List of Mining - Civil Services Projects in NSW


COONARAH GAS PROJECT
Currently at the Construction stage In Narrabri is a project estimated to be $ 5000000. This project 10 x 1MW container mounted Jenbacher Gas Engine Generator sets, with all ancillary transformers, switchgear, control systems and cabling. The Austrian built Jenbacher engines are purpose built gas engines. the equipment is available on short delivery, and the target date for commissioning is January 2004. Click for more details...

REDBANK II POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Kurri Kurri to Redbank II site near Bulga mine complex,, Singleton, NSW 2330 of Transmission Lines - Construction & Upgrading type of New development. 132 kv transmission line from Redbank 2 power plant site (near Bulga Coal Mine) to an existing 132kV transmission line on the Putty Rd (5km); uprating of existing 132kVtransmission line from the existing Redbank 1 power plant to Kurri Kurri substation and replacement of an existing overhead earth wire from Kurri Kurri to the VAW aluminium smelter. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo currently at Construction stage. The main infrastructure requirements at the mine site include a High Voltage power supply. 66 kv transmission line. Click for more details...

WAMBO COAL OPERATIONS - RAILWAY & BRIDGEWORKS
Railway/Bridgeworks project at Mount Thorley to Jerrys Plains Rd Wambo, Jerrys Plains, NSW 2330 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Rail link from Mt Thorley to United Collieries mine Wambo. Bridges, rail underpass. Click for more details...

ASHTON COAL PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Ravensworth, NSW 2330. 3.5km rail siding . Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

COONARAH GAS PROJECT
10 Mw Power Station - Boot Contract project at At Wilga Park, midway between the Coonarah Gasfield and, Narrabri, NSW 2390 in the Mining - Civil Services (Power stations, Power generation). Includes design, installation, operation and maintenance of a 10MW power station fuelled by Coonarah Gas via a tolling agreement for three years, with an option for Eastern Star to purchase the complete station and take over operations at the end of the initial term. The site will now be at Wilga Park, which removes the need to build a new 22v transmission line from west Narrabri to the north east of Narrabri, but requires a new 66kv transformer and circuit protection at the power station site. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

COWAL GOLD PROJECT
Site Office project at North west of, West Wyalong, NSW 2671 In The Council Area Of Bland of Private. Includes the construction/supply of buildings and services required to establish a site office at the Cowal Gold Project. Capabilities required include-supply/fabrication of steel industrial shed, construction management, transportable office accommodation, fencing, electrical, concrete works, sewerage plant and plumbing. Click for more details...

LIDDELL POWER STATION - GENERATOR TRANSFORMER/REWIND
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Generator Transformer/Rewind - Supply type of New development. The contract involves the removal of the transformer to the contractors work site. The transformer is a 585 MVA, 22/350 kV generator, 200 t in weight. Carry out an inspection and assess the transformers condition. Rewind and rehabilitate the transformer. electrically and mechanically test the transformer. Return the transformer to the site and place in storage. Click for more details...

LIDDELL POWER STATION - CLEANING CONTRACT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. The work covered by this specification include the routine cleaning of various offices, amenities and miscellaneous plant and structures at the power station and surrounding plant areas. Surrounding areas include coal conveyors, rail unloader facility, Liddell ash dam, switchyards and switchrooms. The work will include the cleaning of offices, meal rooms, kitchens, public areas, vestibules, porches, toilets, showers, plant and equipment rooms at the power station and environs. This shall cover the exteriors of buildings including any courtyard areas, external paving, adjacent footpaths, nature strips and guttering. Clean up and /or removal of various accumulated, or split, non toxic materials and rubbish from all areas of the plant. Unblocking/cleaning out material transfer points (ie. coal chutes), various pits, pipes,conduits, trenches, gutters, bunds, sluiceways etc. Degreasing and pressure cleaning of plant and equipment. Click for more details...

LIDDELL POWER STATION - ASH DAM MAINTENANCE CONTRACT
A project in the NSW Within Muswellbrook. The work involved the maintenance and minor modification of existing earthworks including earthfill embankments and slurry channels at the Liddell ash dam. Click for more details...

LIDDELL POWER STATION - VALVES
Liddell Power Station - Valves is currently at the Construction stage, valued at about $ 200000 it is Supply and delivery of miscellaneous valves and components. The successful supplier would be expected to offer technical assistance and information on current products in use, and the introduction of new or substitute products which are compatible with existing plant and equipment. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work involves the inspection, splicing and repair of conveyor belts. Click for more details...

LIDDELL POWER STATION - DCS ENHANCEMENTS
New project of Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333. Supply of engineering services to implement modifications and enhancements on the control systems for a two year period. Click for more details...

LIDDELL POWER STATION - INSTRUMENTATION MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 200000. This project Work involves the calibration and maintenance of instrumentation, modifications to existing equipment installations, provision of new equipment installations and the provision of urgent labour services related to instrumentation and control at the power station. Contract will run for two years with an option for a further two years at the principals discretion. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

LIDDELL POWER STATION - PERIODIC SLASHING/PLOUGHING CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Private ownership. Work involves the provision of mobile plant and labour to undertake grass mowing, slashing, whipper snipping, ploughing of fire breaks and other general site maintenance work. Click for more details...

LIDDELL POWER STATION - BEARING/SEALS/V BELTS SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. Contract comprises the supply and delivery of bearings, seals and V-belts. The contractor will also provide technical support and information on contract materials and on new or substitute materials which are compatible with the existing plant and equipment. Click for more details...

LIDDELL POWER STATION - TUBE/PIPE/HOSE FITTING SUPPLY
Miscellaneous Tube/Pipe/Hose Fittings - Supply New project In The Muswellbrook Council Area. The developer is seeking to establish and foster a vendor relationship for the supply of Tube, Pipe and Hose Fittings. The principle objective of this contract is for the supply and delivery of tube, pipe and hose fittings on an as required basis by Macquarie Generation. The successful tenderer/vendor will be required to provide technical support and information on current materials, and on new or substitute materials, which are compatible with the existing plant and equipment. Click for more details...

LIDDELL POWER STATION - CONVEYOR ROLLERS
New project of Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333. Supply of conveyor rollers and miscellaneous components. The successful tenderer/vendor will be required to provide technical support and information on current materials, and on new or substitute materials, which are compatible with the existing plant and equipment. Click for more details...

LIDDELL POWER STATION - BOILER OVERHAUL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project for New development. The scope of work covers the overhaul of Boiler Plant (including but not limited to pressure parts, milling plant, fabric filter plant , dampers and actuators, air heaters, valves, burners, fans) and Ash and Dust Plant ( including but not limited to dust removal plant and economiser grit removal system) on Generating Units 1 and 3 at Liddell Power Station during scheduled outages. Unit 1 Outage is currently scheduled to commence in March 2006 and will be conducted over a period of five (5) weeks. Unit 3 outage is currently scheduled to commence in September 2006 and will be conducted over a period of six (6) weeks. The timing of outages may vary. Click for more details...

LIDDELL POWER STATION - FIBRE OPTIC CABLES
Overhead/Underground Installation Of Fibre Optic Cables project at At, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the installation of four fibre optic cables in the areas surrounding the Bayswater and Liddell Power Stations. The four items of work are summarised as follows. Installation, termination and testing of a twenty-four core All Dielectric Self Supporting (ADSS) fibre optic cable between the Bayswater Cooling Water Make-up Pumping Station and the Liddell 33kV Switching Station. Secondly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the Liddell 33kV Switching Station and Liddell Power Station Administration Building.Thirdly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System Low Pressure Pumping Station (LPPS) and the River Pumping System High Pressure Pumping Station (HPPS). Lastly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System High Pressure Pumping Station (HPPS) and the Bayswater Power Station Administration Building. Click for more details...

LIDDELL POWER STATION - MILLING PLANT
A project in the NSW Within Muswellbrook. Work comprises the overhaul of RP 803 Bowl Mill Rolls and includes surveys and reports on the mill internals, the repair of eroded RP 803 Bowl Mill internals, the removal and replacement of three mill roll assemblies and doors, replacement of worm shafts and bearings and the replacement of eroded and holed PF piping system components and greasing of milling plant. Response time to a request for repair work shall be less than 24 hours, i.e. time from receipt of request to time of readiness to commence work on the plant. The contracted work will be carried out on a Schedule of Rates basis, as and when directed by the Contract Manager. Click for more details...

LIDDELL POWER STATION - CONTINUOUS OPACITY MONITORING SYSTEM
New project of Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333. This Specification is for the design, supply, delivery, installation, commissioning and field audit performance tests for four continuous opacity monitoring systems (COMS) including dedicated air blowers for each COMS unit, weather covers and installation of new instrument tapping points into the side of the inclined duct work for each COMS unit. An optional firm price for the design, supply, delivery, installation, commissioning and field audit performance tests for an additional four COMS units and dedicated air blowers for each COMS unit. Click for more details...

LIDDELL POWER STATION - PERIODIC UNDERWATER INSPECTION/MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 of Periodic Underwater Inspection And Maintenance type of New development. This Specification is for the provision of underwater diving services as and when required by the principal and includes the underwater inspection, cleaning and maintenance of plant or equipment at Bayswater and Liddell Power Stations. The locations and the type of work to be executed under the contract shall include, but not be limited to, the following: Inspection of CW Pump and associated pipework; Inspections, cleaning and maintenance of Cooling Tower Screens; Inspection and maintenance of pump pits and associated equipment; Inspection and maintenance of dam outlet works and structures; Inspection and cleaning of River Trash Rakes; Removal of the marine growth and other deposits from Ash and Dust Pump Pits; Underwater welding and cutting to various other items of plant as required; Inspection of and impression moulds on various pump impellors and provision of a written and/or photographic report on the various activities listed above. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Civil Services (Power stations, Power generation) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

LIDDELL POWER STATION - ELECTRIC MOTORS/LOW VOLTAGE - OVERHAUL/REPAIR
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work includes the rewind and repair of low voltage electric motors for Liddell Power Station as and when directed by Macquarie Generation for a three (3) year period from the date of issue of Macquarie Generation's Contract. Rewinding and repairs will be required for a.c. and d.c. motors designed for voltages up to 440 Volts and rating up to 315 kW. The majority will be 3 phase a.c., cage rotor, induction motors. The Specification includes, but is not limited to, work associated with stator coils, rotor coils, stator iron, bearings, rotor, heaters, heat exchangers, temperature sensors and general mechanical work. All work shall be carried out off-site at the Contractors'/Subcontractors' premises. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

LIDDELL POWER STATION - BOILER/TURBINE
Bolier/Turbine - Repair/Maintenance project at At, Liddell, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). The Boiler and Turbine Plant at Liddell Power Station has an extensive miscellaneous power and lighting (MP&L) system. This Specification covers the provision of labour hire services in the form of trades and non trades labour, materials and equipment as and when directed by the Principal, to undertake repairs and maintenance of the MP&L system at Liddell Power Station. Work may be required both during generating unit outages and at other times as required by the Principal. It is envisaged that a minimum of one (1) and a maximum of six (6) trades persons would be required at any one time. This number may however vary and the Principal makes no guarantee as to the extent of the work to be undertaken. Click for more details...

LIDDELL POWER STATION - COAL PLANT MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Coal Plant - Hydraulic Maintenance type. Liddell Power station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. The Site, which is to be made available to the Contractor for the purpose of the Contract, is at the Principal's Liddell Power Station and along the bin/conveyor system feeding Liddell and Bayswater Power Stations, including the Rail Unloading Facility at Ravensworth. The work covered by this Specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell coal Handling Plant Hydraulic Equipment for a period of two years from the date of placing the Order. Work will generally be carried out during normal working hours. Work on the specified areas will also be required outside these nominated periods. The Contract shall be for a period of two (2) years from the awarding of the Contract by the Principal, with a Macquarie Generation option to extend the Contract for a further two (2) year period. Click for more details...

LIDDELL POWER STATION - HYDRAULIC EQUIPMENT MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 800000. This project Work comprises the dismantling, inspection, report, repair, reassembly, servicing and testing of hydraulic and pneumatic items, that will include but not be limited to the refurbishment of various components for a period of two years. The Contractor may also be called to perform on-site repairs to any hydraulic component of installed equipment at Liddell. Click for more details...

LIDDELL POWER STATION - ACCESS PLATFORMS & WALKWAYS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the design, documentation, construction, manufacture, supply, installation, repair, maintenance and modification of fixed platforms, walkways, stairways and ladders on the power station site as directed by the Principal. The plant access ways require modifying at places to provide safer access to items of equipment such as valves. The Contract shall be for a period of one year from the awarding of the Contract by the Principal. Click for more details...

LIDDELL POWER STATION - BULK DISTILLATE
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Bulk Distillate - Supply type of New development. To supply approximately 16 million litres of bulk distillate, for boiler ignition purposes and as a fuel for gas turbine and mobile plant to Macquarie's power stations. Click for more details...

LIDDELL POWER STATION - CRANE MAINTENANCE & INSPECTION
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Cranes - Periodic Inspection & Maintenance type. Periodic and major inspections of cranes including maintenance. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Operating Mine - Expansion - Stage 2 type of New development. Expansion of existing Boggarbri open cut coal operations. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 1.5 million tonnes per annum (Mtpa) to 2.5Mtpa in 2011 & 4.3Mtpa in 2013. Installation of a new 132kV switchyard/sub-station/overhead power lines. Installation of modular buildings for offices & bathhouse extension. Construction of a light vehicle workshop, a heavy vehicle workshop with warehouse & a car park. 150 construciton jobs expected as well as 500 operational jobs. Click for more details...

LIDDELL POWER STATION - FIRE APPLIANCE REPAIR SERVICES
At, Liddell, NSW 2333 Has Liddell Power Station - Fire Appliance Repair Services currently at Construction stage. The work to be carried out under the Contract is the provision of the fire appliance servicing repairs and maintenance. Work will comprise establishing and maintaining records, inspections, cleaning, discharging, recharging, reconditioning, pressure testing, maintaining, lubricating and servicing of all fire appliances. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

SPRINGVALE COAL OPERATIONS - RAILWAY SIDING
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at 16km northwest of, Lithgow, NSW 2790. This type is Railway Siding - Construction with Private ownership. Construction of a new siding at the existing Lidsdale siding which has a coal loading capacity using front end loaders of 2million tonnes per annum (Mtpa). Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - HIGH VOLTAGE ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 17km northeast of, Boggabri, NSW 2382 of Switchyard/Substation/Transmission Lines type of New development. Construction of a 132KV high voltage switchyard & associated transmission lines. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

BULGA COAL OPERATIONS - TRAIN REFEULLING FACILITY
Train Refeulling Facility project at 16km southwest of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a rail refuelling facility adjacent to the existing Bulga Coal rail loop. To include a 1000kL diesel storage tank (12m x 2.5m); 5000L oil & 10,000L water storage tanks, oily water separator, 60 m long steel maintenance gantry as well as a roof over the main area. Mechanical & electrical equipment including switching panels, pumps & lighting. Above ground power line from existing easement & then underground power lines to the new facility. Existing access road upgrade. Click for more details...

TOMINGLEY GOLD PROJECT - TRANSFORMERS
Transformers project at Tomingley, near, Peak Hill, NSW 2869 In The Council Area Of Parkes of Private. For the provision of transformers. Click for more details...

SPRINGVALE COAL OPERATIONS DEWATERING BORE NO 8
Bore Holes/Pumps/Transformers/Switchroom/Tracks/Pipelines New project In The Lithgow Council Area. A project to install an additional 30ML/day dewatering bore (no 8) in a fenced compound. To include construction of 4 dewatering boreholes, each with a submersible pump. A high voltage switchroom & 2 x 11-3.3kV transformers. Installation of a buried water transfer pipeline along with 11kV cables. Upgrade of an access track. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...