABLISHMENT
Mining (Open Cut) project for New development. For the provision of mining mobilisation & establishment. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect