HONEYMOON WELL NICKEL PROJECT - WEDGETAIL STAGE ONE- RESOURCE
Currently at the Early Planning stage In Wiluna is a project estimated to be $ 20000000. This project The study is to assess the viability of an underground mine based on the Wedgetail massive sulphide resource. The new resource estimate at Wedgetail is 650,000 tonnes at 6.6% nickel. Results from Harrier confirm continuity of the massive sulphide mineralisation. Click for more details...

REPUBLICAN GOLD/NICKEL PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Coolgardie is a project estimated to be $ 1000000. This project Equinox has completed a mobile metal ion soil sampling programme. Click for more details...

BONNIEVALE PROJECT
New project of Mining (Underground - including longwall) project at 10km north of, Coolgardie, WA 6429. Retrieval of the tailings and rehabilitation of the site will now be undertaken in-house. Historical gold mining and treatment has resulted in an estimated 10,000 tonnes of tailings being retained on the lease. Approximately half of the tailings are now contained within a vat having been partially leached; the remainder are in 1.5 metres high mounds. auger samples were analysed for gold using an aqua-regia digestion. From this work it is estimated that 4,500 tonnes at 0.7g/t gold is within the vat and 5500 tonnes at 1.3g/t gold remains un-retained in mounds. The bulk sampling was analysed using a cyanide leach method. It returned similar grades to the auger sampling for the tailings in the mounds, however the grades within the vat averaged 0.4g/t gold. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MOUNT NICHOLAS
Mining (Open Cut) New project at North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 390 Mt. The ore at Mount Nicholas will be benificiated. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed and shared at Mount Nicholas, Mount Lewin, Christmas Creek and Cloud Break will comprise a semi-mobile crusher; overland conveyors; haul road and or rail to benificiation plant; haul roads and access tracks; secondary crushers; screening plant; benificiation plant; iron ore product stockpile and train loading facilities; mobile plant and machinery workshop; construction of 132 kv transmission line to Newman with capcity upgrade at Newman or a 45 MW power station (to be provided and maintained by an external supplier); bulk hydrocarbon storage facility; explosive,detonater and magazines; Accommodation and camp facilities, administration and ancillary support facilities; concrete batching plant (during construction), 11 Glpa water supply from borefield supplemeted by mine dewatering; a reverse osmosis plant for portable water use. Click for more details...

KAMBALDA NICKEL OPERATIONS - NICKEL RESOURCE
Mining (Exploration - Drilling) New project at Via, Kambalda, WA 6442. This type is Minesite - Ongoing Exploration with Private ownership. Drilling programme for long south is planned for mid 2005. Encouraging drill results have been recorded in the resource extension drilling programme. Mineralisation at Victor remains open in many directions at Victor South. Click for more details...

BETA HUNT NICKEL PROJECT
Resource - Nickel New project In The Coolgardie Council Area. The project includes a remnant resource at the Hunt nickel mine and the developed but un-mined Beta nickel project. Access to the mine is via a portal situated on the northern shoreline of Lake Lefroy, 5 km by road from the WMC nickel concentrator. The Hunt deposit is accessed by a 4 km decline and has remnant blocks available for mining. The Beta deposit is accessed via a 2 km decline developed from the base of the Hunt decline. The Beta deposit is partially developed but is otherwise unmined and requires only pumping and rehabilitation to recommence production in the first quarter of 2004. The acquisition of the project is via a sub-lease associated with agreements and rights in relation to the mining of nickel. Targets within the project area that have the potential to significantly increase the resource base have been identified. Click for more details...

TEUTONIC BORE JV PROJECT - SNOWYS
40km north of, Leonora, WA 6438 Has Teutonic Bore Jv Project - Snowys currently at Exploration, Drilling, Survey & Assessment stage. A programme of 1,800 metres, 3 holes is planned. Two holes 100 metres apart will test the large STEP anomaly down dip of TBD-0304. One hole will test the large Step anomaly targeted by hole TBD-0306 in 2003 which was abandoned before reaching target depth. Click for more details...

MOUNT WELD PHOSPHATE PROJECT
Mining (Open Cut) project for New development. Possible open cut operation. Click for more details...

CAPRICORN NICKEL SULPHIDE PROJECT - RESOURCE
Mining (Underground - including longwall) project at 50 km southeast of, Newman, WA 6753 of Resource - Nickel type of New development. A strongly anomalous nickel and copper mineralisation was intersected at the Milipede prospect. Recent RC drilling returned promising results. Drill hole was 54m to 56m, width 2m returning 1.36% Ni. A fourth hole was drilled and a geophysical survey conducted 105 km east of Millipede prospect confirming the target is further to the west of the prospect. Follow up RC drilling is planned. Click for more details...

PLUMRIDGE PROJECT - COPPER RESOURCE
Resource - Copper/Nickel/Platinum Group Elements project at Approx 400 km east of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. A major airborne electromagnetic survey has identified a number of high priority targets coincident with magnetic anomalies under thin cover and extending over a strike length of 1.5 km. Click for more details...

BULLABULLING GOLD PROJECT
Resource - Gold project at 25 km west of Coolgardie,, Bullabulling, WA 6429 in the Mining (Underground - including longwall). Diamond Rose applications lie along strike (approx 5 km) to the north of the Phoenix, Dicksons, Bacchus and Griffin gold deposits and covers the same geological horizon. Immediately to the south (120m) of P15/4519 is the May Joy Gold Deposit and immediately north of P15/4521-4522 lies extensive gold in laterite. Click for more details...

MINJAR NORTH PROJECT - SILVERSTONE SOUTH
Resource - Gold New project In The Yalgoo Council Area. Intercepts have included 16 metres at 20.56g/t gold and 10 metres at 18.56g/t gold. A number of holes have been drilled below the base of the existing pit. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Mining (Onshore - oil & gas) project at Canning Basin, ., WA 6999 for New. Seismic Reprocessing Services and a Hydrocarbon Prospectivity Appraisal in the onshore Canning Basin. Click for more details...

MIITEL NICKEL OPERATIONS - MARINERS
New project of Mining (Underground - including longwall) project at 4 km north of, Kambalda, WA 6442. These include highly specialised pumps (oil & gas technology). Supply is expected to be negotiated with specialised suppliers. Also includes underground pumps which will also be negotiated with specialised suppliers. Click for more details...

EP 413 - JINGEMIA OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Irwin Council Area of Private ownership. The well intersected a hydrocarbon column of approximately 15m within the Dongara sandstone. The well was subsequently cased and cemented for production. Click for more details...

TENT HILL PROJECT
Mining (Underground - including longwall) project In The Halls Creek Council Area of Private ownership. Lag sampling programmes have returned anomalous gold-arsenic values from subcrop and shallow cover areas within the tenement. At Tent Hill North, gold values ranging from 2 to 5 ppb gold outline an area of subcrop covering approximately 5 square km, on a 200 x 200 metre sampling grid. At Tent Hill South, regional lag sampling has returned a zone of gold-arsenic-bismuth anomalism through shallow sand cover (approx 1 metre). Infill lag sampling is in progress and RAB/vacuum drilling will target the anomalous zones. The Tent Hill anomalies occur within interpreted Kookaburra-Larranganni stratigraphy. Click for more details...

KANOWNA BELLE GOLD OPERATIONS
Addition project of Mining (Underground - including longwall) project at 16 km northeast of, Kalgoorlie, WA 6430. Stage 3A is to involve a portal development & a decline from below the open pit floor (approximately 220m from surface). Mining to a depth of 360m will involve vertical haulage shaft & long-hole open stoping mining methods. The resource below 200m has been divided into two main categories. From 200m to 360m a total of 3.6mt grading 7.2gpt gold is estimated. Between 360m and 800m an inferred resource of 3.85mt at 5.5gpt gold has been estimated. Ore production is due to start in 1998 for a mine life of approximately 16 years at a rate of 1mtpa-1.25mtpa. Drilling to test mineralisation from 650m to 1,000m demonstrated encouraging widths and grades with best results including 27.5m (from 1,008m) grading 10.1gpt gold. Mining & haulage expected to utilise inhouse resources. Ore will be processed through the Joint Venture's refractory plant at Kanowna Belle. The decline is expected to extend to 760m to allow additional exploration & ore definition work to be conducted. This contract will include diamond drilling (28,000m), raise boring (1,400m) & decline (9,000m). Associated electricals to also form part of this tender. Click for more details...

ROWES FIND GOLD PROJECT
Rowes Find Gold Project is currently at the Planning stage, valued at about $ 15000000 it is These areas have potential to add mill feed to the Aldiss gold project. Resource estimate of 161 493 tonnes at 3.53g/t gold for 18 328 ounces gold. Click for more details...

MOUNT DIMER EXPLORATION PROJECT - GOLDEN SLIPPER/FRODO/LIGHTNING/SILVERWING
Resource - Gold project at 150 km northwest of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Two exploration drill programmes and a review of goechemical and geophysical data were completed over the mine leases during the quarter. In total, 7 underground exploration diamond drill holes for 1,177.9 m were undertaken on lode extensions on Lo3 and to follow up a near surface intercept on 9 metres at 21.2 g/t gold on the Silverwing prospect. A drill programme comprising 38 angled holes and totalling 2,587 m was completed on the Anomaly 2, EMI, Lo5, Ultramafic Contact and Silverwing prospects. This drill programme was designed to further evaluate prospect areas known to have the potential to host economic open pit mineralisation within a 600 metre radius of the Lo2 open pit. This drilling mainly confirmed narrow Mt Dimer lode structures. The current exploration activities on the Mount Dimer mine leases are directed toward the generation of new supergene exploration targets in the Frodo, Golden Slipper and Karli West regions. Reprocessing of existing Mt Dimer aeromagnetic survey data resulted in the delineation of several targets coincident with areas of high soil geochemical response and in keeping with the revised geological model. Click for more details...

MOUNT CRAWFORD PROJECT - GOLD RESOURCE
New project of Mining (Open Cut) project at Approximately 4 km northeast of, Laverton, WA 6440. A 28 hole Rotary Air Blast drilling programme for a total depth of 851m has been completed. Many of the drill holes intersected anomalous gold values and the anomaly defined by Oxania's earlier work has been shown to extend further to the south. Highest gold intersections include 4m at 0.20 g/t Au from 29m, 4m at 1.21 g/t Au from 28m and 9m at 0.78 g/t Au from 42m (incl. 2.86 g/t Au at 42-43m, and 2.09 g/t Au at 46-47m) Click for more details...

HOPE DOWNS IRON ORE PROJECT
Currently at the Construction stage In East Pilbara is a project estimated to be $ 2000000. This project Includes dust monitoring geotechnical work, monitoring bores for extended pump test. Click for more details...

NORSEMAN GOLD PROJECT - RESOURCES
Mining (Exploration - Drilling) New project at 4 km south of, Norseman, WA 6443. This type is Resource - Gold with Private ownership. A resource estimate of 584,000 tonnes @ 2.2 g/t au for 41,300 ounces of gold for Iron duke and 418,100 tonnes @ 1.8 g/t au for 24,200 ounces of gold for Suprise. Click for more details...

MAGGIE HAYS NICKEL OPERATION - RESOURCE
Currently at the Construction stage In Dundas is a project estimated to be $ 20000000. This project A change in mining method to sub level caving is expected to increase annual production of nickel concentrate and extend the mine life until 2009. Three kilometres from the Emily Ann nickel mine. Click for more details...

ELLENDALE PROJECT - ELLENDALE NORTH
Ellendale Project - Ellendale North is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is Kimberley signed a farm-in agreement with Diamond Mines Australia Pty Ltd to allow flying of a 275 square kilometre survey using the Falcon Airborne Gradiometer System [Falcon "TM"]. Click for more details...

ENEABBA MINERAL SANDS OPERATIONS - ADAMSON - RESOURCE
Currently at the Construction stage In Carnamah is a project estimated to be $ 10000000. This project Resource estimate 17.47 million tonnes of ore @ 4.0% HM for 706,000 tonnes of contained HM. HM assemblage is 40% Ilmenite, 19% Zircon and 6% Rutile and 17% Clay. Measured resource is 6.42 Million tonnes of ore @ 4.3% HM for 274,000 tonnes of contained HM. Click for more details...

KANOWNA BELLE GOLD OPERATIONS - TROY SHOOT
A project in the WA Within Kalgoorlie-Boulder. Orebody definition drilling programme Click for more details...

COSMOS NICKEL OPERATIONS - ANOMALY 1 - RESOURCE
Cosmos Nickel Operations - Anomaly 1 - Resource is currently at the Early Planning stage, valued at about $ 5000000 it is Resource estimate is 53 Mt @ 0.62% Ni for 328,000 tonnes of contained nickel metal. The measured and indicated estimate is 41 Mt @ 0.65% Ni for 265,000 tonnes of contained nickel. Click for more details...

SHERLOCK BAY PROJECT - SYMONDS/DISCOVERY
Private ownership Mining (Underground - including longwall) project In The City Of Karratha Council Area for New development. A programme to expand the current resource position is planned. This will target both underground and open pit potential. The company plans to extend the initial 4 year mine life. Click for more details...

SAND GEORGE JV GOLD PROJECT - MINING CONTRACT
Mining (Underground - including longwall) project In The Kalgoorlie-Boulder Council Area of Private ownership. Mining is not expected to begin until early 2006. Click for more details...

NEW WATTLE DAM GOLD PROJECT
Mining (Open Cut) project for New development. The Western Zone is characteristically lower grade (1.8 to 2.5 g/t Au) and displays less alteration and shearing than the Eastern Zone. The two zones appear to coalesce to the north and south of the pit. Resource estimate of 226 500 tonnes at 18.0 g/t gold for 130 900 ounces gold. Click for more details...

CLINKER HILL GOLD PROJECT - RESOURCE
Mining (Underground - including longwall) New project at 35 km east south east of, Kalgoorlie, WA 6430. This type is Resource - Gold with Private ownership. Drilling on P25/1693 intersected a 30m thick black shale unit which returned a best result of 12m averaging 0.35% copper, 11.5gt gold and 100g/t arsenic. A costean sample from the Platinum Group Elements anomaly returned 2m at 1.1g/t platinum and 0.57g/t palladium. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - GLADSTONE - RESOURCE
Currently at the Construction stage In Dundas is a project estimated to be $ 10000000. This project Indicated resource is 482,000 tonnes @ 3.4% for 52,700 ounces of gold and inferred resource is 297,000 tonnes @ 5.5% for 52,500 ounces of gold. Click for more details...

ELLENDALE DIAMOND PROJECT - ELLENDALE PIPE 12/ELLENDALE PIPE 13 - RESOURCE
Ellendale Diamond Project - Ellendale Pipe 12/Ellendale Pipe 13 - Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 2000000 it is Six drill targets have returned geochemical assay results displaying lamproite affinities. New lamproite fissure intrusions are likely and further testing will be undertaken. Two large pipes are being prepared for bulk sampling. Six million tonnes of tuffaceous lamproite was identified in Ellendale Pipe 13 in Terrace 5 headwaters. Click for more details...

TOM PRICE IRON ORE PROJECT - NAMELESS
Mining (Exploration - Drilling) New project at 5 Km North West of, Tom Price, WA 6751. This type is Resource - Iron Ore with Private ownership. Reconnaissance mapping and sampling at the project has identified channel fill pisolitic iron mineralisation over a strike length of approximately 15 kilometres. Click for more details...

GOAT PADDOCK DIAMOND PROJECT - RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In Halls Creek is a project estimated to be $ 2000000. This project Detailed ground magnetic and gravimetic surveys carried out have demonstrated an internal magnetic anomaly (1.5km in diameter) disposed within the much larger topographic anomaly or crater structure (5kms in diameter). This anomaly is interpreted to reflect a 'melt pool' related to a meterorite impact or a sub-volcanic intrusive possibly related to a kimberlitic diatreme. Click for more details...

CHARON WA-392-P PROJECT - OIL & GAS RESOURCE
Charon Wa-392-P Project - Oil & Gas Resource is currently at the Early Planning stage, valued at about $ 5000000 it is The proposed seismic survey will map the sub surface geology of the survey area via the acquisition of 3D seismic data. The survey operations will be undertaken by a specialised seismic survey vessel towing seismic equipment along pre-determined grid. The purpose of the survey will be to evaluate potential sub-surface oil and gas deposits. Click for more details...

ATLANTIS PROJECT - URANIUM RESOURCE
Mining (Exploration - airborne surveys etc.) project for New development. The project area is located at the south-eastern end of the Ashburton Trough and is marked by the presence of an open, westerly-plunging anticline. Previous surface sampling has returned values up to 37% U3O8. Significantly, the extension of the anomaly in the northwest end of the tenement does appear to be limited by the outcropping unconformity, highlighting the potential for undercover mineralisation of that area. Click for more details...

LAKE DARLOT PROJECT - URANIUM RESOURCE
Private ownership Mining (Exploration - Drilling) project In The Leonora Council Area for New development. The prospect comprises broad calcareous sedimentary deposits estimated to be up to 10 metres thick at the margins of Lake Darlot. The calcareous sediments have been identified as being enriched by uranium by precipitation from drainage inflows from nearby catchments that host "hot" granites (high uranium levels). Regional radiometrics data identified a broad zone of anomalous uranium in sediments that is approximately 7km long x 2.4km wide. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Mining (Onshore - oil & gas) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

SAINT IVES GOLD OPERATIONS EXPANSION - LAKE LEFROY
Operating Mine - Expansion project at 20km southeast of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. An open cut & underground mining operation based on June 2009 gold reserves of 5.6 million ounces contained in 30 million tonnes (Mt) of resources. A project to extend the Life-of-Mine (LOM) to 2014 by mining 778ha of saline Lake Lefroy & 22ha of riparian zone at the Pistol Club & Neptune localities. Continued use of central infrastructure including administration & engineering facilities, a 4.8Mtpa mill/CIP processing plant & a 2.3Mtpa heap leach processing plant with 3 associated 5.5Mt leach pads. New expansion infrastructure expected to include a fourth heap leach pad & a fourth tailings dam. Click for more details...

SHELL PRELUDE GAS FIELD - FLNG - MARINE STEAM BOILER
Private ownership Mining (Open Cut) project In The Broome Council Area for New development. For the provision of a marine steam boiler. Click for more details...

GREATER GORGON GAS PROJECT - DRILLING & COMPLETIONS - CORING SERVICES
Coring Services New project In The Ashburton Council Area. For the provision of coring services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM - OPERABILITY RELIABILITY & MAINTAINABILITY CONTRACTOR
Wheatstone Development Project - Offshore Platform - Operability Reliability & Maintainability Contractor is currently at the Construction stage, valued at about $ 15000000 it is For a operability, reliability and maintainability contractor. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - TRUNKLINE SECONDARY STABILISATION - ACCOMMODATION OFFSHORE
Private ownership Mining (Offshore - oil & gas) project In The Ashburton Council Area for New development. For the provision of offshore accommodation. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 & 4 PORT LANDSIDE & PORT MARINE - TANK HOPPER & BIN
Currently at the Construction stage In East Pilbara is a project estimated to be $ 2500000. This project For the supply of tank, hopper & bin. Click for more details...

ROY HILL IRON ORE PROJECT - PACKAGE 1 MINE PROCESS PLANT - TRAIN LOAD OUT
Train Load Out project at 110km north of, Newman, WA 6753 in the Mining (Open Cut). For the supply of a train load out system. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - COMPRESSED AIR
New project of Mining (Onshore - oil & gas) project at 110km north of, Newman, WA 6753. For the provision of compressed air. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - OFFSHORE PLUG & ABANDONMENT SERVICES
Private ownership Mining (Offshore - oil & gas) project In The Various Council Area for New development. TVI plug & abandon program offshore Western Australia comprising 22 offshore production wells on 9 monopods/tripods & one exploration well suspended at the mud line in water depths between 6.4 & 16 meters (Lowest Astronomical Tide). Click for more details...