List of Mining Projects


GULGONG PROJECT
Resource - Gold project at via, Gulgong, NSW 2852 In The Council Area Of Mid Western Regional of Private. Targets for drilling have been modelled from low level high resolution aeromagnetic survey data. Click for more details...

LIGHTS OF ISRAEL GOLD OPERATIONS
New project of Mining (Underground - including longwall) project at Approx 140 km northwest of, Kalgoorlie, WA 6430. Ore reserves have been extended by 50,000 ounces. Click for more details...

PANTON NORTH JOINT VENTURE PROJECT - NICKEL/COPPER RESOURCE
Resource - Nickel/Copper project at East Kimberley area via, Halls Creek, WA 6770 in the Mining (Open Cut). Previous drillhole has returned an intercept of 51 metres at 0.28% nickel and 0.14% copper from surface, including 15 metres @ 0.48% nickel and 0.2% copper from 18 metres. The Mabel Hill intrusion and the new zone to the north form a narrow and elongate pyroxenite-gabbro-norite igneous body. The intrusion is interpreted to represent a feeder conduit, analogous in style to the Sally Malay and Voisey's Bay intrusions and their associated nickel-copper-cobalt sulphide mineralisation. Results indicate the Mabel Hill intrusive is a fertile, nickel sulphide rich system. The known prospect area, where the intrusion crops out, displays broad by low grade nickel sulphide mineralisation. The prospective target zone may extend for up to 2 km to the north. Click for more details...

QUEST 29 GOLD OPERATIONS
Quest 29 Gold Operations is currently at the Construction stage, valued at about $ 500000 it is A 6-7 week mining campaign. 170,000 tonnes to leach pad. (Ore to be dump leached on site). 1:1 strip ratio. Click for more details...

SOUTH AUSTRALIAN MAGNESIUM METAL PROJECT (SAMAG) - COLLABY HILL
New project of Mining (Open Cut) project at Via Weerona 8 km north east of, Port Pirie, SA 5540. The Collaby Hill area is approximately 12 km from the smelter site. Mapping was undertaken in the June 2003 quarter and agreement has been reached with Primary Industries and Resources SA to allow commencement of costeaning of potential magnesite bearing areas. Click for more details...

GERMAN CREEK EAST PROJECT
Deposit - Coal project at South East of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. Situated between two operating coal mines. It lies down dip and east of Anglo's German Creek opencuts and west of Foxleigh opencut mine. Both mines are developed on coal deposits in the Middlemount seam similar to the coals underlying the Aquila tenement. Aquila executed an agreement with Bowen Central Coal Pty Ltd to form a Joint Venture to be known as the Bowen Central Coal Joint Venture, to explore, develop and mine for coal on all its current coal portfolio in the Surat and Bowen Basins, except a large portion of EPC 755 (Moranbah East). Aquila will share in the co-management of all JV activities through a jointly owned management entity. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

CENTRAL DESERT JV TANAMI DESERT - GOLD
Central Desert Jv Tanami Desert - Gold is currently at the Construction stage, valued at about $ 20000000 it is Work to date includes resource definition, pit planning, metallurgical testwork & scoping studies (on several deposits). Area contains Jim's Find, Jim's South, Dogbolter & Redback deposits with a total estimated resource of 4.6mt grading 3.4gpt gold. Initial mining involving 7 small pits is envisaged with an average strip ratio of 9:1. Earlier drilling results included 8m grading 76.5gpt gold from Dogbolter's main zone. First deposits to be mined to also include the Harleys area. Mining reserves currently estimated at 2mt grading 3.8gpt gold with potential to prove up additional reserves. Haulage of ore to the plant site approximately 8 km distant & up to 25 km (Jim's Find deposit) is included in this tender. Original contract period is for 2 years with a 2 year option. These deposits to be mined to various depths up to 110m for this 1mtpa operation. Haulage roads to be constructed as mine site are developed. Click for more details...

NICOLSON'S FIND/PALM SPRINGS - GOLD
Currently at the Construction stage In Halls Creek is a project estimated to be $ 4000000. This project Contract to involve crushing 1mt of ore & carry out trial mining on one satellite deposit. 2 additional gyratory crushers to be provided in order to improve production size & throughput rates. Nicholson's Find ore to be trucked to Palm Springs via Great Northern Hwy (78 km journey). Followup drilling to be undertaken in area. Click for more details...

LARRANGANNI PROJECT - GOLD RESOURCE
Private ownership Mining (Open Cut) project In The Halls Creek Council Area for New development. 35km north of Coyote. Drilling to maximise open pittable resources. The recent intercepts will add to resource for treatment at Coyote. Click for more details...

GREENBUSHES TANTALITE OPERATIONS - UNDERGROUND DEVELOPMENT/EXPANSION
Underground Decline - Ongoing Development project at Near, Greenbushes, WA 6254 in the Mining (Underground - including longwall). Three year contract. Underground production will be 500,000 lbs of Ta2O5 per annum with ramp up taking 18 months and a capital expenditure of A$10 million. Full production for both the underground and open cut is expected to be 1.1 million lbs per annum. Click for more details...

MOUNT GARNET PROJECT - DRY RIVER SOUTH - BASE METALS RESOURCE
Mount Garnet Project - Dry River South - Base Metals Resource is currently at the Construction stage, valued at about $ 15000000 it is The proven and probale reserve for Dry River South is 1,051,000 tonnes at 8.2% zinc, 2.9% lead, 1.0% copper, 69 g/t silver and 0.65g/t gold . Inferred Resource is 1.559 million tonnes at 7.8% zinc, 2.8% lead, 1.0% copper, 68 g/t silver and 0.67 g/t gold. Click for more details...

WA-261P - VESTA - OIL & GAS RESOURCE
Private ownership Mining (Offshore - oil & gas) project In The Offshore Council Area for New development. The Vesta prospect is a shallow buttress-stratigraphic trap lying west southwest of the Stag oilfield. Prospect potential from 11.5 to 23.2 mean million barrels of oil recoverable. If drilling is successful, Chamois could be included in a development to tie back to the Stag Oil Field. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT - EXPANSION
Bhp Billiton Iron Ore Rapid Growth Project - Expansion is currently at the Construction stage, valued at about $ 150000000 it is An expansion of capacity at the Pilbara Iron ore operations from 100 million tonnes per annum to 110 Mtpa by late 2004. Includes additional rail and port capacity. The project will be completed on the back of infrastructure and equipment installed as part of Area C and Pace (Nelson Point) projects. BHP Billtions' Pilbara iron ore operations includes Mount Newman Iron ore Operations as well as Area C and the Nelson Point Ore Handling Facility. Click for more details...

YERILLA PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Kalgoorlie-Boulder is a project estimated to be $ 5000000. This project The project covers an area of approximately 18.5 sq km. Click for more details...

BENGALLA COAL OPERATIONS EXPANSION PHASE 1
Mining (Open Cut) New project at 4 km west of, Muswellbrook, NSW 2333. This type is Operating Mine - Expansion - Phase 1 with Private ownership. Expansion of open cut operations with Phase 1 to increase Run-of-Mine (RoM) coal to 9.3Mtpa for 7.5Mtpa approx product coal. To include upgrade of the existing 8.7million tonnes per annum (Mtpa) capacity coal washery to 2 stage washing. Purchase of additional mining equipment. Upgrades of associated mine infrastructure including a heavy vehicle workshop, bathhouse & wash bay. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

HOPE DOWNS IRON ORE PROJECT
Hope Downs Iron Ore Project is currently at the Construction stage, valued at about $ 3000000 it is Likely to include RC & diamond drilling & larger diameter drilling. Click for more details...

EDNA BERYL GOLD PROJECT
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Includes sinking a shaft up to 150 m and associated drivage. Also includes moving 7,000 to 10,000 tonnes of ore. Click for more details...

MUNDI SOUTH PROJECT - ANOMALY B
Mining (Open Cut) project at West of, Broken Hill, NSW 2880 of Resource - Base Metals/Gold type of New development. A percussion/core hole to 318 metres has been completed at the Anomaly B prospect. There are two weakly mineralised zones of 10.9 and 16.2 metres width with 3 - 5% finely disseminated pyrite. Selected intervals are being analysed currently. Click for more details...

KATHLEEN VALLEY GOLD PROJECT
A project in the WA Within Leonora. A project with an upgraded resource estimate of 1,814 million tonnes (Mt) @ 2.8 g/t for 163,000 contained ounces. Click for more details...

EILEEN BORE PROJECT - PLATINUM/NICKEL/COAL RESOURCE
Resource - Platinum Group/Nickel/Copper project at East Kimberley area via, Halls Creek, WA 6770 in the Mining (Underground - including longwall). Detailed surface soil sampling over the Black Bull prospect identified a nickel copper soil anomaly. Click for more details...

HILLVIEW VERMICULITE PROJECT - RESOURCE
Mining (Open Cut) project In The Lachlan Council Area of Private ownership. A 40 tonne bulk sample of vermiculite has been processed through a pilot plant by Mintek in South Africa. The aim of the work was to test a new dry method of beneficiation which includes air tabling as well as more classical winnowing. The test work was very successful and showed that recoveries of approximately 50% of the vermiculite could be expected across most of the size ranges. These results are seen as a major step forward for the project and studies are underway to determine the economics of developing a small 5,000 to 10,000 tpa plant on the Hillview site. Click for more details...

ROSEBY PROJECT - COPPER/GOLD RESOURCE
Roseby Project - Copper/Gold Resource is currently at the Early Planning stage, valued at about $ 20000000 it is The exploration joint venture. The company is working towards delineating an open-pittable resource within the exploration area. Drilling at Bedford north and south continues to produce encouraging results. Assay results are pending for recently completed drilling at Burke & Wills. Additional drillig is required to test resources to depth of 200 metres approx. Click for more details...

LAKE FROME JOINT VENTURE - URANIUM/COPPER RESOURCE
Resource - Uranium/Copper New project In The Far North Council Area. Geophysical surveys identified an additional structural target extending south from the Beverly mine into Lake Frome joint venture tenements. Click for more details...

LANFRANCHI NICKEL PROJECT - RESOURCE
Mining (Underground - including longwall) project In The Coolgardie Council Area of Private ownership. Resource estimate is 74,000 tonnes of nickel. Mining operations began in January 2005 and the underground decline began in May 2005. It is expected by September/October 2005 that the decline will reach the ore body. Operations by then are expected to be 10,000 tonnes per month. Production for the 2005-2006 financial year is expected to be 3370 tonnes of nickel and for 2006-2007 financial year is expected to be 6820 tonnes of nickel. A second hand paste plant and associated infrastructure has been purchased and is being refurbished in kalgoorlie and will be delivered to the site. The plant will provide cemented fill for the under hand cut and fill mining method which will be used to extract ore from Helmut South. Click for more details...

REWARD GOLD PROJECT
Mining (Underground - including longwall) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Exploration - Drilling) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

BALLARAT EAST GOLD PROJECT
Via, Ballarat, VIC 3350 Has Ballarat East Gold Project currently at Construction stage. Includes geotechnical drilling of ventilation shaft, drilling from surface to define resource cross sections on Sulieman and first chance lines, drilling targets from surface on Yarrowee Creek anticline. Click for more details...

TREWILGA PROJECT - GOLD RESOURCE
A project in the NSW Within Parkes. Drilling will target the Great Britain mine prospect during April/May 2005. 350 metres of aircore and RC drilling will be carried out. Previous drilling encountered 38 metres at 0.44g/t gold. Click for more details...

MANDALONG COAL OPERATIONS - MANDALONG SOUTH - RESOURCE
Mining (Open Cut) project at South of Mandalong Coal Mine, west of, Wyee, NSW 2259 of Resource - Coal type of New development. An execution of agreement with Hunter Valley Energy Coal Limited (a subsidiary of BHP Billiton) has been achieved in relation to the transfer of a part of exploration licence A405 held currently by the Wyong Areas Coal Joint Venture, to Centennial Mandalong Pty Ltd. This area immediately adjoins the existing Mandalong Mine. Click for more details...

MEGASCOLIDES 1 - NARRACAN TROUGH - GAS RESOURCE
Mining (Exploration - Drilling) New project at Hunter Road, Warragul, VIC 3820. This type is Resource - Coalbed Methane Gas with Private ownership. 2D sesmic survey will explore the Crayfish group level oil play to provide suitable areas for drilling in 2006. The Narracan trough is a black seam extending from near Warragul south to Coal Creek at Korumburra and to Wonthaggi. Megascolides 1 well is expected to be gas charged with CBM targets from 700 to 1100 metres and the conventional gas targets at depths of 1700 metres. Click for more details...

MOUNT CAROLINE PROJECT - VARIOUS MINERALS RESOURCE
Resource - Nickel/Copper/Gold/Platinum Group Elements/Precious Stones project at 40 km south west of Amata, 250 km west of, Marla, SA 5724 In The Council Area Of Far North of Private. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

RUTH WELL BASE METAL PROJECT
Mining (Open Cut) project at Approx 15km South, Karratha, WA 6714 for New. Resource estimate of 69 000 tonnes at 1% nickel, 0.84% copper and 0.04% cobalt for 690 tonnes nickel, 600.3 tonnes copper and 27.6 tonnes cobalt. Click for more details...

MANDILLA GOLD PROJECT - OPERATING MINE
Resource - Gold project at 20 km south west of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. Resource estimate is based on the recent RC & AC drilling programme that has been completed. Probable ore reserve is 70,100 tonnes @ 7.52 g/t Au for 16,960 ounces gold. Ore will be custom treated at the nearby Higginsville Mill. Click for more details...

ELLENDALE DIAMOND PROJECT - NORTHERN RECONNAISSANCE PROJECT - DIAMOND RESOURCE
Mining (Open Cut) project at Approx 125 km south east of, Derby, WA 6728 of Resource - Diamonds type of New development. Programmes to examine the potential gravels within palaeo-channels identified within NRP will also be undertaken along with bulk sampling on two microdiamond-rich lanproites already identified in the area. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Exploration - Drilling). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

CARNILYA HILL PROJECT - NICKEL RESOURCE
Minesite project at 25 Km North east of, Kambalda, WA 6442 in the Mining (Underground - including longwall). Production is expected to ramp up over the next six months to an average rate of approximately 15 000 tonnes of ore per month, or 5 000 tonnes of nickel per annum. Current Ore Reserves are 483 500 tonnes @ 2.9% Ni for 14 000 tonnes of contained nickel metals and the mineralised system remains entirely open at depth. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining (Open Cut) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

ROCKLANDS COAL PROJECT
New project of Mining (Exploration - airborne surveys etc.) project at 50 km S of, Blackwater, QLD 4717. A project based on a resource estimate (inferred) of 700 million tonnes (Mt). Click for more details...

GRAYBRIDGE PROJECT - HEAVY MINERAL SANDS RESOURCE
Graybridge Project - Heavy Mineral Sands Resource is currently at the Early Planning stage, valued at about $ 2000000 it is Indicated and Inferred Resource of 47.6 Mt with 3.42% THM and 15.8% Zircon has been defined. Click for more details...

VALHALLA NORTH PROJECT - URANIUM RESOURCE
Resource - Uranium project at North of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. The project has a number of highly prospective areas for uranium mineralisation. Historical drilling has intercepts of 17.8m @ 0.123% U3O8. These drill results confirm the prospectivity of the Company's project and have highlighted drill intersected mineralisation over a strike kength of one kilometre. Click for more details...

ATP 1056P TAIPAN JOINT VENTURE OIL & GAS PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Bulloo Shire is a project estimated to be $ 5000000. This project A project located south of Jackson. Drilling of 4 exploration wells (Andromedae-1, Braford-1, Rani-1 & Triangulum-1) may be followed by 3 more. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - RESISTANCE TEMPERATURE DETECTORS
Mining (Onshore - oil & gas) project In The Ashburton Council Area of Private ownership. For the provision of resistance temperature detectors. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - CATHODIC PROTECTION SERVICES
Cathodic Protection Services project at Off, Barrow Island, WA 6712 in the Mining (Offshore - oil & gas). For the provision of cathodic protection services. Click for more details...

OLD PIRATE GOLD PROJECT - TRIAL MINING
Private ownership Mining (Open Cut) project In The Central Desert Shire Council Area for New development. A project based on a Resource Estimate of 1.88 million tonnes at 11.96 g/t gold for 723 800 ounces gold. Trial mining will include the extraction of 10 000 tonnes of gold bearing material, installation of a pilot plant & tailings facility, associated site works & ground water extraction. Pilot plant will include 15tph gravity gold plant including crushers, coarse gold jig, ball mill Knelson gravity concentrator & tabling/gold room. Click for more details...

NORTHERN GAS PIPELINE AIR IMPACT ASSESSMENT
Mining (Onshore - oil & gas) New project at Warrego (NT) - Mount Isa (QLD), ., NT 8999. This type is Consultancy - For Air Impact Assessment with State ownership. Provision of consultancy services for air impact assessment for the 623km Northern Gas Pipeline. To include prediction of air impacts & comparison to the National Environment Protection Measure. Click for more details...

ATP852/ATP768 - QCLNG SURAT NORTH (CHARLIE) PROJECT - VESSEL INSPECTION
New project of Mining (Onshore - oil & gas) project at 20km North of, Wandoan, QLD 4419. For the provision of Pressure Vessel Inspection including all required material, equipment & personnel & provide all handover documents associated with this service for the Projects facilities. Internal Inspections: The successful service provider shall conduct internal inspections & record information about the condition of the internal surfaces, welds & process components of pressure equipment. This usually requires confined space vessel entry or visual inspections using equipment such as boroscopes, video scopes & cameras or alternatively ultrasonic or radiographic testing. External Inspections: The purpose of the external inspection is to detect anomalies or defects such as corrosion, leaks, bulging, signs of excessive heat or cold, or signs of cracking including comprehensive visual inspection, which may be supplemented by non-destructive examination methods such as dye penetrant, magnetic particle, ultrasonic & radiography inspection. The successful service providers personnel will be working in accordance with CPB Contractors site safety, environmental & quality management plans. Click for more details...

NORTHERN GAS PIPELINE - HP & LP FLARE PACKAGE
Hp/Lp Flare Package New project In The Various Council Area. For the provision of a flare system for each of the blowdown systems for the Phillip Creek, NT Compressor Station. Click for more details...