List of Mining - Civil Services Projects in WA


BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

YANDI - IRON ORE
Mining - Civil Services (Power stations, Power generation) project at Yandi Operations 90 km northwest of, Newman, WA 6753 of Mine - Plant - Upgrade & Infrastructure - Epc & M Contract type of Addition development. Proposal expected to increase throughput from 25mtpa to 35mtpa. Some minor works undertaken in order to increase capacity of existing plant to more than 12mtpa. Additional processing & mine site village facilities to be constructed as required. A new 10mtpa fixed plant, 10 km of rail spur line terminating in a loop & new train loading facility also proposed. Project contains a previously advised overall resource of 1,800mt grading 58% iron, 1.3% alumina, 5% silica & 0.04% phosphorus. EPA assessment conducted on the consultative environmental review (CER). Contract to involve power generation, dewatering systems, offices & accommodation requirements. Click for more details...

NELSON POINT - IRON ORE
Nelson Point - Iron Ore is currently at the Construction stage, valued at about $ 250000 it is Works for the automation of dumper No: 1 to include programme logic controls, lighting, ladder racks, cable, limit switches & positioners. Additional definition to be attached to the scope of works. Click for more details...

TELFER GOLD OPERATIONS
Addition project of Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project at Site operations via, Telfer, WA 6762. Airfield lighting required for new sealed airstrip extending over 200 m with a width of 30 m. Overall project includes a small terminal & a new refuelling facility. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Civil Services (Water distribution & pipelines, borefields). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Private ownership. 2 large motor control centres required for new coal mine development. Contract to include transportable buildings which will also house high tension switchgear. Associated equipment such as programme logic controls & variable speed drives also form part of this tender. Click for more details...

HIGGINSVILLE GOLD PROJECT - RESOURCE
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Between St Ives and, Norseman, WA 6443. This type is Resource - Gold with Private ownership. The developer is planning to construct a 1 Mtpa treatment plant in 2007 to be completed by 2008. The project includes 36 tenement including the Trident deposit. Resource estimate from the project is 8.7 Mt @ 4.0 g/t Au for 1.1 million ounces of gold. Resource estimate for Trident are 4.3 million tonnes at 6.2 g/t gold for 855,000 ounces and the Athena lodes is 960,000 tonnes @ 11.1 g/t Au for 343,000 ounces. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

FORTNUM GOLD PROJECT - RESOURCE
Mining - Civil Services (Power stations, Power generation) project for New development. Resource estimate of 13,100,000 tonnes @ 2.5 g/t for 1,045,300 ounces of gold. Click for more details...

PLUTONIC GOLD MINE
Currently at the Construction stage In Meekatharra is a project estimated to be $ 20000000. This project This 20 megawatt gas-fired power station is a complete turnkey contract. Project will involve a 20 km spur line, gas metering & construction of a new power station. Associated civils & electrical services are included in contract. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area for New development. Contract to involve erection of two gas turbine generator sets. The new 75 megawatt power station is to utilise 2 x LM6000 aero engine derivative gas turbine units. First engine scheduled for operation in January 1996 with the second unit due mid 1996. Click for more details...

PILBARA PETROCHEMICAL PROJECT%
Infrastructure New project In The City Of Karratha Council Area. Likely to include power station, fresh water availability, roadworks & port facilities. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

JAGUAR BASE METALS PROJECT - TEUTONIC BORE - POWER STATION
Power Station project at 40 km north of, Leonora, WA 6438 in the Mining - Civil Services (Power stations, Power generation). Contractor has constructed and commisioned stage 1 of the power station. Future stages will be upgrades when the mine production ramps up. Click for more details...

BHP BILLTION RAPID GROWTH PROJECT 2 - PORT ADDITIONS
Via, Port Hedland, WA 6721 Has Bhp Billtion Rapid Growth Project 2 - Port Additions currently at Planning stage. Includes construction of a new car dumper and ancillary works. Initial capacity fo car dumper 8Mtpa. Ultimate capacity of 40Mtpa, following future expanison projects. Additional car dumping capacity will allow upgrades to existing dumpers to be undertaken ready for future market growth. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

EMILY ANN WORKERS CAMP EXPANSION
Currently at the Planning stage In Dundas is a project estimated to be $ 13000000. This project Proposal comprises an expansion of the existing 240 person accommodation village by 100 rooms, the existing sewerage evaporation pond and the domestic tip. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - POWER FACTOR CORRECTION UNITS
Private ownership Mining - Civil Services (Power stations, Power generation) project In The East Pilbara Council Area for New development. Power Factor Correction Units. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 33 KV SWITCHGEAR
New project of Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753. 33 Kv Switchgear. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - TRANSPORTABLE SWITCHROOMS/415V MCCS
Mining - Civil Services (Power stations, Power generation) project In The East Pilbara Council Area of Transportable Switchrooms/415v Mccs type. Transportable Switchrooms and 415V MCCs Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - INTERLOCKING EQUIPMENT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Near, Newman, WA 6753 of Interlocking Equipment type of New development. Interlocking Equipment. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - VVVF LV
Mining - Civil Services (Power stations, Power generation) project In The Port Hedland Council Area of Variable Voltage Variable Frequency System/ Low Voltage type. Variable Voltage Variable Frequency System - Low Voltage Click for more details...

COBURN MINERAL SANDS PROJECT - POWER STATION
Mining - Civil Services (Power stations, Power generation) project for New development. For a fixed build/own/operate power station located next to the Ilmenite Plant and mine office complex. This facility is to be based on diesel generators converted to run jointly on diesel and natural gas (duel fuel). Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SEWAGE TREATMENT PLANT
Sewage Treatment Plant Effluent Laborartory Analysis project at 15 Km South east of, Collie, WA 6225 In The Council Area Of Collie of Private. Sewage treatment plant effluent laboratory analysis. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - 415 V MOTOR CONTROL CENTRES & LOAD CENTRES
Mining - Civil Services (Power stations, Power generation) project at 15 Km South east of, Collie, WA 6225 of 415 V Motor Control Centres/Load Centres - Supply type of New development. 415 V Motor Control Centres (MCC) and Load Centres. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - LEVEL & CLARITY MEASUREMENT
Mining - Civil Services (Power stations, Power generation) New project at 15 Km South east of, Collie, WA 6225. This type is Level/Clarity Measurement - Supply Of with Private ownership. For the supply of level and clarity management. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - RELIEF VALVES
Relief Valves - Supply New project In The Collie Council Area. For the supply of relief valves. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - MOTOR OPERATED VALVES
Mining - Civil Services (Power stations, Power generation) project In The Collie Council Area of Private ownership. For the supply of motor operated valves. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - 132 & 33 KV SWITCHGEAR
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) New project at On, Finucane Island, WA 6721. This type is 132 & 33 Kv Switchgear - Supply with Private ownership. 132 & 33 kV Switchgear. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - END OF TRAIN REPEATERS
End Of Train Repeaters - Supply project at Newman Hub, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). For the supply of end of train repeaters. Click for more details...

SINO IRON ORE EXTENSION PROJECT - DESALINATION PLANT DOUBLE ENTRY REFER TO PROJECT ID 857138
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Cape Preston 80km southeast of, Karratha, WA 6714. Construction of groundwater bores, a 30 GLpa desalination plant, & the construction of seawater intake & brine disposal outfall. Click for more details...

SINO IRON ORE PROJECT - SEA WATER DESALINATION UNITS FOR CONSTRUCTION WATER
Mining - Civil Services (Water distribution & pipelines, borefields) New project at Cape Preston 100 km Southwest of, Karratha, WA 6714. This type is Temporary Sea Water Desalination Units - Design/Construct with Private ownership. For the design, manufacture, supply & commission of a 1ML per day temporary desalination plant Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

ARGYLE DIAMOND OPERATIONS UNDERGROUND EXPANSION - CRUSHERS, CONVEYORS & DEWATERING
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) New project at 110km south-southwest of, Kununurra, WA 6743. This type is Crushers/Conveyors/Dewatering Pump Stations with Private ownership. Supply of 2 underground crushers. 1.2km of conveyors. Dewatering pump stations. Associated piping, electrical, instrumentation & control equipment. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - WELDING OF PIPE MATERIALS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Welding Of Pipe Materials currently at Construction stage. For the cutting, bevelling, welding, & provision of supervision for carbon steel pipework. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

FORTESCUE RIVER GAS PIPELINE
Mining - Civil Services (Power stations, Power generation) project at From DBNGP to SOLOMON HUB 150km south of, Karratha, WA 6714 of Pipeline - Gas type of New development. Construction of a 16 inch diameter, 270km long, 64 TJ/day capacity pipeline from an Inlet Station on the Dampier to Bunbury Natural Gas Pipeline (DBNGP) compressor station 1 to a Delivery Station at TransAlta's 125MW power station at Fortescue Metal Group's Solomon Hub. To allow for conversion of the Solomon power station from diesel. Associated access track along the construction corridor & a temporary accommodation camp (demountable buildings, ablutions, laundry, food mess, wet mess/bar, recreation rooms) in the central portion. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - WASTE WATER TREATMENT
Roy Hill Iron Ore Project - Infrastructure - Rail Non Process - Waste Water Treatment is currently at the Construction stage, valued at about $ 10000000 it is For the provision of waste water treatment. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

PLUTONIC DOME GOLD OPERATIONS RECOMMENCEMENT - K2 DEWATERING
Plutonic Dome Gold Operations Recommencement - K2 Dewatering is currently at the Construction stage, valued at about $ 5000000 it is For the provision of pit dewatering services. Click for more details...

DEGRUSSA SOLAR POWER PROJECT
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Meekatharra Council Area for New development. Construction of a state-of-the-art 10.6MW solar power plant with 6MW of battery storage utilising 34,080 solar panels over 20 hectares. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...