REDBANK II POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Kurri Kurri to Redbank II site near Bulga mine complex,, Singleton, NSW 2330 of Transmission Lines - Construction & Upgrading type of New development. 132 kv transmission line from Redbank 2 power plant site (near Bulga Coal Mine) to an existing 132kV transmission line on the Putty Rd (5km); uprating of existing 132kVtransmission line from the existing Redbank 1 power plant to Kurri Kurri substation and replacement of an existing overhead earth wire from Kurri Kurri to the VAW aluminium smelter. Click for more details...

WAMBO COAL OPERATIONS - RAILWAY & BRIDGEWORKS
Railway/Bridgeworks project at Mount Thorley to Jerrys Plains Rd Wambo, Jerrys Plains, NSW 2330 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Rail link from Mt Thorley to United Collieries mine Wambo. Bridges, rail underpass. Click for more details...

ASHTON COAL PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Ravensworth, NSW 2330. 3.5km rail siding . Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS
Water Pipeline New project In The Armidale Dumaresq Council Area. A utility pipeline/corridor between Gara dam and the mine. There are 2 options for the route of the pipeline. Polyethylene pipe. Trench installation. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

LIDDELL POWER STATION - ASH DAM MAINTENANCE CONTRACT
A project in the NSW Within Muswellbrook. The work involved the maintenance and minor modification of existing earthworks including earthfill embankments and slurry channels at the Liddell ash dam. Click for more details...

LIDDELL POWER STATION - MILL PYRITES
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. The supply and installation of new hydraulic pipelines and support structures from the Hydraulic Cabinets to the Mill Pyrites Hopper Isolating valves and Pyrites Spray Water Valves on Unit 1 A and B side, Unit 2 A side only and Unit 3 A and B sides. Installation of the new pipework will take place prior to outages. Cut over to the new pipework will begin during planned outages in Sept/Nov 2005, Dec/Jan 2006 and March/April 2006. Click for more details...

LIDDELL POWER STATION - VALVES
Liddell Power Station - Valves is currently at the Construction stage, valued at about $ 200000 it is Supply and delivery of miscellaneous valves and components. The successful supplier would be expected to offer technical assistance and information on current products in use, and the introduction of new or substitute products which are compatible with existing plant and equipment. Click for more details...

LIDDELL POWER STATION - DCS ENHANCEMENTS
New project of Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333. Supply of engineering services to implement modifications and enhancements on the control systems for a two year period. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

LIDDELL POWER STATION - PERIODIC SLASHING/PLOUGHING CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Private ownership. Work involves the provision of mobile plant and labour to undertake grass mowing, slashing, whipper snipping, ploughing of fire breaks and other general site maintenance work. Click for more details...

LIDDELL POWER STATION - BOILER MAINTENANCE CONTRACT
Liddell Power Station - Boiler Maintenance Contract is currently at the Construction stage, valued at about $ 200000 it is Work comprises the emergency repair of the four 500 MW boilers. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

LIDDELL POWER STATION - MECHANICAL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Work comprises the general machining and miscellaneous mechanical repairs to items of plant and components, which will include but not be limited to the refurbishment of valves, slurry pump bearing cartridges and pedestals, gear pumps, oil and water strainers and ash crusher flywheel assemblies. All work shall be carried out off site at the Contractor/Sub-Contractors premises. Click for more details...

LIDDELL POWER STATION - TUBE/PIPE/HOSE FITTING SUPPLY
Miscellaneous Tube/Pipe/Hose Fittings - Supply New project In The Muswellbrook Council Area. The developer is seeking to establish and foster a vendor relationship for the supply of Tube, Pipe and Hose Fittings. The principle objective of this contract is for the supply and delivery of tube, pipe and hose fittings on an as required basis by Macquarie Generation. The successful tenderer/vendor will be required to provide technical support and information on current materials, and on new or substitute materials, which are compatible with the existing plant and equipment. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

LIDDELL POWER STATION - BOILER OVERHAUL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project for New development. The scope of work covers the overhaul of Boiler Plant (including but not limited to pressure parts, milling plant, fabric filter plant , dampers and actuators, air heaters, valves, burners, fans) and Ash and Dust Plant ( including but not limited to dust removal plant and economiser grit removal system) on Generating Units 1 and 3 at Liddell Power Station during scheduled outages. Unit 1 Outage is currently scheduled to commence in March 2006 and will be conducted over a period of five (5) weeks. Unit 3 outage is currently scheduled to commence in September 2006 and will be conducted over a period of six (6) weeks. The timing of outages may vary. Click for more details...

LIDDELL POWER STATION - TURBINE/AUXILIARIES
Turbine/Auxiliaries - Overhaul Services project at Via Liddell, Muswellbrook, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Contract shall consist of 2 separable portions. Separable Portion 1 shall include all turbo-generator and feedheating plant overhaul work to be performed on Unit 1, the anticipated length of the outage is four (4) weeks. Separable Portion 2 shall include all turbo-generator and feedheating plant overhaul work required to be performed on Unit 3, the anticipated length of the outage is six (6) weeks. Click for more details...

LIDDELL POWER STATION - CONTINUOUS OPACITY MONITORING SYSTEM
New project of Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333. This Specification is for the design, supply, delivery, installation, commissioning and field audit performance tests for four continuous opacity monitoring systems (COMS) including dedicated air blowers for each COMS unit, weather covers and installation of new instrument tapping points into the side of the inclined duct work for each COMS unit. An optional firm price for the design, supply, delivery, installation, commissioning and field audit performance tests for an additional four COMS units and dedicated air blowers for each COMS unit. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

LIDDELL POWER STATION - CARPENTRY/MISCELLANEOUS MAINTENANCE
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the provision of labour for the maintenance and repairs of buildings and offices, minor concreting works, the repair and replacement of glass windows and the removal, preparation and installation of tiles and miscellaneous maintenance such as fencing, gardening, mowing and whipper snipping as required and so directed by the Principal. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

LIDDELL POWER STATION - COAL PLANT MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Coal Plant - Hydraulic Maintenance type. Liddell Power station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. The Site, which is to be made available to the Contractor for the purpose of the Contract, is at the Principal's Liddell Power Station and along the bin/conveyor system feeding Liddell and Bayswater Power Stations, including the Rail Unloading Facility at Ravensworth. The work covered by this Specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell coal Handling Plant Hydraulic Equipment for a period of two years from the date of placing the Order. Work will generally be carried out during normal working hours. Work on the specified areas will also be required outside these nominated periods. The Contract shall be for a period of two (2) years from the awarding of the Contract by the Principal, with a Macquarie Generation option to extend the Contract for a further two (2) year period. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

LIDDELL POWER STATION - ACCESS PLATFORMS & WALKWAYS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the design, documentation, construction, manufacture, supply, installation, repair, maintenance and modification of fixed platforms, walkways, stairways and ladders on the power station site as directed by the Principal. The plant access ways require modifying at places to provide safer access to items of equipment such as valves. The Contract shall be for a period of one year from the awarding of the Contract by the Principal. Click for more details...

LIDDELL POWER STATION - FABRIC FILTER-BAG CHANGEOUTS
At, Liddell, NSW 2333 Has Liddell Power Station - Fabric Filter-Bag Changeouts currently at Construction stage. Liddell Power Station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. This Specification calls for the replacement of Fabric Filter bags on Units 1, 3 and 4 Passes #1-A,B & E, Passes #3-A,B,C,D & E, Passes #4 - A,B & C. Click for more details...

LIDDELL POWER STATION - ASH DAM CIVIL MAINTENANCE WORK
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Ash Dam Civil Maintenance Work type of New development. The work will include the construction of new earth fill embankments and raising of existing embankments at the Liddell Ash Dam. The work required involves maintenance and minor modification of existing earthworks, including earthfill embankments and slurry channels at Liddell Ash Dam. Click for more details...

LIDDELL POWER STATION - UPPER HUNTER POWER STATION EMISSION MONITORING
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Flue Gas Emission Monitoring type. Work comprises the Flue Gas Emission Monitoring for Bayswater and Liddell Power Stations as and when directed by the principal, for a two year period from the date of issue of the contract with an option to extend for a further two year period. Work specifically comprises Oxygen (O2) and Carbon Dioxide (CO2) Testing at Bayswater Power Station, Carbon Monoxide (CO) Testing, Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NOX) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride, Sulphuric Acid Mist and Sulphur Trioxide Testing, Sulphur Dioxide (SO2), Temperature (0C), Velocity and Volumetric Flowrate Testing, PM2.5 Testing, Dioxins, Furans and Polychlorinated Byphenyls Testing Volatile Organic Emissions Testing, Benzo(a)pyrene (equivalent) Testing at Bayswater Power Station. For Liddell Power Station: Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content of Stack Gases Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NO2) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride Testing, Sulphuric Acid Mist, Sulphur Dioxide and Trioxide Testing, Temperature (0C), Velocity and Volumetric Flowrate Testing, Dioxins and Furans Testing, Volatile Organic Emissions Testing. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

LIDDELL POWER STATION - FIRE APPLIANCE REPAIR SERVICES
At, Liddell, NSW 2333 Has Liddell Power Station - Fire Appliance Repair Services currently at Construction stage. The work to be carried out under the Contract is the provision of the fire appliance servicing repairs and maintenance. Work will comprise establishing and maintaining records, inspections, cleaning, discharging, recharging, reconditioning, pressure testing, maintaining, lubricating and servicing of all fire appliances. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

MOUNT PLEASANT COAL PROJECT - HIGH VOLTAGE POWER LINES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at 3km West of, Muswellbrook, NSW 2333. This type is Power Lines with Private ownership. For the provision of high voltage power lines for the mine site. Click for more details...

WILGA PARK COALBED METHANE GAS POWER STATION - UPGRADE GAS POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 7 km west of, Narrabri West, NSW 2390 of Gas Power Station - Upgrade type of New development. The upgrade of the coalbed methane gas power station from 12MW to 40MW. Up to 12, 3 MW gas engine driven generators, subject to gas availability will be installed, with the first underway & expected to be commissioned in June 2009. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

SPRINGVALE COAL OPERATIONS - RAILWAY SIDING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at 16km northwest of, Lithgow, NSW 2790. This type is Railway Siding - Construction with Private ownership. Construction of a new siding at the existing Lidsdale siding which has a coal loading capacity using front end loaders of 2million tonnes per annum (Mtpa). Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Civil Services (Power stations, Power generation) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

TOMINGLEY GOLD PROJECT - TRANSFORMERS
Transformers project at Tomingley, near, Peak Hill, NSW 2869 In The Council Area Of Parkes of Private. For the provision of transformers. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...