AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

HAZELWOOD COAL MINE/POWER STATION
Hazelwood Coal Mine/Power Station is currently at the Construction stage, valued at about $ 100000 it is Includes design, manufacture, factory testing, supply and delivery. Click for more details...

GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Civil Services (Power stations, Power generation) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Lot 1 on SP144277 Dawson Highway, Parish of Albina, via, Rolleston, QLD 4702 of Fuel Depot type of New development. Southern fuel depot at South Rail Camp. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

PILBARA PETROCHEMICAL PROJECT%
Infrastructure New project In The City Of Karratha Council Area. Likely to include power station, fresh water availability, roadworks & port facilities. Click for more details...

TARONG NORTH POWER STATION PROJECT
New project of Mining - Civil Services (Power stations, Power generation) project at Tarong Rd (adjacent to existing power station), Tarong, QLD 4615. Coal fired power station & supply 800-850 MW. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS
Water Pipeline New project In The Armidale Dumaresq Council Area. A utility pipeline/corridor between Gara dam and the mine. There are 2 options for the route of the pipeline. Polyethylene pipe. Trench installation. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes all earthworks, culverts, bridges, rail, sleeper and rolling stock requirements, with the exception of locomotives. These are continuing to be sourced internationally and may be added to this agreement. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Kogan Creek Power Station - Boiler House/Piping is currently at the Construction stage, valued at about $ 200000 it is Main Components Sheet: 0.42bmt zincalume: 10,000m2 Purline & Girts: Z300, Z250, 7,700m2 Total weight Approx. 350ton. Delivery date at site June 2005. Basic design by BHK. Detailed design, Material & Fabrication by Supplier. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Civil Services (Power stations, Power generation). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

JAGUAR BASE METALS PROJECT - TEUTONIC BORE - POWER STATION
Power Station project at 40 km north of, Leonora, WA 6438 in the Mining - Civil Services (Power stations, Power generation). Contractor has constructed and commisioned stage 1 of the power station. Future stages will be upgrades when the mine production ramps up. Click for more details...

CONDAMINE POWER STATION PROJECT - GAS FIRED
Gas Fired Power Station project at Warrego Hwy, 8Km east of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A proposed 135 Mw combined cycle gas turbine base load power station, connecting into the Chinchilla substation. Click for more details...

LIDDELL POWER STATION - MILL PYRITES
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. The supply and installation of new hydraulic pipelines and support structures from the Hydraulic Cabinets to the Mill Pyrites Hopper Isolating valves and Pyrites Spray Water Valves on Unit 1 A and B side, Unit 2 A side only and Unit 3 A and B sides. Installation of the new pipework will take place prior to outages. Cut over to the new pipework will begin during planned outages in Sept/Nov 2005, Dec/Jan 2006 and March/April 2006. Click for more details...

DAANDINE GAS PROJECT - POWER GENERATION FACILITY
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area for New development. Development comprises the construction of a 27.4 MW output power generation facility. The power plant will be fuelled by coal gas from the Daandine field. Click for more details...

LIDDELL POWER STATION - COAL PLANT MAINTENANCE
A project in the NSW Within Muswellbrook. The scope of works involves, Installation of 'M' Series Conveyor access walkways; Replacement of the roof above Conveyor 16 vibratory feeders and the installation of a deflector roof under Conveyor 19, to prevent coal falls onto Conveyor 16 roof; Replacement of missing roof sheeting to conveyor 19, installation of head end access platform to Conveyor 19, installation of grated flooring to an open area adjacent to conveyor 19; Repair of walkway cleats on 5AR, 5 BR, 6AR, 6BR Conveyor incline; Replate G3/G4 Hoppers; Fabrication and installation of G1/G4 work access platforms; Replate conveyor 12B Vibratory Feed Chutes; Fabrication and installation of Demin Tank access work platforms. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - EARTHWORKS/DRAINAGE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Private ownership. Formation Earthworks and Drainage at Weeli, Poonda, Yeerabiddy and Area C . Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - EAST YARD SUBSTATION
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - East Yard Substation currently at Construction stage. Substation with three seperable portions. Click for more details...

COBURN MINERAL SANDS PROJECT - POWER STATION
Mining - Civil Services (Power stations, Power generation) project for New development. For a fixed build/own/operate power station located next to the Ilmenite Plant and mine office complex. This facility is to be based on diesel generators converted to run jointly on diesel and natural gas (duel fuel). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - LOCOMOTIVES CONTRACT
Locomotives - Supply New project In The East Pilbara Council Area. To supply 15 Dash 9 CW44 locomotives. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Civil Services (Power stations, Power generation) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

TARONG POWER STATION PULVERISER TABLES
Pulveriser Tables - Refurbishment project at Maidenwell Rd, Tarong, QLD 4615 In The Council Area Of South Burnett Regional of State. Refurbishment of pulveriser tables to crush coal. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - FWRP HIGH VOLTAGE SWITCHGEAR
Mining - Civil Services (Power stations, Power generation) project for New development. FWRP High Voltage Switchgear. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Power stations, Power generation) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining - Civil Services (Power stations, Power generation) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

LIDDELL POWER STATION - ACCESS PLATFORMS & WALKWAYS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the design, documentation, construction, manufacture, supply, installation, repair, maintenance and modification of fixed platforms, walkways, stairways and ladders on the power station site as directed by the Principal. The plant access ways require modifying at places to provide safer access to items of equipment such as valves. The Contract shall be for a period of one year from the awarding of the Contract by the Principal. Click for more details...

LIDDELL POWER STATION - UPPER HUNTER POWER STATION EMISSION MONITORING
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Flue Gas Emission Monitoring type. Work comprises the Flue Gas Emission Monitoring for Bayswater and Liddell Power Stations as and when directed by the principal, for a two year period from the date of issue of the contract with an option to extend for a further two year period. Work specifically comprises Oxygen (O2) and Carbon Dioxide (CO2) Testing at Bayswater Power Station, Carbon Monoxide (CO) Testing, Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NOX) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride, Sulphuric Acid Mist and Sulphur Trioxide Testing, Sulphur Dioxide (SO2), Temperature (0C), Velocity and Volumetric Flowrate Testing, PM2.5 Testing, Dioxins, Furans and Polychlorinated Byphenyls Testing Volatile Organic Emissions Testing, Benzo(a)pyrene (equivalent) Testing at Bayswater Power Station. For Liddell Power Station: Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content of Stack Gases Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NO2) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride Testing, Sulphuric Acid Mist, Sulphur Dioxide and Trioxide Testing, Temperature (0C), Velocity and Volumetric Flowrate Testing, Dioxins and Furans Testing, Volatile Organic Emissions Testing. Click for more details...

LIDDELL POWER STATION - CRANE MAINTENANCE & INSPECTION
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Cranes - Periodic Inspection & Maintenance type. Periodic and major inspections of cranes including maintenance. Click for more details...

MOUNT ARTHUR UNDERGROUND COAL PROJECT - SITE SERVICES
Mining - Civil Services (Power stations, Power generation) project at Approx 3 km south west of, Muswellbrook, NSW 2333 for New. Site services required will include powerlines, potable water pipelines, mine water and groundwater pipelines, a water extraction point on the Hunter River and a clean water pipeline and minor access roads and other such minor infrastructure within the project mining leases. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - SANDING PLANT
Currently at the Tenders & Building stage In East Pilbara is a project estimated to be $ 600000. This project For the supply of a sanding plant. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

SPRINGVALE COAL OPERATIONS - RAILWAY SIDING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at 16km northwest of, Lithgow, NSW 2790. This type is Railway Siding - Construction with Private ownership. Construction of a new siding at the existing Lidsdale siding which has a coal loading capacity using front end loaders of 2million tonnes per annum (Mtpa). Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

MIDDLEMOUNT COAL OPERATIONS - STAGE 2 EXPANSION
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Isaac Regional Council Area of Operating Mine - Expansion type. A pulverised coal injection (PCI) & coking coal open cut mine based on an estimated resource of 122.6million tonnes (Mt). The stage 2 expansion project to increase production from 1.8million tonnes per year (Mtpa) to 5.4Mtpa of run-of-mine (RoM) coal for 23 years. Removal of overburden & coal to continue by conventional truck, shovel & excavator. To includes a 30kL/day package potable water treatment plant (WTP), a sewage treatment plant (STP), the 650m x 200m go line area (including office, crib facility, amenities, kitchen/dining area), flood protection levees & diversion of Roper Creek & Thirteen Mile Gully. Later upgrading of feed conveyors, coal stackers, screens, valves & control systems of the existing coal handling & preparation plant (CHPP) to increase capacity from 400 to 700 tonnes per hour (t/h) for 4Mt/y product coal. Extension of the existing vehicle workshop to include 4 additional covered & 2 outdoor bays with aprons. Additional 600,00l diesel & 1.2ML fuel storage facilities. Associated out-of-pit spoil dumps & additional haul/access roads. Possibility of a dragline & associated 200m x 200m construction pad. Later diversion of part of the Bingegang (Saraji) pipeline. Some of the additional 397 operational personnel expected to be accommodated in an extension to The MAC Middlemount village. Click for more details...

PROMINENT HILL COPPER GOLD OPERATIONS - WATER SUPPLY UPGRADE
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 100km southeast of, Coober Pedy, SA 5723. A project to allow the 1200tph mill work in a range of throughput rates by upgrading the existing 15 water production wells & drilling an additional one. Optimisation also of the well field including variable speed drives & upgrading well headworks, electrical controls & the operating system. Click for more details...

MANGOOLA COAL OPERATIONS - 500KV TRANSMISSION LINE RELOCATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Muswellbrook Council Area for New development. A project to enable more efficient Mangoola coal mine operations & so reduce the Life-of-Mine (LoM) from 21 to 15 years. Decommissioning of a 9km section including 25 towers of the Bayswater to Mt Piper 500kV electricity transmission line which bisects the coal mine site. Construction of a replacement 11km line including 32 new transmission towers (8 tension & 24 suspension) on 25x25m bases along the western boundary of the project's target deposits (Upper Pilot, Fassifern & Great Northern Seams of the Newcastle Coal Measures). Click for more details...

CAVAL RIDGE COAL PROJECT - WATER INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at 16km south of, Moranbah, QLD 4744. This type is Water Diverson & Collection/Sewerage Treatment with Private ownership. The mine water management system to include clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if there is surplus water at any time. Sewerage and wastewater treatment by packaged sewerage treatment plant (STP). Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

GROSVENOR COAL PROJECT - ELECTRICAL TRANSMISSION SYSTEMS
A project in the QLD Within Isaac Regional. A contract including design, engineering, testing & project commissioning for electrical transmission equipment & systems. Supply of a 66kV substation, power & distribution transformers, 15 modular pre-fabricated switchrooms equipped with medium-voltage switchgear along with low voltage motor control centres, power quality systems & multi-drive variable speed drives. Supply also of an automation system to integrate & control all processes & power systems to enhance productivity. Click for more details...

YARNIMA CCGT POWER STATION POWER BLOCKS CONSTRUCTION
New project of Mining - Civil Services (Power stations, Power generation) project at At, Newman, WA 6753. Construciton of the main power blocks for the power station. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - RETRACTABLE ROOF
Retractable Roof New project In The Darwin City Council Area. Design, fabrication & delivery of a motorised retractable roof (28m long x 16m wide x 1.5m high) to prevent rainwater entering an evaporation pond. Click for more details...

MOUNT CARLTON GOLD SILVER & COPPER PROJECT PIPELINE
Pipeline project at 45km north-northwest of, Collinsville, QLD 4804 In The Council Area Of Whitsunday Regional of Private. Proposed construction of 225mm subterranean HDPE pipeline & associated pumping infrastructure to carry river water from the Burdekin River to the main site water dam at Mount Carlton mine for use in processing. The pipeline will be approximately 36km long. Click for more details...