List of Mining Projects


RADIO HILL NICKEL OPERATIONS
Mining (Underground - including longwall) New project at 35km south of, Karratha, WA 6714. This type is Resource - Nickel/Copper/Cobalt/Palladium with Private ownership. Initial mine life is two years, with potential to extend this through the exploration and drilling programme. The underground development will provide better drilling angles to exploit extensions to the ore body and other identified targets. Click for more details...

DUCHESS OF YORK PROJECT - GOLD RESOURCE
60 km south east of, Kalgoorlie, WA 6430 Has Duchess Of York Project - Gold Resource currently at Exploration, Drilling, Survey & Assessment stage. During the quarter, Hampton carried out 2394 m of RAB bedrock drilling on a 200 x 50 m grid pattern plus 3 RC holes totalling 270 m. The main target zone covered by the RAB drilling extends southward from the Duchess of York prospect which is situated on top of an outcropping hill associated with intensely veined quartz prophyry. The zone covers a modest but distinct gold in soil auger drill anomaly and north trending lineaments interpreted from detailed aeromagnetics. Click for more details...

MEEKATHARRA GOLD OPERATIONS - ROCK LEE
Resource - Gold project at 6 km north of the Bluebird plant via, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. At Rock Lee, the results of five confirmatory and six infill RC drillholes in the central part of the BIF-associated deposit, which had a listed gold resource of 100,000 tonnes at 2.8 g/t (9,900 oz) deposit, included a number of good intercepts, including 6 m at 19.86 g/t. An OBM resource was subsequently estimated at 373,000 tonnes at 1.32 g/t (15,800 oz), and Whittle optimised reserve calculated at 37,000 tonnes at 1.62 g/t (1,900 oz). Click for more details...

BONNIE DOON COAL PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Central Highlands Regional is a project estimated to be $ 1000000. This project Bonniedoon covers an area of 378 sq km in the central part of the Bowen Basin and lies in an area underlain by the Rangal Coal Measures. Exploration drilling by the Queensland Department of Mines has verified that at least four coal seam are present, dipping gently to the west and are variable in distribution and thickness. The Aries II seam appears to be the most persistent. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

MYALL CREEK - CULTANA PROJECT
A project in the SA Within Port Augusta. The area lies approximately halfway between the Moonta and Mt Gunson copper mines within the prospective 'Olympic Dam' corridor and covers prospects of known copper mineralisation. The survey will cover EL application 105/00, held by Minotaur Resources Ltd where Eagle Bay may earn a 75% interest by expenditure of $350,000, and part of EL 3098, 100% owned by Eagle Bay. Gravity Capital may elect to spend $200,000 to earn a 55% interest in the overflown area; and will be entitles to assign its interst to BHP Billiton. Click for more details...

FIFIELD PROJECT
Currently at the Construction stage In Parkes is a project estimated to be $ 500000. This project 3,000 metre air core and RC drill programme. Click for more details...

MCPHAILS PROJECT - GOLD RESOURCE
Mining (Exploration - Drilling) project at Newell Highway near, Peak Hill, NSW 2869 of Resource - Gold type of New development. Deep diamond hole beneath previous gold intersection. Click for more details...

CLONCURRY COPPER PROJECT - RESOURCE
A project in the QLD Within Cloncurry Shire. A 1000 metre RC drilling program to depths of 150 metre will target Winston Churchill. Follow up drilling will then target Mount Debbie and Little Beauty. Click for more details...

MOUNT MULGINE WESTERN CORRIDOR PROJ - BLACK DOG/BOBBY MCGEE/PROMISES
Currently at the Early Planning stage In Yalgoo is a project estimated to be $ 5000000. This project The Bobby McGee prospect has attracted most attention following an intersection of 7 metres at 171g/t gold in earlier exploration. Additional drilling has been undertaken this quarter (March 2004) to test structural controls on the ore body. Click for more details...

PUZZLE/NIAGARA - GOLD
Mining (Open Cut) project at Kookynie area approximately 50 km southeast of, Leonora, WA 6438 for New. ((Contract to also include tailings dam construction.)) Area considered to have potential for a large, low-grade shallow deposit. Total proven reserves for this project now total more than 1.17mt grading 2.85gpt gold. Encouraging results returned from first pass drilling on nearby Redbank prospect (Horizon). Mining contract to include the Niagara deposit approximately 10 km distant. Project does not require EPA assessment. Contract period of 2 years involving 4 million cu m of material with a strip ratio of 8:1 (500,000tpa) is envisaged. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining (Exploration - Drilling) project at 80 Km South of, Kambalda, WA 6442 of Resource - Gold type of New development. A 6000 metre RC and DC drilling program is planned for both this project and the adjacent Chalice Gold mine project. Drilling will commence April 2006 and target Poseidon Footwall, Mitchell Basement North and South prospects. Click for more details...

MOUNT GIBSON GOLD PROJECT
Private ownership Mining (Open Cut) project In The Yalgoo Council Area for New development. Indicated and inferred mineral resource of 8.7Mt at 1.98g/t gold for 559 000 ounces gold. Area is considered prospective for volcanic-hosted massive sulphide (VHMS) mineralisation similar to the Golden Grove Mine. Click for more details...

REVENGE MINE -GOLD
Mining Contract - Underground project, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. Contract comprises underground mining Click for more details...

FOSTERVILLE GOLD OPERATIONS - UNDERGROUND MINING
Mining (Underground - including longwall) project at Near Fosterville 20 km east northeast of, Bendigo, VIC 3550 for New. Decline development will begin in the southern end of the Falcon Pit to facilitate early access to underground ore, in the high-grade Phoenix shoot. A underground work shop and dewatering dam will also be constructed. Long lead items for underground development have been ordered and will arrive first quarter 2006. At present surface mining is being undertaken by Roche. Click for more details...

LAVERTON GOLD PROJECT - SICKLE - RESOURCE
Resource - Gold project at 50 km surrounding the Laverton treatment plant, Laverton, WA 6440 in the Mining (Open Cut). Mine production is expected to be 90,000 ounces of gold per annum. Resource estimate is ore reserve of 6,424,000 tonnes of ore @ 1.8 g/t for 374,000 ounces of gold. Indicated Resource is 20,100,000 tonnes of ore @ 1.5 g/t for 950,000 ounces of gold and inferred resource is 10,400,000 tonnes of ore @ 1.5 g/t for 480,000 ounces of gold. The low grade stockpile is 1,160,000 tonnes of ore @ 0.7 g/t for 26,000 ounces of gold. The first gold pour occured on 19th March 2007 and a total gold poured for the month of March was 953oz compared to a forecast of 754oz. Click for more details...

GYMPIE MINE SHAFT REPAIR PROJECT
Gympie Mine Shaft Repair Project is currently at the Construction stage, valued at about $ 800000 it is Includes backhoes, cranes, loaders, dozers/drotts, graders, trucks (single and tandem drive), excavators, bobcats, compaction equipment, compressors & tools, chain trencher and drilling rigs. Click for more details...

PEEL FAULT PROJECT - SPRING CREEK
Prospect - Gold New project In The Gwydir Council Area. Rimfire Pacific Mining announced the acceptance by Regional Exploration Management Pty Ltd of termination of the option agreement over Rimfire's Peel Fault Gold tenements. Click for more details...

EILEEN BORE PROJECT - PLATINUM/NICKEL/COAL RESOURCE
Resource - Platinum Group/Nickel/Copper project at East Kimberley area via, Halls Creek, WA 6770 in the Mining (Underground - including longwall). Detailed surface soil sampling over the Black Bull prospect identified a nickel copper soil anomaly. Click for more details...

MANUMBAR GOLD PROJECT - RESOURCE
Resource - Gold New project In The Gympie Regional Council Area. A 10,000 metre RC drilling program will be conducted in two phases and target numerous prospects including the Elginvale and Manumbar projects. Click for more details...

LENNARD SHELF ZINC/LEAD OPERATIONS - OPERATING MINE
Mining (Underground - including longwall) project In The Derby-W Kimberley Council Area of Mine type. Underground mining operation. Resource estimate is 21.54 Mt @ 7.7% zinc and 3.6% lead with total reserves of 13.92 Mt @ 7.6% zinc and 2.8% lead. Click for more details...

CUMNOCK NO 1 COLLIERY
Consultancy For Environmental Impact Study New project In The Singleton Council Area. The environmental impact study is being undertaken in order to convert the exploration licence to a mining lease so that production can be increased to 4,500 million tonnes per annum. Click for more details...

GOLDEN GROVE PROJECT - ZINC/COPPER/GOLD RESOURCE
Mining (Open Cut) project In The Yalgoo Council Area of Minesite type. At Scuddles Deeps four drillholes all intersected significant mineralisation, defining the new Zeewijk mineralised zone. The Zone is interpreted to have a strike length of around 135m, a vertical extent of around 135m, and is around 20 m thick at an average grade of 14.5% zinc. This is a significant addition to the Scuddles resource, with positive implications for future development of the adjoining deep Batavia resource. At Gossan Hill, two further diamond drillholes into the new Ethel zone returned significant results. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH
Mining (Underground - including longwall) project at At, Tahmoor, NSW 2573 of Underground Conveyor - Upgrade type of New development. Refurbishing the underground route and installation of the new conveyor. Click for more details...

GROUNDRUSH GOLD OPERATIONS - RIPCORD
Mining (Open Cut) project In The Alice Springs Town Council Area of Private ownership. A major drilling programme to test for both strike and depth extensions of the Groundrush deposit was completed during the June 2002 quarter. Drilling to test for extensions to the south of the current pit returned a number of positive results and assays on three diamond drill holes testing extensions to the north were also completed during the June 2002 quarter. All results will be incorporated into a review or mining options at Groundrush. The Groundrush open pit production was 371, 248 tonnes at 37.5g/t gold. Tanami plant throughput was 310,382 tonnes at 4.06g/t gold. Click for more details...

BEACONSFIELD NICKEL/CHROMITE PROJECT - RESOURCE
Private ownership Mining (Exploration - Drilling) project In The West Tamar Council Area for New development. This licence covers 34 square kilometres and covers defined nickel and cobalt laterite deposits and extensive chromite occurrences. Click for more details...

POONCARIE MINERAL SANDS PROJECT - ROAD/RAIL TRANSPORT
Road/Rail Transport Of Product New project In The Central Darling Council Area. A transport logistics package. Haulage of concentrate between mine site and mineral separation plant at Broken Hill. Involves 440,000tpa concentrate to Broken Hill and 130,000 tpa residue back to site for disposal. Rail transport of product from separation plant by rail to SA port. The NSW government has approved the use of AB triple truck configurations for concentrate haulage from the mine site to the MSP. Trucks in this size will permit over 60 tonne payloads to be carried and thus minimise transport costs. Click for more details...

CHARTERS TOWERS CITY COUNCIL MINE SHAFT REPAIR PROJECT
Charters Towers City Council Mine Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 100000 it is Construction plant including backhoes, skid steer loaders, excavators (Min 30 tonne and 2 tonne), front end loaders in 3-5 cu m minimum, for the period 1/07/02 to 1/06/02. Click for more details...

GASCOYNE PROJECT - ARTHUR RIVER /BERYL HILL
Mining (Open Cut) project at Approx 120 km northeast of, Gascoyne Junction, WA 6705 for New. The Gascoyne project covers an area of 400 sq km and is located in the Gascoyne mineral field of Western Australia. Tantalite has been produced predominantly from alluvial/eluvial sources, however a large swarm of rare pegamites stretches in an east west arc across the area for a strike length of about 60 km. Niobium rich columbite has been produced from a kaolinised pegamite at Arthur River and will be the focus of early bulk sampling and exploration as this product is in demand. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Turnkey Contract - Design & Project Management Of Processing Facilities New project In The West Wimmera Council Area. Includes design, procurement, construction & commissioning of the mineral sands processing facilities and associated infrastructure. Click for more details...

LAKE JOHNSTON PROJECT - MOUNT DAY - RESOURCE
Resource - Gold New project In The Dundas Council Area. Three deep RC holes are planned to test for extensions of mineralisation identified by previous exploration. Click for more details...

EURIOWE PROJECT - GOLD/COPPER RESOURCE
Mining (Exploration - Drilling) project for New development. RAB drilling program will focus on Fairy Hill copper prospect and then at Smith Well and Yalcowinna Creek. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

NEW WATTLE DAM GOLD PROJECT
Mining (Open Cut) project for New development. The Western Zone is characteristically lower grade (1.8 to 2.5 g/t Au) and displays less alteration and shearing than the Eastern Zone. The two zones appear to coalesce to the north and south of the pit. Resource estimate of 226 500 tonnes at 18.0 g/t gold for 130 900 ounces gold. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - NEW CHUM - RESOURCE
Mining (Exploration - Drilling) project at Via, Norseman, WA 6443 for New. Resource estimate of an indicated and inferred mineral resource of 318,000 tonnes @ 1.98g/t for 20,000 ounces of gold. Geological mapping and interpretation has identified new targets for drilling. Open pit mining will be the preferred method because the ore is located at shallow levels. Mining design planning is in progress as well necessary government regulatory approvals. Click for more details...

ROCKLANDS COAL PROJECT
New project of Mining (Sample analysis, Laboratory testing) project at 50 km S of, Blackwater, QLD 4717. A project based on a resource estimate (inferred) of 700 million tonnes (Mt). Click for more details...

CYMBRIC VALE JOINT VENTURE PROJECT - COPPER GOLD NICKEL RESOURCE
Mining (Underground - including longwall) project In The Broken Hill Council Area of Resource - Copper/Gold/Nickel type. The Cymbric Vale project is located in the Koonenberry Belt on the easter margin of the Curnamona Craton, with the geology of the prospect similar to the nearby Koonenberry Base Metal Project. The copper prospect extends over 1.2 kilometres of strike lenght returning grades of up to 5.61% and 4.91% copper, and sampling has confimed the presence of ultramafic rocks with anomalous nickel assays to 2200ppm and cobalt up to 4250ppm, with anomalous gold to 0.11g/t. Click for more details...

TANK WELL URANIUM PROJECT
New project of Mining (Exploration - Drilling) project at Near Willaraddie Creek via, Menzies, WA 6436. The ground contains several major radiometric anomalies grading in excess of 65ppm uranium over large areas. The largest anomaly is 5km long by 1.5km wide. The second anomaly is 4km long and 1km wide. The third is 2km long by .8km wide. The tenements also contain a large number of smaller anomalies around 300-500m across. Click for more details...

GAWLER JOINT VENTURE PROJECT - IRON ORE RESOURCE
Mining (Exploration - Drilling) New project at Via, Launceston South, TAS 7249. This type is Resource - Iron Ore with Private ownership. The project contains two linear magnetic anomalies that are parallel to and delineate the strike length of the hematite potential. Hematite iron float (locally transported surface samples) have been identified over a potential 3-5km strike length adjacent to the magnetic anomalies. Average assay results for the surface rock samples are 63% Iron, 0.01% phosphorous and 8% silica. Click for more details...

LACHLAN FOLD BELT NICKEL, GOLD PROJECT
Mining (Open Cut) project for New development. Drill testing of the Merri Hill nickel and gold targets in 2008 returned lower order gold results and interesting nickel results in the oxide layer. At Merri Hill, a near surface zone of secondary nickel mineralization identified by prior air core drilling (eg.8m at 1.45% nickel from 20m in SMRA64) was drilled tested last quarter with 3 RC holes totalling 168 metres to obtain samples for metallurgical test work. Significant assay results returned from this RC drilling in the current quarter are shown in Table 1. Samples have been submitted for detailed petrography (microscope analysis) and metallurgical assessment. Results are pending. Gold drill targets in the highly prospective western part of the tenement have been identified. In this area, the Macquarie Arc Volcanics host a number of prospects and old workings including Mother Shipton where historically, approximately 30,000oz of gold has been mined from hard rock and alluvial sources (see figure ). A review of previous work has revealed that surface geochemistry and RAB drilling has identified epithermal style gold prospects within two north west striking andesitic sequences. At Mother Shipton, RAB drilling by previous explorers included best intersections of 2m at 6.80g/t Au from 38m and 2m at 3.95g/t Au from 4m. Mother Shipton has been reported to have produced 30,000 oz of gold in the past. Nickel results of m @ 0.93% nickel confirm presence of nickel oxide at Merrill hill Prospect. Click for more details...

GLEN ISLA GOLD PROJECT
Mining (Open Cut) New project at 50km southeast of, Dubbo, NSW 2830. This type is Resource - Gold with Private ownership. Drill results from the northern-most hole completed at Glen Isla returned a strongly anomalous gold intersection, which indicates the potential for a near surface mineralized system extending north of current drilling. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - OPERABILITY RELIABILITY & MAINTAINABILITY CONTRACTOR
Wheatstone Development Project - Offshore Platform - Operability Reliability & Maintainability Contractor is currently at the Construction stage, valued at about $ 15000000 it is For a operability, reliability and maintainability contractor. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining (Open Cut) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

BAYU-UNDAN GAS PROJECT - OPERATIONS & MAINTENANCE SERVICES EXTENSION
Private ownership Mining (Offshore - oil & gas) project In The Offshore Council Area for New development. For the provision of operations & maintenance services for a floating storage & offloading facility & three fixed platforms, a remote wellhead platform & a compression, utilities & quarters platform which is bridge-linked to a drilling, production & processing platform. Click for more details...

ROSEBERY POLYMETALLIC OPERATIONS DRILLING CONTRACT
A project in the TAS Within West Coast. A 3 year contract for diamond coring at the polymetallic (copper, gold, lead, silver, zinc) underground mine. Additional 2 x 1 year contract extension options. Click for more details...

WA-28-L GREATER ENFIELD OIL & GAS - DRILLING & COMPLETIONS - PROVISION OF CONDUCTORS & ASSOCIATED SERVICES
Conductors/Associated Services - Provision project at 49km off the coast of, Exmouth, WA 6707 In The Council Area Of Exmouth of Private. For the provision of conductors & associated services. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...

NORTHERN GAS PIPELINE - HP & LP FLARE PACKAGE
Hp/Lp Flare Package New project In The Various Council Area. For the provision of a flare system for each of the blowdown systems for the Phillip Creek, NT Compressor Station. Click for more details...