State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Civil Services Projects in QLD


COPPABELLA COAL OPERATIONS
Currently at the Construction stage In Mackay Regional is a project estimated to be $ 1000000. This project To reduce risks of dry periods. The pipeline will run between Coppabella and a large source of water. This pipeline could also benefit the Monto coal project. This previously long term plan has been brought forward in response to dry conditions in the region. Click for more details...

GERMAN CREEK WASTE MINE GAS POWER PROJECT - GRASSTREE
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 11000000. This project Energy Developments has signed a Memorandum of Understanding with Anglo Coal for the development of a 32 megawatt waste coal seam methane (WCSM) power plant at the German Creek (Grasstree) mine. The project will utilise new technology, the Carburetted Gas Turbine (CGT), developed by Energy Developments for the utilisation of ultra lean fuels in gas turbines. The Australian Greenhouse Office, the Commonwealth Government agency responsible for greenhouse matters, has awarded a $15.47 million grant to the project under the Greenhouse Gas Abatement Program. The focus of the CGT development to date has been on the utilisation of ventilation air from underground coal mines. The 2.5MW CGT prototype has demonstrated that the technology can be successfully applied on a commercial scale. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
A project in the QLD Within Isaac Regional. Includes some in-field compression, reticulation of water and power. Click for more details...

BLACKWATER COMET CHPP PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Central Highlands Regional Council Area of Prep Plant/Raw Coal Area/Loadout/High Voltage - Design/Const Package (Combined) type. Now includes the Comet CPP Project (Preparation Plant), and all coal handling facilities, as well a high voltage electrical package. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Currently at the Construction stage In Banana Shire is a project estimated to be $ 100000. This project Additional water requirements. Small package. Click for more details...

TOWNSVILLE POWER STATION
Civil Contract - For Power Station Modification project at via, Yabulu, QLD 4818 in the Mining - Civil Services (Power stations, Power generation). Civil works & foundations for conversion of a gas powered plant to a co generation plant for production of electricity. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

KOGAN CREEK POWER STATION PROJECT
J/V - Private & Govt ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Western Downs Regional Council Area for New development. A750MW single unit steam turbine plant, fired on coal from the adjacent Kogan Creek mine. The Siemens portion of the project includes site preparation, civil, turbine-generator island, balance of plant, electrical control & instrumentation. (Related projects coded SIE on www.icnwa.org.au) The Hitachi portion of the project includes boiler island and main steam piping. (Related projects to be coded HIT on www.icnwa.org.au) Click for more details...

KOGAN CREEK POWER STATION PROJECT
Mining - Civil Services (Water distribution & pipelines, borefields) project at 9 km south of, Brigalow, QLD 4412 for New. Proposed 600-850 MW power station adjacent to Kogan Creek coal deposit. Click for more details...

KOGAN CREEK POWER STATION PROJECT - CONCRETE & FINISHING WORKS
New project of Mining - Civil Services (Power stations, Power generation) project at 9 km south of, Brigalow, QLD 4412. Procurement, (fabrication) and erection of: 36,500 m³ concrete for foundations, walls, columns, ceilings and turbine foundation. 3,500 to reinforcement, 49,000 m² formwork for foundations, walls, columns, ceilings and turbine foundation. 1,570 m³ Brickwork 17,5 cm to 36,5 cm thickness, 600 m² Brickwork 12 cm thickness, 8,770 m² Plastering of walls, columns, ceilings, 24,300 m² Painting of walls, columns, ceilings, 2,150 m² Ceramic tiles for walls and floors, 2,200 m² Carpet tiles / linoleum flexible sheets, 2,000 m² Suspended ceilings, 350 m² Raised floors, 210 No Toilets, washbasins, showers, urinal. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

KOGAN CREEK POWER PLANT
Kogan Creek Power Plant is currently at the Construction stage, valued at about $ 1000000 it is Water Treatment Plant: raw water treatment (gravel filters) capacity 2x95m3/h potable water treatment (activated carbon filters) capacity 150m3/d demineralisation plant (ion exchange with circ. regeneration system) capacity. Click for more details...

KOGAN CREEK POWER PROJECT - HVAC
A project in the QLD Within Western Downs Regional. Ventilation system for steam turbine hall. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

KOGAN CREEK POWER PROJECT - FIRE FIGHTING SYSTEM
Private ownership Mining - Civil Services (Pump stations, Above ground reservoirs) project In The Western Downs Regional Council Area for New development. Includes pumps, extinguishers. Click for more details...

KOGAN CREEK POWER PROJECT - COATING & SURFACE PROTECTION
Mining - Civil Services (Power stations, Power generation) project for New development. Application of protective coatings (including scaffolding, necessary protective measures during blasting and/or coating and extended surface preparation in case of need) on site for generally prime coated pipes, pipe supports, tanks etc. in order to obtain corrosive protection. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project for New development. The Windbox main components consist of 6t, 3.2t Plate, Shape Steel, etc. Material: Carbon Steel (Total weight) Approx. 70ton. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Kogan Creek Power Station - Boiler House/Piping is currently at the Construction stage, valued at about $ 200000 it is Main Components Sheet: 0.42bmt zincalume: 10,000m2 Purline & Girts: Z300, Z250, 7,700m2 Total weight Approx. 350ton. Delivery date at site June 2005. Basic design by BHK. Detailed design, Material & Fabrication by Supplier. Click for more details...

KOGAN CREEK POWER STATION - BOILER HOUSE/PIPING
Mining - Civil Services (Power stations, Power generation) project for New development. Spring hanger, constant hanger, snubber. Click for more details...

TARONG NORTH POWER STATION
Mining - Civil Services (Power stations, Power generation) project In The South Burnett Regional Council Area of Furnace Ash Removal type. Includes supply of all labour, equipment and supervision in order to remover and transport furnace ash from Tarong North Power station to a designated unloading point. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

KOGAN CREEK POWER STATION - TRANSPORT TO KOGAN CREEK
New project of Mining - Civil Services (Power stations, Power generation) project at Via, Brigalow, QLD 4412. Scope of work: Booking of ship space and related services as well as follow up for 1 HP-Turbine 145 to 1 LP-Turbine 160 to 1 Generator 316 to 1 Pre-Heater 220 to 1 Pre-Heater 125 to 1 Transformer 350 to FCA/FAS European North Sea Port to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for Condenser Parts 860 FRT FCA/FAS Indonesia to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 1 Feedwater-Tank 100 to FCA India to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 11.000 FRT of General Cargo and ODC from FCA/FAS various Ports worldwide to DDP Kogan Creek Site- Customs clearance for equipment above. Scope of work Booking of ship space and related services as well as follow up for 1 HP-Turbine 145 to 1 LP-Turbine 160 to 1 Generator 316 to 1 Pre-Heater 220 to 1 Pre-Heater 125 to 1 Transformer 350 to FCA/FAS European North Sea Port to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for Condenser Parts 860 FRT FCA/FAS Indonesia to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 1 Feedwater-Tank 100 to FCA India to Port of Discharge in East Australia. Booking of ship space and related services as well as follow up for 11.000 FRT of General Cargo and ODC from FCA/FAS various Ports worldwide to DDP Kogan Creek Site . - Customs clearance for equipment above Experience required, prerequisites: ? handling of sea- and air-transport, import and onward transport of equipment for large industrial projects ? European partner, preferably German required for daily work (ship booking, coordination, customs aspects, etc.) with Siemens Power Generation in Germany. Heavy-load shipping experience required. Click for more details...

ABBOT POINT COAL TERMINAL EXPANSION STAGE 3
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Abbot Point 25 km north west of, Bowen, QLD 4805 of Coal Terminal Expansion - Stage 3 type of New development. Expansion of terminal capacity from 15 mtpa to 50 mtpa. Key components of the stage 3 expansion will involve the construction of a second berth, a second rail loop and train dump facilities and associated second in loading conveyor. Installation of a new stockyard bund and two new stockpile rows. Up to three new stacker reclaimers and a new yard conveyor and transfer towers will be installed. A second outloading conveyor to the offshore berth, using the existing jetty structure will be installed. Installation of a second offshore berth and a second shiploader on the new berth. Lastly there will dredging work associated with the second berth and the dredge material will be disposed of on either land or sea. Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - PIPES FOR DAMS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Isaac Regional Council Area for New development. From west dam to process dam Click for more details...

TARONG NORTH POWER STATION - MILL CRANAGE SYSTEM
Mill Cranage System - Modification project at Tarong Rd,, Tarong, QLD 4615 In The Council Area Of South Burnett Regional of Private. Modifications to the existing Mill Crane System that will allow the required lifts to be completed. Design could involve modifying the existing cranes, replacing the existing cranes or installing other equipment. Click for more details...

DAANDINE GAS PROJECT - POWER STATION CIVIL WORKS CONTRACT
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Civil Works Contract type. Civil works for a new power station. Click for more details...

NEW ACLAND COAL STAGE 2 EXPANSION PROJECT - WATER MANAGEMENT INFRASTRUCTURE
Water Management Infrastructure - For Process Water project at 14 km north west of, Oakey, QLD 4401 in the Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes). Contract includes pipes & pumps. Scope of work currently being modified. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining - Civil Services (Power stations, Power generation) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

MIDDLEMOUNT COAL OPERATIONS - STAGE 2 EXPANSION
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Isaac Regional Council Area of Operating Mine - Expansion type. A pulverised coal injection (PCI) & coking coal open cut mine based on an estimated resource of 122.6million tonnes (Mt). The stage 2 expansion project to increase production from 1.8million tonnes per year (Mtpa) to 5.4Mtpa of run-of-mine (RoM) coal for 23 years. Removal of overburden & coal to continue by conventional truck, shovel & excavator. To includes a 30kL/day package potable water treatment plant (WTP), a sewage treatment plant (STP), the 650m x 200m go line area (including office, crib facility, amenities, kitchen/dining area), flood protection levees & diversion of Roper Creek & Thirteen Mile Gully. Later upgrading of feed conveyors, coal stackers, screens, valves & control systems of the existing coal handling & preparation plant (CHPP) to increase capacity from 400 to 700 tonnes per hour (t/h) for 4Mt/y product coal. Extension of the existing vehicle workshop to include 4 additional covered & 2 outdoor bays with aprons. Additional 600,00l diesel & 1.2ML fuel storage facilities. Associated out-of-pit spoil dumps & additional haul/access roads. Possibility of a dragline & associated 200m x 200m construction pad. Later diversion of part of the Bingegang (Saraji) pipeline. Some of the additional 397 operational personnel expected to be accommodated in an extension to The MAC Middlemount village. Click for more details...

GOONYELLA RIVERSIDE COAL OPERATIONS - EXPANSION PROJECT - 132KV SWITCHING STATION
Off Red Hill Rd 30km north of, Moranbah, QLD 4744 Has Goonyella Riverside Coal Operations - Expansion Project - 132kv Switching Station currently at Construction stage. A project to accommodate the Goonyella Riverside Mine's increase in electrical requirements from 50MW to 93MW by providing access to 132kV transmission capacity. Existing Feeders at the Mornabah-Stony Creek Tee North Goonyella (7122) & Moranbah-Newlands (7155) to loop in & out of the new switchyard atop concrete poles. The switching station to include 2 x 132kV busbars, 8 x 132kV double circuit breaker bays, 2 x 132kV capacitor banks & a 250kVA emergency diesel generator. Civil works expected to include site clearance & levelling, drainage, fencing, installation of cable trench & a site wide earthing mat. Buildings to include 2 demountables for a bay control building (14 x 3.2m) & communications building (7 x 3.2m) as well as a 9 x 9m, slab on ground storage shed with metal walls & roof. Up to 30 construction personnel & a similar number for the following electrical fit-off expected during the 1 year project. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Civil Services (Water distribution & pipelines, borefields). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

DAUNIA COAL PROJECT - SEWERAGE PUMPS
Sewerage Pumps project at 25km southeast of, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Supply of submersible, grinder type, sewerage pumps including couplings & guide rails. Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - NORTH COAST ALDOGA UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via, Gladstone, QLD 4680 for New. Construction of additional rail track along the North Coast Rail Line to provide some triplication. Click for more details...

CAVAL RIDGE COAL PROJECT - COAL PREPARATION PLANT & RAIL FACILITIES
Mining - Civil Services (Water distribution & pipelines, borefields) project at 16km south of, Moranbah, QLD 4744 of Coal Preparation Plant/Rail Loadout/Conveyor/Roads type of New development. The proposed Caval Ridge CHPP will have a nominal feed capacity of 2 000 t/h and is capable of processing 14-16 Mt/a to produce a nominal 8 Mt/a of hard coking coal, 5.5 Mt/a of which will be sourced from the Caval Ridge Mine & the balance to come by conveyor from the expanded Peak Downs mine. The facility shall operate seven days per week on a continuous basis. The CHPP will consist of: ROM dump hopper for primary sizing; secondary and tertiary sizers with intermediate screening; raw coal stockpiles with mechanised stacking and reclaim facilities; 2 module coal preparation plant, nominally 1000 tph, per module; product coal stockpiles with mechanised stacking and reclaim facilities; train loadout to the north of the Peak Downs Highway, a conveyor will transport material crossing the highway; reject bin and handling system and ultrafine tailings dewatering system. Water supply to be a combination of site water reuse & a raw water supply via a new off take pipeline from existing bulk pipelines. Process plant water will be recycled to minimise raw water make-up requirements for the site. The product coal will be railed approximately 185km to the Hay Point and/or Dalrymple Bay coal terminals for shipment. Click for more details...

CAVAL RIDGE COAL PROJECT - WATER INFRASTRUCTURE
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at 16km south of, Moranbah, QLD 4744. This type is Water Diverson & Collection/Sewerage Treatment with Private ownership. The mine water management system to include clean water diversion, disturbed area runoff collection & treatment, pit water management, water reuse & water disposal if there is surplus water at any time. Sewerage and wastewater treatment by packaged sewerage treatment plant (STP). Click for more details...

BMA MORANBAH HDPE PIPELINES CONTRACT
Pipelines - Supply & Install project at Bowen Basin via, Moranbah, QLD 4744 In The Council Area Of Isaac Regional of Private. Contract for the supply & installation of high density polyethylene (HDPE) pipelines at 2 BHP Billiton Mitsubishi Alliance (BMA) Bowen Basin sites around Moranbah. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM CONTRACT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 300000000. This project Construction of 6 field compressor stations & a central processing plant within 60km of Dalby with works extending into the Chinchilla & Miles regions. Click for more details...

GROSVENOR COAL PROJECT ELECTRICAL SYSTEMS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project for New development. A contract for the design, engineering, testing & project commissioning of an integrated automation & electrification system to control all processes & power systems. To include a 66kV substation, power & distribution transformers. Modular pre-fabricated switchrooms equipped with medium voltage switchgear & low voltage power control centres & multi-drive variable speed drives. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - POWER STATION
Currently at the Construction stage In Weipa Shire is a project estimated to be $ 5000000. This project For the design procurement, construction, testing & long term operation & maintenance of a nominal 20 MW diesel-powered power station with an expected ~18 MW peak load, minimum 2MW load & average ~14 MW load by the Independent Power Producer (IPP) to supply sole customer Rio Tinto for the offtake of electricity. Diesel fuel will be free issued from a local fuel farm by Rio Tinto to the IPP. To include: Power system studies. Undertaking of all engineering to facilitate the procurement, construction, pre-operational testing & commissioning of the power station & ancillary equipment within the power station boundary. Coordination with the Amrun Project Team in the design of engineering interfaces between the power station & the mine project at the designated battery limits. Provision of vendor data to the Amrun Project Team to support downstream electrical studies on the distribution system. Conducting of studies to confirm compliance with network technical rules. Conducting of studies to confirm emissions (stack, noise and vibration) compliance within project approval limits. Scope of Works extends to the following battery limits: HV terminals of step-up transformers. Control & communications within power station (integrated with mine operations). Potable water/ fire water/ diesel & sewer at the fence-line. Cleared & grubbed surveyed pad (Amrun Project Team to arrange site clearance & grubbing). Click for more details...

BMA CENTRAL REGION WATER PIPELINE
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at Between Saraji & Norwich Park mines via, Dysart, QLD 4745. This type is Pipeline with Private ownership. Construction of a 34km long high density polyethylene (HDPE) water pipeline including road & creek crossings. Associated pump station & electrical infrastructure. Click for more details...

CARMICHAEL RAIL PROJECT
from Mistake Creek to Abbott Point via, Bowen, QLD 4805 Has Carmichael Rail Project currently at Tenders & Building stage. For the provision of Package CT-01 (ch-10~115km) - From Abbot Point to northern section of Main line of approximately 165 km length to include main line, balloon loop at Abbot Point, passing loops, maintenance yard, track laying work by track machine & manual & flash butt welding facilities. Package CT-02 (ch.115~388km) - From northern section of main line to Carmichael Coal Mine of approximately 280km length to include main line, balloon loop at Carmichael Coal Mine, passing loops, ballast siding, bad order siding, maintenance siding, construction depot, track laying work by track machine & manual & flash butt welding facilities. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project at ., Curtis Island, QLD 4680 of Septic Pump Out type of New development. For the provision of Septic Pump Out Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

BYERWEN COAL PROJECT - HIGH VOLTAGE POWER DISTRIBUTION EQUIPMENT
Mining - Civil Services (Power stations, Power generation) project In The Isaac Regional Council Area of High Voltage Power Distribution Equipment type. For the provision of High Voltage Power Distribution equipment, including: Item A: 66kV Switching Station Supply: Installation & commissioning of a skid mounted 66kV circuit breaker complete with isolators, VT?s, CT?s, protection, metering & control devices. Item B: 66/11kV Relocatable Sub-station: Supply, installation & commissioning of a 10/12MVA, 66/11kV skid mounted substation complete with 66kV circuit breaker, ONAN/ONAF transformer & 11kV switchgear. Item C: 11kV, Pad mounted, 3000kVAR Power Factor Correction Unit Supply & commissioning of an enclosed, pad mounted 11kV, 3000kVAr rated Power Factor Correction Unit. 11kV Fault rating: 1kV/25kA/3s Ingress protection: IP55 SCR switching modules: 2 x 400amp/12kV Capacitors: 12, Unit rating: 3000kVAr. No of switched steps: 4 (in 1:1 ratio). Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

GROSVENOR COAL MINE POWER STATION
Mining - Civil Services (Power stations, Power generation) project at Via, Moranbah, QLD 4744 for New. Construction of a new 21MW waste coal mine gas (WCMG) power station located on Anglo American's new Grosvenor metallurgical coal mine. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - TEMPORARY POWER FOR CONSTRUCTION OFFICE FACILITIES
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Weipa Shire Council Area for New development. Provision of diesel generators & self bunded diesel storage tanks in various sizes to supply power to construction office facilities across site. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect