GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

HAZELWOOD COAL MINE/POWER STATION
Cw Pumps - Electic Motors project at Latrobe Valley via, Morwell, VIC 3840 In The Council Area Of La Trobe of Private. Electric motors that drive the circulating water (CW) pumps. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

OREBODY 18 IRON ORE PROJECT
A project in the WA Within East Pilbara. BHP plans to mine 116 million tonnes of ore over the next 12 -15 years. Part of the development will be the construction of a 35 km, 66kV powerline from BHP's gas fired power station at Nweman to the mine Click for more details...

TARONG NORTH POWER STATION PROJECT
Mining - Civil Services (Power stations, Power generation) project at Tarong Rd (adjacent to existing power station), Tarong, QLD 4615 for New. Additional coal fired plant to supply 800-850MW Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

TOWNSVILLE POWER STATION
Addition project of Mining - Civil Services (Power stations, Power generation) project at via, Yabulu, QLD 4818. Conversion and expansion of the existing peak-load jet-fuel-fired plant into a gas-fired base-load plant. Expansion of capacity form 160 mega watts to 220 megawatts. Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Power stations, Power generation) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

RAVENSTHORPE NICKEL PROJECT - TREATMENT PLANT PACKAGES
A project in the WA Within Ravensthorpe. Processing includes a combination of pressure acid leach (PAL), atmospheric leach (AL) and Enhanced Pressure Acid Leach (EPAL). The EPAL process entails separate mining, stockpiling and beneficiation of Ilmonite ( high iron, low magnesium and calcium, upper levels) ore. The ilmonite is treated by PAL, whilst the saprolite is treated by AL using the PAL discharge and additional acid. This allows recovery of an additional 15,000 tpa of nickel. The process downstream of the leaching circuit uses the Cawse flowsheet with partial neutralisation, followed by separation of the barrren tailings from the nickel bearing solution, further impurity removal and preciptiation of MHP. This intermediate product is then transported to the QNI Yabulu refinery. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

ROSEBY COPPER PROJECT - POWER
Mining - Civil Services (Power stations, Power generation) project at North west of, Cloncurry, QLD 4824 of Power Generation - Diesel type of New development. Diesel power generation. Options under consideration include purchase of generation equipment by the company, and provision and operation of diesel generation equipment by a contractor. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes all earthworks, culverts, bridges, rail, sleeper and rolling stock requirements, with the exception of locomotives. These are continuing to be sourced internationally and may be added to this agreement. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412 of Damper Drive type of New development. Qty: 61, Electircal actuated type. Click for more details...

KOGAN CREEK POWER STATION - TANKS
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Site Erected Tanks type. Demineralised water tank (1200m3) carbon steel, Service water tank (200m3) carbon steel. Click for more details...

QR - OVERHEAD TRACTION WIRING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Central Highlands Regional Council Area of State ownership. Various overhead traction wiring projects. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

LIDDELL POWER STATION - PERIODIC SLASHING/PLOUGHING CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Private ownership. Work involves the provision of mobile plant and labour to undertake grass mowing, slashing, whipper snipping, ploughing of fire breaks and other general site maintenance work. Click for more details...

LIDDELL POWER STATION - MECHANICAL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Work comprises the general machining and miscellaneous mechanical repairs to items of plant and components, which will include but not be limited to the refurbishment of valves, slurry pump bearing cartridges and pedestals, gear pumps, oil and water strainers and ash crusher flywheel assemblies. All work shall be carried out off site at the Contractor/Sub-Contractors premises. Click for more details...

MOUNT TODD GOLD MINE - CONTAINMENT WKS/HEAP LEACH PAD PUMP STATION/PUMPING MAIN
Mining - Civil Services (Pump stations, Above ground reservoirs) project at 45 km north east of, Katherine, NT 0850 of Containment Works/Heap Leach Pad Pump Station/Pumping Main - Construct type of New development. Containment works at the decommissioned Mount Todd Gold Mine. Click for more details...

KWINANA TITANIUM DIOXIDE PIGMENT PLANT - SUPPLY OF PIPING
Piping - Supply project at Mason Rd, Kwinana, WA 6966 in the Mining - Civil Services (Water distribution & pipelines, borefields). For the supply of piping. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - TRANSPORTABLE SWITCHROOMS/415V MCCS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The East Pilbara Council Area of Transportable Switchrooms/415v Mccs type. Transportable Switchrooms and 415V MCCs Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - EAST YARD SUBSTATION
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - East Yard Substation currently at Construction stage. Substation with three seperable portions. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - 132 & 33 KV SWITCHGEAR
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at On, Finucane Island, WA 6721. This type is 132 & 33 Kv Switchgear - Supply with Private ownership. 132 & 33 kV Switchgear. Click for more details...

LIDDELL POWER STATION - BOILER/TURBINE
Bolier/Turbine - Repair/Maintenance project at At, Liddell, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Boiler and Turbine Plant at Liddell Power Station has an extensive miscellaneous power and lighting (MP&L) system. This Specification covers the provision of labour hire services in the form of trades and non trades labour, materials and equipment as and when directed by the Principal, to undertake repairs and maintenance of the MP&L system at Liddell Power Station. Work may be required both during generating unit outages and at other times as required by the Principal. It is envisaged that a minimum of one (1) and a maximum of six (6) trades persons would be required at any one time. This number may however vary and the Principal makes no guarantee as to the extent of the work to be undertaken. Click for more details...

HAZELWOOD POWER STATION/COAL MINE - FACILITY MANAGEMENT SERVICE
Facility Management Service New project In The La Trobe Council Area. Civil and site services including security and emergency services. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - TRANSMISSION LINE/SUBSTATION
A project in the SA Within Coober Pedy. Construction will comprise the building of a 164 km 132 kV transmission line and substation at the mine site. The power line will comprise approx 500 towers x 26 metre height pre-constructed of galvinised steel poles or lattice. Towers will take approx two days to construct on site. About 50,000 metres of service track will be constructed to service the transmission line. A substation and associated switchyard will be constructed at the mine site and will have a land area of 1 Hectare. The annual consumption of the mine and association infrastructure will be 211.1 GWh per annum. Click for more details...

GROOTE EYLANDT MANGANESE OPERATIONS - POWER SUPPLY
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Darwin City Council Area of Power Supply type. GEMCO is considering the option of outsourcing power generation and electricity supply to the mine site and surrounding town area into the future. The current average load is approx 8 MW with a peak of 9 MW depending on production, ship-loading and seasonal influences. Increases in power demand to the Eylandt are expected over the next 10 years. Click for more details...

LIDDELL POWER STATION - ASH DAM CIVIL MAINTENANCE WORK
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Ash Dam Civil Maintenance Work type of New development. The work will include the construction of new earth fill embankments and raising of existing embankments at the Liddell Ash Dam. The work required involves maintenance and minor modification of existing earthworks, including earthfill embankments and slurry channels at Liddell Ash Dam. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

BODDINGTON GOLD MINE EXPANSION - WATER TREATMENT FACILITIES
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Pinjarra - Williams Rd, Boddington, WA 6390. Facilities include Reverse Osmosis Plant, water transmitters and water management telemetry system. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - POWER PLANT FOR DEMONSTRATION GEOTHERMAL PLANT - STAGE 2 - ERECTION
Power Plant - For Demonstration Geothermal Plant - Stage 2 - Erection project at Cooper Basin via, Innamincka, SA 5731 in the Mining - Civil Services (Power stations, Power generation). For the construction of a power plant for the 3-5 MW demonstration plant. Turbines & Generators have been purchased. Click for more details...

BICKHAM COAL COMPANY - BULK SAMPLE EXCAVATION PROJECT - RAIL LOOP
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 13 km south of, Murrurundi, NSW 2338 for New. For the provision of a rail loop. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - LNG PLANT
Currently at the Construction stage In Gladstone Regional is a project estimated to be $ 8000000000. This project QCLNG is a project to develop coal seam gas wells in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product LNG by ship. The LNG plant to have an ultimate capacity of up to 12 million tonnes per annum (Mtpa) from 3 LNG trains, each of 3 to 4 Mtpa production capacity. These involve feed gas metering & filtration to remove entrained pipeline debris; gas processing to remove carbon dioxide & other components contained in the gas; gas chilling & drying in a 3-bed molecular sieve system to remove the final traces of water;dry gas processing through activated carbon bed system for mercury removal & gas refrigeration for liquefaction to LNG . The refrigeration systems to be powered by gas turbines equipped with dry low NOx emission systems; heat removal (as part of the liquefaction process) using fin coolers. Onshore LNG storage in tanks including 2 LNG storage tanks up to 200,000cu m for the first 2 trains & a tank of similar size for the third train; 1 butane storage tank up to 100,000cu m (including vapour recovery system) for imported butane required for spiking LNG product to meet a required high heating value (HHV) along with ancillary equipment & infrastructure including flares. Storage of refrigerant as well diesel fuel, lube oil etc. Associated infrastructure to include fuel gas systems; effluent treatment & outfall for treated wastewater, power generation/distribution; fire protection systems; water systems including seawater desalination plant for process & potable water supply. Additional buildings to include compressor control building, analyser shelter, maintenance buildings, offices and staff amenities building. A temporary pioneer construction camp to accommodate 100-300 people expected to be built within the LNG facility area before early site preparation activities for the first LNG train. This camp will be replaced by a larger construction camp on Curtis Island and/or on the mainland during the LNG Facility construction to house a workforce of 3000 approx people. The construction camp expected to include necessary amenities such as a dining hall & kitchen, a primary health care facility & recreation centre. Other services & camp infrastructure to include a water treatment plant & storage, sewerage treatment plant, temporary power supply, fuel storage facility & fire-fighting equipment, some of which will remain as permanent facilities for the operations phase. Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

SINO IRON ORE PROJECT - SEA WATER DESALINATION UNITS FOR CONSTRUCTION WATER
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Cape Preston 100 km Southwest of, Karratha, WA 6714. This type is Temporary Sea Water Desalination Units - Design/Construct with Private ownership. For the design, manufacture, supply & commission of a 1ML per day temporary desalination plant Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

KENYA TO CHINCHILLA WEIR WATER PIPELINE (QCLNG WATER TREATMENT PROJECT)
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. 20 km underground pipeline. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - UNDERGROUND
Goonyella Riverside Broadmeadow Coal Operations Expansion - Underground is currently at the Construction stage, valued at about $ 900000000 it is The existing underground Broadmeadow Mine to be expanded eastwards using either conventional longwall mining as used currently or alternatively Longwall Top Coal Caving (LTCC). Additional coal handling & preparation plant (CHPP) capacity of 2370 tonnes per hour (t/h) approx required to achieve a production rate of 24 Mt/a which may include an upgrade of the existing plant as well as a new CHPP. Associated infrastructure upgrades expected to include a second 66kV feeder adjacent to the present line; expanded tailings storage facilities & improvements to the existing mine water management system (clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if required). The product coal will be railed approximately 190km to the Hay Point and/or Dalrymple Bay coal terminals. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - MAINTENANCE & REPAIR OF EMERGENCY DIESEL GENERATORS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Ashburton Council Area of Private ownership. For the provision of maintenance & repair of emergency diesel generators. Click for more details...

PILBARA ELECTRICAL INFRASTRUCTURE REPLACEMENT PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Tom Price, Paraburdoo & Channar Mines via, Dampier, WA 6713 for New. Major upgrades to electrical & control systems infrastructure at Rio Tinto Pilbara mines including Tom Price, Paraburdoo & Channar. Click for more details...

BOOTU CREEK MANGANESE PROJECT - POWER STATION CONTRACT EXTENSION
Mining - Civil Services (Power stations, Power generation) project for New development. Extension of 4MW power station generation supply contract for further 2 years. Click for more details...

GRUYERE JOINT VENTURE GOLD PROJECT - POWER SUPPLY
New project of Mining - Civil Services (Power stations, Power generation) project at 200km East of, Laverton, WA 6440. For the provision of power supply. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SEWAGE TREATMENT PLANT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Mapoon Shire Council Area for New development. For the provision of a sewage treatment plant for effluent & sludge waste streams. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect