CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

MINDARIE MINERAL SANDS PROJECT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Karoonda Council Area of Power Supply type. Electricity requirements have increased from 5.5 to 7.5 million units. Mains supply will be supplied via the Pyap 66kv substation. Click for more details...

CHALLENGER GOLD OPERATIONS
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Roxby Downs Council Area for New development. The first gold bar at the Challenger Gold project was poured on 12 October during the commissioning process with the first shipment of gold bullion, expected to total 750 ounces, scheduled for 24 October. Ramp-up to full production levels is expected by the end of October. The initial open pit will recover 105,000 ounces of gold over a 20 month operating period from the start-up in October 2002 with head grades expected to average 5.9 g/t. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - DEMONSTRATION GEOTHERMAL PLANT - STAGE 2 - ERECTION
Cooper Basin via, Innamincka, SA 5731 Has Cooper Basin Hdr Geothermal Project - Demonstration Geothermal Plant - Stage 2 - Erection currently at Planning stage. For the stage 2 construction of 3-5 MW demonstration geothermal plant. Click for more details...

MINDARIE MINERAL SANDS PROJECT - TRANSMISSION LINE CONTRACT
Mindarie Mineral Sands Project - Transmission Line Contract is currently at the Construction stage, valued at about $ 1000000 it is A 57 Km long 66,000 volt Transmission line. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - TRANSMISSION LINE/SUBSTATION
A project in the SA Within Coober Pedy. Construction will comprise the building of a 164 km 132 kV transmission line and substation at the mine site. The power line will comprise approx 500 towers x 26 metre height pre-constructed of galvinised steel poles or lattice. Towers will take approx two days to construct on site. About 50,000 metres of service track will be constructed to service the transmission line. A substation and associated switchyard will be constructed at the mine site and will have a land area of 1 Hectare. The annual consumption of the mine and association infrastructure will be 211.1 GWh per annum. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - PORT FACILITIES
Currently at the Construction stage In Whyalla is a project estimated to be $ 60000000. This project For the construction of a rail loop, tip pocket, storage shed and barge loading facility. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - POWER PLANT FOR DEMONSTRATION GEOTHERMAL PLANT - STAGE 2 - ERECTION
Power Plant - For Demonstration Geothermal Plant - Stage 2 - Erection project at Cooper Basin via, Innamincka, SA 5731 in the Mining - Civil Services (Power stations, Power generation). For the construction of a power plant for the 3-5 MW demonstration plant. Turbines & Generators have been purchased. Click for more details...

COOPER BASIN HDR GEOTHERMAL PROJECT - PILOT POWER PLANT
Mining - Civil Services (Power stations, Power generation) project In The Unincorporated Council Area of Private ownership. For the development of a 1MW pilot generation plant. Click for more details...

KANMANTOO COPPER & GOLD PROJECT - WATER PIPELINE
Water Pipeline New project In The Mount Barker Council Area. Construction of a 16km buried pipeline from the Mount Barker Brown Dam to the mine site. To supply up to 750ML a year. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

PROMINENT HILL COPPER GOLD OPERATIONS - WATER SUPPLY UPGRADE
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 100km southeast of, Coober Pedy, SA 5723. A project to allow the 1200tph mill work in a range of throughput rates by upgrading the existing 15 water production wells & drilling an additional one. Optimisation also of the well field including variable speed drives & upgrading well headworks, electrical controls & the operating system. Click for more details...

PORT OF WHYALLA NORTH HARBOUR EXPANSION
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The Whyalla Council Area of Rail Facilities/Ship Loading type. Expansion of OneSteel's bulk export operations from 7 million tonnes per annum (Mtpa) approx to 12 Mtpa. To include construction of additional receival & storage facilities (rail infrastructure, tip pocket & storage sheds), ship loading facilities (conveyors, loader, berthing infrastructure) & expansion of transhipping operations. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities. Click for more details...

TARCOOLA GOLD PROJECT - WATER SUPPLY
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at 3km West of, Tarcoola, SA 5710. For the provision of water supply. Click for more details...