SALLY MALAY NICKEL PROJECT
Currently at the Tenders & Building stage In Wyndham-E Kimberley is a project estimated to be $ 500000. This project Water pumps, process/reagent pumps bore pumps. Click for more details...

AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

YABULU NICKEL REFINERY EXTENSION - COOLING WATER TOWER CONTRACT
Mining - Civil Services (Power stations, Power generation) project at Refinery site at, Yabulu, QLD 4818 for New. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be augmented by the addition of a new cooling tower to cater for the additional heat loadings. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo currently at Construction stage. The main infrastructure requirements at the mine site include a High Voltage power supply. 66 kv transmission line. Click for more details...

NELSON POINT - IRON ORE
Nelson Point - Iron Ore is currently at the Construction stage, valued at about $ 250000 it is Works for the automation of dumper No: 1 to include programme logic controls, lighting, ladder racks, cable, limit switches & positioners. Additional definition to be attached to the scope of works. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Power stations, Power generation) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Includes pipes, crib rooms, escape rooms, ladder ways. Detailed mine plans have been completed for Warrior East and Sunburst laying out access, exploration and production drives, escapeways, drainage and ventilation connections. Click for more details...

ASHTON COAL PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Ravensworth, NSW 2330. 3.5km rail siding . Click for more details...

OAKDALE COLLIERY
Gas Drainage System For Coal Mine - Installation project at Burragorang Valley approx 80km south west of Sydney, Burragorang, NSW 2570 In The Council Area Of Wollondilly of Private. To reduce carbon dioxide levels. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area for New development. Contract to involve erection of two gas turbine generator sets. The new 75 megawatt power station is to utilise 2 x LM6000 aero engine derivative gas turbine units. First engine scheduled for operation in January 1996 with the second unit due mid 1996. Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

COWAL GOLD PROJECT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 45 km north east of, West Wyalong, NSW 2671. Includes production bores & pipeline across Lake Cowal. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

BATCHELOR MAGNESIUM PROJECT
Infrastructure project at Rum Jungle district 85 km south of, Darwin, NT 0800 in the Mining - Civil Services (Water distribution & pipelines, borefields). Following completion of the Stage one Feasibility study, locations were selected for each of the facilities necessary for development of the Project. All available technical data relating to each site was compiled and reviewed. Some further exploration drilling was carried out. Based on this review it has been concluded that the sites seem suitable for the assigned purpose. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

KOGAN CREEK POWER PROJECT - COMMUNICATION SYSTEM
A project in the QLD Within Western Downs Regional. Includes telephone system with PABX and hardwired and cordless telephones (cordless telephones must operate in the complete power plant area). Also includes an alarm response pocket pager system with on- and off-site pagers Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Inner Casing type. The Inner Casing main components consist of 6t, 3.2t Plate, Shape Steel, Bellow, etc. Material: Carbon Steel, Low Alloy Steel (Total weight) Approx. 200ton. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT 2 - RAIL & ROLLING STOCK
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes procurement of additonal rolling stock and additional railway to support the new mines and car dumper. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

MACARTHUR/BURDEKIN FALLS DAM TO NORTHERN BOWEN BASIN PIPELINE - PUMPS ET AL
A project in the QLD Within Isaac Regional. Supply, install and commission three 3.3KV submersible centrifugal Pumpsets, motors and Six 11KV horizontal double suction centrifugal Pumpsets including associated pipework and valves, control and communications equipment and cabling over four sites along the proposed Burdekin to Moranbah Pipeline. Click for more details...

LIDDELL POWER STATION - FIBRE OPTIC CABLES
Overhead/Underground Installation Of Fibre Optic Cables project at At, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the installation of four fibre optic cables in the areas surrounding the Bayswater and Liddell Power Stations. The four items of work are summarised as follows. Installation, termination and testing of a twenty-four core All Dielectric Self Supporting (ADSS) fibre optic cable between the Bayswater Cooling Water Make-up Pumping Station and the Liddell 33kV Switching Station. Secondly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the Liddell 33kV Switching Station and Liddell Power Station Administration Building.Thirdly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System Low Pressure Pumping Station (LPPS) and the River Pumping System High Pressure Pumping Station (HPPS). Lastly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System High Pressure Pumping Station (HPPS) and the Bayswater Power Station Administration Building. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - TRACKWORK
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Near, Newman, WA 6753. This type is Trackwork with Private ownership. Trackwork at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - RR CUBICLES/NE RESISTORS
Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753 for New. Rotor Resistance Cubicles and Neutral Earthing Resistors. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - POWER FACTOR CORRECTION UNITS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The East Pilbara Council Area for New development. Power Factor Correction Units. Click for more details...

LIDDELL POWER STATION - TURBINE/AUXILIARIES
Turbine/Auxiliaries - Overhaul Services project at Via Liddell, Muswellbrook, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Contract shall consist of 2 separable portions. Separable Portion 1 shall include all turbo-generator and feedheating plant overhaul work to be performed on Unit 1, the anticipated length of the outage is four (4) weeks. Separable Portion 2 shall include all turbo-generator and feedheating plant overhaul work required to be performed on Unit 3, the anticipated length of the outage is six (6) weeks. Click for more details...

COBURN MINERAL SANDS PROJECT - POWER STATION
Mining - Civil Services (Power stations, Power generation) project for New development. For a fixed build/own/operate power station located next to the Ilmenite Plant and mine office complex. This facility is to be based on diesel generators converted to run jointly on diesel and natural gas (duel fuel). Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - DIFFERENTIAL PRESSURE
Mining - Civil Services (Power stations, Power generation) project for New development. For the supply of pressure, differential pressure and flow. Click for more details...

LIDDELL POWER STATION - BOILER/TURBINE
Bolier/Turbine - Repair/Maintenance project at At, Liddell, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Boiler and Turbine Plant at Liddell Power Station has an extensive miscellaneous power and lighting (MP&L) system. This Specification covers the provision of labour hire services in the form of trades and non trades labour, materials and equipment as and when directed by the Principal, to undertake repairs and maintenance of the MP&L system at Liddell Power Station. Work may be required both during generating unit outages and at other times as required by the Principal. It is envisaged that a minimum of one (1) and a maximum of six (6) trades persons would be required at any one time. This number may however vary and the Principal makes no guarantee as to the extent of the work to be undertaken. Click for more details...

HAZELWOOD POWER STATION/COAL MINE - FACILITY MANAGEMENT SERVICE
Facility Management Service New project In The La Trobe Council Area. Civil and site services including security and emergency services. Click for more details...

CAMEBY DOWNS COAL PROJECT - MINING CONTRACT - OPEN CUT
Mining Contract - Open Cut - Stage 1 project at 17km northeast of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. Mining will commence in the northeast corner of the site & progress in a westerly & southwesterly direction using strip mining methods at a rate of 1.8Mtpa. Initial activities to include clearing vegetation, topsoil stripping & stockpiling, overburden removal from the initial area to be mined & storage of the overburden in permanent overburden dumps. Coal extraction using excavators & trucks & progressive rehabilitation of overburden emplacement areas. Construction of surface water management structures to manage the quality and quantity of surface waters on the site including diversions, drains & sediment control dams. Storage of coal rejects & tailings in an appropriately designed & engineered Tailings Dam. Loading of coal product into a dedicated rail loading facility for transport off-site to the Port of Brisbane. McMahon's stage1 contract includes planning, mine development, waste stripping, coal mining, coal preparation & train loading. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - PILOT POWER PLANT
Mining - Civil Services (Power stations, Power generation) project In The Unincorporated Council Area of Private ownership. For the development of a 1MW pilot generation plant. Click for more details...

SINO IRON ORE EXTENSION PROJECT - DESALINATION PLANT DOUBLE ENTRY REFER TO PROJECT ID 857138
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Cape Preston 80km southeast of, Karratha, WA 6714. Construction of groundwater bores, a 30 GLpa desalination plant, & the construction of seawater intake & brine disposal outfall. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - HIGH VOLTAGE ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Switchyard/Substation/Transmission Lines type of New development. Construction of a 132KV high voltage switchyard & associated transmission lines. Click for more details...

KENYA TO CHINCHILLA WEIR WATER PIPELINE (QCLNG WATER TREATMENT PROJECT)
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. 20 km underground pipeline. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

RANGER URANIUM OPERATIONS - BRINE CONCENTRATORS
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Arnhem Hwy 11km east of, Jabiru, NT 0866. This type is Brine Concentrators with Private ownership. Installation of brine concentrators with a capacity to treat up to 1.8 gigalitres a year to produce clean distillate able to be returned to a wetlands for filtering. Installation of 3 units in a row with the first two processing water from the tailings storage facility & the third one returning brine to that facility. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS & CENTRAL PROCESSING PLANTS
Compression Stations/Central Processing Plants New project In The Western Downs Regional Council Area. Construction & fabrication of 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at ., Curtis Island, QLD 4680 of Septic Pump Out type of New development. For the provision of Septic Pump Out Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

MATILDA GOLD MINE POWER STATION
A project in the WA Within Wiluna. Construction of 8MW gas powered generation, expandable to 12MW as the plant grows. Click for more details...