ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Civil Services (Power stations, Power generation) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

MT KEITH - NICKEL
Mt Keith - Nickel is currently at the Construction stage, valued at about $ 12500000 it is Project underwent EPA assessment on the consultative environmental review level. Proposal is to reduce saline seepage risk & increase system stability. A total tailings storage capacity of about 240mt is required due to increased operations. Proposed facility to incorporate a 5 km diameter x 3m x 5m high embankment plus ring main distribution pipe & will feed 9 vertical risers (purchased). Tailings slurry will be discharged through risers & will flow out to form a series of low, overlapping cones (approximately 3% slope). Tailings water & stormwater runoff to be recycled as plant process water. Works approval granted by EPA for associated works (grinding & milling). Main components of the contract will be earthworks & steel piping. Click for more details...

LAKE VERMONT COAL PROJECT - RAIL SPUR
Rail Spur New project In The Isaac Regional Council Area. A rail spur from site to the existing adjoining rail line. Click for more details...

WEIPA BAUXITE OPERATIONS - NEWEIPA/ANDOOM
Pipeline - Installation project at From Ely Dam to Andoom, Weipa, QLD 4874 in the Mining - Civil Services (Water distribution & pipelines, borefields). Water pipeline. Click for more details...

PLUTONIC GOLD MINE
Currently at the Construction stage In Meekatharra is a project estimated to be $ 20000000. This project This 20 megawatt gas-fired power station is a complete turnkey contract. Project will involve a 20 km spur line, gas metering & construction of a new power station. Associated civils & electrical services are included in contract. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP BILLITON IRON ORE OPNS - ASSET DEVELOPMENT PROJECTS -RAIL
Via, Newman, WA 6753 Has Bhp Billiton Iron Ore Opns - Asset Development Projects -Rail currently at Early Planning stage. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

KOGAN CREEK POWER PROJECT - CABLE SUPPORT STRUCTURE
A project in the QLD Within Western Downs Regional. Prefabricated concrete component parts. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 100000. This project Exp. Joint & Damper for Boiler Duct Work. Exp. Joint: 77 Quantity, Material: Carbon Steel, Size: Min.2mx2m, Max. 10.5x5m. Damper; 52 qty, Material: Carbon Steel Size: Min.2mx2m, Max.22.5mx6m. Total weight approx 200ton. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

HARTS RANGE GARNET/AMH PROJECT - WATER PIPELINE
15 Km Water Pipeline New project In The Alice Springs Town Council Area. Pipeline will now longer be needed as there will now be no wet plant constructed. Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Civil Services (Power stations, Power generation) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

LIDDELL POWER STATION - MECHANICAL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Work comprises the general machining and miscellaneous mechanical repairs to items of plant and components, which will include but not be limited to the refurbishment of valves, slurry pump bearing cartridges and pedestals, gear pumps, oil and water strainers and ash crusher flywheel assemblies. All work shall be carried out off site at the Contractor/Sub-Contractors premises. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Currently at the Construction stage In Ashburton is a project estimated to be $ 15000000. This project Construction of a new gas turbine compressor at the Paraburdoo compressor station site. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - PIPES FOR DAMS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. From west dam to process dam Click for more details...

MOUNT ISA MINE UNDERGROUND HIGH VOLTAGE RETICULATION SYSTEM PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Electrical upgrades and installation works for the high voltage reticulation system for 2007 and 2008. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - RR CUBICLES/NE RESISTORS
Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753 for New. Rotor Resistance Cubicles and Neutral Earthing Resistors. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - POWER FACTOR CORRECTION UNITS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The East Pilbara Council Area for New development. Power Factor Correction Units. Click for more details...

LIDDELL POWER STATION - PERIODIC UNDERWATER INSPECTION/MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 of Periodic Underwater Inspection And Maintenance type of New development. This Specification is for the provision of underwater diving services as and when required by the principal and includes the underwater inspection, cleaning and maintenance of plant or equipment at Bayswater and Liddell Power Stations. The locations and the type of work to be executed under the contract shall include, but not be limited to, the following: Inspection of CW Pump and associated pipework; Inspections, cleaning and maintenance of Cooling Tower Screens; Inspection and maintenance of pump pits and associated equipment; Inspection and maintenance of dam outlet works and structures; Inspection and cleaning of River Trash Rakes; Removal of the marine growth and other deposits from Ash and Dust Pump Pits; Underwater welding and cutting to various other items of plant as required; Inspection of and impression moulds on various pump impellors and provision of a written and/or photographic report on the various activities listed above. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

LIDDELL POWER STATION - CARPENTRY/MISCELLANEOUS MAINTENANCE
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the provision of labour for the maintenance and repairs of buildings and offices, minor concreting works, the repair and replacement of glass windows and the removal, preparation and installation of tiles and miscellaneous maintenance such as fencing, gardening, mowing and whipper snipping as required and so directed by the Principal. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

HAZELWOOD POWER STATION/COAL MINE - FACILITY MANAGEMENT SERVICE
Facility Management Service New project In The La Trobe Council Area. Civil and site services including security and emergency services. Click for more details...

HAZELWOOD 2030 PROJECT - POWER STATION UPGRADE
Mining - Civil Services (Power stations, Power generation) project for New development. The project involves a retro-fit of the power station to reduce greenhouse emissions. Work will comprise the trial fitting of two technologies into the power station. The station comprises 8 units that generate electricity from brown coal. The first technology will involve replacing the mills that produce the brown coal feed into the boiler. This coal drying technology will reduce coal moisture from 60% to about 12% before being fired into a modified and retro fitted boiler. When installed it will take less energy to convert coal into electricity and reduce emissions by 30%. The carbon dioxide capture technology will involve the construction of a plant to capture carbon dioxide from the burnt coal, which will be used for sequestration. When construction is completed this will reduce emissions by 50%. In total by 2009 emissions will be reduced by 80%. Click for more details...

LIDDELL POWER STATION - ACCESS PLATFORMS & WALKWAYS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the design, documentation, construction, manufacture, supply, installation, repair, maintenance and modification of fixed platforms, walkways, stairways and ladders on the power station site as directed by the Principal. The plant access ways require modifying at places to provide safer access to items of equipment such as valves. The Contract shall be for a period of one year from the awarding of the Contract by the Principal. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - OIL FILLED TRANSFORMER
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Oil Filled Transformer. Click for more details...

BATCHELOR SUBSTATION PROJECT - ELECTRICAL PACKAGE
New project of Mining - Civil Services (Power stations, Power generation) project at Batchelor Road, Batchelor, NT 0845. Electrical works for the Batchelor 132/22 KV Substation. Click for more details...

KING ISLAND SCHEELITE PROJECT - EFFLUENT PIPELINE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project for New development. For the provision of effluent pipeline. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - LOW VOLTAGE - FOR MINESITE
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of various low voltage installations for the minesite. Click for more details...

MOUNT STUART POWER STATION EXPANSION CONTROL BUILDING
Mount Stuart Power Station Expansion Control Building is currently at the Construction stage, valued at about $ 2000000 it is Construction of building and fitout excluding telecommunications. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - NORTH COAST ALDOGA UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via, Gladstone, QLD 4680 for New. Construction of additional rail track along the North Coast Rail Line to provide some triplication. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

BARALABA COAL OPERATIONS EXPANSION MIA
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at near, Baralaba, QLD 4702 for New. Construction of all infrastructure associated with 20 year expansion for central, south & north pits. To include workshops, wash down area, administration, fuel tanks, water & sewerage treatment & other civil infrastructure. Concrete, structural steel, civil/earthworks, hydraulics & drainage, piling & electrical works. Click for more details...

GROSVENOR COAL PROJECT ELECTRICAL SYSTEMS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project for New development. A contract for the design, engineering, testing & project commissioning of an integrated automation & electrification system to control all processes & power systems. To include a 66kV substation, power & distribution transformers. Modular pre-fabricated switchrooms equipped with medium voltage switchgear & low voltage power control centres & multi-drive variable speed drives. Click for more details...

PEAK DOWNS COAL OPERATIONS - DYSART ROAD RELOCATION
A project in the QLD Within Isaac Regional. Relocation of a 16.4km section of Dysart Rd some 46-62km north of Dysart to allow for continued eastward expansion of the open cut pit. To include new bitumen sealing & association drainage. Relocation of existing fibre optic cable. Construction of a new at grade level rail crossing. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 & 4 - PORT LANDSIDE & PORT MARINE - CONVEYOR BELT INSTALL & SPLICE SERVICES
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Boodarie Industrials Estate, SW of, Port Hedland, WA 6721. For the provision of conveyor belt install & splice services. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - TEMPORARY POWER FOR CONSTRUCTION OFFICE FACILITIES
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Weipa Shire Council Area for New development. Provision of diesel generators & self bunded diesel storage tanks in various sizes to supply power to construction office facilities across site. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SEWAGE TREATMENT PLANT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Mapoon Shire Council Area for New development. For the provision of a sewage treatment plant for effluent & sludge waste streams. Click for more details...