State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Civil Services Projects in NSW


COONARAH GAS PROJECT
Currently at the Construction stage In Narrabri is a project estimated to be $ 5000000. This project 10 x 1MW container mounted Jenbacher Gas Engine Generator sets, with all ancillary transformers, switchgear, control systems and cabling. The Austrian built Jenbacher engines are purpose built gas engines. the equipment is available on short delivery, and the target date for commissioning is January 2004. Click for more details...

WAMBO COAL OPERATIONS - RAILWAY & BRIDGEWORKS
Railway/Bridgeworks project at Mount Thorley to Jerrys Plains Rd Wambo, Jerrys Plains, NSW 2330 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Rail link from Mt Thorley to United Collieries mine Wambo. Bridges, rail underpass. Click for more details...

ASHTON COAL PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Ravensworth, NSW 2330. 3.5km rail siding . Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

OAKDALE COLLIERY
Gas Drainage System For Coal Mine - Installation project at Burragorang Valley approx 80km south west of Sydney, Burragorang, NSW 2570 In The Council Area Of Wollondilly of Private. To reduce carbon dioxide levels. Click for more details...

COWAL GOLD PROJECT
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Approx 45 km north east of, West Wyalong, NSW 2671. Includes production bores & pipeline across Lake Cowal. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS
Water Pipeline New project In The Armidale Dumaresq Council Area. A utility pipeline/corridor between Gara dam and the mine. There are 2 options for the route of the pipeline. Polyethylene pipe. Trench installation. Click for more details...

GLENNIES CREEK COAL OPERATIONS
A project in the NSW Within Singleton. Namoi Hunter has obtained development consent for an underground coal mine located at Glennies Creek near Singleton in the NSW Hunter Valley. The mine is expected to produce from three to four million tonnes ROM per annum of high quality coking coal . The project is currently scheduled for completion by late 2004 is proceeding in three stages. I. Infrastructure development - including ventilation and access facilities. 2. Underground development requiring the acquisition of the following items of capital equipment - longwall mining System, underground conveyors, development, transportation and mobile equipment (including shuttle cars). 66kv power system. 3. Coal preparation plant - washery upgrade 3 km overland conveyor, coal handling equipment. Click for more details...

LIDDELL POWER STATION - GENERATOR TRANSFORMER/REWIND
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Generator Transformer/Rewind - Supply type of New development. The contract involves the removal of the transformer to the contractors work site. The transformer is a 585 MVA, 22/350 kV generator, 200 t in weight. Carry out an inspection and assess the transformers condition. Rewind and rehabilitate the transformer. electrically and mechanically test the transformer. Return the transformer to the site and place in storage. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Civil Services (Power stations, Power generation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

LIDDELL POWER STATION - BOILER/TURBINE PLANT MAINTENANCE
A project in the NSW Within Muswellbrook. The work covered by this specification involves the provision of labour hire services in the form of trades and/or non-trades labour, materials and equipment as and when directed by Macquarie Generation, to undertake repairs and maintenance of the miscellaneous power and lighting system. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

LIDDELL POWER STATION - MILL PYRITES
Mining - Civil Services (Power stations, Power generation) project at Via, Liddell, NSW 2333 for New. The supply and installation of new hydraulic pipelines and support structures from the Hydraulic Cabinets to the Mill Pyrites Hopper Isolating valves and Pyrites Spray Water Valves on Unit 1 A and B side, Unit 2 A side only and Unit 3 A and B sides. Installation of the new pipework will take place prior to outages. Cut over to the new pipework will begin during planned outages in Sept/Nov 2005, Dec/Jan 2006 and March/April 2006. Click for more details...

LIDDELL POWER STATION - VALVES
Liddell Power Station - Valves is currently at the Construction stage, valued at about $ 200000 it is Supply and delivery of miscellaneous valves and components. The successful supplier would be expected to offer technical assistance and information on current products in use, and the introduction of new or substitute products which are compatible with existing plant and equipment. Click for more details...

LIDDELL POWER STATION - BOILER FEED PUMP
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 for New. Work involves rectifying the ongoing problem of feedwater flow being inadequate at high unit loads. This will involve upgrading the steam driven boiler feed pump to increase its flow capacity. The purpose of this specification is to outline the general requirements for this upgrade, determining the extent of supply to ensure the requirements of clause 1.11 and the completed pump must be restored to a condition that will provide 15 years service. One pump is intially the target but there is an option to overhaul a further two pumps. Click for more details...

LIDDELL POWER STATION - DCS ENHANCEMENTS
New project of Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333. Supply of engineering services to implement modifications and enhancements on the control systems for a two year period. Click for more details...

LIDDELL POWER STATION - INSTRUMENTATION MAINTENANCE
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 200000. This project Work involves the calibration and maintenance of instrumentation, modifications to existing equipment installations, provision of new equipment installations and the provision of urgent labour services related to instrumentation and control at the power station. Contract will run for two years with an option for a further two years at the principals discretion. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

LIDDELL POWER STATION - PERIODIC SLASHING/PLOUGHING CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Private ownership. Work involves the provision of mobile plant and labour to undertake grass mowing, slashing, whipper snipping, ploughing of fire breaks and other general site maintenance work. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

LIDDELL POWER STATION - BOILER OVERHAUL MAINTENANCE
Mining - Civil Services (Power stations, Power generation) project for New development. The scope of work covers the overhaul of Boiler Plant (including but not limited to pressure parts, milling plant, fabric filter plant , dampers and actuators, air heaters, valves, burners, fans) and Ash and Dust Plant ( including but not limited to dust removal plant and economiser grit removal system) on Generating Units 1 and 3 at Liddell Power Station during scheduled outages. Unit 1 Outage is currently scheduled to commence in March 2006 and will be conducted over a period of five (5) weeks. Unit 3 outage is currently scheduled to commence in September 2006 and will be conducted over a period of six (6) weeks. The timing of outages may vary. Click for more details...

LIDDELL POWER STATION - COAL PLANT MAINTENANCE
A project in the NSW Within Muswellbrook. The scope of works involves, Installation of 'M' Series Conveyor access walkways; Replacement of the roof above Conveyor 16 vibratory feeders and the installation of a deflector roof under Conveyor 19, to prevent coal falls onto Conveyor 16 roof; Replacement of missing roof sheeting to conveyor 19, installation of head end access platform to Conveyor 19, installation of grated flooring to an open area adjacent to conveyor 19; Repair of walkway cleats on 5AR, 5 BR, 6AR, 6BR Conveyor incline; Replate G3/G4 Hoppers; Fabrication and installation of G1/G4 work access platforms; Replate conveyor 12B Vibratory Feed Chutes; Fabrication and installation of Demin Tank access work platforms. Click for more details...

LIDDELL POWER STATION - FIBRE OPTIC CABLES
Overhead/Underground Installation Of Fibre Optic Cables project at At, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the installation of four fibre optic cables in the areas surrounding the Bayswater and Liddell Power Stations. The four items of work are summarised as follows. Installation, termination and testing of a twenty-four core All Dielectric Self Supporting (ADSS) fibre optic cable between the Bayswater Cooling Water Make-up Pumping Station and the Liddell 33kV Switching Station. Secondly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the Liddell 33kV Switching Station and Liddell Power Station Administration Building.Thirdly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System Low Pressure Pumping Station (LPPS) and the River Pumping System High Pressure Pumping Station (HPPS). Lastly, Installation, termination and testing of a twenty-four core ADSS fibre optic cable between the River Pumping System High Pressure Pumping Station (HPPS) and the Bayswater Power Station Administration Building. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Civil Services (Power stations, Power generation) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

LIDDELL POWER STATION - CARPENTRY/MISCELLANEOUS MAINTENANCE
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the provision of labour for the maintenance and repairs of buildings and offices, minor concreting works, the repair and replacement of glass windows and the removal, preparation and installation of tiles and miscellaneous maintenance such as fencing, gardening, mowing and whipper snipping as required and so directed by the Principal. Click for more details...

LIDDELL POWER STATION - MAINTENANCE OF EXTERNAL ELECTRICAL POWER DISTRIBUTION SYSTEMS
A project in the NSW Within Muswellbrook. Work comprises the routine inspection and breakdown maintenance work on the electrical power distribution systems external to the Bayswater and Liddell Power Stations as and when required by the Principal for a two year period from the date of issue of the Principal's Contracts. These distribution systems are owned and operated by the Principal. Click for more details...

LIDDELL POWER STATION - ELECTRIC MOTORS/LOW VOLTAGE - OVERHAUL/REPAIR
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work includes the rewind and repair of low voltage electric motors for Liddell Power Station as and when directed by Macquarie Generation for a three (3) year period from the date of issue of Macquarie Generation's Contract. Rewinding and repairs will be required for a.c. and d.c. motors designed for voltages up to 440 Volts and rating up to 315 kW. The majority will be 3 phase a.c., cage rotor, induction motors. The Specification includes, but is not limited to, work associated with stator coils, rotor coils, stator iron, bearings, rotor, heaters, heat exchangers, temperature sensors and general mechanical work. All work shall be carried out off-site at the Contractors'/Subcontractors' premises. Click for more details...

LIDDELL POWER STATION - HVGT 1 & 2 COMMUNICATIONS/DCS INTERGRATION
New project of Mining - Civil Services (Power stations, Power generation) project at At, Muswellbrook, NSW 2333. The design, engineering, procurement, project management, manufacture, works inspection and testing, supply, packaging and protection, transportation, unloading, installation, site inspection, setting to work, site testing, site commissioning, site acceptance testing and ?provision? of warranty services, for the defects liability period, and all work incidental thereto, whether specified in detail or not, necessary for the safe and efficient provision of high speed communication network facilities, consisting of dual redundant paths, between the Hunter Valley Gas Turbine unit controllers, the Liddell 33kV Switching Station and the existing Liddell Power Station Yokogawa DCS. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Civil Services (Power stations, Power generation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

LIDDELL POWER STATION - ACCESS PLATFORMS & WALKWAYS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area for New development. Work comprises the design, documentation, construction, manufacture, supply, installation, repair, maintenance and modification of fixed platforms, walkways, stairways and ladders on the power station site as directed by the Principal. The plant access ways require modifying at places to provide safer access to items of equipment such as valves. The Contract shall be for a period of one year from the awarding of the Contract by the Principal. Click for more details...

LIDDELL POWER STATION - FABRIC FILTER-BAG CHANGEOUTS
At, Liddell, NSW 2333 Has Liddell Power Station - Fabric Filter-Bag Changeouts currently at Construction stage. Liddell Power Station is a 2000 MW coal fired sub critical generating facility comprising of four individual 500 MW Units. This Specification calls for the replacement of Fabric Filter bags on Units 1, 3 and 4 Passes #1-A,B & E, Passes #3-A,B,C,D & E, Passes #4 - A,B & C. Click for more details...

LIDDELL POWER STATION - BULK DISTILLATE
Mining - Civil Services (Power stations, Power generation) project at At, Liddell, NSW 2333 of Bulk Distillate - Supply type of New development. To supply approximately 16 million litres of bulk distillate, for boiler ignition purposes and as a fuel for gas turbine and mobile plant to Macquarie's power stations. Click for more details...

LIDDELL POWER STATION - UPPER HUNTER POWER STATION EMISSION MONITORING
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Flue Gas Emission Monitoring type. Work comprises the Flue Gas Emission Monitoring for Bayswater and Liddell Power Stations as and when directed by the principal, for a two year period from the date of issue of the contract with an option to extend for a further two year period. Work specifically comprises Oxygen (O2) and Carbon Dioxide (CO2) Testing at Bayswater Power Station, Carbon Monoxide (CO) Testing, Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NOX) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride, Sulphuric Acid Mist and Sulphur Trioxide Testing, Sulphur Dioxide (SO2), Temperature (0C), Velocity and Volumetric Flowrate Testing, PM2.5 Testing, Dioxins, Furans and Polychlorinated Byphenyls Testing Volatile Organic Emissions Testing, Benzo(a)pyrene (equivalent) Testing at Bayswater Power Station. For Liddell Power Station: Hydrogen Chloride (HCl) and Chlorine (Cl) Testing, Hazardous Substances and Copper Testing, Moisture Content of Stack Gases Testing, Dry Gas Density and Molecular Weight of Stack Gases Testing, Nitrogen Oxides (NO2) Testing, Undifferentiated Particulates Testing, PM10 Testing, Total Fluoride Testing, Sulphuric Acid Mist, Sulphur Dioxide and Trioxide Testing, Temperature (0C), Velocity and Volumetric Flowrate Testing, Dioxins and Furans Testing, Volatile Organic Emissions Testing. Click for more details...

LIDDELL POWER STATION - CRANE MAINTENANCE & INSPECTION
Mining - Civil Services (Power stations, Power generation) project In The Muswellbrook Council Area of Cranes - Periodic Inspection & Maintenance type. Periodic and major inspections of cranes including maintenance. Click for more details...

LIDDELL POWER STATION - FIRE APPLIANCE REPAIR SERVICES
At, Liddell, NSW 2333 Has Liddell Power Station - Fire Appliance Repair Services currently at Construction stage. The work to be carried out under the Contract is the provision of the fire appliance servicing repairs and maintenance. Work will comprise establishing and maintaining records, inspections, cleaning, discharging, recharging, reconditioning, pressure testing, maintaining, lubricating and servicing of all fire appliances. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Power stations, Power generation) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

MOUNT PLEASANT COAL PROJECT - HIGH VOLTAGE POWER LINES
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at 3km West of, Muswellbrook, NSW 2333. This type is Power Lines with Private ownership. For the provision of high voltage power lines for the mine site. Click for more details...

WILGA PARK COALBED METHANE GAS POWER STATION - UPGRADE GAS POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 7 km west of, Narrabri West, NSW 2390 of Gas Power Station - Upgrade type of New development. The upgrade of the coalbed methane gas power station from 12MW to 40MW. Up to 12, 3 MW gas engine driven generators, subject to gas availability will be installed, with the first underway & expected to be commissioned in June 2009. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Civil Services (Power stations, Power generation) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

BOGGABRI COAL OPERATIONS EXPANSION - CHPP UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 386 Leard Forest Rd 17km northeast of, Boggabri, NSW 2382 for Renovations, Refurbishments etc.. Upgrade of the coal handling & preparation plant (CHPP) to increase throughput from 3 million tonnes per annum (Mtpa) to 6.9 Mtpa. Construction also of a new rail loop & load out facility & upgrade of the present one. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - CHPP ELECTRICAL
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Lemington Rd, Singleton, NSW 2330. This type is Electrical - For Coal Handling & Processing Plant with Private ownership. Low voltage power supply & reticulation as well as high voltage transmission supply & relocation. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

SPRINGVALE COAL OPERATIONS DEWATERING BORE NO 8
Bore Holes/Pumps/Transformers/Switchroom/Tracks/Pipelines New project In The Lithgow Council Area. A project to install an additional 30ML/day dewatering bore (no 8) in a fenced compound. To include construction of 4 dewatering boreholes, each with a submersible pump. A high voltage switchroom & 2 x 11-3.3kV transformers. Installation of a buried water transfer pipeline along with 11kV cables. Upgrade of an access track. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Civil Services (Water distribution & pipelines, borefields) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect