List of Mining - Civil Services⊂category= Projects in NSW®ion= in region


COONARAH GAS PROJECT
Currently at the Construction stage In Narrabri is a project estimated to be $ 5000000. This project 10 x 1MW container mounted Jenbacher Gas Engine Generator sets, with all ancillary transformers, switchgear, control systems and cabling. The Austrian built Jenbacher engines are purpose built gas engines. the equipment is available on short delivery, and the target date for commissioning is January 2004. Click for more details...

REDBANK II POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Kurri Kurri to Redbank II site near Bulga mine complex,, Singleton, NSW 2330 of Transmission Lines - Construction & Upgrading type of New development. 132 kv transmission line from Redbank 2 power plant site (near Bulga Coal Mine) to an existing 132kV transmission line on the Putty Rd (5km); uprating of existing 132kVtransmission line from the existing Redbank 1 power plant to Kurri Kurri substation and replacement of an existing overhead earth wire from Kurri Kurri to the VAW aluminium smelter. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo currently at Construction stage. The main infrastructure requirements at the mine site include a High Voltage power supply. 66 kv transmission line. Click for more details...

WAMBO COAL OPERATIONS - RAILWAY & BRIDGEWORKS
Railway/Bridgeworks project at Mount Thorley to Jerrys Plains Rd Wambo, Jerrys Plains, NSW 2330 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Rail link from Mt Thorley to United Collieries mine Wambo. Bridges, rail underpass. Click for more details...

ASHTON COAL PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Ravensworth, NSW 2330. 3.5km rail siding . Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

COONARAH GAS PROJECT
10 Mw Power Station - Boot Contract project at At Wilga Park, midway between the Coonarah Gasfield and, Narrabri, NSW 2390 in the Mining - Civil Services (Power stations, Power generation). Includes design, installation, operation and maintenance of a 10MW power station fuelled by Coonarah Gas via a tolling agreement for three years, with an option for Eastern Star to purchase the complete station and take over operations at the end of the initial term. The site will now be at Wilga Park, which removes the need to build a new 22v transmission line from west Narrabri to the north east of Narrabri, but requires a new 66kv transformer and circuit protection at the power station site. Click for more details...

OAKDALE COLLIERY
Gas Drainage System For Coal Mine - Installation project at Burragorang Valley approx 80km south west of Sydney, Burragorang, NSW 2570 In The Council Area Of Wollondilly of Private. To reduce carbon dioxide levels. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS
Water Pipeline New project In The Armidale Dumaresq Council Area. A utility pipeline/corridor between Gara dam and the mine. There are 2 options for the route of the pipeline. Polyethylene pipe. Trench installation. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

LIDDELL POWER STATION - GENERATOR TRANSFORMER/REWIND
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Generator Transformer/Rewind - Supply type of New development. The contract involves the removal of the transformer to the contractors work site. The transformer is a 585 MVA, 22/350 kV generator, 200 t in weight. Carry out an inspection and assess the transformers condition. Rewind and rehabilitate the transformer. electrically and mechanically test the transformer. Return the transformer to the site and place in storage. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

LIDDELL POWER STATION - INSULATION/SUPPLY/REPAIRS
Insulation/Cladding Repairs/Provision Of Temporary Scaffolding/Rigging Services New project In The Muswellbrook Council Area. The work covered by this specification involve the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the contract manager. The provision of labour to carry out general rigging work and mobile crane operation. Click for more details...

LIDDELL POWER STATION - CLEANING CONTRACT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. The work covered by this specification include the routine cleaning of various offices, amenities and miscellaneous plant and structures at the power station and surrounding plant areas. Surrounding areas include coal conveyors, rail unloader facility, Liddell ash dam, switchyards and switchrooms. The work will include the cleaning of offices, meal rooms, kitchens, public areas, vestibules, porches, toilets, showers, plant and equipment rooms at the power station and environs. This shall cover the exteriors of buildings including any courtyard areas, external paving, adjacent footpaths, nature strips and guttering. Clean up and /or removal of various accumulated, or split, non toxic materials and rubbish from all areas of the plant. Unblocking/cleaning out material transfer points (ie. coal chutes), various pits, pipes,conduits, trenches, gutters, bunds, sluiceways etc. Degreasing and pressure cleaning of plant and equipment. Click for more details...

LIDDELL POWER STATION - BOILER/TURBINE PLANT MAINTENANCE
A project in the NSW Within Muswellbrook. The work covered by this specification involves the provision of labour hire services in the form of trades and/or non-trades labour, materials and equipment as and when directed by Macquarie Generation, to undertake repairs and maintenance of the miscellaneous power and lighting system. Click for more details...

LIDDELL POWER STATION - ASH DAM MAINTENANCE CONTRACT
A project in the NSW Within Muswellbrook. The work involved the maintenance and minor modification of existing earthworks including earthfill embankments and slurry channels at the Liddell ash dam. Click for more details...

LIDDELL POWER STATION - HYDROGEN SUPPLY
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification involves the supply and delivery of bulk hydrogen over a period of two years. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work involves the inspection, splicing and repair of conveyor belts. Click for more details...

LIDDELL POWER STATION - BOILER FEED PUMP
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 for New. Work involves rectifying the ongoing problem of feedwater flow being inadequate at high unit loads. This will involve upgrading the steam driven boiler feed pump to increase its flow capacity. The purpose of this specification is to outline the general requirements for this upgrade, determining the extent of supply to ensure the requirements of clause 1.11 and the completed pump must be restored to a condition that will provide 15 years service. One pump is intially the target but there is an option to overhaul a further two pumps. Click for more details...

LIDDELL POWER STATION - SOLAR FARM/EARTH WORKS STAGE 1
Mining - Civil Services (Power stations, Power generation) New project at At, Liddell, NSW 2333. This type is Solar Farm/Earth Works Stage 1 with Private ownership. Work involves the preparation of an area south of Liddell Power Station for the installation of a solar farm. Click for more details...

LIDDELL POWER STATION - INSTRUMENTATION MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 200000. This project Work involves the calibration and maintenance of instrumentation, modifications to existing equipment installations, provision of new equipment installations and the provision of urgent labour services related to instrumentation and control at the power station. Contract will run for two years with an option for a further two years at the principals discretion. Click for more details...

LIDDELL POWER STATION - BEARING/SEALS/V BELTS SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Contract comprises the supply and delivery of bearings, seals and V-belts. The contractor will also provide technical support and information on contract materials and on new or substitute materials which are compatible with the existing plant and equipment. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

LIDDELL POWER STATION - MECHANICAL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Work comprises the general machining and miscellaneous mechanical repairs to items of plant and components, which will include but not be limited to the refurbishment of valves, slurry pump bearing cartridges and pedestals, gear pumps, oil and water strainers and ash crusher flywheel assemblies. All work shall be carried out off site at the Contractor/Sub-Contractors premises. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

LIDDELL POWER STATION - CONVEYOR ROLLERS
New project of Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333. Supply of conveyor rollers and miscellaneous components. The successful tenderer/vendor will be required to provide technical support and information on current materials, and on new or substitute materials, which are compatible with the existing plant and equipment. Click for more details...

LIDDELL POWER STATION - COAL PLANT MAINTENANCE
A project in the NSW Within Muswellbrook. The scope of works involves, Installation of 'M' Series Conveyor access walkways; Replacement of the roof above Conveyor 16 vibratory feeders and the installation of a deflector roof under Conveyor 19, to prevent coal falls onto Conveyor 16 roof; Replacement of missing roof sheeting to conveyor 19, installation of head end access platform to Conveyor 19, installation of grated flooring to an open area adjacent to conveyor 19; Repair of walkway cleats on 5AR, 5 BR, 6AR, 6BR Conveyor incline; Replate G3/G4 Hoppers; Fabrication and installation of G1/G4 work access platforms; Replate conveyor 12B Vibratory Feed Chutes; Fabrication and installation of Demin Tank access work platforms. Click for more details...

LIDDELL POWER STATION - FIBRE OPTIC CABLES
Overhead/Underground Installation Of Fibre Optic Cables project at At, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the installation of four fibre optic cables in the areas surrounding the Bayswater and Liddell Power Stations. The four items of work are summarised as follows. Installation, termination and testing of a twenty-four core All Dielectric Self Supporting (ADSS) fibre optic cable between the Bayswater Cooling Water Make-up Pumping Station and the Liddell 33kV Switching Station. Secondly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the Liddell 33kV Switching Station and Liddell Power Station Administration Building.Thirdly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System Low Pressure Pumping Station (LPPS) and the River Pumping System High Pressure Pumping Station (HPPS). Lastly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System High Pressure Pumping Station (HPPS) and the Bayswater Power Station Administration Building. Click for more details...

LIDDELL POWER STATION - DENIM PLANT
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 1000000. This project Development will comprise the replacement of the existing Modicon based control system for the water pre-treatment plant, demineralisation plant, Bayswater supply line and all associated plant with a Yokogowa CS3000 DCS system. The works shall include for all design, fabrication, construction and commissioning of the new control system. Included in the specification are upgrades to selected field devices that have been problematic and modifications to the existing control philosophies that are not meeting plant needs. The specification requires a high level of competency and experience with plant control systems and particular experience with Yokogawa technology. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

LIDDELL POWER STATION - ELECTRIC MOTORS/LOW VOLTAGE - OVERHAUL/REPAIR
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work includes the rewind and repair of low voltage electric motors for Liddell Power Station as and when directed by Macquarie Generation for a three (3) year period from the date of issue of Macquarie Generation's Contract. Rewinding and repairs will be required for a.c. and d.c. motors designed for voltages up to 440 Volts and rating up to 315 kW. The majority will be 3 phase a.c., cage rotor, induction motors. The Specification includes, but is not limited to, work associated with stator coils, rotor coils, stator iron, bearings, rotor, heaters, heat exchangers, temperature sensors and general mechanical work. All work shall be carried out off-site at the Contractors'/Subcontractors' premises. Click for more details...

LIDDELL POWER STATION - HYDRAULIC EQUIPMENT MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 800000. This project Work comprises the dismantling, inspection, report, repair, reassembly, servicing and testing of hydraulic and pneumatic items, that will include but not be limited to the refurbishment of various components for a period of two years. The Contractor may also be called to perform on-site repairs to any hydraulic component of installed equipment at Liddell. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

LIDDELL POWER STATION - ACCESS PLATFORMS & WALKWAYS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the design, documentation, construction, manufacture, supply, installation, repair, maintenance and modification of fixed platforms, walkways, stairways and ladders on the power station site as directed by the Principal. The plant access ways require modifying at places to provide safer access to items of equipment such as valves. The Contract shall be for a period of one year from the awarding of the Contract by the Principal. Click for more details...

LIDDELL POWER STATION - UPPER HUNTER POWER STATION EMISSION MONITORING
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Flue Gas Emission Monitoring type. Work comprises the Flue Gas Emission Monitoring for Bayswater and Liddell Power Stations as and when directed by the principal, for a two year period from the date of issue of the contract with an option to extend for a further two year period. Work specifically comprises Oxygen (O2) and Carbon Dioxide (CO2) Testing at Bayswater Power Station, Carbon Monoxide (CO) Testing, Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NOX) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride, Sulphuric Acid Mist and Sulphur Trioxide Testing, Sulphur Dioxide (SO2), Temperature (0C), Velocity and Volumetric Flowrate Testing, PM2.5 Testing, Dioxins, Furans and Polychlorinated Byphenyls Testing Volatile Organic Emissions Testing, Benzo(a)pyrene (equivalent) Testing at Bayswater Power Station. For Liddell Power Station: Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content of Stack Gases Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NO2) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride Testing, Sulphuric Acid Mist, Sulphur Dioxide and Trioxide Testing, Temperature (0C), Velocity and Volumetric Flowrate Testing, Dioxins and Furans Testing, Volatile Organic Emissions Testing. Click for more details...

MOUNT ARTHUR UNDERGROUND COAL PROJECT - SITE SERVICES
Mining - Civil Services (Power stations, Power generation) project at Approx 3 km south west of, Muswellbrook, NSW 2333 for New. Site services required will include powerlines, potable water pipelines, mine water and groundwater pipelines, a water extraction point on the Hunter River and a clean water pipeline and minor access roads and other such minor infrastructure within the project mining leases. Click for more details...

LIDDELL POWER STATION - FIRE APPLIANCE REPAIR SERVICES
At, Liddell, NSW 2333 Has Liddell Power Station - Fire Appliance Repair Services currently at Construction stage. The work to be carried out under the Contract is the provision of the fire appliance servicing repairs and maintenance. Work will comprise establishing and maintaining records, inspections, cleaning, discharging, recharging, reconditioning, pressure testing, maintaining, lubricating and servicing of all fire appliances. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

SPRINGVALE COAL OPERATIONS - RAILWAY SIDING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at 16km northwest of, Lithgow, NSW 2790. This type is Railway Siding - Construction with Private ownership. Construction of a new siding at the existing Lidsdale siding which has a coal loading capacity using front end loaders of 2million tonnes per annum (Mtpa). Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Civil Services (Power stations, Power generation) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - HIGH VOLTAGE ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Switchyard/Substation/Transmission Lines type of New development. Construction of a 132KV high voltage switchyard & associated transmission lines. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...