List of Mining - Civil Services Projects


COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

MURRAY BASIN MINERAL SANDS EXPLORATION PROJECT
North western Victoria, Ouyen, VIC 3490 Has Murray Basin Mineral Sands Exploration Project currently at Construction stage. Major earthworks and establishment and management of a dewatering system for a mining exploration project in North West Victoria. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
A project in the QLD Within Central Highlands Regional. Queensland Rail will construct, own and operate a new 110 km spur to expand their existing rail network in the Blackwater system. The new spur will connect to the existing system near Kinrola. The Rolleston mine will be charged a fee under a 20 year contract to access the line. Click for more details...


Mining - Civil Services (Power stations, Power generation) project for New development. The power station will run on waste heat and produce approximately 7 mW of electricity from hot gas produced in the processing of synthetic rutile. Under full operation, the new plant will require about 13 mW of electricity, the balance to be supplied by Western Power. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Private ownership. 2 large motor control centres required for new coal mine development. Contract to include transportable buildings which will also house high tension switchgear. Associated equipment such as programme logic controls & variable speed drives also form part of this tender. Click for more details...

OAK PARK PROJECT - GAS RESOURCE
New project of Mining - Civil Services (Pump stations, Above ground reservoirs) project at 19km south of, Bacchus Marsh, VIC 3340. The pilot project comprises five wells into the Maddingley Brown Coal Seam (approx 17 metres thick). Includes four wells 300 metres apart surrounding a central well. Pumping of water from the central well is in progress, with reconfiguration of electrical and mechanical services in progress at the end of the September 2003 quarter to enable simultaneous pumping at optimal rates from each of the five wells. This should enable higher water production form each of the five wells, thus accelerating the onset of possible gas desorption. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

ALCOA REFINERIES - CO-GENERATION POWER PLANTS
Mining - Civil Services (Power stations, Power generation) project at Various sites, Pinjarra, Kwinana & Wagerup, ., WA 6999 for New. Under the MOU. Mitsubishi and Downer will supply the first of Alinta's co-generation units for installation at Alcoa's Pinjarra alumina refinery and support Alcoa's ongoing development of cogeneration units. Siemens not involved. Electricity will be produced for sale from the second quarter of 2005. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

KOGAN CREEK COAL/POWER STATION PROJECT
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. Proposed open cut coal mine and associated power station Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE WAGONS
Ore Wagons project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Design, supply and assembly of 2 prototype ore wagons and 820 ore wagons. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. HIT501 Motor Valve DN40-DN300, QTY: 39, ASME Design. HIT502 General Valve DN15-DN700, QTY: 441, ASME Design. HIT504 Relief Valve Electrical actuated type, ASME design ASME V stamp is required. Click for more details...

KOGAN CREEK POWER STATION - ORIFICE & FLOW NOZZLE
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 1000000. This project Ventury type and orifice type, ASME design ASME S stamp is required. Click for more details...

CONDAMINE POWER STATION PROJECT - GAS FIRED
Gas Fired Power Station project at Warrego Hwy, 8Km east of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A proposed 135 Mw combined cycle gas turbine base load power station, connecting into the Chinchilla substation. Click for more details...

TARONG NORTH POWER STATION
Mining - Civil Services (Power stations, Power generation) project In The South Burnett Regional Council Area of Furnace Ash Removal type. Includes supply of all labour, equipment and supervision in order to remover and transport furnace ash from Tarong North Power station to a designated unloading point. Click for more details...

ABBOT POINT COAL TERMINAL EXPANSION STAGE 3
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Abbot Point 25 km north west of, Bowen, QLD 4805 of Coal Terminal Expansion - Stage 3 type of New development. Expansion of terminal capacity from 15 mtpa to 50 mtpa. Key components of the stage 3 expansion will involve the construction of a second berth, a second rail loop and train dump facilities and associated second in loading conveyor. Installation of a new stockyard bund and two new stockpile rows. Up to three new stacker reclaimers and a new yard conveyor and transfer towers will be installed. A second outloading conveyor to the offshore berth, using the existing jetty structure will be installed. Installation of a second offshore berth and a second shiploader on the new berth. Lastly there will dredging work associated with the second berth and the dredge material will be disposed of on either land or sea. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

MOUNT ISA MINE UNDERGROUND MEDIUM VOLTAGE INFRASTRUCTURE PROJECT
Underground Medium Voltage Infrastructure - Installation New project In The Mt Isa City Council Area. Work comprises installation of 33 kv cable & switchgear, installation of transformer and switchgear, installation of two mobile sub stations, relocation of between 2-4 mobile mining substations throughout the mine and installation of cable. Click for more details...

MOUNT ISA MINE UNDERGROUND HIGH VOLTAGE RETICULATION SYSTEM PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Electrical upgrades and installation works for the high voltage reticulation system for 2007 and 2008. Click for more details...

KWINANA TITANIUM DIOXIDE PIGMENT PLANT - SUPPLY OF PIPING
Piping - Supply project at Mason Rd, Kwinana, WA 6966 in the Mining - Civil Services (Water distribution & pipelines, borefields). For the supply of piping. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - UPS UNITS
Mining - Civil Services (Power stations, Power generation) project at 15 Km South east of, Collie, WA 6225 for New. Uninterruptible Power Supply Units (UPS). Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - LEVEL & CLARITY MEASUREMENT
Mining - Civil Services (Power stations, Power generation) New project at 15 Km South east of, Collie, WA 6225. This type is Level/Clarity Measurement - Supply Of with Private ownership. For the supply of level and clarity management. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - DIFFERENTIAL PRESSURE
Mining - Civil Services (Power stations, Power generation) project for New development. For the supply of pressure, differential pressure and flow. Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

HAZELWOOD POWER STATION/COAL MINE - FACILITY MANAGEMENT SERVICE
Facility Management Service New project In The La Trobe Council Area. Civil and site services including security and emergency services. Click for more details...

MINE MOUTH GAS POWER STATION
Mining - Civil Services (Power stations, Power generation) project In The Isaac Regional Council Area of Power Station type. To construct a 100 MW gas fired power station. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - END OF TRAIN REPEATERS
End Of Train Repeaters - Supply project at Newman Hub, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). For the supply of end of train repeaters. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SWITCHYARD SUBSTATION & TRANSMISSION EQUIPMENT
Switchyard/Substation & Transmission Equipment - Supply Of New project In The Collie Council Area. For the supply of switchyard/substation and transmission equipment. Click for more details...

WILGA PARK COALBED METHANE GAS POWER STATION - UPGRADE GAS POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 7 km west of, Narrabri West, NSW 2390 of Gas Power Station - Upgrade type of New development. The upgrade of the coalbed methane gas power station from 12MW to 40MW. Up to 12, 3 MW gas engine driven generators, subject to gas availability will be installed, with the first underway & expected to be commissioned in June 2009. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

MOUNT STUART POWER STATION EXPANSION CONTROL BUILDING
Mount Stuart Power Station Expansion Control Building is currently at the Construction stage, valued at about $ 2000000 it is Construction of building and fitout excluding telecommunications. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

GOONYELLA TO ABBOT POINT (GAP) EXPANSION PROJECT
A project in the QLD Within Various. Development of a new ballast quarry at Byerwen, located 85km south of Collinsville. Supply and delivery of railway ballast as specified. Supply of pavement materials as specified. Supply of other quarry produts as specified. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Civil Services (Power stations, Power generation) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment including a wheel lathe to service and m Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - DEWATERING SYSTEM
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 30km north of, Newman, WA 6753. Dewatering systems expected to include bores, dewatering pipeline & intrafield pipeline, exchange dam, collector tanks & associated power supply infrastructure. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS EXPANSION - POWER STATION
Mining - Civil Services (Power stations, Power generation) project at 60km southwest of, Borroloola, NT 0854 for New. Construction of a 53MW capacity gas powered power station to be used in conjunction with part of the existing 24MW power station to deliver 68MW overall. To include 6 Wartsila 34SG engines. Gas to continue to be brought to the site by the Daly Waters to McArthur River natural gas pipeline. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

MOUNT CARLTON GOLD SILVER & COPPER PROJECT PIPELINE
Pipeline project at 45km north-northwest of, Collinsville, QLD 4804 In The Council Area Of Whitsunday Regional of Private. Proposed construction of 225mm subterranean HDPE pipeline & associated pumping infrastructure to carry river water from the Burdekin River to the main site water dam at Mount Carlton mine for use in processing. The pipeline will be approximately 36km long. Click for more details...

KALGOORLIE NORTH GOLD PROJECT - POWER/PIPELINE/CABLE RELOCATION
Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area of Power/Pipeline/Cable - Relocation type. For the provision of power, pipeline & cable relocation. Click for more details...

KALGOORLIE NORTH GOLD PROJECT - POWER/PIPELINE/CABLE RELOCATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Power/Pipeline/Cable - Relocation type. For the provision of power, pipeline & cable relocation. Click for more details...