State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining Projects in NT


KINTORE JOINT VENTURE PROJECT - GOLD RESOURCE
Mining (Exploration - Drilling) project In The Alice Springs Town Council Area of Resource - Gold type. Geochemical surveys over the Worman Rocks area in the Kintore Joint Venture detected only scattered low level gold anomalism. The survey has significantly downgraded the project's prospectivity. Click for more details...

ARUNTA PROJECT
Mining (Exploration - Drilling) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

ARUNTA PROJECT
Mining (Open Cut) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

AUQUEST PROJECT- STEVES HILL - GOLD RESOURCE
Resource - Gold project at 15 km west of Toms Gully 100 km SSE of, Darwin, NT 0800 in the Mining (Underground - including longwall). A 12 hole 1200m RC drilling program is to be conducted at the Steve Hill deposit. Steves Hill is located 15 km from the Toms Gully CIP processing plant. Potential open cut. Click for more details...

MOUNT BUNDY PROJECT - GOLD RESOURCE
Mining (Open Cut) project In The Coomalie Community Council Area of Resource - Gold type. Indicated resource estimate is 15,141,000 tonnes of ore @ 1.34 g/t Au for 652,278 ounces of gold and an inferred resource of 1,461,000 tonnes of ore @ 1.23 g/t Au for 57,773 ounces of gold at an 0.7 cut off. Click for more details...

CENTRAL AUSTRALIAN PROJECT
A project in the NT Within Alice Springs Town. Tanami Gold NL has entered into an agreement to joint venture with BHP Billiton and Teck Cominco. The Alliance (being BHP Billiton and Teck Cominco) has the option to earn a 51% interest in the EL's after expenditure of $2million. The Alliance may then elect to continue sole funding through to completion of a bankable feasibility study or dilute. Tanami Gold has the right to explore the tenements for mineral deposits other than base metals provided such programmes do not interfere with the Alliance programmes. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining (Open Cut) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

CENTRAL DESERT JV TANAMI DESERT - GOLD
Central Desert Jv Tanami Desert - Gold is currently at the Construction stage, valued at about $ 20000000 it is Work to date includes resource definition, pit planning, metallurgical testwork & scoping studies (on several deposits). Area contains Jim's Find, Jim's South, Dogbolter & Redback deposits with a total estimated resource of 4.6mt grading 3.4gpt gold. Initial mining involving 7 small pits is envisaged with an average strip ratio of 9:1. Earlier drilling results included 8m grading 76.5gpt gold from Dogbolter's main zone. First deposits to be mined to also include the Harleys area. Mining reserves currently estimated at 2mt grading 3.8gpt gold with potential to prove up additional reserves. Haulage of ore to the plant site approximately 8 km distant & up to 25 km (Jim's Find deposit) is included in this tender. Original contract period is for 2 years with a 2 year option. These deposits to be mined to various depths up to 110m for this 1mtpa operation. Haulage roads to be constructed as mine site are developed. Click for more details...

MUD TANK VERMICULITE OPERATIONS
New project of Mining (Open Cut) project at Plenty Hwy 160 km northeast of, Alice Springs, NT 0870. An insitu resource of several million tonnes of vermiculite is indicated & a net saleable yield of 750,000t has been estimated. A mine life in excess of 20 years is currently envisaged. This contract to form a shallow gravel pit with extraction using a bulldozer for ore extraction. Minimal cartage required for this initial work. Click for more details...

CHARIOT GOLD PROJECT- MALBEC WEST
Mining (Open Cut) project at Via, Tennant Creek, NT 0860 of Resource - Gold type of New development. Interim resource has enabled an open pit to be designed with the base of the pit above the defined mineralisation. Click for more details...

ATLEE CREEK PROJECT
New project of Mining (Open Cut) project at Approximately 580 km west of, Alice Springs, NT 0870. A Rab drilling programme has commenced at the Atlee project 200 km south-east of the Granites Mine. Click for more details...

BROWNS EMBAYMENT PROJECT - BROWNS/AREA 55/BROWNS EAST
Resource - Copper/Cobalt/Nickel project at 65 km south of, Darwin, NT 0800 In The Council Area Of Darwin City of Private. The joint venture covers portions of the highly mineralised Embayment Structure that hosts Browns and Bro-wns East and the Area 55 copper cobalt deposit. It excludes the currently defined polymetallic resources at Browns to a vertical depth of 350 metres and at Browns East to a depth of 300 metres as well as the defined Area 55 deposit. The recent gravity survey recorded encouraging result. Additional surveying is required to help refine deep drill targets. Click for more details...

THE GRANITES GOLD OPERATIONS - BUNKERS HILL/TWIN HILLS
The Granites Gold Operations - Bunkers Hill/Twin Hills is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is Results from the December 2000 quarter drilling to test lithologies between Bunkers Hill and Twin Hills were disappointing, with best 60 at 0.5g/t. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Screening For Dam Walls For Tailings Dam project at Approx 200 km east of, Daly Waters, NT 0852 In The Council Area Of Darwin City of Private. Providing plant, equipment and services for screening materials for the dam walls. Click for more details...

AUQUEST PROJECT - TOMS GULLY GOLD UNDERGROUND - RESOURCE
100 km southeast of, Darwin, NT 0800 Has Auquest Project - Toms Gully Gold Underground - Resource currently at Construction stage. The AuQuest project includes Toms Gully underground (proposed). The existing Quest 29 open cut operation. The Toms Gully CIP Plant and additional resources. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Mining (Open Cut) project at Approx 200 km east of, Daly Waters, NT 0852 for Subcontract. Work on tailings dam expected to be completed within 10 - 11 weeks of commencement. Click for more details...

TENNANT CREEK JOINT VENTURE - QUEEN OF SHEBA
Mining (Open Cut) project In The Barkly Shire Council Area of Private ownership. Interpretation & modelling of recently acquired detailed helicopter magnetic data has identified a high priority target at the Queen of Sheba Prospect. Previous work at this location although returning encouraging results failed to intersect economic mineralisation. With the aid of the new data & downhole magnetic probe surveys, a large magnetic body has been modelled at depth with two near surface extensions neither of which have been intersected by previous drilling. Click for more details...

PETERMANN RANGE BASE METALS PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Macdonnell Shire is a project estimated to be $ 5000000. This project Follow-up sampling could not replicate the results of first pass samplina nd further investigation is required. Click for more details...

TANAMI DOWNS JOINT VENTURE PROJECT
Tanami Downs Joint Venture Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is Tanami Downs is located approximately 25 km west of the +5 million ounce Callie gold deposit operated by Newmont Australia Ltd. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS - MRM EXPANSION PROJECT
Mining (Exploration - Drilling) project for New development. Looking at options from a feasability study. Click for more details...

QUEST 29 GOLD OPERATIONS - NORTH KOOLPIN/TAIPAN
A project in the NT Within Darwin City. A six week open cut mining campaign. Click for more details...

CHARIOT GOLD PROJECT
Mining (Underground - including longwall) project at 9 km west of, Tennant Creek, NT 0860 for New. Underground mine plan includes establishment of a decline portal towards the base of the Chariot open pit. decline to be developed to a depth of 300 metres below the surface with the first ore development level at 120 metres below the surface. Flat back cut and fill stoping. production rates 10,000 to 12,000 tonnes per month. Click for more details...

BATCHELOR MAGNESIUM PROJECT - WINCHESTER
Mining (Open Cut) project In The Darwin City Council Area of Private ownership. Construction of a small pit and extraction of a sample of 2,000 tonnes approx for stockpiling and use as required for testing at Mintek pilot plant. Click for more details...

HARTS RANGE PROJECT-MOUNT RIDDOCH/KONGO/COPPER KING/COPPER QUEEN
Harts Range Project-Mount Riddoch/Kongo/Copper King/Copper Queen is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is A helicopter supported stream sediment sampling programme was completed in mid April as follow-up to the anomalous results returned from the 2002 reconnaissance programme. Click for more details...

STANTON PROJECT
A project in the NT Within Roper Gulf Shire. Proposed as a small open cut to supply feedstock to the company's cobalt chemicals business in Newcastle, New South Wales. Following a scoping study carried out by an independent engineer, the board is considering Infill drilling to confirm the preliminary reports. timing of infill drilling is dependent on weather conditions and availability of contractors for this exercise. Click for more details...

LITCHFIELD PROJECT - NICKEL RESOURCE
New project of Mining (Open Cut) project at South west of, Darwin, NT 0800. A 450 metre drilling program targeting the Cobia and barra prospects. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Exploration - Drilling) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Onshore - oil & gas) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

MOUNT HARCUS PROJECT - VARIOUS MINERALS RESOURCE
South east of Pipalyatjara, 200 km from, Yulara, NT 0872 Has Mount Harcus Project - Various Minerals Resource currently at Exploration, Drilling, Survey & Assessment stage. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

PEKO TAILINGS DAM PROJECT - EARTHMOVING CONTRACT
Peko Tailings Dam Project - Earthmoving Contract is currently at the Construction stage, valued at about $ 1000000 it is Earthmoving contract is for moving 4 million tonnes of magnetite stockpile to plant. Click for more details...

HOPEFUL STAR GOLD PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Barkly Shire is a project estimated to be $ 5000000. This project Hopeful star was previously worked mine and there is still visible gold present. Drilling is to target defined BIF and quartz vein mineralisations. Click for more details...

HALE RIVER URANIUM PROJECT - RESOURCE
Mining (Exploration - Drilling) New project at 90 km north east of, Alice Springs, NT 0872. This type is Resource - Uranium with Private ownership. A 10km strike length of identified redox boundaries, producing advanced targets for roll-front or sandstone-type uranium deposits have been identified at Hale River. Click for more details...

DARWIN TERRITORY WILDLIFE PARK - COMMUNICATIONS
State ownership Mining (Open Cut) project In The Darwin City Council Area for New development. Upgrade wildlife parks communications system. Click for more details...

BURNSIDE GOLD OPERATIONS - FOUNTAIN HEAD - RESOURCE
Private ownership Mining (Open Cut) project In The Katherine Town Council Area. Indicated resource is 1,985,000 tonnes @ 1.7 g/t for 106,100 ounces of Au and an inferred resource of 661,000 tonnes @ 1.6 g/t for 34,000 ounces of Au. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining (Open Cut) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

BURT PLAIN PROJECT - COPPER/GOLD/URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Alice Springs Town Council Area of Private ownership. High grade metamorphics of the Palaeoproterozoic Arunta Block crop out in the north-east part, and sporadically in the western part of the tenement. Aeoromagnetic and gravity information shows anomalies indicative of a huge iron oxide system. It is interpreted to be seven kilometres long by five kilometres wide, and is in places within 50 metres of the surface. This area has many attractive exploration attributes including the geophysical signature is comparable with that over the giant Olympic Dam deposit in South Australia. The prospect is trannsected by the Stuart Highway and Australasia Railway Line. Of particular interest is the U/Th ratio data, which shows a general correlation of elevated values with drainage patterns. Significantly the highest occur in the central eastern part of the tenement area, adjacent to inferred and mapped structures. This further expands the uranium exploration area to include roll-front deposits in palaeochannels incised in basement, and calcrete deposits. Click for more details...

VICTORIA RIVER JOINT VENTURE PROJECT - URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Victoria Daly Shire Council Area of Resource - Uranium type. The eight tenements all contain radiometric anomalies and are variously prospective for a range of uranium mineralisations styles, including primary and secondary. Click for more details...

BUSHY PARK JOINT VENTURE PROJECT - ENERGY MINERAL RESOURCE
A project in the NT Within Roper Gulf Shire. The area is potentially prospective for primary, hard-rock uranium, secondary, sandstone hosted and surficial calcrete-styles of mineralisation. Click for more details...

MOUNT TODD MINE
Consultancy For Materials Source Assessment project at ., Darwin, NT 0800 In The Council Area Of Darwin City of State. Consultancy for Materials Source Assessment Click for more details...

BOOTU CREEK NORTH MANGANESE PROJECT
Mining (Exploration - Drilling) project at Approximately 110km North of, Tennant Creek, NT 0860 for New. The project tenement covers prospective ground along strike from the Bootu Creek mine within the same geological-structural corridor. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Mining (Onshore - oil & gas) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining (Underground - including longwall) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

ROPER BAR IRON ORE PROJECT - MINING CONTRACT
Mining Contract project at Via St Vidgeon pastoral lease, 80km Southeast of Roper Bar via, Ngukurr, NT 0852 in the Mining (Open Cut). For the provision of mining services. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - MAINTENANCE SERVICES
Private ownership Mining (Offshore - oil & gas) project In The Darwin City Council Area for New development. For the provision of maintenance services for the Ichthys offshore & onshore assets. Click for more details...

NORTHERN GAS PIPELINE ACOUSTIC INVESTIGATION
Mining (Onshore - oil & gas) project for New development. Provision of consultancy services for acoustic investigation for the 623km Northern Gas Pipeline. To include prediction of noise levels from the proposed pipeline, specification of noise management levels & provision of noise mitigation strategies. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining (Onshore - oil & gas) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect