COONARAH GAS PROJECT
Currently at the Construction stage In Narrabri is a project estimated to be $ 5000000. This project 10 x 1MW container mounted Jenbacher Gas Engine Generator sets, with all ancillary transformers, switchgear, control systems and cabling. The Austrian built Jenbacher engines are purpose built gas engines. the equipment is available on short delivery, and the target date for commissioning is January 2004. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
A project in the QLD Within Central Highlands Regional. Queensland Rail will construct, own and operate a new 110 km spur to expand their existing rail network in the Blackwater system. The new spur will connect to the existing system near Kinrola. The Rolleston mine will be charged a fee under a 20 year contract to access the line. Click for more details...

YANDI - IRON ORE
Mining - Civil Services (Power stations, Power generation) project at Yandi Operations 90 km northwest of, Newman, WA 6753 of Mine - Plant - Upgrade & Infrastructure - Epc & M Contract type of Addition development. Proposal expected to increase throughput from 25mtpa to 35mtpa. Some minor works undertaken in order to increase capacity of existing plant to more than 12mtpa. Additional processing & mine site village facilities to be constructed as required. A new 10mtpa fixed plant, 10 km of rail spur line terminating in a loop & new train loading facility also proposed. Project contains a previously advised overall resource of 1,800mt grading 58% iron, 1.3% alumina, 5% silica & 0.04% phosphorus. EPA assessment conducted on the consultative environmental review (CER). Contract to involve power generation, dewatering systems, offices & accommodation requirements. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Power stations, Power generation) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
8 km north west of, Newman, WA 6753 Has Yandicoogina Iron Ore Operations currently at Early Planning stage. Additional power and other infrastructure to complement the new port and mine requirements. Click for more details...

FORTNUM GOLD PROJECT - RESOURCE
Mining - Civil Services (Power stations, Power generation) project for New development. Resource estimate of 13,100,000 tonnes @ 2.5 g/t for 1,045,300 ounces of gold. Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Currently at the Construction stage In Ravensthorpe is a project estimated to be $ 10000000. This project The power and steam generation plant includes three steam turbines, three package boilers, two diesel generators and mechanical and electrical equipment. Available steam from the acid plant will also be used in the steam turbines to generate electrical power. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BOOTU CREEK MANGANESE PROJECT - RAIL SIDING/RAIL HAULAGE
Bootu Creek Manganese Project - Rail Siding/Rail Haulage is currently at the Construction stage, valued at about $ 1000000 it is Rail siding to be constructed to enable rail containers to be loaded so that the product can be transported to the Port of Darwin for export to China. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE WAGONS
Ore Wagons project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Design, supply and assembly of 2 prototype ore wagons and 820 ore wagons. Click for more details...

MINERVA COAL PROJECT - RAIL
Currently at the Construction stage In Central Highlands Regional is a project estimated to be $ 5000000. This project Coal to be railed on Emerald to Springsure rail link. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

MORANBAH PIPELINE EASTERN EXTENSION PROJECT - DUCTILE IRON & SWAB REMOVAL POINTS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 1000000. This project The contract includes: manufacture, supply deliver and unload ductile iron pipes, general pipes, swab removal points. & 2,420 metres of polyethelene pipe. Click for more details...

LIDDELL POWER STATION - BOILER MAINTENANCE CONTRACT
Liddell Power Station - Boiler Maintenance Contract is currently at the Construction stage, valued at about $ 200000 it is Work comprises the emergency repair of the four 500 MW boilers. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

LIDDELL POWER STATION - BOILER OVERHAUL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project for New development. The scope of work covers the overhaul of Boiler Plant (including but not limited to pressure parts, milling plant, fabric filter plant , dampers and actuators, air heaters, valves, burners, fans) and Ash and Dust Plant ( including but not limited to dust removal plant and economiser grit removal system) on Generating Units 1 and 3 at Liddell Power Station during scheduled outages. Unit 1 Outage is currently scheduled to commence in March 2006 and will be conducted over a period of five (5) weeks. Unit 3 outage is currently scheduled to commence in September 2006 and will be conducted over a period of six (6) weeks. The timing of outages may vary. Click for more details...

LIDDELL POWER STATION - FIBRE OPTIC CABLES
Overhead/Underground Installation Of Fibre Optic Cables project at At, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the installation of four fibre optic cables in the areas surrounding the Bayswater and Liddell Power Stations. The four items of work are summarised as follows. Installation, termination and testing of a twenty-four core All Dielectric Self Supporting (ADSS) fibre optic cable between the Bayswater Cooling Water Make-up Pumping Station and the Liddell 33kV Switching Station. Secondly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the Liddell 33kV Switching Station and Liddell Power Station Administration Building.Thirdly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System Low Pressure Pumping Station (LPPS) and the River Pumping System High Pressure Pumping Station (HPPS). Lastly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System High Pressure Pumping Station (HPPS) and the Bayswater Power Station Administration Building. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - INSTALL PIPES FROM PROCESS DAM TO PLANT
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. From process dam to plant Click for more details...

LIDDELL POWER STATION - MILLING PLANT
A project in the NSW Within Muswellbrook. Work comprises the overhaul of RP 803 Bowl Mill Rolls and includes surveys and reports on the mill internals, the repair of eroded RP 803 Bowl Mill internals, the removal and replacement of three mill roll assemblies and doors, replacement of worm shafts and bearings and the replacement of eroded and holed PF piping system components and greasing of milling plant. Response time to a request for repair work shall be less than 24 hours, i.e. time from receipt of request to time of readiness to commence work on the plant. The contracted work will be carried out on a Schedule of Rates basis, as and when directed by the Contract Manager. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - SIGNALLING
Signalling project at Near, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Signalling at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

LIDDELL POWER STATION - TURBINE/AUXILIARIES
Turbine/Auxiliaries - Overhaul Services project at Via Liddell, Muswellbrook, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Contract shall consist of 2 separable portions. Separable Portion 1 shall include all turbo-generator and feedheating plant overhaul work to be performed on Unit 1, the anticipated length of the outage is four (4) weeks. Separable Portion 2 shall include all turbo-generator and feedheating plant overhaul work required to be performed on Unit 3, the anticipated length of the outage is six (6) weeks. Click for more details...

COBURN MINERAL SANDS PROJECT - ELECTRICAL RETICULATION
Coburn Mineral Sands Project - Electrical Reticulation is currently at the Construction stage, valued at about $ 1000000 it is Electrical reticulation from the planned fixed location power station. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ELECTRICAL JUNCTION BOXES
A project in the WA Within Collie. For the supply of electrical junction boxes. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

LIDDELL POWER STATION - MAINTENANCE OF EXTERNAL ELECTRICAL POWER DISTRIBUTION SYSTEMS
A project in the NSW Within Muswellbrook. Work comprises the routine inspection and breakdown maintenance work on the electrical power distribution systems external to the Bayswater and Liddell Power Stations as and when required by the Principal for a two year period from the date of issue of the Principal's Contracts. These distribution systems are owned and operated by the Principal. Click for more details...

TARONG POWER STATION PULVERISER TABLES
Pulveriser Tables - Refurbishment project at Maidenwell Rd, Tarong, QLD 4615 In The Council Area Of South Burnett Regional of State. Refurbishment of pulveriser tables to crush coal. Click for more details...

LIDDELL POWER STATION - COAL PLANT MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Coal Plant - Hydraulic Maintenance type. Liddell Power station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. The Site, which is to be made available to the Contractor for the purpose of the Contract, is at the Principal's Liddell Power Station and along the bin/conveyor system feeding Liddell and Bayswater Power Stations, including the Rail Unloading Facility at Ravensworth. The work covered by this Specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell coal Handling Plant Hydraulic Equipment for a period of two years from the date of placing the Order. Work will generally be carried out during normal working hours. Work on the specified areas will also be required outside these nominated periods. The Contract shall be for a period of two (2) years from the awarding of the Contract by the Principal, with a Macquarie Generation option to extend the Contract for a further two (2) year period. Click for more details...

LIDDELL POWER STATION - FABRIC FILTER-BAG CHANGEOUTS
At, Liddell, NSW 2333 Has Liddell Power Station - Fabric Filter-Bag Changeouts currently at Construction stage. Liddell Power Station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. This Specification calls for the replacement of Fabric Filter bags on Units 1, 3 and 4 Passes #1-A,B & E, Passes #3-A,B,C,D & E, Passes #4 - A,B & C. Click for more details...

LIDDELL POWER STATION - BULK DISTILLATE
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Bulk Distillate - Supply type of New development. To supply approximately 16 million litres of bulk distillate, for boiler ignition purposes and as a fuel for gas turbine and mobile plant to Macquarie's power stations. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

KING ISLAND SCHEELITE PROJECT - PIT DEWATERING CONTRACT
Near, Grassy, TAS 7256 Has King Island Scheelite Project - Pit Dewatering Contract currently at Planning stage. For the provision of pit dewatering services. Click for more details...

MOUNT PLEASANT COAL PROJECT - HIGH VOLTAGE POWER LINES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at 3km West of, Muswellbrook, NSW 2333. This type is Power Lines with Private ownership. For the provision of high voltage power lines for the mine site. Click for more details...

COSMO DEEPS UNDERGROUND GOLD PROJECT - PIT DEWATERING
40 km south east of, Adelaide River, NT 0846 Has Cosmo Deeps Underground Gold Project - Pit Dewatering currently at Construction stage. Detailed design is scheduled for completion late March 2008. The Company will need to hire pumps for the pit dewatering. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - PILOT POWER PLANT
Mining - Civil Services (Power stations, Power generation) project In The Unincorporated Council Area of Private ownership. For the development of a 1MW pilot generation plant. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

MANGOOLA COAL OPERATIONS - 500KV TRANSMISSION LINE RELOCATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Muswellbrook Council Area for New development. A project to enable more efficient Mangoola coal mine operations & so reduce the Life-of-Mine (LoM) from 21 to 15 years. Decommissioning of a 9km section including 25 towers of the Bayswater to Mt Piper 500kV electricity transmission line which bisects the coal mine site. Construction of a replacement 11km line including 32 new transmission towers (8 tension & 24 suspension) on 25x25m bases along the western boundary of the project's target deposits (Upper Pilot, Fassifern & Great Northern Seams of the Newcastle Coal Measures). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

TOMINGLEY GOLD PROJECT - TRANSFORMERS
Transformers project at Tomingley, near, Peak Hill, NSW 2869 In The Council Area Of Parkes of Private. For the provision of transformers. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Civil Services (Water distribution & pipelines, borefields) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

MULGA DOWNS IRON ORE PROJECT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Ashburton Council Area for New development. A direct shipping ore (DSO) project based on the 14 million tonnes (Mt) Murray Hill bedded & detrital ore deposit at the Mulga Downs pastoral station. A single, above watertable open pit (2.5km x 1.8km) worked at a rate of 5 million tonnes per annum (Mtpa) for a life-of-mine (LoM) of 5 years. Conventional drill & blast, excavators & loader methods with ore trucked to a run-of-mine (ROM) stockpile prior to crushing & screening (mobile or modular/skid-mounted plant). Product ore to be trucked along the upgraded, 30km long Fenceline Rd to the Great Northern Highway for haulage 60km to join the proposed Roy Hill Infrastructure Railway by either the Coonarie or Two Camel roads. Associated infrastructure to include waste rock dumps, explosives store, generator power supply with associated double-skinned diesel storage tanks (18 x 110kL) & lined refuelling pads, potable water borefield & turkeys nest storage dam, access roads. A mines operation centre of transportable buildings plus contractor's facilities (offices, amenities, ablutions, fuel storage, refuelling area, heavy & light vehicle workshops, washdown area, laydown areas, parking). Permanent on site accommodation for up to 400 workers fly-in fly-out via Newman. Packaged wastewater treatment plant. Click for more details...

BMA CENTRAL REGION WATER PIPELINE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Between Saraji & Norwich Park mines via, Dysart, QLD 4745. This type is Pipeline with Private ownership. Construction of a 34km long high density polyethylene (HDPE) water pipeline including road & creek crossings. Associated pump station & electrical infrastructure. Click for more details...

MOUNT CARLTON GOLD SILVER & COPPER PROJECT PIPELINE
Pipeline project at 45km north-northwest of, Collinsville, QLD 4804 In The Council Area Of Whitsunday Regional of Private. Proposed construction of 225mm subterranean HDPE pipeline & associated pumping infrastructure to carry river water from the Burdekin River to the main site water dam at Mount Carlton mine for use in processing. The pipeline will be approximately 36km long. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining - Civil Services (Power stations, Power generation) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...