GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

MOUNT ISA MINES - BLACK STAR - OPEN CUT MINE
Open Cut Mine- Zinc/Lead project at North-west Queensland via, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Includes pre-stripping of waste ($22.5 million approx) and infrastructure ($5 million approx). Production is expected to be 1.5 million tonnes of ore per year to supplement the George Fisher underground. There is potential for further extensions to the mine. Click for more details...

COPPABELLA COAL OPERATIONS - CREEK PIT
Private ownership Mining (Open Cut) project In The Isaac Regional Council Area for New development. Mining services contract beginning when the Marion 8200 dragline becomes operational at end first quarter 2003 approx. Roche will refurbish and assemble the dragline, due to arrive in Mackay May 2002 approx. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Underground - including longwall) project at Via, Charters Towers, QLD 4820 of Electronic Tagging System type of New development. For underground monitoring of personnel and equipment. Safety item. Click for more details...

CLONCURRY COPPER PROJECT - RESOURCE
A project in the QLD Within Cloncurry Shire. A 1000 metre RC drilling program to depths of 150 metre will target Winston Churchill. Follow up drilling will then target Mount Debbie and Little Beauty. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Mining (Open Cut) project In The Whitsunday Regional Council Area of Private ownership. Preliminary feasibility study results show heap leach processing, rather than using existing plant could improve economics. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - BROADMEADOW
Underground Conveyors New project In The Isaac Regional Council Area. Coal Clearance Conveyors. The Drivers may be part of package. Ramp 4 (now renamed Broadmeadow) potential new underground off the highwall. Click for more details...

GERMAN CREEK COAL OPERATIONS - SOUTHERN COLLIERY
of Mining (Underground - including longwall) project at 15 km south of, Middlemount, QLD 4746. Production is currently 3.5 million tonnes per year of raw coal. Mining is undertaken in-house using Capricorn Coal personnel. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

BURTON COAL OPERATIONS EXPANSION
Mining (Open Cut) project for New development. A terrace mining, truck & shovel open cut operation based on the Broadmeadows, Plumtree & Wallanbah pits. A project to increase production to over 2.5million tonnes per annum (Mtpa) through reopening of the original Burton pit including its deepening to 240m. Processing to continue through the existing central coal handling & preparation plant (CHPP) with 2 x 400tonnes per hour modules. Product coal trucked 36km south along the Mallawa haul road to a train loadout facility for export through the Dalrymple Bay Coal Terminal. Life-of-Mine (LoM) to be extended until 2016 while employing more than 500 people. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Raise Bore project at Via, Charters Towers, QLD 4820 in the Mining (Underground - including longwall). A 150 metre raisebore, 2 metres approx. Angled. Click for more details...

CHARTERS TOWERS SHAFT REPAIR PROJECT
Charters Towers Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 10000 it is The Department of Mines and Energy has commenced capping abandoned mine shafts in the urban areas of the City of Charters Towers. Management of the project has been assumed by the Charters Towers City Council. Concrete capping up to $10,000. Cubic Metre rate per cap finished. Click for more details...

SOUTH WALKER COAL MINE
Coal Mine - Initial Development project at Approx 25 kms west south west of, Nebo, QLD 4742 in the Mining (Open Cut). Suitable for open pit mining with soft overburden and relatively low stripping ratios. Click for more details...

ROLLESTON COAL PROJECT
Mining (Open Cut) project In The Central Highlands Regional Council Area of Private ownership. An open cut thermal coal mine with two draglines as the prime waste stripping machines. Click for more details...

NEWLANDS COAL OPERATIONS - NORTHERN UNDERGROUND
Mining (Underground - including longwall) project at Via, Glenden, QLD 4743 for New. A punch longwall mine. The Northern Underground at Newlands is a proposed new longwall mine to replace production from the southern underground at end of the 2005 financial year. A punch longwall with access to longwall panels from the pit floor, eliminating the need to drive mains into the deposit. Peak expected production likely to be 7.5 to 8 million tonnes per year. Click for more details...

AURUKUN ALUMINA PROJECT - BAUXITE RESOURCE
A project in the QLD Within Weipa Shire. Preferred development is a mine based on the Aurukun bauxite resource, a washing plant at the mine site, and a new alumina refinery of at least 600,000 tonnes per annum output located in either Bowen, Townsville or Gladstone and all necessary supporting infrastructure and associated facilities. A resource of 480 Mt of dry beneficiated bauxite. Click for more details...

LILLEYVALE JOINT VENTURE PROJECT - IOCG RESOURCE
Lilleyvale Joint Venture Project - Iocg Resource is currently at the Early Planning stage, valued at about $ 2000000 it is The Company has identified a large & complex magnetic body that measures 4km x 3.4km & which is located under nearly 600m of cover. Click for more details...

ALICE RIVER GOLD MINE
Cape York Peninsula 140 km northwest of, Laura, QLD 4871 Has Alice River Gold Mine currently at Planning stage. The Company plans to produce gold from tailings, underpinned by pre-existing on site and fully operational infrastructure including: a CIP Processing Plant, a water supply dam, a Tailings dam with a capacity of approximately 200,000 tonnes, and accessibility by road and air. Accommodation units, laboratory, communications facilities are also included. Click for more details...

CRACOW GOLD PROJECT - RESOURCE
Operating Mine New project In The Banana Shire Council Area. Resource estimate is 3.6 Mt @ 10 gpt with reserves being 780,000 tonnes @ 12 gpt. Gold production for December Quarter 2006 was 29,000,000 tonnes @ 9.7 g/t for 8,400 ounces of Au. Development expenditure of $23 million for 2006/2007 includes a decline access to the sovereign shoot and towards the Empire and Sterling zones of mineralisation; decline development of the lower portion of Crown shoot and the lifting of the tailings storage facility. The recently discovered Kilkenny structure is located on the western side of this zone. Recent exploration at Cracow has been focused on drilling of Kilkenny, in addition to drilling on the Sovereign, Roses Pride and Empire shoots. Drilling of the Kilkenny structure defined two steeply plunging shoots of epithermal gold mineralisation. Gold is hosted within a lode structure similar to the Crown and Sovereign shoots. At June 2008, Newcrest calculated an Inferred Resource for Kilkenny (based on a cut off grade of 2.3 g/t gold) of 0.9 Mt at 7.1 g/t for 200,000 ounces. Click for more details...

HAPPY VALLEY PROJECT- COPPER/GOLD RESOURCE
Mining (Underground - including longwall) project at Approx 32 kms south south east of, Cloncurry, QLD 4824 for New. Includes four copper prospects - Mount Davis, Cut Snake, Sandy Creek and Consternation. Some sampling has ben undertaken. No significant results to date. Click for more details...

SARAJI COAL OPERATIONS
Exploration Drilling Programme project at via, Dysart, QLD 4745 in the Mining (Underground - including longwall). The potential longwall mine down-dip of the existing open cuts will not now proceed. The coal is likely to be mined by open cut methods using company personnel. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - RESOURCE
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 20000000. This project Resource estimate is 44.5 million ounces of silver. Measured resource is 7.37 million ounces, Indicated resource is 13.15 million ounces and inferred is 23.98 million ounces. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

KOGAN CREEK COAL/POWER STATION PROJECT
Mining (Open Cut) project In The Western Downs Regional Council Area of Private ownership. Proposed open cut coal mine and associated power station Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining (Exploration - Drilling) project at via, Charters Towers, QLD 4820 of Underground Development type of New development. Initial development at Warrior of a 900 metres decline. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
300 km west of Mackay via, Mount Coolon, QLD 4804 Has Drummond Basin Project - Wirralie currently at Early Planning stage. Assets include a 315,000 ounce gold resource at the Wirralie gold mine, three tenement packages totalling some 3,200 sqkm with excellent exploration potential and the Wirralie 1.5 Mtpa CIP treatment plant, infrastructure, administration buildings, Camp Yandan heap leach pad. The Wirralie treatment plant is currently on care and maintenance. The company plans to begin mining the relatively straightforward oxide ore and then using the time and cash flow to expand the suplhide resrouce base. The sulphide resource is beneath the oxide resource. Click for more details...

SOUTH WALKER CREEK COAL OPERATIONS
Mining (Exploration - Drilling) project at South of, Nebo, QLD 4742 for New. Mining services including in-pit drilling, coal sampling and analysis. CCI has established a testing laboratory at Moranbah. Click for more details...

TEXAS NORTH GOLD PROJECT - RESOURCE
Mining (Exploration - Drilling) project In The Goondiwindi Regional Council Area of Resource - Gold/Silver type. The Company is principally targeting silver and gold mineralisation similar to that discovered by Macmin at their Mt Gunyan and Twin Hills sites (Texas Silver Project). Click for more details...

MOUNT RAWDON GOLD & SILVER PROJECT - MOUNT SHAMROCK - RESOURCE
New project of Mining (Exploration - Drilling) project at West south west of, Bundaberg, QLD 4670. Soil sampling in the area, o a 200 metre by 50 metre grid, has defined two continuous zones of gold and arsenic anomalism at the 50 ppb gold contour. Each of these anomalous zones had dimensions of 900 metres by 150 metres, with a highest value of 8,430 ppb. Click for more details...

ATP 552 - BELLBIRD/BELLBIRD WEST - OIL & GAS RESOURCE
Mining (Onshore - oil & gas) project at Surat Basin near, Roma, QLD 4455 for New. ATP's 552/823P are approximately 5 km west of the Bellbird-1 well which flowed approximately 12 barrels of oil per day on test from tight Permian reservoirs when drilled in 1984. The prospects are located in the prospective oil-prone portion of the Surat Basin, approximately 12 km to the northeast of the Alton Oil Field. Click for more details...

ROCKLANDS COAL PROJECT
New project of Mining (Sample analysis, Laboratory testing) project at 50 km S of, Blackwater, QLD 4717. A project based on a resource estimate (inferred) of 700 million tonnes (Mt). Click for more details...

CAMEBY DOWNS COAL PROJECT - MINING CONTRACT - OPEN CUT
Mining Contract - Open Cut - Stage 1 project at 17km northeast of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. Mining will commence in the northeast corner of the site & progress in a westerly & southwesterly direction using strip mining methods at a rate of 1.8Mtpa. Initial activities to include clearing vegetation, topsoil stripping & stockpiling, overburden removal from the initial area to be mined & storage of the overburden in permanent overburden dumps. Coal extraction using excavators & trucks & progressive rehabilitation of overburden emplacement areas. Construction of surface water management structures to manage the quality and quantity of surface waters on the site including diversions, drains & sediment control dams. Storage of coal rejects & tailings in an appropriately designed & engineered Tailings Dam. Loading of coal product into a dedicated rail loading facility for transport off-site to the Port of Brisbane. McMahon's stage1 contract includes planning, mine development, waste stripping, coal mining, coal preparation & train loading. Click for more details...

BLACKBRAES PROJECT - URANIUM RESOURCE
80km South of Oasis via, Croydon, QLD 4871 Has Blackbraes Project - Uranium Resource currently at Exploration, Drilling, Survey & Assessment stage. The exploration targets include uranium, gold and base metal occurences within units of the Einasleigh Metamorphics and younger igneous units of the Georgetown Block. The potential for Kidston style sub-volcanic breccia systems exist. A small uranium occurrence also falls within the area indicating prospectivity for Maureen style hydrothermal uranium, thorium and flourine mineralisation. Additional potential occurs for roll front or palaeochannel style uranium mineralisation within overlying Mesozoic units. Click for more details...

HANDLEBAR HILL ZINC & LEAD PROJECT
Mining (Open Cut) project In The Mt Isa City Council Area of Private ownership. Recent drilling, metallurgical testing and design has confirmed a 3.4 million tonne open pit reserve in an area south of the George Fisher underground mine. Ore will be mined at a rate of up to 1.75 million tonnes per annum, crushed at George Fisher and trucked to the Mount Isa zinc-lead concetrator from mid 2008. The concentrator is currently being expanded from 6.5mtpa to 8mtpa. The open cut mine has an expected life time of two and a half years with the potential for underground mining operations into the future. Click for more details...

BOWEN PROJECT - GOLD RESOURCE
Bowen Project - Gold Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 2000000 it is The tenements are prospective for gold. Primary exploration targets include porphyry-related bulk tonnage gold deposits and epithermal gold-silver deposits. The tenements have 18 distinct gold-silver-copper discoveries, with the potential for a Carlton Hill-style deposit. Previous drilling yielded an intersection of 8m @ 3.2 g/t gold, including 1m @ 15.4 g/t gold. Click for more details...

CURRAGH COAL OPERATIONS EXPANSION
Mining (Open Cut) project In The Central Highlands Regional Council Area of Private ownership. The proposal will release approximately 33.6Mt of ROM coal reserves which is within the current Blackwater Creek Corridor. Infrastructure requirements will include a new services corridor of 20m width which will be established to provide for the relocation and installation of infrastructure and utility services. The services corridor will be located on the mine side of the diversion channel, 50m from the diversion batters. Existing 66kV and 22kV electricity distribution lines will require relocation to within this corridor. Additional light vehicle access roads will be established within the Curragh East Mining Lease. The 2.4km relocation and extension to the existing haul road on the mining leas will allow the transfer of ROM coal to the existing CHPP. Progressive rehabilitation works would commence in November 2008 and will run concurrently with the construction works. Blackwater Creek is proposed to be diverted from its current alignment to a newly constructed channel alignment. The diversion channel will be constructed using large earthmoving equipment. The total volume of cut material require to construct the channel is estimate at approximately 16 million bank cubic metres (MBCM) and the total volume of fill would be approximately 0.7 MBCM. The channel will be constructed on a single grade of 0.143% over a length of 10.2km, which is some 800m longer than the existing creek route, eliminating the need for the current drop structure. Approximately 6.1km of levee, including diversion embankments, will be constructed as part of the proposal, with batter 1V to 3H on the water and dry side and with 10m crest width. Diversion embankments will be constructed upstream and downstream to enable the diversion of to be achieved and to prevent the potential inundation of the future working coal pits. The low flow channel will be lined with clay material in some sections of the creek to provide a low permeability layer. The creek diversion will be topsoiled and appropriately vegetated over the total disturbed profile. Click for more details...

HELIDON PROJECT - URANIUM RESOURCE
New project of Mining (Exploration - airborne surveys etc.) project at VIa, Helidon, QLD 4344. The target is conceptual uranium-enrichment settings. Click for more details...

MT RUBY PROJECT - IRON ORE RESOURCE
Private ownership Mining (Underground - including longwall) project In The Tablelands Regional Council Area for New development. The tenement covers an outcropping hill of ironstone and surrounding zone of magnetite-rich float. The iron at the tenement comprises a magnetite skarn and the iron assays up to 69.48% Fe with low phosphorous and silica. On the western side of the hill, zones of higher garnet content (up to 30%) were observed, but the garnet should be easily removed by crushing and magnetic separation producing a high-quality iron concentrate. Click for more details...

THE RETURN GOLD & BASE METALS PROJECT
Resource - Gold/Base Metals New project In The Etheridge Shire Council Area. A number of historical workings have produced significant amounts of gold, silver, lead and copper. Click for more details...

GREENVALE EAST GOLD TIN TUNGSTEN PROJECT
New project of Mining (Open Cut) project at 170km west-northwest of Townsville via, Greenvale, QLD 4816. The tenement area contains 14 known mineralised occurrences, including old workings that have produced modest volumes of tin tungsten and gold. Click for more details...

KUNIOON CONSULTANCY FOR COST REVIEWER OF SURFACE MINE INFRASTRUCTURE
Mining (Underground - including longwall) project In The South Burnett Regional Council Area of Consultancy For Surface Mine Infrastructure Cost Reviewer type. To provide services as a Cost Reviewer as to provide an independent review of detailed cost estimates that will be prepared by a third party, to support its business case for the development of a new coal mine at Kunioon in the South Burnett region. The Cost Reviewer will provide independent review and advice to Tarong Energy with regards to the completeness and accuracy of the cost estimates. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

VOMACKA BASE METALS PROJECT
Resource - Base Metals project at 35 km s-w of, Charters Towers, QLD 4820 In The Council Area Of Charters Towers Regional of Private. Resource estimate (inferred and indicated) 743 000 tonnes grading 4.7% zinc, 1.8% copper, 1.4% lead, 0.5g/t gold and 46g/t silver. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining (Underground - including longwall) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

MOUNT RAWDON GOLD & SILVER OPERATIONS EXPANSION
New project of Mining (Open Cut) project at Swindon Rd 15km southeast of, Mount Perry, QLD 4671. Open cut operations based on resource estimates of 56.7 million tonnes(Mt) containing 1.276 million ounces (Moz) of gold & 37.2Mt containing 2.87 Moz of silver. Extension of the life-of-mine (LoM) through stage 4 cut back of the existing open pit. Associated development of a second waste rock dump (West Dump) & new mine water dam. Click for more details...

ISAAC PLAINS COAL OPERATIONS - MINING SERVICES CONTRACT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 249000000. This project A 3 year mining services contract at a rate of 2.7 million tonnes (Mt) of run-of-mine (ROM) coal. To include dragline operations & supply & maintenance of mobile plant & equipment. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Mining (Onshore - oil & gas) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

GARBUTT DEPOT REDEVELOPMENT STAGE 2
Depot - Redevelopment - Stage 2 project at Dalrymple Rd (Lot 426, SP250843 & Lot 285, SP101947), Garbutt, QLD 4814 in the Mining (Onshore - oil & gas). Stage 2 of redevelopment works to the existing Ergon Energy oil handling facility depot at Garbutt. Works to occur over 3 sub-stages. Stage 2a & 2b - complete refurbishment of building 3 to include construction of staff amenities, lobby & reception area, work stations, workshop areas, offices, meeting rooms, quiet rooms, training rooms, utility rooms, breakout room with coffee station, kitchen & staff cafe, communications room, video editing suite, testing laboratories, first aid room, storage, mail room, hazardous materials storage & packing bay. Extension of existing mezzanine & installation of new lift, construction of additional wash bay & oil handling facility to provide 2 x 24000L tanks, pumps, hazardous substances enclosures & heavy & light fleet vehicle parking. To include construction of new internal roadways & demolition of canteen amenities building, 5 x underground storage tanks, bunded area & B14 awning. Stage 2c - demolition of buildings 5, 6, 7, 9, 10, 11, 14 & carports, 15, shed, demountable & existing gate house. Concrete pavements & pathways, carpet, glass doors, window blinds & black aluminium spike fencing. Associated electrical works, earthworks, stormwater draining, civil works & car parking. Click for more details...