State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Civil Services Projects


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

MINDARIE MINERAL SANDS PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Karoonda Council Area of Power Supply type. Electricity requirements have increased from 5.5 to 7.5 million units. Mains supply will be supplied via the Pyap 66kv substation. Click for more details...

TELFER GOLD OPERATIONS
Addition project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Site operations via, Telfer, WA 6762. Airfield lighting required for new sealed airstrip extending over 200 m with a width of 30 m. Overall project includes a small terminal & a new refuelling facility. Click for more details...

PARKESTON POWER STATION
Parkeston Power Station is currently at the Construction stage, valued at about $ 240000 it is Work to involve tie-ins for new gas turbine generator units (2). Associated power distribution & lighting expected to be included in this tender. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Power stations, Power generation) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

TOWNSVILLE POWER STATION
Addition project of Mining - Civil Services (Power stations, Power generation) project at via, Yabulu, QLD 4818. Conversion and expansion of the existing peak-load jet-fuel-fired plant into a gas-fired base-load plant. Expansion of capacity form 160 mega watts to 220 megawatts. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

HOPE DOWNS IRON ORE PROJECT - RAIL FACILITIES
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Private ownership. A 58 km rail line from the Hope Downs iron ore deposit to Rio Tinto rail network. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

KOGAN CREEK POWER PROJECT - CLADDING WORKS
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. Procurement, fabrication and erection of: 14,050 m² single skin wall / roof steel cladding, 7,810 m² double skin wall / roof steel cladding, 550 m² single / double leaf steel doors painted, 260 m² folding steel doors painted. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project for New development. Bag Filter capacity 2378, 100 N/h Bag Filter Quantity: 1 set (2 lines), Inlet gas temp:125 Dust concentration: 48g/ N Outlet duct dust condition: 50mg. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

GOONYELLA TO ABBOT POINT EXPANSION PROJECT NORTHERN MISSING RAIL LINK
Goonyella To Abbot Point Expansion Project Northern Missing Rail Link is currently at the Construction stage, valued at about $ 500000000 it is Staged works to include - construction of 69km rail line, interconnection to existing systems at Goonyella & Newlands, upgrade line to increased axle loading, lengthen loops on Newlands system to accommodate Goonyella length trains. Upgrade works Buckley to Newlands Mine. Click for more details...

LIDDELL POWER STATION - BOILER FEED PUMP
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 for New. Work involves rectifying the ongoing problem of feedwater flow being inadequate at high unit loads. This will involve upgrading the steam driven boiler feed pump to increase its flow capacity. The purpose of this specification is to outline the general requirements for this upgrade, determining the extent of supply to ensure the requirements of clause 1.11 and the completed pump must be restored to a condition that will provide 15 years service. One pump is intially the target but there is an option to overhaul a further two pumps. Click for more details...

LIDDELL POWER STATION - PERIODIC SLASHING/PLOUGHING CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Private ownership. Work involves the provision of mobile plant and labour to undertake grass mowing, slashing, whipper snipping, ploughing of fire breaks and other general site maintenance work. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - PIPES FOR DAMS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. From west dam to process dam Click for more details...

MOUNT ISA MINE UNDERGROUND MEDIUM VOLTAGE INFRASTRUCTURE PROJECT
Underground Medium Voltage Infrastructure - Installation New project In The Mt Isa City Council Area. Work comprises installation of 33 kv cable & switchgear, installation of transformer and switchgear, installation of two mobile sub stations, relocation of between 2-4 mobile mining substations throughout the mine and installation of cable. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 66 KV SWITCHGEAR/EQUIPMENT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Near, Newman, WA 6753 for New. 66 kV Switchgear and Equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 33 KV SWITCHGEAR
New project of Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753. 33 Kv Switchgear. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREAC/PORT - FIELD ETHERNET SWITCHES
Iron Ore Rapid Growth 3 Project - Areac/Port - Field Ethernet Switches is currently at the Construction stage, valued at about $ 1000000 it is Field Ethernet Switches. Click for more details...

LIDDELL POWER STATION - TURBINE/AUXILIARIES
Turbine/Auxiliaries - Overhaul Services project at Via Liddell, Muswellbrook, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Contract shall consist of 2 separable portions. Separable Portion 1 shall include all turbo-generator and feedheating plant overhaul work to be performed on Unit 1, the anticipated length of the outage is four (4) weeks. Separable Portion 2 shall include all turbo-generator and feedheating plant overhaul work required to be performed on Unit 3, the anticipated length of the outage is six (6) weeks. Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SITE LV ELECTRICAL & CONTROL WORKS (LS)
Mining - Civil Services (Power stations, Power generation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Site Lv Electrical & Control Works (Ls) type of New development. Site LV Electrical & Control Works (LS). Low voltage reticulation, controls and ancillary supply and installation throughout the material handling systems. Click for more details...

GOONDICUM PIPELINE PROJECT (MONTO)
Pipeline/Pump Station New project In The North Burnett Regional Council Area. Construction/testing approx 35 km DN300 DI & 355 OD PE pipeline, including pipeline structures, pump station/control building civil works, steel storage & break pressure tanks, using Principal-supplied pipes/fittings/valves. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining - Civil Services (Power stations, Power generation) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

MOUNT GORDON COPPER MINE - WATER TREATMENT PLANT
Mount Gordon Copper Mine - Water Treatment Plant is currently at the Construction stage, valued at about $ 5000000 it is To construct Waste Water Treatment Plant that will have the capacity to treat approximately 2.2 billion litres of acid water per annum containing approximately 1.2 million pounds of copper and 75,000 pounds of cobalt. The plant is designed to selectively recover certain saleable minerals and provide environmental benefit to the mine. Click for more details...

BATCHELOR SUBSTATION PROJECT - OXYGEN CONDUCTOR
Mining - Civil Services (Power stations, Power generation) project at Batchelor Road, Batchelor, NT 0845 of Oxygen Conductor - Supply & Deliver type of New development. Supply and delivery of an Oxygen Conductor. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - POWER PLANT FOR DEMONSTRATION GEOTHERMAL PLANT - STAGE 2 - ERECTION
Power Plant - For Demonstration Geothermal Plant - Stage 2 - Erection project at Cooper Basin via, Innamincka, SA 5731 in the Mining - Civil Services (Power stations, Power generation). For the construction of a power plant for the 3-5 MW demonstration plant. Turbines & Generators have been purchased. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

MANGOOLA COAL OPERATIONS - 500KV TRANSMISSION LINE RELOCATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Muswellbrook Council Area for New development. A project to enable more efficient Mangoola coal mine operations & so reduce the Life-of-Mine (LoM) from 21 to 15 years. Decommissioning of a 9km section including 25 towers of the Bayswater to Mt Piper 500kV electricity transmission line which bisects the coal mine site. Construction of a replacement 11km line including 32 new transmission towers (8 tension & 24 suspension) on 25x25m bases along the western boundary of the project's target deposits (Upper Pilot, Fassifern & Great Northern Seams of the Newcastle Coal Measures). Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - DEWATERING SYSTEM
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 30km north of, Newman, WA 6753. Dewatering systems expected to include bores, dewatering pipeline & intrafield pipeline, exchange dam, collector tanks & associated power supply infrastructure. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - RAIL SPUR LINE
Rail Spur Line New project In The East Pilbara Council Area. A project to extend the existing Lang Hancock Railway. Construction of a 52km spur line from the new Hope Downs 4 mine to south of the existing Hope Downs 1 Mine to provide connection to rail & port infrastructure. Associated rail bridges over the Weeli Wolli & Coondiner Creeks. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - KENYA WATER TREATMENT PLANT
Water Treatment Plant - For Coal Seam Gas Water project at 20km southwest of, Chinchilla, QLD 4413 In The Council Area Of Western Downs Regional of Private. Construction near the Kenya coal seam gas processing plant of a 100megalitres a day capacity water treatment plant to process water coming to the surface from gas extraction. Associated infrastructure to include a 33MW gas fired power plant to run the reverse osmosis process, ponds & pipelines. Initial operations from October 2011 to be at 72MW. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT - RAIL DUPLICATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Emu Siding to Cape Lambert via, Karratha, WA 6714. This type is Rail Duplication with Private ownership. A project to duplicate the 70km rail line between Emu Creek Siding & Cape Lambert as part of a project to increase iron ore capacity to 320 million tonnes per annum (Mtpa). To include construction of a marshalling yard adjacent to Cape Lambert Port, a locomotive refuelling facility, a ballast loadout facility & Arches Siding. Crossovers between the existing & duplicate rail line at Arches, Harding, Green Pool & Emu Sidings. Installation of communication cabling, asset protection & signalling equipment including works to support Automated Train Operation facilities. Modification of existing Harding Siding & expansion of the existing 50km quarry. Extension to the existing Emu Siding to service Deepdale Line. Water for the 5 year construction period expected to be supplied via Harding Dam with new bores also under consideration. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

SPRINGVALE COAL OPERATIONS DEWATERING BORE NO 8
Bore Holes/Pumps/Transformers/Switchroom/Tracks/Pipelines New project In The Lithgow Council Area. A project to install an additional 30ML/day dewatering bore (no 8) in a fenced compound. To include construction of 4 dewatering boreholes, each with a submersible pump. A high voltage switchroom & 2 x 11-3.3kV transformers. Installation of a buried water transfer pipeline along with 11kV cables. Upgrade of an access track. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - WASTE WATER TREATMENT
Roy Hill Iron Ore Project - Infrastructure - Rail Non Process - Waste Water Treatment is currently at the Construction stage, valued at about $ 10000000 it is For the provision of waste water treatment. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect