SNAKE CREEK PROJECT - COPPER & GOLD RESOURCE
Private ownership Mining (Open Cut) project In The Cloncurry Shire Council Area for New development. The soil sampling by Xstrata Copper (previous JV partner) recorded numerous anomalous gold (up to 150ppb) and copper ( up to 757ppb) values. The infill sampling will define targets with potential to meet Glengarry's size parameters. Strongly anomalous uranium (248ppm) was recorded by on the rock ship samples associated with high gold (0.6g/t) and copper (8.6%) values. The Snake Creek Project is in the same geological province that hosts the Mary Kathleen uranium deposit approx 70 km to the west-north-west. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 of Electronic Tagging System type of New development. For underground monitoring of personnel and equipment. Safety item. Click for more details...

GERMAN CREEK COAL OPERATIONS - SOUTHERN COLLIERY
of Mining (Underground - including longwall) project at 15 km south of, Middlemount, QLD 4746. Production is currently 3.5 million tonnes per year of raw coal. Mining is undertaken in-house using Capricorn Coal personnel. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining (Open Cut) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

BURTON COAL OPERATIONS EXPANSION
Mining (Open Cut) project for New development. A terrace mining, truck & shovel open cut operation based on the Broadmeadows, Plumtree & Wallanbah pits. A project to increase production to over 2.5million tonnes per annum (Mtpa) through reopening of the original Burton pit including its deepening to 240m. Processing to continue through the existing central coal handling & preparation plant (CHPP) with 2 x 400tonnes per hour modules. Product coal trucked 36km south along the Mallawa haul road to a train loadout facility for export through the Dalrymple Bay Coal Terminal. Life-of-Mine (LoM) to be extended until 2016 while employing more than 500 people. Click for more details...

PL 192 (ATP-471) - MYALL BLOCK - CHURCHIE GAS PROJECT
Mining (Onshore - oil & gas) project at Surat Basin south east of, Roma, QLD 4455 for New. Churchie 4 is located on the producing Churchie gas field and is flowing at 7 million cubic feet per day through a 1 inch choke. This follows earlier discoveries at Churchie 2 and 3. The rig was at a total depth of 2123 metres on 8 January 2004 and the well was being prepared for rig release. The Churchie 4 results increase P reserves, which are the basis for marketing the gas. Click for more details...

MOUNT GARNET PROJECT - DRY RIVER SOUTH - BASE METALS RESOURCE
Mount Garnet Project - Dry River South - Base Metals Resource is currently at the Construction stage, valued at about $ 15000000 it is The proven and probale reserve for Dry River South is 1,051,000 tonnes at 8.2% zinc, 2.9% lead, 1.0% copper, 69 g/t silver and 0.65g/t gold . Inferred Resource is 1.559 million tonnes at 7.8% zinc, 2.8% lead, 1.0% copper, 68 g/t silver and 0.67 g/t gold. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Charters Towers Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 10000 it is The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Concrete capping up to $10,000. Cubic Metre rate per cap finished. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Equipment Hire project at Not Known, Charters Towers, QLD 4820 in the Mining (Underground - including longwall). The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Equipment Hire includes Backhoes, Skid Steer Loaders, Excavators (30 Tonne Class & 2 Tonne Class), Front End Loaders in 3-5 sq.m. and Motor Graders. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - VENTILATION SHAFT
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 for New. Work comprises the installation of the primary ventilation shaft. This will involve the excavation of the 2.4 metre diameter 110 metre long shaft and the installation of a second exit method from the underground workings. Click for more details...

SOUTH WALKER COAL MINE
Coal Mine - Initial Development project at Approx 25 kms west south west of, Nebo, QLD 4742 in the Mining (Open Cut). Suitable for open pit mining with soft overburden and relatively low stripping ratios. Click for more details...

NYMBOOL GOLD PROJECT - BLACKS CREEK - RESOURCE
Mining (Underground - including longwall) project at 120 km south west of Cairns & north west of, Mount Garnet, QLD 4872 for New. The Nymbool gold-copper prophyry system and associated gold mineralisation is located just north-west of the township of Mount Garnet. A small resource of low-grade gold (2.4 million tonnes grading 0.7g/t gold) has been outlined at the Nymbool Gold prospect but exploration is still at an early stage. Click for more details...

WA-235P
Resource Oil & Gas - Offshore project at Approximately 270 km northeast of Cape Bougainville, ., QLD 4999 in the Mining (Offshore - oil & gas). Primary objective of work in the area WA-235P of the Timor Gap is to test the Sandpiper sandstone, lower Flamingo & upper Plover formations. These formations have produced encouraging oil & gas shows in nearby wells. Click for more details...

HORSE CREEK PROJECT
via, Mount Isa, QLD 4825 Has Horse Creek Project currently at Exploration, Drilling, Survey & Assessment stage. BHP Billiton has completed a drilling programme to test seven Cannington style targets. Seven mud/diamond core holes were completed for a total of 2,450.6 metres. No visible mineralisation or alteration indicative of Broken Hill Style lead-zinc-silver mineralisation was intersected. Samples have been despatched for analysis and results should be available shortly. Click for more details...

MOUNT WINDSOR COPPER JOINT VENTURE - REWARD MINE
Mining Contract New project In The Charters Towers Regional Council Area. The contained copper in the Reward Supergene deposit is 61,000 tonnes, an increase of 25% over the previous estimate carried out in 1995. The project envisages mining the Reward deposit by open pit, trucking the ore to the Thalanga Mine to produce a 30% copper concentrate for sale to overseas smelters. A small oxide gold resource would be recovered during mining and probably treated by a local gold producer. Click for more details...

FORT CONSTANTINE SOUTH COPPER & GOLD PROJECT
Currently at the Early Planning stage In Cloncurry Shire is a project estimated to be $ 5000000. This project The Fort Constantine South Project is located 10 km south of the Ernest Henry Copper-Gold deposit and covers the same sequences and structures that host this deposit. Previous work focusing on magnetic anomalism has intersected strong alteration and anomalous copper mineralisation in drilling at several prospects. Click for more details...

ENTERPRISE COPPER MINE
Private ownership Mining (Underground - including longwall) project In The Mt Isa City Council Area for New development. A 710 m internal shaft from which the copper ore will be hoisted. The internal shaft sinking phase includes pre-project development and mullock removal from the exising Deep copper Mine. The internal shaft contract will include a raisebore, strip and line method, which involves drilling, stripping the shaft hole and concrete lining the 3.5 metre diameter shaft. The contract includes shaft development from 19B sub-level, which is the top of the internal shaft, to 31A sub-level, which is the bottom of the shaft. Skips at 30 level will hoist ore to 20 level, from where it will be transported to the surface using the existing shaft hoisting system. Once on the surface, the ore will undergo concentrating and smelting at the operation's smelting complex. Click for more details...

KESTREL COAL OPERATIONS
New project of Mining (Underground - including longwall) project at 49 km north east of, Emerald, QLD 4720. The mine is capable of annual production of up to five million tonnes of high quality metallurgical coal and high energy thermal coal for export markets in Asia and Europe. The lease contains 190 million tonnes of recoverable reserves, part of total coal resources of 289 million tonnes. The purchase includes the nearby Gordonstone West property, which has additional recoverable resources of 126 million tonnes. Click for more details...

ROSEBY PROJECT - COPPER/GOLD RESOURCE
Roseby Project - Copper/Gold Resource is currently at the Early Planning stage, valued at about $ 20000000 it is The exploration joint venture. The company is working towards delineating an open-pittable resource within the exploration area. Drilling at Bedford north and south continues to produce encouraging results. Assay results are pending for recently completed drilling at Burke & Wills. Additional drillig is required to test resources to depth of 200 metres approx. Click for more details...

MOUNT GORDON COPPER OPERATIONS
Mining (Underground - including longwall) project at 155 km north of, Mount Isa, QLD 4825 of Mine/Infrastructure type of New development. Resource estimate is 495,000 tonnes of contained copper metal. Recent drilling at the Mammoth deposit has increased the resource estimate and the mine life has now been extended to late 2008. Click for more details...

MANUMBAR GOLD PROJECT - RESOURCE
Resource - Gold New project In The Gympie Regional Council Area. A 10,000 metre RC drilling program will be conducted in two phases and target numerous prospects including the Elginvale and Manumbar projects. Click for more details...

OSBORNE COPPER/GOLD OPERATIONS
Underground Development - Phase 2 project at 150 km south of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. Possibly another two stages. Click for more details...

HAPPY VALLEY PROJECT- COPPER/GOLD RESOURCE
Mining (Open Cut) project at Approx 32 kms south south east of, Cloncurry, QLD 4824 for New. Includes four copper prospects - Mount Davis, Cut Snake, Sandy Creek and Consternation. Some sampling has ben undertaken. No significant results to date. Click for more details...

ATP-608P - ROOKWOOD - ONSHORE OIL/GAS RESOURCE
Atp-608p - Rookwood - Onshore Oil/Gas Resource is currently at the Construction stage, valued at about $ 10000000 it is Oil rate from Rookwood South 1 is 400 barrels per day. Rockwood East 1 has been completed as an oil producer. Click for more details...

CANNINGTON BASE METALS OPERATIONS - NORTHERN ZONE DEVELOPMENT
Mining (Underground - including longwall) project for New development. An increase in production from 2.25 million tones per annum to 2.4 million tonnes per annum. Includes mining into the northern zone, modifications to processing facilities and upgrades in infrastructure. The Northern zone will be accessed "off the decline". Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project at via, Charters Towers, QLD 4820 of Underground Development type of New development. Initial development at Warrior of a 900 metres decline. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
300 km west of Mackay via, Mount Coolon, QLD 4804 Has Drummond Basin Project - Wirralie currently at Early Planning stage. Assets include a 315,000 ounce gold resource at the Wirralie gold mine, three tenement packages totalling some 3,200 sqkm with excellent exploration potential and the Wirralie 1.5 Mtpa CIP treatment plant, infrastructure, administration buildings, Camp Yandan heap leach pad. The Wirralie treatment plant is currently on care and maintenance. The company plans to begin mining the relatively straightforward oxide ore and then using the time and cash flow to expand the suplhide resrouce base. The sulphide resource is beneath the oxide resource. Click for more details...

BOMBANDY PROJECT - BOMBANDY EXTENDED
Mining (Open Cut) project at 30 km south of Peak Downs Highway via, Nebo, QLD 4742 for New. Bombandy Extended is approximately 50km south of the Peak Downs Highway. This Permit competes the coverage of the Coxendean syncline feature. Exploration in the December 2001 quarter was designed to quantify a potential resource area on Wilunga and Bombandy stations where three seams, Leichhardt Lower 2 (4m), Leichhardt Lower 3 (2m) and Vermont Upper (4.5m), subcrop around the nose of a local synclinal block. The work is ongoing, but so far, slimcore drilling has defined 38 million tonnes of Inferred Resources between 50 to 100m of cumulative overburden and interburden. Click for more details...

CS ENERGY
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Gas Supply Contract type. An early delivery of 3 terrajoules per day will take plane in June, July, August and December 2004. Substantial delivery of 3PJ each year will begin in April 2005. The contract is for five years. Ther amount of gas can be increased by mutual consent to 4PJ per year. Click for more details...

CONDAMINE POWER STATION PROJECT - GAS FIRED
Gas Fired Power Station project at Warrego Hwy, 8Km east of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A proposed 135 Mw combined cycle gas turbine base load power station, connecting into the Chinchilla substation. Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

ANERINNA HILLS PROJECT - GOLD RESOURCE
Mining (Exploration - Drilling) project In The Richmond Shire Council Area of Resource - Gold type. A further 12 months of exploration is planned, including deeper drilling to the hard rock. Click for more details...

WOLFRAM CAMP PROJECT - TUNGSTEN MOLYBDENUM & BISMUTH RESOURCE
Private ownership Mining (Exploration - Drilling) project In The Tablelands Regional Council Area for New development. Total resources in Wolfram Camp were increased by some 45% to 876,500 tonnes measured plus indicated @ 0.41% WO3 and 0.20%MoS2 and inferred is 211,500 tonnes @ 0.4%WO3 and 0.3%MoS2. Infrastructure to include processing plant, pipeline and electrical. Click for more details...

ISAAC PLAINS SOUTH (IPS) COAL OPERATIONS
Mining (Open Cut) project for New development. A project to the south of Isaac Plains North operations. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION
A project in the QLD Within Isaac Regional. The project involves an expansion of the existing Goonyella Riverside open cut and the underground operations at Broadmeadow to increase the capacity from 16 Mt/a to 24 Mt/a. Mining and processing will yield a Hard Coking Coal product for the export market. The open cut expansion and underground expansions will result in an additional 5Mt/a and 3Mt/a of product coal respectively. The surface expansion will use the current open cut mining methods, which involve truck and shovel fleets and draglines exposing coal. Most of the open cut spoil from the expanded operations will be disposed of within mined out pits as is the current practice. However, it is expected that some of the spoil will need to be disposed of in out-of-pit spoil dumps. The existing Broadmeadow Mine, which extracts the Goonyella Middle Seam (GMS), will be expanded eastwards using either the conventional longwall mining practices currently being used for its operations or see the introduction of Longwall Top Coal Caving (LTCC) technology once its feasibility is proven as a means to improve the levels of resource recovery compared to conventional longwall mining methods. A second longwall mine is currently under investigation using either conventional longwall methods or LTCC method. The existing mine has much of the necessary infrastructure in place, however, there are infrastructure upgrades required for the expansion of the mine including: a new CHPP and upgrade to the existing CHPP; construction of an additional 66kV feeder adjacent to the present Goonyella 66kV line; expansion of the existing tailings storage facilities to accommodate increased tailings volumes; improvements to the existing mine water management system, including clean water diversion, disturbed area runoff collection and treatment, pit water management, water reuse and water disposal if there is surplus water at any time that cannot be reused on site. The expansion element of the project requires an additional coal preparation capacity of approximately 2 370 tonnes per hour (t/h) to achieve a production rate of 24 Mt/a. The options to achieve this throughput are to expand the existing CHPP's and/or build a new plant to supplement one or both existing plants. The new CHPP is likely to be tied into the existing product handling system. Alternatively a separate train load-out will be constructed on one of the existing rail loops. The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining (Open Cut) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

STYX BASIN COAL PROJECT
Mining (Underground - including longwall) project In The Mackay Regional Council Area of Private ownership. 14m aggregate seams outlined during recent coal seam gas exploration, high head values of 34kj/kg swell to 7 1/2, prospective belt is 3km wide 20km long on the west side of the basin. Target is open cut and underground coking coal. Click for more details...

WOOLGAR SOUTH PROJECT - URANIUM RESOURCE
Mining (Exploration - Drilling) project In The Flinders Shire Council Area of Private ownership. The area is showing an extensive train of uranium anomalism in uranium channel radiometric data over sediments and channels draining from unconformity style mineralisation to the North. The Company will test the channels for roll front style uranium mineralisation. Click for more details...

GREGORY PROJECT - URANIUM RESOURCE
Mining (Exploration - Drilling) project at 200km West of Townsville, North of, Mount Isa, QLD 4825 for New. The tenement has a strong structural control and is hosted by Proterozoic Einsaleigh meta-morphics which have been intruded by a series of fractionated Permian volcanics and comagmatic volcanics. The tenement covers the extension of a major fault zone - the Lynd Mylonite zone. Extrapolation of the major structure can be observed along strike both influencing geology and mineral occurences as 25km to theSW the Warren series of polymetallic workings show a similar structural influence but also exhibit a strong hydrothermal system. The scope here is for both secondary and primary style deposits. Click for more details...

MARY KATHLEEN SOUTH PROJECT - URANIUM RESOURCE
Mary Kathleen South Project - Uranium Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 2000000 it is The tenement currently has two target areas that display radiometric anomalism, and contain rocls from the same geological formation found at the Mary Kathleen mine. These targets are considered geologically prospective for uranium and it is planned to conduct further tests on this area. Click for more details...

KING EAGLE PROJECT - URANIUM/COPPER/GOLD RESOURCE
King Eagle Project - Uranium/Copper/Gold Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 2000000 it is The tenements cover potentially uranium-bearing Cambrian phosphatic units within the Georgina Basin. Large phosphorite deposits have excellent potential to contain depositional trap sites for uranium sourced from the Mt Isa Inlier. Click for more details...

WERRINGTON-OAK PARK JOINT VENTURE PROJECT - BASE METALS RESOURCE
Resource - Base Metals project at 50km South of, Kidston, QLD 4871 In The Council Area Of Etheridge Shire of Private. The tenement covers the Einasleigh Metamorphics that is considered prospective for world class Cannington and Broken Hill type lead-zinc-silver mines because part of the palaeoproterozoic metamorphics in the Georgetown block is correlated with Cannington and Broken Hill mine sequences. Click for more details...

HELIDON PROJECT - URANIUM RESOURCE
New project of Mining (Exploration - airborne surveys etc.) project at VIa, Helidon, QLD 4344. The target is conceptual uranium-enrichment settings. Click for more details...

MT RUBY PROJECT - IRON ORE RESOURCE
Private ownership Mining (Exploration - Drilling) project In The Tablelands Regional Council Area for New development. The tenement covers an outcropping hill of ironstone and surrounding zone of magnetite-rich float. The iron at the tenement comprises a magnetite skarn and the iron assays up to 69.48% Fe with low phosphorous and silica. On the western side of the hill, zones of higher garnet content (up to 30%) were observed, but the garnet should be easily removed by crushing and magnetic separation producing a high-quality iron concentrate. Click for more details...

THE PYRAMID PROJECT - GOLD RESOURCE
Resource - Gold project at 9km East of, Croydon, QLD 4871 In The Council Area Of Croydon Shire of Private. Six historic gold workings have been located within the tenement. Click for more details...

BARALABA COAL MINE - MINING CONTRACT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 30000000. This project The contract includes a fully integrated range of mining services including provision of a Senior site Executive, equipment, operators, maintenance, service & support, & drilling & blasting services. Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

HEY POINT BAUXITE PROJECT
A project in the QLD Within Weipa Shire. Development of an open cut bauxite mining operation with an expected mining life of approximately 3 years. To produce up to 4 Mt of product bauxite, exporting up to 1.6Mt per annum. Click for more details...