State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining Projects in NT


YIMUYN MANJEER GOLD MINE - MOUNT TODD TENEMENTS
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 1000000. This project The first mortgagee is offering for sale by tender a number of exploration titles. These are highly prospective tenements near Mount Todd, located in the historic Pine Creek geosyncline. Potential also exists for base metal mineralisation. Click for more details...

ARUNTA PROJECT
Mining (Open Cut) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

AUQUEST PROJECT- STEVES HILL - GOLD RESOURCE
Resource - Gold project at 15 km west of Toms Gully 100 km SSE of, Darwin, NT 0800 in the Mining (Underground - including longwall). A 12 hole 1200m RC drilling program is to be conducted at the Steve Hill deposit. Steves Hill is located 15 km from the Toms Gully CIP processing plant. Potential open cut. Click for more details...

TASSIE SHOAL METHANOL PROJECT - LNG PRODUCTION FACILITY/STORAGE TANKS
Lng Production Facility/Storage Tanks project at Tassie Shoal in the Timor Sea 275 km north of, Darwin Mc, NT 0820 in the Mining (Offshore - oil & gas). A 2.5 million tonnes per annum LNG production and export facility. Includes construction for two concrete structure each containing conventional nickel steel LNG storage tanks. These structure would provide support for the LNG production module. The facility would be serviced and provisioned out of Darwin. Click for more details...

TIMBER CREEK PROJECT
Timber Creek Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 10000000 it is In 2004 kimberlite had been put through an on-site rented Dense Media Separation plant and the heavy mineral concentrate produced shipped to the Company's diamond recovery facility in South Africa for final diamond recovery. Rehabilitation of the areas where previous bulk sampling had been undertaken is planned. Click for more details...

MOUNT BUNDY PROJECT - GOLD RESOURCE
Mining (Exploration - Drilling) project In The Coomalie Community Council Area of Resource - Gold type. Indicated resource estimate is 15,141,000 tonnes of ore @ 1.34 g/t Au for 652,278 ounces of gold and an inferred resource of 1,461,000 tonnes of ore @ 1.23 g/t Au for 57,773 ounces of gold at an 0.7 cut off. Click for more details...

MOUNT BUNDY PROJECT - GOLD RESOURCE
Mining (Open Cut) project In The Coomalie Community Council Area of Resource - Gold type. Indicated resource estimate is 15,141,000 tonnes of ore @ 1.34 g/t Au for 652,278 ounces of gold and an inferred resource of 1,461,000 tonnes of ore @ 1.23 g/t Au for 57,773 ounces of gold at an 0.7 cut off. Click for more details...

MOUNT BUNDY PROJECT - GOLD RESOURCE
Mining (Underground - including longwall) project In The Coomalie Community Council Area of Resource - Gold type. Indicated resource estimate is 15,141,000 tonnes of ore @ 1.34 g/t Au for 652,278 ounces of gold and an inferred resource of 1,461,000 tonnes of ore @ 1.23 g/t Au for 57,773 ounces of gold at an 0.7 cut off. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining (Open Cut) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining (Underground - including longwall) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

CHARIOT GOLD PROJECT- MALBEC WEST
Mining (Open Cut) project at Via, Tennant Creek, NT 0860 of Resource - Gold type of New development. Interim resource has enabled an open pit to be designed with the base of the pit above the defined mineralisation. Click for more details...

ATLEE CREEK PROJECT
New project of Mining (Underground - including longwall) project at Approximately 580 km west of, Alice Springs, NT 0870. A Rab drilling programme has commenced at the Atlee project 200 km south-east of the Granites Mine. Click for more details...

BROWNS EMBAYMENT PROJECT - BROWNS/AREA 55/BROWNS EAST
Resource - Copper/Cobalt/Nickel project at 65 km south of, Darwin, NT 0800 In The Council Area Of Darwin City of Private. The joint venture covers portions of the highly mineralised Embayment Structure that hosts Browns and Bro-wns East and the Area 55 copper cobalt deposit. It excludes the currently defined polymetallic resources at Browns to a vertical depth of 350 metres and at Browns East to a depth of 300 metres as well as the defined Area 55 deposit. The recent gravity survey recorded encouraging result. Additional surveying is required to help refine deep drill targets. Click for more details...

BROWNS OXIDE PROJECT - NICKEL/COBALT/COPPER/LEAD RESOURCE
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - Nickel/Cobalt/Copper/Lead Resource currently at Construction stage. The ore is to be mined, crushed, ground and slurried on site. Ore will be processed in a onsite process plant and tailing will be stored in a onsite tailings dam. The in-ground oxide resource estimate for the Batchelor region projects has an estimated value at over 1 billion dollars. Measured resource is 18 million tonnes, indicated is 27 million tonnes and inferred is 37 million tonnes. Metals in the ground are lead at 1,865,000 tonnes, copper 622,000 tonnes, cobalt at 98,000 tonnes and nickel at 90,000 tonnes. There are also significant exploration prospects at Mount Fitch and Mount Burton. Click for more details...

MCARTHUR RIVER BASE METALS MINE - UNDERGROUND OPERATIONS
Near, Borroloola, NT 0854 Has Mcarthur River Base Metals Mine - Underground Operations currently at Construction stage. Up to 1.5 mil. tonnes of ore will be extracted annually from an underground mine to produce 350,000 tonnes of mixed concentrate containing 160,000 tonnes of zinc, 45,000 tonnes of lead and 1.6 million ounces of silver. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining (Open Cut) project for New development. Testwork to date indicates ore is free milling & that high gravity concentrates are obtainable. Mine life in excess of 6 years currently envisaged. Sacred site clearance has been granted. Department of Minerals & Energy assessing mining lease application. Present plan envisages a carbon-in-leach gravity processing plant operating at about 1mtpa capacity. Feasibility study undertaken by Signet included reserve estimates, mine planning & scheduling plus pit optimisation. Process engineering, metallurgical testwork & infrastructure & environmental costings conducted. Proposed plant purchase includes semi-autogenous grind & ball mills plus primary crusher. Carbon-in-leach circuit, gold stripping circuit & miscellaneous support infrastructure also form part of proposed acquisition. Due diligence being conducted on the 1.3mtpa Moline plant which is in storage (Indochina). Selected tenders expected to be called for mining, power supply & general construction requirements. The Draft Environmental Impact Study is awaiting assessment by the NT Government. Click for more details...

PINE CREEK GEOSYNCLINE/ MT TYMN
Resource - Gold New project In The Katherine Town Council Area. A recent comprehensive drilling programme demonstrated that the resource previously outlined was less continuous than the earlier drilling had indicated & cannot be readily traced from drill section to drill section. A new geological resource of 1.1 million tonnes @ 1.4 gpt has been calculated for the Central Hill area & the South Hill area has shown a calculated resource of 150 000 tonnes @ 2.0 gpt. Click for more details...

AUQUEST PROJECT - TOMS GULLY GOLD UNDERGROUND - RESOURCE
100 km southeast of, Darwin, NT 0800 Has Auquest Project - Toms Gully Gold Underground - Resource currently at Construction stage. The AuQuest project includes Toms Gully underground (proposed). The existing Quest 29 open cut operation. The Toms Gully CIP Plant and additional resources. Click for more details...

RUSTLERS ROOST GOLD MINE
Addition project of Mining (Underground - including longwall) project at 100 km southeast of, Alice Springs, NT 0870. Likely to include widening and deepening of the existing pit. Click for more details...

TANAMI DOWNS JOINT VENTURE PROJECT
Tanami Downs Joint Venture Project is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is Tanami Downs is located approximately 25 km west of the +5 million ounce Callie gold deposit operated by Newmont Australia Ltd. Click for more details...

TOMS GULLY GOLD OPERATIONS - QUEST 29
Toms Gully Gold Operations - Quest 29 is currently at the Construction stage, valued at about $ 3000000 it is Over the first 2-3 years of the project ore will be mined from a number of small open pits at Quest 29, approx 17 km from Tom's Gully. Approx 250,000 tpa of higher grade ore will be hauled to Tom's Gully for processing through the existing CIL processing plant. Lower grade ore will be dump leached on site. The final length of the contract will be dependent on further exploration success within the company's prospective tenement holdings. The open pit mining contract will include mainly drill & blast mining, ore & waste haulage & maintenance of haul roads. Mining will be a rate of about 2000 bcm per day. Other services will include pit de-watering & the construction of siltation ponds & a diversionary berm. Click for more details...

WHITE RANGE GOLD OPERATIONS - RESOURCE
Mining (Open Cut) project In The Alice Springs Town Council Area of Private ownership. Orex will construct a new leach pad to treat the residual stockpile of ore. The December Quarter 2006 saw the mine produce 346 ounces of gold. At present Orex is shifting over 7000 tonnes of ore @ 2 g/t au for leaching. Click for more details...

CHARIOT GOLD PROJECT
Mining (Open Cut) project at 9 km west of, Tennant Creek, NT 0860 for New. Underground mine plan includes establishment of a decline portal towards the base of the Chariot open pit. decline to be developed to a depth of 300 metres below the surface with the first ore development level at 120 metres below the surface. Flat back cut and fill stoping. production rates 10,000 to 12,000 tonnes per month. Click for more details...

BATCHELOR MAGNESIUM PROJECT - WINCHESTER
Mining (Open Cut) project In The Darwin City Council Area of Private ownership. Construction of a small pit and extraction of a sample of 2,000 tonnes approx for stockpiling and use as required for testing at Mintek pilot plant. Click for more details...

HARTS RANGE PROJECT-MOUNT RIDDOCH/KONGO/COPPER KING/COPPER QUEEN
Harts Range Project-Mount Riddoch/Kongo/Copper King/Copper Queen is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is A helicopter supported stream sediment sampling programme was completed in mid April as follow-up to the anomalous results returned from the 2002 reconnaissance programme. Click for more details...

GROUNDRUSH GOLD OPERATIONS - RIPCORD
Mining (Open Cut) project In The Alice Springs Town Council Area of Private ownership. A major drilling programme to test for both strike and depth extensions of the Groundrush deposit was completed during the June 2002 quarter. Drilling to test for extensions to the south of the current pit returned a number of positive results and assays on three diamond drill holes testing extensions to the north were also completed during the June 2002 quarter. All results will be incorporated into a review or mining options at Groundrush. The Groundrush open pit production was 371, 248 tonnes at 37.5g/t gold. Tanami plant throughput was 310,382 tonnes at 4.06g/t gold. Click for more details...

STANTON PROJECT
A project in the NT Within Roper Gulf Shire. Proposed as a small open cut to supply feedstock to the company's cobalt chemicals business in Newcastle, New South Wales. Following a scoping study carried out by an independent engineer, the board is considering Infill drilling to confirm the preliminary reports. timing of infill drilling is dependent on weather conditions and availability of contractors for this exercise. Click for more details...

BARROW CREEK PROJECT - NICKEL/COPPER RESOURCE
Mining (Exploration - Drilling) project at Via, Barrow Creek, NT 0872 of Resource - Nickel/Copper type of New development. Nickel, copper and silver mineralisation intersected over a strike extent of 800 metres. Click for more details...

DEPARTMENT OF THE CHIEF MINISTER GAS INDUSTRY CONSULTANCY
Gas Industry Attraction And Development - Consultancy Contract project at Various location in the Timor Sea, ., NT 8999 In The Council Area Of Offshore of Private. Gas Industry attraction and development consultancy for various locations in the Timor Sea. The consultancy involves providing the Office of Territory Development with specific information, analysis and advice in order for the government to promote the development of offshore gas reserves. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Onshore - oil & gas) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

MOUNT HARCUS PROJECT - VARIOUS MINERALS RESOURCE
South east of Pipalyatjara, 200 km from, Yulara, NT 0872 Has Mount Harcus Project - Various Minerals Resource currently at Exploration, Drilling, Survey & Assessment stage. The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

HOPEFUL STAR GOLD PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Barkly Shire is a project estimated to be $ 5000000. This project Hopeful star was previously worked mine and there is still visible gold present. Drilling is to target defined BIF and quartz vein mineralisations. Click for more details...

HALE RIVER URANIUM PROJECT - RESOURCE
Mining (Open Cut) New project at 90 km north east of, Alice Springs, NT 0872. This type is Resource - Uranium with Private ownership. A 10km strike length of identified redox boundaries, producing advanced targets for roll-front or sandstone-type uranium deposits have been identified at Hale River. Click for more details...

HALE RIVER URANIUM PROJECT - RESOURCE
Mining (Underground - including longwall) New project at 90 km north east of, Alice Springs, NT 0872. This type is Resource - Uranium with Private ownership. A 10km strike length of identified redox boundaries, producing advanced targets for roll-front or sandstone-type uranium deposits have been identified at Hale River. Click for more details...

BURNSIDE GOLD OPERATIONS - RISING TIDE - RESOURCE
Burnside Gold Operations - Rising Tide - Resource is currently at the Construction stage, valued at about $ 10000000 it is Inferred resource of 1,775,000 tonnes @ 1.8 g/t for 100,600 ounces of Au. Click for more details...

BURT PLAIN PROJECT - COPPER/GOLD/URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Alice Springs Town Council Area of Private ownership. High grade metamorphics of the Palaeoproterozoic Arunta Block crop out in the north-east part, and sporadically in the western part of the tenement. Aeoromagnetic and gravity information shows anomalies indicative of a huge iron oxide system. It is interpreted to be seven kilometres long by five kilometres wide, and is in places within 50 metres of the surface. This area has many attractive exploration attributes including the geophysical signature is comparable with that over the giant Olympic Dam deposit in South Australia. The prospect is trannsected by the Stuart Highway and Australasia Railway Line. Of particular interest is the U/Th ratio data, which shows a general correlation of elevated values with drainage patterns. Significantly the highest occur in the central eastern part of the tenement area, adjacent to inferred and mapped structures. This further expands the uranium exploration area to include roll-front deposits in palaeochannels incised in basement, and calcrete deposits. Click for more details...

BUSHY PARK JOINT VENTURE PROJECT - ENERGY MINERAL RESOURCE
A project in the NT Within Roper Gulf Shire. The area is potentially prospective for primary, hard-rock uranium, secondary, sandstone hosted and surficial calcrete-styles of mineralisation. Click for more details...

GILBA BORE PROJECT - URANIUM RESOURCE
Mining (Exploration - airborne surveys etc.) project at Bangemall Basin via, Alice Springs, NT 0870 of Resource - Uranium type of New development. The mineralisation style sought is unconformity-hosted uranium mineralisation, similar to Ranger and Jabiluka. No radiometric anomalies were found in the outcrops, however covered areas require further investigation. Click for more details...

MOUNT TODD MINE
Consultancy For Materials Source Assessment project at ., Darwin, NT 0800 In The Council Area Of Darwin City of State. Consultancy for Materials Source Assessment Click for more details...

BOOTU CREEK NORTH MANGANESE PROJECT
Mining (Exploration - Drilling) project at Approximately 110km North of, Tennant Creek, NT 0860 for New. The project tenement covers prospective ground along strike from the Bootu Creek mine within the same geological-structural corridor. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

EPS 253 & 286 AMADEUS BASIN OIL & GAS PROJECT NOT PUBLISHED
Private ownership Mining (Onshore - oil & gas) project In The Alice Springs Town Council Area for New development. A project in the vicinity of conventional oil & gas discoveries. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Mining (Onshore - oil & gas) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

NORTHERN GAS PIPELINE - SUPPLY OF COMPRESSOR STATION PIPE & FITTINGS
A project in the NT Within Various. For the provision of carbon steel, low temperature carbon steel & stainless steel pipe, fittings and flanges nominally sized from DN15 to DN 450. Click for more details...