State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Civil Services Projects


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Currently at the Construction stage In Banana Shire is a project estimated to be $ 100000. This project Additional water requirements. Small package. Click for more details...

LOY YANG A POWER STATION
Ps Emergency Evacuation System New project In The La Trobe Council Area. Design, supply, installation, commissioning of and emergency warning system at Loy Yang Power. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

PARKESTON POWER STATION
Parkeston Power Station is currently at the Construction stage, valued at about $ 240000 it is Work to involve tie-ins for new gas turbine generator units (2). Associated power distribution & lighting expected to be included in this tender. Click for more details...

TOWNSVILLE POWER STATION
Civil Contract - For Power Station Modification project at via, Yabulu, QLD 4818 in the Mining - Civil Services (Power stations, Power generation). Civil works & foundations for conversion of a gas powered plant to a co generation plant for production of electricity. Click for more details...

PAULSENS GOLD PROJECT
Mining - Civil Services (Power stations, Power generation) project at Approx 186 km west of, Paraburdoo, WA 6754 for New. A small 1-2MW power station. BOO or Boot contract. Supply, install, provide power. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

HOPE DOWNS IRON ORE PROJECT - RAIL FACILITIES
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Private ownership. A 58 km rail line from the Hope Downs iron ore deposit to Rio Tinto rail network. Click for more details...

KOGAN CREEK POWER PROJECT - FIRE FIGHTING SYSTEM
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area for New development. Includes pumps, extinguishers. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 100000. This project Exp. Joint & Damper for Boiler Duct Work. Exp. Joint: 77 Quantity, Material: Carbon Steel, Size: Min.2mx2m, Max. 10.5x5m. Damper; 52 qty, Material: Carbon Steel Size: Min.2mx2m, Max.22.5mx6m. Total weight approx 200ton. Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

KOGAN CREEK POWER STATION - TRANSPORT TO KOGAN CREEK
New project of Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412. Scope of work: Booking of ship space and related services as well as follow up for 1 HP-Turbine 145 to 1 LP-Turbine 160 to 1 Generator 316 to 1 Pre-Heater 220 to 1 Pre-Heater 125 to 1 Transformer 350 to FCA/FAS European North Sea Port to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for Condenser Parts 860 FRT FCA/FAS Indonesia to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 1 Feedwater-Tank 100 to FCA India to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 11.000 FRT of General Cargo and ODC from FCA/FAS various Ports worldwide to DDP Kogan Creek Site- Customs clearance for equipment above. Scope of work Booking of ship space and related services as well as follow up for 1 HP-Turbine 145 to 1 LP-Turbine 160 to 1 Generator 316 to 1 Pre-Heater 220 to 1 Pre-Heater 125 to 1 Transformer 350 to FCA/FAS European North Sea Port to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for Condenser Parts 860 FRT FCA/FAS Indonesia to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 1 Feedwater-Tank 100 to FCA India to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 11.000 FRT of General Cargo and ODC from FCA/FAS various Ports worldwide to DDP Kogan Creek Site . - Customs clearance for equipment above Experience required, prerequisites: ? handling of sea- and air-transport, import and onward transport of equipment for large industrial projects ? European partner, preferably German required for daily work (ship booking, coordination, customs aspects, etc.) with Siemens Power Generation in Germany. Heavy-load shipping experience required. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

LIDDELL POWER STATION - HYDROGEN SUPPLY
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification involves the supply and delivery of bulk hydrogen over a period of two years. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Civil Services (Power stations, Power generation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

LIDDELL POWER STATION - INSTRUMENTATION MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 200000. This project Work involves the calibration and maintenance of instrumentation, modifications to existing equipment installations, provision of new equipment installations and the provision of urgent labour services related to instrumentation and control at the power station. Contract will run for two years with an option for a further two years at the principals discretion. Click for more details...

MACARTHUR/BURDEKIN FALLS DAM TO NORTHERN BOWEN BASIN PIPELINE - PUMPS ET AL
A project in the QLD Within Isaac Regional. Supply, install and commission three 3.3KV submersible centrifugal Pumpsets, motors and Six 11KV horizontal double suction centrifugal Pumpsets including associated pipework and valves, control and communications equipment and cabling over four sites along the proposed Burdekin to Moranbah Pipeline. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 33 KV SWITCHGEAR
New project of Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753. 33 Kv Switchgear. Click for more details...

LIDDELL POWER STATION - CONTINUOUS OPACITY MONITORING SYSTEM
New project of Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333. This Specification is for the design, supply, delivery, installation, commissioning and field audit performance tests for four continuous opacity monitoring systems (COMS) including dedicated air blowers for each COMS unit, weather covers and installation of new instrument tapping points into the side of the inclined duct work for each COMS unit. An optional firm price for the design, supply, delivery, installation, commissioning and field audit performance tests for an additional four COMS units and dedicated air blowers for each COMS unit. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL SLEEPERS CONTRACT
Rail Sleepers - Supply project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Supply of 420,000 Rail Sleepers and cross ties for the railway line. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - RELIEF VALVES
Relief Valves - Supply New project In The Collie Council Area. For the supply of relief valves. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - COMMUNICATIONS EQUIPMENT
Communications Equipment - Supply project at 15 Km South east of, Collie, WA 6225 in the Mining - Civil Services (Power stations, Power generation). For the supply of communications equipment. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

LIDDELL POWER STATION - BULK DISTILLATE
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Bulk Distillate - Supply type of New development. To supply approximately 16 million litres of bulk distillate, for boiler ignition purposes and as a fuel for gas turbine and mobile plant to Macquarie's power stations. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - OIL FILLED TRANSFORMER
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Oil Filled Transformer. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRAIN LOAD OUT
Iron Ore Rapid Growth 4 Project - Train Load Out is currently at the Planning stage, valued at about $ 100000000 it is The new TLO facility will match the existing train load-out plant for through train capacity at 58Mtpa. The new TLO will comprise a new section of rail passing through a single tunnel that has two loading vaults. Each vault is located under a discrete stockpile, each with a minimum 25,000 live capacity. These stockpiles will be product specific, one for lump and one for fines, to eliminate product cross-contamination. Each stockpile will be built and maintained by a fixed stacker conveyor, fed from the diverter transfer station at the head of the stockyard reclaim conveyor (the transfer station and stacker conveyors are part of work pack 4N0). The conveyors will discharge from fixed cantilever booms. Dust suppression sprays will be mounted at the head of each conveyor discharge. The spray system will be complete with break tank and pumps for the high pressure for the spray canon. The TLO will have dedicated dust extraction/collection and ventilation systems for each of the vaults. Each of the dust systems will comprise dust hoods, ducting, wet scrubbers, extraction fans, seal tank, circulation pumps, sump tanks, pumps and associated pipe work. The complete tunnel with the vaults will have a vault ventilation system complete with fans, ducting, discharge registers and intake silencers. The stockpiles and stacker conveyors will have dust suppression sprays. Process water will be supplied for dust suppression and dust extraction scrubbers. The dust suppression spray system comprises piping, water cannon and controls. Click for more details...

CAMEBY DOWNS COAL PROJECT - MINING CONTRACT - OPEN CUT
Mining Contract - Open Cut - Stage 1 project at 17km northeast of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. Mining will commence in the northeast corner of the site & progress in a westerly & southwesterly direction using strip mining methods at a rate of 1.8Mtpa. Initial activities to include clearing vegetation, topsoil stripping & stockpiling, overburden removal from the initial area to be mined & storage of the overburden in permanent overburden dumps. Coal extraction using excavators & trucks & progressive rehabilitation of overburden emplacement areas. Construction of surface water management structures to manage the quality and quantity of surface waters on the site including diversions, drains & sediment control dams. Storage of coal rejects & tailings in an appropriately designed & engineered Tailings Dam. Loading of coal product into a dedicated rail loading facility for transport off-site to the Port of Brisbane. McMahon's stage1 contract includes planning, mine development, waste stripping, coal mining, coal preparation & train loading. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - END OF TRAIN REPEATERS
End Of Train Repeaters - Supply project at Newman Hub, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). For the supply of end of train repeaters. Click for more details...

KANMANTOO COPPER & GOLD PROJECT - WATER PIPELINE
Water Pipeline New project In The Mount Barker Council Area. Construction of a 16km buried pipeline from the Mount Barker Brown Dam to the mine site. To supply up to 750ML a year. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Civil Services (Power stations, Power generation) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - LOW VOLTAGE - FOR MINESITE
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of various low voltage installations for the minesite. Click for more details...

MANGOOLA COAL OPERATIONS - 500KV TRANSMISSION LINE RELOCATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Muswellbrook Council Area for New development. A project to enable more efficient Mangoola coal mine operations & so reduce the Life-of-Mine (LoM) from 21 to 15 years. Decommissioning of a 9km section including 25 towers of the Bayswater to Mt Piper 500kV electricity transmission line which bisects the coal mine site. Construction of a replacement 11km line including 32 new transmission towers (8 tension & 24 suspension) on 25x25m bases along the western boundary of the project's target deposits (Upper Pilot, Fassifern & Great Northern Seams of the Newcastle Coal Measures). Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

DAUNIA COAL PROJECT - SEWERAGE PUMPS
Sewerage Pumps project at 25km southeast of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Supply of submersible, grinder type, sewerage pumps including couplings & guide rails. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

TOMINGLEY GOLD PROJECT - TRANSFORMERS
Transformers project at Tomingley, near, Peak Hill, NSW 2869 In The Council Area Of Parkes of Private. For the provision of transformers. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - 33KV POWERLINE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The East Pilbara Council Area of Distribution Overhead Powerline - 33kv type. A contract for the design, supply & construction of a 33kV distribution overhead line. Part of the Yandi Sustaining Project involving upgrades of lines from the existing 220kV switchyard & new sections of powerlines. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

YARNIMA CCGT POWER STATION POWER BLOCKS CONSTRUCTION
New project of Mining - Civil Services (Power stations, Power generation) project at At, Newman, WA 6753. Construciton of the main power blocks for the power station. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at ., Curtis Island, QLD 4680. This type is Distribution Transformer Install/Commissioning with Private ownership. For the provision of Distribution transformer installation & commissioning for the Surat North Upstream QCLNG Project Phase 2. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ACCOMMODATION VILLAGE (DESIGN & CONSTRUCTION)
New project of Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at 40km SW of, Weipa, QLD 4874. For the design & construction of an Accommodation Village (comprising approximately 1,200 accommodation rooms) & temporary on-site construction facilities at different locations external to the construction camp. Accommodation rooms will be supplied by Rio Tinto. The accommodation village & the temporary on-site construction facilities includes but is not limited to: Four (4) bed unsuited accommodation modules. People with Disabilities (PWD) two (2) bed unsuited accommodation modules. Maintenance & storage facilities. Office & administration facilities. Communications/data/television signal facility. Close Circuit Television (CCTV) monitoring facilities. Ablutions modules. Kitchen, dining & crib facilities. Entertainment facilities. Gymnasiums. Sporting facilities. Training/education centre. Laundry modules. Commercial laundry facility. First aid facility Power generation units & distribution panels with reticulation network. Area & general lighting requirements. Potable water treatment, storage & distribution networks. Waste water treatment systems & collection networks. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect