List of Mining Projects in NT


YIMUYN MANJEER GOLD MINE - MOUNT TODD TENEMENTS
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 1000000. This project The first mortgagee is offering for sale by tender a number of exploration titles. These are highly prospective tenements near Mount Todd, located in the historic Pine Creek geosyncline. Potential also exists for base metal mineralisation. Click for more details...

ARUNTA PROJECT
Mining (Exploration - Drilling) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

ARUNTA PROJECT
Mining (Underground - including longwall) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

AUQUEST PROJECT- STEVES HILL - GOLD RESOURCE
Resource - Gold project at 15 km west of Toms Gully 100 km SSE of, Darwin, NT 0800 in the Mining (Exploration - Drilling). A 12 hole 1200m RC drilling program is to be conducted at the Steve Hill deposit. Steves Hill is located 15 km from the Toms Gully CIP processing plant. Potential open cut. Click for more details...

AUQUEST PROJECT- STEVES HILL - GOLD RESOURCE
Resource - Gold project at 15 km west of Toms Gully 100 km SSE of, Darwin, NT 0800 in the Mining (Underground - including longwall). A 12 hole 1200m RC drilling program is to be conducted at the Steve Hill deposit. Steves Hill is located 15 km from the Toms Gully CIP processing plant. Potential open cut. Click for more details...

TIMBER CREEK PROJECT
Timber Creek Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 10000000 it is In 2004 kimberlite had been put through an on-site rented Dense Media Separation plant and the heavy mineral concentrate produced shipped to the Company's diamond recovery facility in South Africa for final diamond recovery. Rehabilitation of the areas where previous bulk sampling had been undertaken is planned. Click for more details...

UNION REEFS GOLD OPERATIONS - MINE & PLANT
Mining (Open Cut) project In The Katherine Town Council Area of Mine/Infrastructure type. Includes Union Reefs Gold Project and a 2.8mtpa gold plant, on care and maintenance since late 2003, and related site infrastructure. Situated 50 km south of Bocks Creek and Cosmo Deeps and approx 20 km north of Pine Creek. Click for more details...

CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining (Open Cut) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

QUEST 29 GOLD OPERATIONS
Quest 29 Gold Operations is currently at the Construction stage, valued at about $ 500000 it is A 6-7 week mining campaign. 170,000 tonnes to leach pad. (Ore to be dump leached on site). 1:1 strip ratio. Click for more details...

CENTRAL DESERT JV TANAMI DESERT - GOLD
Central Desert Jv Tanami Desert - Gold is currently at the Construction stage, valued at about $ 20000000 it is Work to date includes resource definition, pit planning, metallurgical testwork & scoping studies (on several deposits). Area contains Jim's Find, Jim's South, Dogbolter & Redback deposits with a total estimated resource of 4.6mt grading 3.4gpt gold. Initial mining involving 7 small pits is envisaged with an average strip ratio of 9:1. Earlier drilling results included 8m grading 76.5gpt gold from Dogbolter's main zone. First deposits to be mined to also include the Harleys area. Mining reserves currently estimated at 2mt grading 3.8gpt gold with potential to prove up additional reserves. Haulage of ore to the plant site approximately 8 km distant & up to 25 km (Jim's Find deposit) is included in this tender. Original contract period is for 2 years with a 2 year option. These deposits to be mined to various depths up to 110m for this 1mtpa operation. Haulage roads to be constructed as mine site are developed. Click for more details...

MUD TANK VERMICULITE OPERATIONS
New project of Mining (Open Cut) project at Plenty Hwy 160 km northeast of, Alice Springs, NT 0870. An insitu resource of several million tonnes of vermiculite is indicated & a net saleable yield of 750,000t has been estimated. A mine life in excess of 20 years is currently envisaged. This contract to form a shallow gravel pit with extraction using a bulldozer for ore extraction. Minimal cartage required for this initial work. Click for more details...

THE GRANITES GOLD OPERATIONS - BUNKERS HILL/TWIN HILLS
The Granites Gold Operations - Bunkers Hill/Twin Hills is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is Results from the December 2000 quarter drilling to test lithologies between Bunkers Hill and Twin Hills were disappointing, with best 60 at 0.5g/t. Click for more details...

MCARTHUR RIVER BASE METALS MINE - UNDERGROUND OPERATIONS
Near, Borroloola, NT 0854 Has Mcarthur River Base Metals Mine - Underground Operations currently at Construction stage. Up to 1.5 mil. tonnes of ore will be extracted annually from an underground mine to produce 350,000 tonnes of mixed concentrate containing 160,000 tonnes of zinc, 45,000 tonnes of lead and 1.6 million ounces of silver. Click for more details...

BURNSIDE GOLD OPERATIONS - BROCKS CREEK UNDERGROUND MINE - RESOURCE
Currently at the Construction stage In Katherine Town is a project estimated to be $ 25000000. This project Resource estimate is a measured and indicated resource of 264,000 tonnes @ 17.6 g/t for 149,600 ounces of Au. Inferred resources are 138,200 tonnes @ 5.1 g/t for 22,800 ounces of Au. The previous developer had begun decline development. Click for more details...

EDNA BERYL GOLD PROJECT
Mining (Underground - including longwall) project In The Barkly Shire Council Area of Private ownership. Includes sinking a shaft up to 150 m and associated drivage. Also includes moving 7,000 to 10,000 tonnes of ore. Click for more details...

PINE CREEK GEOSYNCLINE/ MT TYMN
Resource - Gold New project In The Katherine Town Council Area. A recent comprehensive drilling programme demonstrated that the resource previously outlined was less continuous than the earlier drilling had indicated & cannot be readily traced from drill section to drill section. A new geological resource of 1.1 million tonnes @ 1.4 gpt has been calculated for the Central Hill area & the South Hill area has shown a calculated resource of 150 000 tonnes @ 2.0 gpt. Click for more details...

AUQUEST PROJECT - TOMS GULLY GOLD UNDERGROUND - RESOURCE
100 km southeast of, Darwin, NT 0800 Has Auquest Project - Toms Gully Gold Underground - Resource currently at Construction stage. The AuQuest project includes Toms Gully underground (proposed). The existing Quest 29 open cut operation. The Toms Gully CIP Plant and additional resources. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining (Open Cut) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

TANAMI DOWNS JOINT VENTURE PROJECT
Tanami Downs Joint Venture Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is Tanami Downs is located approximately 25 km west of the +5 million ounce Callie gold deposit operated by Newmont Australia Ltd. Click for more details...

TOMS GULLY GOLD OPERATIONS - QUEST 29
Toms Gully Gold Operations - Quest 29 is currently at the Construction stage, valued at about $ 3000000 it is Over the first 2-3 years of the project ore will be mined from a number of small open pits at Quest 29, approx 17 km from Tom's Gully. Approx 250,000 tpa of higher grade ore will be hauled to Tom's Gully for processing through the existing CIL processing plant. Lower grade ore will be dump leached on site. The final length of the contract will be dependent on further exploration success within the company's prospective tenement holdings. The open pit mining contract will include mainly drill & blast mining, ore & waste haulage & maintenance of haul roads. Mining will be a rate of about 2000 bcm per day. Other services will include pit de-watering & the construction of siltation ponds & a diversionary berm. Click for more details...

GOLF/TOLLIS - GOLD
A project in the NT Within Katherine Town. An indicated resource of 8.76mt grading 0.85gpt gold has now been estimated (oxide, transition & primary ores) for this area. These deposits are being considered as future feed for the heap leach circuit at the Company's Mt Todd plant. Additional zone of mineralisation also undergoing evaluation & is included in current pit optimisation studies (Golf & Tollis). It is envisaged the Golf pit will provide waste for a new tailings dam to be constructed nearby. Click for more details...

BROWNS POLYMETALLIC PROJECT
Mining (Open Cut) New project at Approx 60 km south east of, Darwin, NT 0800. This type is Bulk Sample Extraction with Private ownership. A contract has been prepared to re-enter the bulk sample pit at Browns. The pit will be dewatered and a clear floor prepared ahead of mining a 400 tonne sample. The sample will be typical of the sulphide to be treated during the first five years of mining. This will be freighted to Adelaide for processing through the flotation prototype plant to be constructed at Amdel. This plant will operate during the June quarter to produce 50 tonnes of concentrate for prototyping through the Ausmelt process and subsequent matte segregation and hydrometallurgical studies. Click for more details...

HARTS RANGE PROJECT-MOUNT RIDDOCH/KONGO/COPPER KING/COPPER QUEEN
Harts Range Project-Mount Riddoch/Kongo/Copper King/Copper Queen is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is A helicopter supported stream sediment sampling programme was completed in mid April as follow-up to the anomalous results returned from the 2002 reconnaissance programme. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Exploration - Drilling) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Exploration - Drilling) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Open Cut) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Underground - including longwall) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Onshore - oil & gas) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

MOUNT HARCUS PROJECT - VARIOUS MINERALS RESOURCE
South east of Pipalyatjara, 200 km from, Yulara, NT 0872 Has Mount Harcus Project - Various Minerals Resource currently at Exploration, Drilling, Survey & Assessment stage. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

PEKO TAILINGS DAM PROJECT - EARTHMOVING CONTRACT
Peko Tailings Dam Project - Earthmoving Contract is currently at the Construction stage, valued at about $ 1000000 it is Earthmoving contract is for moving 4 million tonnes of magnetite stockpile to plant. Click for more details...

HOPEFUL STAR GOLD PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Barkly Shire is a project estimated to be $ 5000000. This project Hopeful star was previously worked mine and there is still visible gold present. Drilling is to target defined BIF and quartz vein mineralisations. Click for more details...

HALE RIVER URANIUM PROJECT - RESOURCE
Mining (Exploration - Drilling) New project at 90 km north east of, Alice Springs, NT 0872. This type is Resource - Uranium with Private ownership. A 10km strike length of identified redox boundaries, producing advanced targets for roll-front or sandstone-type uranium deposits have been identified at Hale River. Click for more details...

BURNSIDE GOLD OPERATIONS - FOUNTAIN HEAD - RESOURCE
Private ownership Mining (Open Cut) project In The Katherine Town Council Area. Indicated resource is 1,985,000 tonnes @ 1.7 g/t for 106,100 ounces of Au and an inferred resource of 661,000 tonnes @ 1.6 g/t for 34,000 ounces of Au. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining (Open Cut) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

BURT PLAIN PROJECT - COPPER/GOLD/URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Alice Springs Town Council Area of Private ownership. High grade metamorphics of the Palaeoproterozoic Arunta Block crop out in the north-east part, and sporadically in the western part of the tenement. Aeoromagnetic and gravity information shows anomalies indicative of a huge iron oxide system. It is interpreted to be seven kilometres long by five kilometres wide, and is in places within 50 metres of the surface. This area has many attractive exploration attributes including the geophysical signature is comparable with that over the giant Olympic Dam deposit in South Australia. The prospect is trannsected by the Stuart Highway and Australasia Railway Line. Of particular interest is the U/Th ratio data, which shows a general correlation of elevated values with drainage patterns. Significantly the highest occur in the central eastern part of the tenement area, adjacent to inferred and mapped structures. This further expands the uranium exploration area to include roll-front deposits in palaeochannels incised in basement, and calcrete deposits. Click for more details...

BURT PLAIN WEST JOINT VENTURE PROJECT - URANIUM RESOURCE
Mining (Exploration - airborne surveys etc.) project at Approximately 100km North Northwest of, Alice Springs, NT 0870 for New. The tenement shows evidence of palaeo-drainage systems adjacent to known uraniferous source rocks and conceptually analogous to the Mt Painter relationship to the Beverley and Beverley Four Mile deposits. Click for more details...

VICTORIA RIVER JOINT VENTURE PROJECT - URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Victoria Daly Shire Council Area of Resource - Uranium type. The eight tenements all contain radiometric anomalies and are variously prospective for a range of uranium mineralisations styles, including primary and secondary. Click for more details...

AMADEUS BASIN PROJECT - URANIUM RESOURCE
Mining (Exploration - Drilling) project for New development. The tenements cover similar lithologies to those that host the nearby Pamela and Angela uranium deposit. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

JPDA 06-105 & 11-106 KITAN DRILLING RIG SERVICES CONTRACTS
Mining (Offshore - oil & gas) project for New development. Proposed drilling of additional wells & connection back to existing FPSO vessel. Specific Services & goods to include: Anchor handling support vessels; Helicopter services; Marine gas oil supply; Supply base; General waste services & dangerous goods disposal; Vessel stevedoring; International Freight Forwarder & Ships agency services; Logistics services (including containers, warehousing & customs); Drilling fluid services; Cementing services; Logging-while-drilling/measurement-while-drilling/directional drilling services; Wireline services; Mud logging services; ROV services; Casing running & tubular handling services; Rig positioning services; Coring services; Fishing services; Down hole tool & well heated abandonment services; Well testing, slickline & sampling services; Well testing heat suppression; Liner hanger equipment; Drill bit supply, Weather forecasting (including tow advice & cyclone alerts); Rig satellite communication services; Wellheads (subsea); Third party QA/QC inspection services; Technical Engineering studies; Geophysical survey; Satellite based oil spill detection; Casing supply; Aeromedical support; Blowout response. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE FPSO - CONDITION PERFORMANCE MONITORING SYSTEM
Condition Performance Monitoring System project at Off Maret Islands & Blaydin Point via, Darwin, NT 0800 in the Mining (Offshore - oil & gas). For the provision of condition performance monitoring system for use on Floating Production Storage & Offloading Facility (FPSO) - 1-63 averaging pitot tubes flow meter. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - MAINTENANCE SERVICES
Private ownership Mining (Offshore - oil & gas) project In The Darwin City Council Area for New development. For the provision of maintenance services for the Ichthys offshore & onshore assets. Click for more details...

NORTHERN GAS PIPELINE ACOUSTIC INVESTIGATION
Mining (Onshore - oil & gas) project for New development. Provision of consultancy services for acoustic investigation for the 623km Northern Gas Pipeline. To include prediction of noise levels from the proposed pipeline, specification of noise management levels & provision of noise mitigation strategies. Click for more details...

NORTHERN GAS PIPELINE AIR IMPACT ASSESSMENT
Mining (Onshore - oil & gas) New project at Warrego (NT) - Mount Isa (QLD), ., NT 8999. This type is Consultancy - For Air Impact Assessment with State ownership. Provision of consultancy services for air impact assessment for the 623km Northern Gas Pipeline. To include prediction of air impacts & comparison to the National Environment Protection Measure. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining (Onshore - oil & gas) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...