List of Mining - Civil Services Projects in WA


SALLY MALAY NICKEL PROJECT
Currently at the Tenders & Building stage In Wyndham-E Kimberley is a project estimated to be $ 500000. This project Water pumps, process/reagent pumps bore pumps. Click for more details...

COBURN MINERAL SANDS PROJECT - POWER SUPPLY
Power Supply project at South of, Hamelin Pool, WA 6532 In The Council Area Of Shark Bay of Private. Power for the mining operation likely to be supplied by contractors using mobile power generation facilities. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

GRIFFIN BLUEWATERS POWER PROJECT - COAL-FIRED POWER STATION
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Lot 8 Wellington Loc 796 approx 3km north east of, Collie, WA 6225 for New. The commissioning of the coal-fired power station at Collie will commence October 2008. Click for more details...

DIRECT REDUCED IRON (DRI)/HOT BRIQUETTED IRON (HBI) PLANT
A project in the WA Within Port Hedland. Two 32 megawatt gas turbine generators to be built at the proposed HBI plant to enable the use of waste heat in the pre-heating process of the iron ore. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

PARKESTON POWER STATION
Parkeston Power Station is currently at the Construction stage, valued at about $ 240000 it is Work to involve tie-ins for new gas turbine generator units (2). Associated power distribution & lighting expected to be included in this tender. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Civil Services (Water distribution & pipelines, borefields). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - RAIL INFRASTRUCTURE
A project in the WA Within East Pilbara. Additional rolling stock and associated infrastructure to complement the Dampier port expansion and mine requirements. Click for more details...

OREBODY 18 IRON ORE PROJECT
A project in the WA Within East Pilbara. BHP plans to mine 116 million tonnes of ore over the next 12 -15 years. Part of the development will be the construction of a 35 km, 66kV powerline from BHP's gas fired power station at Nweman to the mine Click for more details...

NIFTY COPPER OPERATIONS
Mining - Civil Services (Water distribution & pipelines, borefields) project at 200 km southeast of, Marble Bar, WA 6760 for Addition. Contract to involve site preparation, embankments, liner plus associated pumps & piping. Click for more details...

PADDINGTON GOLD OPERATIONS
Mining - Civil Services (Pump stations, Above ground reservoirs) project for New development. Contract to incorporate portal development, dewatering drive, pumping station cavity & decline construction. Water model & development options still undergoing assessment. Tender involves construction of a 1.8 km long decline & drive in the north wall of the Paddington One pit. A drive will be established about 30m below pit floor. The decline is to be utilised as an access ramp & to provide access to the drive underneath the pit base. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
New project of Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Via, Newman, WA 6753. Includes all earthworks, culverts, bridges, rail, sleeper and rolling stock requirements, with the exception of locomotives. These are continuing to be sourced internationally and may be added to this agreement. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINING CONTRACT
Pilbara Iron Ore & Infrastructure Project - Mining Contract is currently at the Construction stage, valued at about $ 200000000 it is Work will be carried out in two stages. The first stage comprises mine planning, equipment selection, procurement and commissioning, mine infrastructure planning, operator input to design, pre-production of initial bulk earthworks, pre-strip, pre-production ore mining, construction of haul roads, service reticulation, dewatering, installation and commissioning of mine site conveyancing and development of all mine site management systems. The second stage comprises ore production and mine planning to optimise annual operations and annual operating targets of the mine. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY UNDERGROUND - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) project In The Laverton Council Area of Underground Mining type. Underground development work and production mining are in progress. Full scale underground mining should commence in 2007. As part of the development work it is proposed to construct a new dewatering system for the mine. Water will be discharged at 250L/scc and a new discharged point will be constructed. This involves the construction of a second Lake Carey outfall with a 3.5 Km pipeline and four discharge outlets, fitted with manual valves. These valves will be fitted over the lake area to the west of the Wallaby waste dump area. Click for more details...

BHP BILLTION RAPID GROWTH PROJECT 2 - PORT ADDITIONS
Via, Port Hedland, WA 6721 Has Bhp Billtion Rapid Growth Project 2 - Port Additions currently at Planning stage. Includes construction of a new car dumper and ancillary works. Initial capacity fo car dumper 8Mtpa. Ultimate capacity of 40Mtpa, following future expanison projects. Additional car dumping capacity will allow upgrades to existing dumpers to be undertaken ready for future market growth. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

IRON ORE RAPID GROWTH PROJECT 2 - RAIL EXPANSION/MAINTENANCE CONTRACT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at At and near, Port Hedland, WA 6721 for New. Two contracts are part of this project. First part is the maintenance contract to install 60,000 sleepers. The resleepering will take place at BHP Billiton Iron Ore yard, Mount Newman yard and Jimbelbar line. The second part involves the extension of track from Bing Siding to Nelson Point yard and track modifications at Goldworthy Junction, Nelson Point arrival area and Finucane Island. Work comprises the construction of approximately 26 Km of ballasted track, 37 turnouts and catch points. Click for more details...

GERALDTON PORT AUTHORITY - IRON ORE EXPANSION PROJECT - MATERIALS HANDLING
Mining - Civil Services (Power stations, Power generation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Development comprises modifications for Conveyor (CV) 13 to allow for the upgrading and reversal for conveying iron to Berth 5. New conveying circuit for iron ore from reversed and upgraded CV 13 to Berth 5. Modifications to the concentrate load out arrangements. Modifications and new conveying circuit to route all minerals and concentrates from the existing mineral sands ship loading truck dump facility to Berth 4. Minor upgrade of Berth 6 ship loader (only if required to accommodate modifications to suit a new minerals conveyor feed circuit such as a reversed feed tipper). New electrical substations, power distribution and electrics for the new development. New control system and provisions for future control systems for all recalim, conveying and ship loading circuits including intergration with existing systems. Upgrade of existing reclaim systems as required to accommodate the loading circuit modifications for both iron ore and minerals. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 66 KV SWITCHGEAR/EQUIPMENT
Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753 for New. 66 kV Switchgear and Equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 66 KV SWITCHGEAR/EQUIPMENT
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Near, Newman, WA 6753 for New. 66 kV Switchgear and Equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - INTERLOCKING EQUIPMENT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Near, Newman, WA 6753 of Interlocking Equipment type of New development. Interlocking Equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - VVVF LV
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Port Hedland Council Area of Variable Voltage Variable Frequency System/ Low Voltage type. Variable Voltage Variable Frequency System - Low Voltage Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - LOCOMOTIVES CONTRACT
Locomotives - Supply New project In The East Pilbara Council Area. To supply 15 Dash 9 CW44 locomotives. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - FIRE DETECTION & ALARMING
Mining - Civil Services (Power stations, Power generation) project at 15 Km South east of, Collie, WA 6225 for New. For the supply of fire detection and alarming. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - RELIEF VALVES
Relief Valves - Supply New project In The Collie Council Area. For the supply of relief valves. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - 132 & 33 KV SWITCHGEAR
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at On, Finucane Island, WA 6721. This type is 132 & 33 Kv Switchgear - Supply with Private ownership. 132 & 33 kV Switchgear. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

BODDINGTON GOLD MINE EXPANSION - SEWAGE TREATMENT PLANT
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Boddington Council Area of Sewage Treatment Plant type. Sewage Treatment Plant will comprise an Aeration tank, Sludge Storage tank, Chlorination tank, Chlorine Dosing System and associated pipe and pumps. Production capacity will be 65 cubic metres per day. Click for more details...

PANNAWONICA TOWN WASTE WATER TREATMENT PLANT
Private ownership Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Ashburton Council Area for New development. Replacement of the waste water treatment plant. The old plant is 30 years old. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - TRANSFORMER
Mining - Civil Services (Power stations, Power generation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Transformer - Supply Of New & Refurbishment Of 2 Existing type of New development. Supply of 1 new transformer and refurbishment of 2 existing transformers. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS - POWER SUBSTATION EXPANSION
Mining - Civil Services (Power stations, Power generation) project for New development. The existing 220/33 kV substation will be effectively rebuilt to increase transformation capability and provide a more secure mesh bus configuration to improve power supply via a new second transmission line. The design will be similar to the Millstream power station utilising power transformers, high and medium voltage switchgear, protection and control systems. Click for more details...

SINO IRON ORE EXTENSION PROJECT - DESALINATION PLANT DOUBLE ENTRY REFER TO PROJECT ID 857138
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Cape Preston 80km southeast of, Karratha, WA 6714. Construction of groundwater bores, a 30 GLpa desalination plant, & the construction of seawater intake & brine disposal outfall. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Civil Services (Power stations, Power generation) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment including a wheel lathe to service and m Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - WET ORE PROCESSOR SMP
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area of Structural/Mechanical/Piping - For Wet Ore Processor type. Contract for the provision of structural, mechanical & piping engineering services for a 15 million tonnes per annum (Mtpa) wet ore processor to accommodate 220t capacity haul trucks. To include primary & secondary crushing & screening, waste fines thickening & discharge return lines, stockpiling of lump & fines product, reclaiming & train loadout. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

FORTESCUE RIVER GAS PIPELINE
Mining - Civil Services (Power stations, Power generation) project at From DBNGP to SOLOMON HUB 150km south of, Karratha, WA 6714 of Pipeline - Gas type of New development. Construction of a 16 inch diameter, 270km long, 64 TJ/day capacity pipeline from an Inlet Station on the Dampier to Bunbury Natural Gas Pipeline (DBNGP) compressor station 1 to a Delivery Station at TransAlta's 125MW power station at Fortescue Metal Group's Solomon Hub. To allow for conversion of the Solomon power station from diesel. Associated access track along the construction corridor & a temporary accommodation camp (demountable buildings, ablutions, laundry, food mess, wet mess/bar, recreation rooms) in the central portion. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

KALGOORLIE NORTH GOLD PROJECT - ROAD & RAIL RELOCATION
Kalgoorlie North Gold Project - Road & Rail Relocation is currently at the Construction stage, valued at about $ 14500000 it is For the provision of road & rail relocation. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - WASTE DUMP
Pilgangoora Lithium-Tantalum Project - Waste Dump is currently at the Construction stage, valued at about $ 1000000 it is For the provision of a waste dump for the mine site. Click for more details...