State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Civil Services Projects in Western Australia


DEPARTMENT OF INDUSTRY & RESOURCES
Mining - Civil Services (Power stations, Power generation) project for New development. A consultancy study of "Energy for Minerals Development in the South West Coast Region of Western Australia". Click for more details...

YANDI - IRON ORE
Mining - Civil Services (Power stations, Power generation) project at Yandi Operations 90 km northwest of, Newman, WA 6753 of Mine - Plant - Upgrade & Infrastructure - Epc & M Contract type of Addition development. Proposal expected to increase throughput from 25mtpa to 35mtpa. Some minor works undertaken in order to increase capacity of existing plant to more than 12mtpa. Additional processing & mine site village facilities to be constructed as required. A new 10mtpa fixed plant, 10 km of rail spur line terminating in a loop & new train loading facility also proposed. Project contains a previously advised overall resource of 1,800mt grading 58% iron, 1.3% alumina, 5% silica & 0.04% phosphorus. EPA assessment conducted on the consultative environmental review (CER). Contract to involve power generation, dewatering systems, offices & accommodation requirements. Click for more details...


Mining - Civil Services (Power stations, Power generation) project for New development. The power station will run on waste heat and produce approximately 7 mW of electricity from hot gas produced in the processing of synthetic rutile. Under full operation, the new plant will require about 13 mW of electricity, the balance to be supplied by Western Power. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Power stations, Power generation) project In The Kalgoorlie-Boulder Council Area for New development. Reinforced concrete foundations to be supplied for new power station. Some miscellaneous works such as buried services & drainage included in tender. Structures also required to house power station equipment. Click for more details...

PREMIER COAL OPERATIONS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The Collie Council Area of Private ownership. Switchgear, transformers, above & below ground cabling & associated electrical services required for 132 kV - 22 kV substation. Project to be commissioned in January 1996. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

JUNDEE - GOLD
Mining - Civil Services (Pump stations, Above ground reservoirs) project In The Wiluna Council Area of Mine - Borefield Pumps - Installation type. Installation of 7 downhole pumps required for new borefield development. Project involves approximately 22 km of pipework. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Civil Services (Water distribution & pipelines, borefields). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
8 km north west of, Newman, WA 6753 Has Yandicoogina Iron Ore Operations currently at Early Planning stage. Additional power and other infrastructure to complement the new port and mine requirements. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Currently at the Construction stage In Ravensthorpe is a project estimated to be $ 10000000. This project The power and steam generation plant includes three steam turbines, three package boilers, two diesel generators and mechanical and electrical equipment. Available steam from the acid plant will also be used in the steam turbines to generate electrical power. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

BHP BILLITON IRON ORE OPNS - ASSET DEVELOPMENT PROJECTS -RAIL
Via, Newman, WA 6753 Has Bhp Billiton Iron Ore Opns - Asset Development Projects -Rail currently at Early Planning stage. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

KWINANA ALUMINA REFINERY
Mining - Civil Services (Waste water/sewerage treatment, sew./waste pipes) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - RAIL
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at 50 km north east of, Southern Cross, WA 6426 of Rail Sidings/Ore Waggons type of New development. Improvements for railway to Esperance Port include extending ten passing loops to accommodate longer ore trains and the purchase of 141 new ore waggons. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

IRON ORE RAPID GROWTH PROJECT 2 - RAIL EXPANSION/MAINTENANCE CONTRACT
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at At and near, Port Hedland, WA 6721 for New. Two contracts are part of this project. First part is the maintenance contract to install 60,000 sleepers. The resleepering will take place at BHP Billiton Iron Ore yard, Mount Newman yard and Jimbelbar line. The second part involves the extension of track from Bing Siding to Nelson Point yard and track modifications at Goldworthy Junction, Nelson Point arrival area and Finucane Island. Work comprises the construction of approximately 26 Km of ballasted track, 37 turnouts and catch points. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

GERALDTON PORT AUTHORITY - IRON ORE EXPANSION PROJECT - MATERIALS HANDLING
Mining - Civil Services (Power stations, Power generation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Development comprises modifications for Conveyor (CV) 13 to allow for the upgrading and reversal for conveying iron to Berth 5. New conveying circuit for iron ore from reversed and upgraded CV 13 to Berth 5. Modifications to the concentrate load out arrangements. Modifications and new conveying circuit to route all minerals and concentrates from the existing mineral sands ship loading truck dump facility to Berth 4. Minor upgrade of Berth 6 ship loader (only if required to accommodate modifications to suit a new minerals conveyor feed circuit such as a reversed feed tipper). New electrical substations, power distribution and electrics for the new development. New control system and provisions for future control systems for all recalim, conveying and ship loading circuits including intergration with existing systems. Upgrade of existing reclaim systems as required to accommodate the loading circuit modifications for both iron ore and minerals. Click for more details...

GOLDFIELDS GAS TRANSMISSION PIPELINE EXPANSION
Currently at the Construction stage In Ashburton is a project estimated to be $ 15000000. This project Construction of a new gas turbine compressor at the Paraburdoo compressor station site. Click for more details...

HOPE DOWNS EXPLORATION CAMP
Hope Downs Exploration Camp is currently at the Construction stage, valued at about $ 4000000 it is Development comprises the construction of 148 person exploration camp in 37 accommodation blocks. Associated infrastructure includes kitchen, laundry,sport facilities, workshop, power generation facilities will also be constructed. A waste water treatment plant will be constructed to service the camp. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - TRACKWORK
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) New project at Near, Newman, WA 6753. This type is Trackwork with Private ownership. Trackwork at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/RAIL - SIGNALLING
Signalling project at Near, Newman, WA 6753 in the Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards). Signalling at Weeli, Poonda, Yeerabiddy and Area C Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - 33 KV SWITCHGEAR
New project of Mining - Civil Services (Power stations, Power generation) project at Near, Newman, WA 6753. 33 Kv Switchgear. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - TRANSPORTABLE SWITCHROOMS/415V MCCS
Mining - Civil Services (Power stations, Power generation) project In The East Pilbara Council Area of Transportable Switchrooms/415v Mccs type. Transportable Switchrooms and 415V MCCs Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - TRANSPORTABLE SWITCHROOMS/415V MCCS
Mining - Civil Services (Transmission lines/towers, switching yards, transformers, substations, cabling) project In The East Pilbara Council Area of Transportable Switchrooms/415v Mccs type. Transportable Switchrooms and 415V MCCs Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - EAST YARD SUBSTATION
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - East Yard Substation currently at Construction stage. Substation with three seperable portions. Click for more details...

COBURN MINERAL SANDS PROJECT - ELECTRICAL RETICULATION
Coburn Mineral Sands Project - Electrical Reticulation is currently at the Construction stage, valued at about $ 1000000 it is Electrical reticulation from the planned fixed location power station. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - CCTV EQUIPMENT & INSTALLATION
Cctv Equipment/Installation - Supply Of New project In The Collie Council Area. For the supply of CCTV equipment and installation. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - DIFFERENTIAL PRESSURE
Mining - Civil Services (Power stations, Power generation) project for New development. For the supply of pressure, differential pressure and flow. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - CONTROL VALVES
Mining - Civil Services (Power stations, Power generation) project at 15 Km South east of, Collie, WA 6225 of Control Valves - Supply type of New development. For the supply of control valves. Click for more details...

BUNGAROO IRON ORE PROJECT - RESOURCE
Private ownership Mining - Civil Services (Water distribution & pipelines, borefields) project In The Ashburton Council Area for New development. Development comprises trial mining of the Bungaroo deposit for three years starting in third quarter 2007. Resource estimate is 15 Mt of Fe ore. Infrastructure proposed for the site include a crushing and screening plant, new haul road, dewatering pipeline, diesel generators for power supply, fuel storage area, refuelling areas, waste water treatment facilities, communication infrastructure and laydown area. A construction camp is also under consideration. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

BODDINGTON GOLD MINE EXPANSION - WATER TREATMENT FACILITIES
New project of Mining - Civil Services (Water distribution & pipelines, borefields) project at Pinjarra - Williams Rd, Boddington, WA 6390. Facilities include Reverse Osmosis Plant, water transmitters and water management telemetry system. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Civil Services (Rail loops, Track work, Signalling, Rolling stock, Switching yards) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

GREATER GORGON GAS PROJECT - DOMGAS PIPELINE INSTALLATION - PROJECT SUPPORT SERVICES - WASTE SERVICES & DISPOSAL
Greater Gorgon Gas Project - Domgas Pipeline Installation - Project Support Services - Waste Services & Disposal is currently at the Construction stage, valued at about $ 2500000 it is For the provision of project support services - waste services and disposal. Click for more details...

PORT HEDLAND INNER HARBOUR - BHP BILLITON STOCKYARD EXPANSION CIVIL WORKS
Port Hedland Inner Harbour - Bhp Billiton Stockyard Expansion Civil Works is currently at the Construction stage, valued at about $ 50000000 it is Upgrade of the existing ore blending stockyard at Nelson Point. To include bulk earthworks, stone column ground improvement works, rail, concrete works, piping & instrumentation for dust suppression & road works. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - WELDING OF PIPE MATERIALS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Welding Of Pipe Materials currently at Construction stage. For the cutting, bevelling, welding, & provision of supervision for carbon steel pipework. Click for more details...

ROY HILL IRON ORE PROJECT - MINE PROCESS PLANT - WATER TREATMENT PACKAGE
Water Treatment New project In The East Pilbara Council Area. For the supply of a water treatment package. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

GRUYERE JOINT VENTURE GOLD PROJECT - POWER SUPPLY
New project of Mining - Civil Services (Power stations, Power generation) project at 200km East of, Laverton, WA 6440. For the provision of power supply. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect