State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Earthworks/Civil Engineering⊂category= Projects in ®ion= in region


NORTHPARKES COPPER/GOLD OPERATIONS
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Parkes Council Area for New development. Northparkes Mines is a copper/gold producer near Parkes. The Company has work conducted on rates base contracts for the supply of daily services in various fields. Includes; provision of mobile machinery including (but not limited to) bobcat, backhoe, small trucks, small excavators, water cart as required; provision of labour for assistance with minor maintenance tasks; fencing etc as assistance to farming operations; civil and road repairs/maintenance as required. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

KAMBALDA WEST PROJECT - SPARGOVILLE 5A
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project for New development. A small nickel resource of 40,000 to 50,000 tonnes. The proposed mining project will produce three separte ore types with the upper and lower transitional ores transported to regional milling facility for toll treatment. The small quantity of oxide ore will be stockpiled until larger tonnages are available. Click for more details...

TRITTON COPPER PROJECT - HAULAGE
New project of Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Via, Girilambone, NSW 2831. Transport of ore to the Tritton ROM pad. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

WIM 150 MINERAL SANDS PROJECT
A project in the VIC Within Horsham. The WIM 150 deposit contains approximately five million tonnes of zircon and preliminary analysis suggest that production of 140,000 tonnes of zircon per annum could be possible. The project is positioned near rail and other infrastructure. Click for more details...

CADIA VALLEY OPERATIONS - CADIA HILL/RIDGEWAY
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Orange Council Area of Private ownership. Cadia Valley Operations is the amalgamation of the established Cadia Hill open cut mine and the Ridgeway Gold Mine, an underground sub-level mine. Cadia Valley Operations are seeking suitably qualified and experienced companies to undertake any or all of the following tasks: direct seeding of indigenous trees and shrubs (including site preparation and maintenance); production of tubestock for revegetation programmes; planting of tubestock (including site preparation and maintenance; weed control (in pastures, along roadsides, natural resource areas, noxious weeds etc); on site/local seed collection from indigenous grasses, shrubs and trees; hydromulching/hydroseeding/sprayseeding. Click for more details...

THE PEAK GOLD OPERATIONS
The Peak Gold Operations is currently at the Tenders & Building stage, valued at about $ 500000 it is Expressions of Interest are sought from suitably qualified businesses to transport bullion from the Peak Gold Mines Pty Ltd operations at Coba NSW to a nominated refinery in Perth WA. Parties interested in tendering for this work should provide a letter indicating your interest and providing documentary proof of the following: Proof of registration as a security company under the Security Industry Act, 1997; Proof of membership of and approved Security Institute: Company profile detailing qualifications of personnel, previous experience, insurance coverage, communications capability; Outline of transport proposal stating transportation options, use of subcontractors (Company Profile Required). Click for more details...

SECOND POND CREEK - OVERALL PROJECT
A project in the NSW Within The Hills Shire. Development of 3200 residential blocks, some to contain medium density housing. Master plan lodged with council along with additional rezoning. Project could contain up to 5000 dwellings. Area location: south of Scholfield Rd, north of Stanhope Parkway, west of Fyfe and east of Hambledon. Street address is yet to be determined. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

COAL STOCKPILE - KOORAGANG ISLAND
Coal Stockpile project at 240 Cormorant Rd, Kooragang Island, Newcastle, NSW 2300 In The Council Area Of Newcastle of Private. A 40,000 tonne coal stockpile. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS - E26/LIFT 2
Mining Contract - Underground project at 30 km north west of, Parkes, NSW 2870 in the Mining - Earthworks/Civil Engineering (Underground mining & crushing). A three year contract with 14 km of vertical development to move approx 1.6 million tonnes of ground including waste and ore. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY
Pre-Strip Contract New project In The Laverton Council Area. Mining will be shared between an owner-operated fleet & a contractor during the pre-strip & will thereafter be entirely owner-operated. Ore will be trucked 11 km to the Granny Smith plant. Click for more details...

COSMOS NICKEL OPERATIONS - COSMOS DEEPS/ILLIAS
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Ilias decline. Click for more details...

LEICHHARDT COPPER OPERATION - MOUNT WATSON - RESOURCE
Leichhardt Copper Operation - Mount Watson - Resource is currently at the Tenders & Building stage, valued at about $ 40000000 it is Resource estimate is 8,030,000 tonnes @ 1.1% Cu. Measured resource is 910,000 tonnes @1.1%. Oxide copper will be mined from the project and hauled 25 kilometres to the Mount Cuthbert processing plant. Click for more details...

MOORVALE COAL PROJECT
Mining Contract project at 10 km south of Copabella mine Bowen Basin via, Nebo, QLD 4742 In The Council Area Of Isaac Regional of Private. Life of mine contract. (Approximately 10 years based on current knowledge of the resource). Click for more details...

LORD HENRY & LORD NELSON GOLD PROJECT - PROCESSING OPTIONS
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Sandstone Council Area of Processing - Options type. A decision has been made to have the ore hauled to another mill located 30 km away. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

WOLFRAM CAMP PROJECT - TUNGSTEN MOLYBDENUM & BISMUTH RESOURCE
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Tablelands Regional Council Area for New development. Total resources in Wolfram Camp were increased by some 45% to 876,500 tonnes measured plus indicated @ 0.41% WO3 and 0.20%MoS2 and inferred is 211,500 tonnes @ 0.4%WO3 and 0.3%MoS2. Infrastructure to include processing plant, pipeline and electrical. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

LIDDELL POWER STATION - PERIODIC PEST/WEED CONTROL
Periodic Pest/Weed Control project at Via, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the provision of services in the eradication and control of unwanted vegetation by herbicide spraying and or mechanical means and the control of spiders, fleas, cockroaches, ants, rats, mice, feral cats and other unwanted pests. Click for more details...

COYOTE GOLD PROJECT - OPEN PIT MINING CONTRACT
Open Pit Mining Contract project at Tanami Region Wa - Northern Territory border south east of, Halls Creek, WA 6770 In The Council Area Of Halls Creek of Private. Mining will be conducted by a conventional 100 tonne excavator and an associated fleet of 95 tonne dump trucks. Open pit mining has commenced and will continue for a year followed by underground mining. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - BULK EARTHWORKS
Bulk Earthworks project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Civil and Concrete Work comprises moving about 1 million cubic metres of dirt. More specifically the construction of the E deposit primary crushing area and mechanically stabilised earth wall (MSE). To construct a 7.5 km long overland conveyor from the E deposit primary crusher to a new Ore Handling Plant 2 (OHP 2), Stockyard 2 located within the rail loop, associated earthworks and heavy vehicle park-up and upgrade of the infrastructure for the operation. This will include office, amenities and waste water services. Click for more details...

ROCGLEN COAL PROJECT - HAULAGE OF ORE
A project in the NSW Within Gunnedah. For the provision of haulage services for a 3 year period. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Earthworks/Civil Engineering (Drill & Blast). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

CHINESE SOUTH EXTENDED & MOTTRAMS GOLD MINE PROJECT
Mining - Earthworks/Civil Engineering (Stockpile Management) project at Doulgas Station, Stuart Hwy, 12km North of Hayes Creek Wayside Inn, via, Pine Creek, NT 0847 for New. The company proposes to recommence gold mining operations. Mining is proposed to commence on two deposits within this area. The proposed mining development consists of two open cut pits and will employ conventional open cut excavation methods. No mineral processing will occur on these sites. The ore will be transported by road, approximately 62km south-east, for processing. The major components of the proposed Chinese South Extended and Mottrams development include: construction of two open cut mines, pit dewatering, water storage and management, stockpiling of ore, construction of access and haul roads; and construction of two waste rock storage facilites. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - MINING CONTRACT
Peculiar Knob Iron Ore Project - Mining Contract is currently at the Construction stage, valued at about $ 285000000 it is A mining services contract for export at a rate of 3.3million tonnes per annum (Mtpa) over 70 months. To include drilling, blasting, loading & haulage of ore & waste material. Over 100 people expected to be employed once full production reached. Click for more details...

CADIA HILL & RIDGEWAY GOLD MINES - WASTE ROCK DUMP EXPANSION
25 km south west of, Orange, NSW 2800 Has Cadia Hill & Ridgeway Gold Mines - Waste Rock Dump Expansion currently at Planning stage. Modification to consent is sought for the expansion of the South Waste Rock Dump by approximately 53 hectares to be south and east of the existing southern boundary. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Lyell Council Area of Private ownership. A 3 year contract commencing 1 October 2010 for the ongoing operations at My Lyell Mine which is expected to produce 2.7million tonnes per annum approx of ore by 250m development per month. To include mine development comprising decline & level development at variable grades (drill, blast, ground support, load, haul & dump or ore/waste); ore production (drill, blast, load, haul & dump of the stope ore); crushing & conveying of the ore from the primary crusher to the skip loading station plus dewatering from underground working areas to the settlers on 1780 level. Click for more details...

MOUNT NEWMAN IRON ORE OPERATIONS - OREBODY 18 - MINING CONTRACT EXTENSION
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Provision of complete surface mining services including drill & blast, mining, crushing & on-site train loading. To include an increase in the level of production which will require an additional 50 approx employees. Contract extended by 3 years. Click for more details...

JIMBLEBAR IRON ORE OPERATIONS - WHEELARRA HILL - MINING CONTRACT EXTENSION
Mining Contract - Open Cut - Extn project at 40km east of, Newman, WA 6753 in the Mining - Earthworks/Civil Engineering (Haulage Of Ore). Provision of complete surface mining services including drill & blast, mining, crushing & on-site train loading. Conventional mining methods sees ore extracted by drilling & blasting being loaded by hydraulic excavators and/or front end loaders into off-highway rear dump haul trucks for transport to the primary crushing areas or to blending stockpiles. Work on deposits W1, W2, W3 & W5 should allow production to increase from 8 million tonnes per annum (Mtpa) to 12Mtpa. Contract extended by 3 years. Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Earthworks/Civil Engineering (Stockpile Management) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

BOGGABRI COAL OPERATIONS - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at 17km northeast of, Boggabri, NSW 2382 of Mining Contract - Open Cut type of New development. Open cut coal mine producing approx 1.5million tonnes (Mt) a year from the Merriown and Jeralong pits. Five year mining contract commencing at expiry of the current contract to include drill & blast services, mine planning & load & haul of both overburden & coal. Expansion plans to produce 2.5Mtpa early in 2011 & 4.3Mtpa by 2013 will require up to $114million investment in new equipment. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

MOUNT ISA MINES NO.7 TAILINGS DAM EXTENSION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Mt Isa City Council Area for New development. Increase in No. 7 tailings dam capacity by raising external walls. To include 5/7 East Embankment & Toe Berm (26,070sq m fill), the 5/7 West Embankment & Toe Berm (59,250sq m fill) & the West Embankment (21,100sq m fill). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - ISBL CONCRETE & CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Within the vicinity of, Onslow, WA 6710 of Isbl Concrete/Civil Works type of New development. For the provision of ISBL concrete and civil works. Click for more details...

MINDARIE MINERAL SANDS OPERATIONS RECOMMENCEMENT
A project in the SA Within Karoonda. A project to recommence operations targeting 10,000t per month of heavy mineral concentrate to be trucked to port for export for overseas processing into zircon, ilmenite & rutile. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS CRUSHER CIRCUIT CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Roper Gulf Shire Council Area for New development. One year extension of the contract to operate the crusher circuit including feeding from the run-of-mine (ROM) stockpile. Covers the primary, secondary & tertiary crushing plants & mobile equipment. Click for more details...

CAROSUE DAM GOLD OPERATIONS - BLASTING SERVICES CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project at 80 km south of, Laverton, WA 6440 for New. Drill & blast contract including full down-the-hole services & product supply. Click for more details...

CALLIE GOLD OPERATIONS - DRILLING CONTRACT
Drilling Contract - Underground New project In The Central Desert Shire Council Area. A 3 year contract extension at the 4.2 million tonnes per annum (Mtpa) underground operations located at Dead Bullock Soak on the Granites goldfield. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

CHRISTMAS ISLAND PHOSPHATE PROJECT
Asbestos Removal - For Mine Site New project In The Christmas Island Council Area. For the provision of asbestos removal at the Christmas Island Phosphate Mine. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...

BLACK DIAMOND COAL MINE REHABILITATION
Mining - Earthworks/Civil Engineering (Landscaping, revegetation) project In The Collie Council Area of State ownership. A 4 stage approach to the rehabilitation of the Black Diamond Coal Mine. Initial work will focus on battering down the steep & unsafe southern lake pit wall, as well as subsequent revegetation work. Stage 1 - The formation of the Black Diamond Working Group. Stage 2 - A detailed site assessment to identify the type & degree of safety & environmental issues & possible solutions. Stage 3 - Undertaking of works to make the site safe & stable. Stage 4 - Site monitoring & further consultation. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect