DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

HAIL CREEK COAL PROJECT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Package to include:Cranage for Dragline House Structure; 3 x 1 ton Electric Chain Hoist; 2 x 2 ton Wire Rope Winches; 2 x 303.75inch Double Girder Bridges; 1 x 186 inch Girder Bridge; and 2 x Electric Powered Under-hung Trolley Hoist. Click for more details...

MOUNT GIBSON IRON ORE PROJECT - STAGE 1
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Approx 100 km north east of, Dalwallinu, WA 6609 of Haulage Of Ore type of New development. To haul ore by road train to the port of Geraldton. Click for more details...

BETA HUNT NICKEL PROJECT
Resource - Nickel New project In The Coolgardie Council Area. The project includes a remnant resource at the Hunt nickel mine and the developed but un-mined Beta nickel project. Access to the mine is via a portal situated on the northern shoreline of Lake Lefroy, 5 km by road from the WMC nickel concentrator. The Hunt deposit is accessed by a 4 km decline and has remnant blocks available for mining. The Beta deposit is accessed via a 2 km decline developed from the base of the Hunt decline. The Beta deposit is partially developed but is otherwise unmined and requires only pumping and rehabilitation to recommence production in the first quarter of 2004. The acquisition of the project is via a sub-lease associated with agreements and rights in relation to the mining of nickel. Targets within the project area that have the potential to significantly increase the resource base have been identified. Click for more details...

RADIO HILL NICKEL PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The City Of Karratha Council Area of Resource - Nickel type. A resource estimate of 874,000 tonnes @ 0.7% nickel for 6000 tonnes of Ni, 1% copper for 8200 tonnes of Cu and 0.4% cobalt for 350 tonnes of cobalt. Infrastructure for development is already in existence including a decline, ventilation, dewatering facilities and power facilities. Production is expected to be 58,350 dmt of Ni and 23,830 dmt of Cu. Click for more details...

KAMBALDA WEST PROJECT - SPARGOVILLE 5A
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project for New development. A small nickel resource of 40,000 to 50,000 tonnes. The proposed mining project will produce three separte ore types with the upper and lower transitional ores transported to regional milling facility for toll treatment. The small quantity of oxide ore will be stockpiled until larger tonnages are available. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

CADIA VALLEY OPERATIONS - CADIA HILL/RIDGEWAY
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Orange Council Area of Private ownership. Cadia Valley Operations is the amalgamation of the established Cadia Hill open cut mine and the Ridgeway Gold Mine, an underground sub-level mine. Cadia Valley Operations are seeking suitably qualified and experienced companies to undertake any or all of the following tasks: direct seeding of indigenous trees and shrubs (including site preparation and maintenance); production of tubestock for revegetation programmes; planting of tubestock (including site preparation and maintenance; weed control (in pastures, along roadsides, natural resource areas, noxious weeds etc); on site/local seed collection from indigenous grasses, shrubs and trees; hydromulching/hydroseeding/sprayseeding. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - RESOURCE
Mine - Lead Carbonate project at 30 km west of, Wiluna, WA 6646 In The Council Area Of Wiluna of Private. Tailings storage facility completed. Prestripping of mine in progress. Phase two includes the capital intensive refinery and is expected to be producing lead metal of 99.95 per cent purity at a capital cost of $40. Click for more details...

THE PEAK GOLD OPERATIONS
The Peak Gold Operations is currently at the Tenders & Building stage, valued at about $ 500000 it is Expressions of Interest are sought from suitably qualified businesses to transport bullion from the Peak Gold Mines Pty Ltd operations at Coba NSW to a nominated refinery in Perth WA. Parties interested in tendering for this work should provide a letter indicating your interest and providing documentary proof of the following: Proof of registration as a security company under the Security Industry Act, 1997; Proof of membership of and approved Security Institute: Company profile detailing qualifications of personnel, previous experience, insurance coverage, communications capability; Outline of transport proposal stating transportation options, use of subcontractors (Company Profile Required). Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

ROLLESTON COAL PROJECT
Resource - Coal project at 16 km west of, Rolleston, QLD 4702 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). A large low ash thermal coal deposit. Coal does not require washing. Initial production of 1 million tpa expected in late 2005, with pmpta export and 2 mtpa domestic production expected in 2008. the project has further expansion potential to 12 mtpa approx with minor additional capital. A low strip ratio, high productivity dragline will be used. Coal to be railed to the port of Gladstone. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

HEBBURN NO 2 COLLIERY - HAULAGE OF COAL & ROADBASE MATERIALS
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Cessnock Council Area of Haulage Of Coal type. The haulage contract is for carting coal to Newcastle Port. Click for more details...

GOONDICUM CRATER PROJECT
Haulage project at From project site near Monto to, Dinmore, QLD 4303 In The Council Area Of Ipswich City. Over 200 tonnes of feldspar to be trucked to the washing plant at Dinmore, Ipswich. Click for more details...

DEPARTMENT OF MINERALS & ENERGY - WA - MURCHISON/CUE/RAVENSTHORPE/MT MAGNET
New project of Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Various sites, ., WA 6999. Survey being undertaken in South-West (Collie to Ravensthorpe), and in the Yalgoo area and Mount Magnet Sandstone & Gidgee areas. An earlier part of the survey was undertaken in the Murchison area (Cue to Meekatharra). Click for more details...

MOUNT WELD RARE EARTHS PROJECT - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Laverton Council Area of Mining Contract - Opencut type. Work comprises the development of an initial pit 150 metres wide x 300 metres long x 65 metres deep, comprising 35 metres of overburden and 30 metres of ore zone. The total mining quantity of ore and waste is 2,890,800 BCM. Of this, 541,256 tonnes of high grade ore (318,230 BCM) is scheduled to be crushed and stockpiled at the site. Optional work that can be included in the contract include the construction of 8.8 km of haul roads to the site. Also the supply and operation of a comminution circuit, which may comprise a jaw crusher or potentially a trommel screen that is to produce 100%<100 mm HG CZ 15% moisture content ore product for stockpiling on load out stockpiles at a minimum annual rate of 137,000 wet tpa. Click for more details...

REWARD GOLD PROJECT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA
A project in the WA Within City Of Greater Geraldon - Mullewa. Contract will run for 7 years and is expected to commence in the last quarter 2005. It is expected that 1 million tpa will be shipped from the mine site to the port of Geraldton. Click for more details...

BALLARAT EAST GOLD PROJECT
Via, Ballarat, VIC 3350 Has Ballarat East Gold Project currently at Construction stage. Includes geotechnical drilling of ventilation shaft, drilling from surface to define resource cross sections on Sulieman and first chance lines, drilling targets from surface on Yarrowee Creek anticline. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE 4
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at (Lot 34 Rp 864576) Duckponds Road, Emerald, QLD 4720 of Dragline 4 type of New development. The dragline will be a Bucyrus 8750 fifth model. It will be operated by DC electrics, carry a 159 YD3 (122 cubic metres) struck capacity bucket and have a rated suspended load (RSL) capacity of over 715,000 lbs (324,322 kgs). Click for more details...

JIMBLEBAR IRON ORE OPERATIONS - MINING CONTRACT
Open Cut Mining Contract project at 60 Km East of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Work will comprise drilling, blasting, mining, crushing and train loading operations. Click for more details...

CHINESE SOUTH EXTENDED & MOTTRAMS GOLD MINE PROJECT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Doulgas Station, Stuart Hwy, 12km North of Hayes Creek Wayside Inn, via, Pine Creek, NT 0847 for New. The company proposes to recommence gold mining operations. Mining is proposed to commence on two deposits within this area. The proposed mining development consists of two open cut pits and will employ conventional open cut excavation methods. No mineral processing will occur on these sites. The ore will be transported by road, approximately 62km south-east, for processing. The major components of the proposed Chinese South Extended and Mottrams development include: construction of two open cut mines, pit dewatering, water storage and management, stockpiling of ore, construction of access and haul roads; and construction of two waste rock storage facilites. Click for more details...

CADIA HILL & RIDGEWAY GOLD MINES - WASTE ROCK DUMP EXPANSION
25 km south west of, Orange, NSW 2800 Has Cadia Hill & Ridgeway Gold Mines - Waste Rock Dump Expansion currently at Planning stage. Modification to consent is sought for the expansion of the South Waste Rock Dump by approximately 53 hectares to be south and east of the existing southern boundary. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

PEKO MAGNETITE PROJECT - TOPSOIL REMOVAL
New project of Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at 10 km from, Tennant Creek, NT 0862. Topsoil removal for 5 hours per day for 12 months using a 22m scraper. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Lyell Council Area of Private ownership. A 3 year contract commencing 1 October 2010 for the ongoing operations at My Lyell Mine which is expected to produce 2.7million tonnes per annum approx of ore by 250m development per month. To include mine development comprising decline & level development at variable grades (drill, blast, ground support, load, haul & dump or ore/waste); ore production (drill, blast, load, haul & dump of the stope ore); crushing & conveying of the ore from the primary crusher to the skip loading station plus dewatering from underground working areas to the settlers on 1780 level. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

JIMBLEBAR IRON ORE OPERATIONS - WHEELARRA HILL - MINING CONTRACT EXTENSION
Mining Contract - Open Cut - Extn project at 40km east of, Newman, WA 6753 in the Mining - Earthworks/Civil Engineering (Drill & Blast). Provision of complete surface mining services including drill & blast, mining, crushing & on-site train loading. Conventional mining methods sees ore extracted by drilling & blasting being loaded by hydraulic excavators and/or front end loaders into off-highway rear dump haul trucks for transport to the primary crushing areas or to blending stockpiles. Work on deposits W1, W2, W3 & W5 should allow production to increase from 8 million tonnes per annum (Mtpa) to 12Mtpa. Contract extended by 3 years. Click for more details...

BOGGABRI COAL OPERATIONS - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at 17km northeast of, Boggabri, NSW 2382 of Mining Contract - Open Cut type of New development. Open cut coal mine producing approx 1.5million tonnes (Mt) a year from the Merriown and Jeralong pits. Five year mining contract commencing at expiry of the current contract to include drill & blast services, mine planning & load & haul of both overburden & coal. Expansion plans to produce 2.5Mtpa early in 2011 & 4.3Mtpa by 2013 will require up to $114million investment in new equipment. Click for more details...

WONAWINTA SILVER LEAD ZINC PROJECT - MINING CONTRACT
Currently at the Construction stage In Cobar is a project estimated to be $ 10000000. This project Contract for a silver mine with a production forecast of 2.5million ounces (Moz) of silver a year. Click for more details...

DAISY STREET WORKERS ACCOMMODATION & TOWNHOUSES - CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Daisy St (Lot 3 SP197442), Miles, QLD 4415. This type is Civil Works - For Accommodation Village with Private ownership. Civil works, including road widening & reticulation of services, for a workers' accommodation village to cater for up to 340 people. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Drill & Blast) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

SOUTH MIDDLEBACK RANGES IRON ORE OPERATIONS - MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Whyalla Council Area for New development. A 5 year mining contract. To include drill & blast, ore extraction, haulage & ancillary components. Click for more details...

FOXLEIGH COAL OPERATIONS - BLAST HOLE DRILLING CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project for New development. Production drilling activity over 3 x 12 month rolling contracts involving 2 new Reichdrill rigs. Click for more details...

WEST ANGELAS IRON ORE OPERATIONS - ACCESS ROAD UPGRADE
Excavation/Embankment Construction/Culverts/Pavement/Floodways project at via, Pannawonica, WA 6716 In The Council Area Of Ashburton of Private. Upgrade of the existing access road between the Great Northern Highway & West Angelas mine. To include 19,000cu m of excavation, 266,000cu m of embankment construction, 5,300m of culverts, 31km of bitumen sealed pavement plus installation of 2 floodways. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SEAWATER INTAKE SHAFT CONSTRUCTION
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Private ownership. For the construction of a seawater intake shaft. Click for more details...


BHP BILLITON MOOKA CAR REPAIR WORKSHOP CIVIL WORKS
Bhp Billiton Mooka Car Repair Workshop Civil Works is currently at the Construction stage, valued at about $ 31000000 it is A contract to include bulk earthworks, rock excavation & culvert construction together with road construction & sub-ballast capping. Click for more details...

MINERVA COAL OPERATIONS BLASTING SERVICES CONTRACT
Minerva Coal Operations Blasting Services Contract is currently at the Construction stage, valued at about $ 10000000 it is Drill & blast contract including full down-the-hole services & product supply. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - DETAILED EARTHWORKS & CONCRETE WORKS
Wheatstone Development Project - Onshore & Infrastructure - Pindan - Detailed Earthworks & Concrete Works is currently at the Construction stage, valued at about $ 1000000 it is For the provision of detailed earthworks & concrete works to 50 modular house lots. Estimated 2500m3 of earthworks & 1900m3 of concrete over a 40 week period. Click for more details...

BLACK DIAMOND COAL MINE REHABILITATION
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Collie Council Area of State ownership. A 4 stage approach to the rehabilitation of the Black Diamond Coal Mine. Initial work will focus on battering down the steep & unsafe southern lake pit wall, as well as subsequent revegetation work. Stage 1 - The formation of the Black Diamond Working Group. Stage 2 - A detailed site assessment to identify the type & degree of safety & environmental issues & possible solutions. Stage 3 - Undertaking of works to make the site safe & stable. Stage 4 - Site monitoring & further consultation. Click for more details...