List of Mining Projects


BETA HUNT NICKEL PROJECT
Resource - Nickel New project In The Coolgardie Council Area. The project includes a remnant resource at the Hunt nickel mine and the developed but un-mined Beta nickel project. Access to the mine is via a portal situated on the northern shoreline of Lake Lefroy, 5 km by road from the WMC nickel concentrator. The Hunt deposit is accessed by a 4 km decline and has remnant blocks available for mining. The Beta deposit is accessed via a 2 km decline developed from the base of the Hunt decline. The Beta deposit is partially developed but is otherwise unmined and requires only pumping and rehabilitation to recommence production in the first quarter of 2004. The acquisition of the project is via a sub-lease associated with agreements and rights in relation to the mining of nickel. Targets within the project area that have the potential to significantly increase the resource base have been identified. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

CAPRICORN NICKEL SULPHIDE PROJECT - RESOURCE
Mining (Open Cut) project at 50 km southeast of, Newman, WA 6753 of Resource - Nickel type of New development. A strongly anomalous nickel and copper mineralisation was intersected at the Milipede prospect. Recent RC drilling returned promising results. Drill hole was 54m to 56m, width 2m returning 1.36% Ni. A fourth hole was drilled and a geophysical survey conducted 105 km east of Millipede prospect confirming the target is further to the west of the prospect. Follow up RC drilling is planned. Click for more details...

MUNGARIE PROJECT
South of the Kalgoorlie-Coolgardie Road, 24 km west of, Kalgoorlie, WA 6430 Has Mungarie Project currently at Early Planning stage. Results from infill drilling include 5 metres at 3.72g/t gold and 5 metres at 3.57g/t gold. Results from previous drilling included 4 metres at 14.51g/t gold. The existing resource of 154,000 tonnes at 4.0g/t gold is being revised. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Mining (Open Cut) project In The Whitsunday Regional Council Area of Private ownership. Preliminary feasibility study results show heap leach processing, rather than using existing plant could improve economics. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - BROADMEADOW
Underground Conveyors New project In The Isaac Regional Council Area. Coal Clearance Conveyors. The Drivers may be part of package. Ramp 4 (now renamed Broadmeadow) potential new underground off the highwall. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Approx 200 km east of, Daly Waters, NT 0852 Has Merlin Diamond Project - Stage 1 currently at Construction stage. First ore is likely to be available from the pits during November 1998. Work on the tailings dam is expected to be completed within 10-11 weeks of commencement. Click for more details...

SHERWOOD - GOLD
Mining (Open Cut) project at Approximately 5 km southwest of, Cue, WA 6640 of Mine - Open Cut type of Addition development. Contract details not yet finalised as drilling & pit design work are continuing. Tender expected to include haulage of ore to company's nearby Tuckabianna gold treatment plant. Work to be completed late February 1996. Click for more details...

DOBROYDE PROJECT - GOLD RESOURCE
Resource - Gold project at Near, Junee, NSW 2663 In The Council Area Of Junee of Private. Inferred gold resource of 1.2 million tonnes at 2.0g/t. Golden Cross is reviewing data to see if resource can be expanded. It appears that the zone may be open down plunge from a depth of 150 metres and a drill hole has been proposed to test this theory. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

LONDONDERRY PROJECT
Mining (Underground - including longwall) project for New development. Approx 10 sq km. The area is prospective for Nepean style mineralisation. Click for more details...

YAKABINDIE NICKEL PROJECT - STAGE 3
Yakabindie Nickel Project - Stage 3 is currently at the Early Planning stage, valued at about $ 50000000 it is Likely to include an increase in mining to 32,000 tpa nickel and an expansion of the concentrator. Click for more details...

NYMBOOL GOLD PROJECT - BLACKS CREEK - RESOURCE
Mining (Underground - including longwall) project at 120 km south west of Cairns & north west of, Mount Garnet, QLD 4872 for New. The Nymbool gold-copper prophyry system and associated gold mineralisation is located just north-west of the township of Mount Garnet. A small resource of low-grade gold (2.4 million tonnes grading 0.7g/t gold) has been outlined at the Nymbool Gold prospect but exploration is still at an early stage. Click for more details...

YUNDAMINDRA GOLD PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Leonora is a project estimated to be $ 1000000. This project The Yundamindra project is located about 90km southeast of Leonora adjacent to Lake Carey, and covers an area of approximately 30 sq km. Wide spaced vertical drilling has identified a 2km long geochemically gold anomalous zone. Goldfields expects to commence exploration in the near future. Click for more details...

BUFFALO OIL FIELD
Currently at the Construction stage In Offshore is a project estimated to be $ 5000000. This project The contract is for the Ron Tappmeyer jack-up rig. Click for more details...

BROKEN HILL PORPHYRY PROJECT
Mining (Underground - including longwall) project at via, Broken Hill, NSW 2880 of Resource - Copper/Gold type of New development. Newcrest expects to commence drilling at the Broken Hill Porphyry Project in late June/early July 2002. Drilling will be conducted on two target areas considered to have potential for porphyry style copper-gold mineralisation. Click for more details...

KATHLEEN VALLEY NICKEL PROJECT - RESOURCE
Mining (Open Cut) project for New development. Evalutaion of recent electromagnetic exploration is expected to highlight target areas for followup work, particluarly at the Venus prospect north of Cosmos. Click for more details...

FORT CONSTANTINE SOUTH COPPER & GOLD PROJECT
Currently at the Early Planning stage In Cloncurry Shire is a project estimated to be $ 5000000. This project The Fort Constantine South Project is located 10 km south of the Ernest Henry Copper-Gold deposit and covers the same sequences and structures that host this deposit. Previous work focusing on magnetic anomalism has intersected strong alteration and anomalous copper mineralisation in drilling at several prospects. Click for more details...

ALICE RIVER GOLD MINE
Cape York Peninsula 140 km northwest of, Laura, QLD 4871 Has Alice River Gold Mine currently at Planning stage. The Company plans to produce gold from tailings, underpinned by pre-existing on site and fully operational infrastructure including: a CIP Processing Plant, a water supply dam, a Tailings dam with a capacity of approximately 200,000 tonnes, and accessibility by road and air. Accommodation units, laboratory, communications facilities are also included. Click for more details...

SANDSTONE JV PROJECT - TIGERMOTH/CESSNA/HANCOCKS
Mining (Open Cut) project at East of, Mount Magnet, WA 6638 for New. As Previously reported, better intersections included 12 metres at 8.7g/t gold and 14 metres at 8.5g/t gold from 2 metres. Click for more details...

NEWLANDS COAL OPERATIONS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 100000. This project Longwall production. 2-3 longwall moves per year. Click for more details...

LAKE FROME JOINT VENTURE - URANIUM/COPPER RESOURCE
Resource - Uranium/Copper New project In The Far North Council Area. Geophysical surveys identified an additional structural target extending south from the Beverly mine into Lake Frome joint venture tenements. Click for more details...

AGNEW GOLD OPERATIONS - KIM/CRUSADER/DELIVERER
New project of Mining (Open Cut) project at 23 km west of, Leinster, WA 6437. Operating mine. Click for more details...

EAST KUNDANA GOLD PROJECT - PEGASUS - RESOURCE
Mining (Exploration - Drilling) project at North west of, Kalgoorlie, WA 6430 for New. A scoping and evaluation study of an open pit and underground operation is in progress. Total resource for open pit is 572,000 tonnes @ 3.3 g/t for 61,305 ounces of gold and underground resource is 719,000 tonnes @ 6.6 g/t for 152,726 ounces of gold. Further drilling will be carried out on resource estimation. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
300 km west of Mackay via, Mount Coolon, QLD 4804 Has Drummond Basin Project - Wirralie currently at Early Planning stage. Assets include a 315,000 ounce gold resource at the Wirralie gold mine, three tenement packages totalling some 3,200 sqkm with excellent exploration potential and the Wirralie 1.5 Mtpa CIP treatment plant, infrastructure, administration buildings, Camp Yandan heap leach pad. The Wirralie treatment plant is currently on care and maintenance. The company plans to begin mining the relatively straightforward oxide ore and then using the time and cash flow to expand the suplhide resrouce base. The sulphide resource is beneath the oxide resource. Click for more details...

MUNNI MUNNI EXTENDED PROJECT - RADIO HILL SOUTH/NORTH WHUNDO/EAST WELL
Mining (Exploration - Drilling) New project at 60 km south of, Karratha, WA 6714. This type is Resource - Platinum with Private ownership. The project is located 60 km south of Karratha in Western Australia's Pilbara region and is contiguous to the Helix Resources NL Munni Munni Platinum Group Metals project. The most prospective tenement is ELA 47/1033 (Munni Munni), which further enclosed on the west, north and east of the Elizabeth Hill silver mine while ELA 47/1032 borders the sulphide nickel-copper deposit at Radio Hill being mined by Titan Resources NL. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - RESOURCE
Mining (Underground - including longwall) New project at 50 km north north east of, Southern Cross, WA 6426. This type is Resource - Iron Ore with Private ownership. Northern Tenements Expansion. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Open Cut) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

WILLUGUDINNA HILL PROJECT - VARIOUS MINERALS RESOURCE
Willugudinna Hill Project - Various Minerals Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

HOPEFUL STAR GOLD PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Barkly Shire is a project estimated to be $ 5000000. This project Hopeful star was previously worked mine and there is still visible gold present. Drilling is to target defined BIF and quartz vein mineralisations. Click for more details...

KARA TUNGSTEN MINE - L5 DEPOSIT
Resource - Tungsten project at 40 Km South of, Burnie, TAS 7320 in the Mining (Exploration - Drilling). An inferred resource of 400,000 tonnes of tungsten @ 1.5 WO3 and in-situ resource of 98,000 tonnes of tungsten @ 1.5 WO3. Click for more details...

FOWLER GOLD & NICKEL PROJECT - RESOURCE
Private ownership Mining (Exploration - Drilling) project In The Ceduna Council Area for New development. The Fowler Project contains numerous large Hiltaba Suite intrusives and large structures which were active and controlled the emplacement of these large intrusive bodies. This area has the necessary ingredients to produce orogenic gold deposits and has not been tested. Calcrete sampling will be used to define anomalies which will be drill tested. Click for more details...

LINDSAYS GOLD PROJECT
Resource - Gold project at Approx 50km North Northeast of, Kalgoorlie, WA 6430 in the Mining (Underground - including longwall). Upgraded indicated and inferred resource estimate of 5.141 Mt at 2g/t gold for 323 600 ounces gold. A binding term agreement for an initial two-year Ore Processing Agreement has been signed for KalNorth to have ore processed at Saracen's Carosue Dam Processing Plant located 72km from the Lindsay's Field via Saracen's private access road. Click for more details...

TALGA GOLD & BASE METALS PROJECT
23 east north east of, Marble Bar, WA 6760 Has Talga Gold & Base Metals Project currently at Exploration, Drilling, Survey & Assessment stage. The target area is prospective for gold and VMS style mineralisation, and in particular is interpreted to contain the strike extension of recently discovered, potentially economic gold mineralisation to the immediate east of the tenement by Mining Projects Group. Click for more details...

STYX BASIN COAL PROJECT
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. 14m aggregate seams outlined during recent coal seam gas exploration, high head values of 34kj/kg swell to 7 1/2, prospective belt is 3km wide 20km long on the west side of the basin. Target is open cut and underground coking coal. Click for more details...

GRAYBRIDGE PROJECT - HEAVY MINERAL SANDS RESOURCE
Graybridge Project - Heavy Mineral Sands Resource is currently at the Early Planning stage, valued at about $ 2000000 it is Indicated and Inferred Resource of 47.6 Mt with 3.42% THM and 15.8% Zircon has been defined. Click for more details...

MARCOLLAT JOINT VENTURE PROJECT - GOLD/BASE METALS RESOURCE
Mining (Open Cut) project at Via, Roxby Downs, SA 5725 for New. The targets consist of a gravity anomaly within a high magnetic area, pwith the potential for base metals and gold within the basement rocks. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining (Open Cut) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

WENTWORTH PROJECT - ZINC GOLD SILVER RESOURCE
Mining (Exploration - airborne surveys etc.) project at 40km Northwest of, Moranbah, QLD 4744 for New. The project is considered prospective for Mt Writght or Kidston style breccia systems associated with felsic volcanics. Click for more details...

MAPOON PROJECT - MINERAL SANDS RESOURCE
Private ownership Mining (Exploration - Drilling) project In The Weipa Shire Council Area for New development. The region offers high grade zircon-rutile potential and the Company will now start exploration before the onset of the wet season. The region has the potential to host deposits considerably larger than those at Tiwi Island. Click for more details...

GREENVALE EAST GOLD TIN TUNGSTEN PROJECT
New project of Mining (Underground - including longwall) project at 170km west-northwest of Townsville via, Greenvale, QLD 4816. The tenement area contains 14 known mineralised occurrences, including old workings that have produced modest volumes of tin tungsten and gold. Click for more details...

PERCYVALE GOLD PROJECT
Mining (Underground - including longwall) project for New development. Initial inferred gold resource containing 14 000 oz grading 4.1 g/t Au to 40m depth only. Click for more details...

TASMANIA GOLD MINE JOINT VENTURE EXPANSION - INFILL MINING CONTRACT
Tasmania Gold Mine Joint Venture Expansion - Infill Mining Contract is currently at the Tenders & Building stage, valued at about $ 5000000 it is Contract mining of high grade remnants in the crown pillar area between the historic & post-1999 workings. Inferred resource of 57,000t @ 17.3g/t gold for 32,000oz. Reserve calculations expected late 2009 after completion of detailed mine designs. Click for more details...

SHELL PRELUDE GAS FIELD - FLNG - MARINE STEAM BOILER
Private ownership Mining (Open Cut) project In The Broome Council Area for New development. For the provision of a marine steam boiler. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - LIGHT VEHICLE HIRE
110km North of, Newman, WA 6753 Has Roy Hill Iron Ore Project - General - Light Vehicle Hire currently at Construction stage. For the provision of light vehicle hire. Click for more details...

GREATER GORGON GAS PROJECT - HEAVY LIFT & TIE INS - CREW TRANSFER VESSEL
New project of Mining (Offshore - oil & gas) project at Off, Barrow Island, WA 6712. For the provision of a crew transport vessel. Click for more details...

GREATER GORGON GAS PROJECT - OFFSHORE - TUGS & BARGES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of tugs and barges (330ft and 400ft). Click for more details...

NORTH KAMBALDA NICKEL OPERATIONS - OTTER JUAN/MACMAHON CLOSURE
Mine - Closure project at via, Kambalda, WA 6442 in the Mining (Underground - including longwall). Closure of the mines at resource exhaustion. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - OFFSHORE PLUG & ABANDONMENT SERVICES
Private ownership Mining (Offshore - oil & gas) project In The Various Council Area for New development. TVI plug & abandon program offshore Western Australia comprising 22 offshore production wells on 9 monopods/tripods & one exploration well suspended at the mud line in water depths between 6.4 & 16 meters (Lowest Astronomical Tide). Click for more details...