State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Earthworks/Civil Engineering⊂category= Projects in NSW®ion= in region


ULAN/BAAL BONE COAL OPERATIONS
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Baal Bone site Mudgee Rd Cullen Bullen and Ulan site Cassilis Rd, Ulan, NSW 2850 for New. Includes field collection of all samples and data for all water, air and meteorological monitoring sites; analysis of all samples by an accredited laboratory; maintenance of all monitoring sites to meet the relevant standard; maintenance and upkeep of the monitoring programme including sampling, analysis, data management and reporting; and other environmental monitoring services as required. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Parkes Council Area for New development. Northparkes Mines is a copper/gold producer near Parkes. The Company has work conducted on rates base contracts for the supply of daily services in various fields. Includes; provision of mobile machinery including (but not limited to) bobcat, backhoe, small trucks, small excavators, water cart as required; provision of labour for assistance with minor maintenance tasks; fencing etc as assistance to farming operations; civil and road repairs/maintenance as required. Click for more details...

BULGA COAL OPERATIONS - REDBANK II COAL TAILINGS PREPARATION & WASTE MANAGEMENT
Coal Tailings Dewatering Plant & Associated Infrastructure New project In The Singleton Council Area. The proposal included construction & operation of a tailings dewatering plant (DBT) and associated infrastructure and facilities. Supply of BDT fuel to the Redbank 2 power plant and receipt and disposal of fly ash, water treatment plant sludge, and wastewater from the Redbank 2 power plant. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

TRITTON COPPER PROJECT - HAULAGE
New project of Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Via, Girilambone, NSW 2831. Transport of ore to the Tritton ROM pad. Click for more details...

CADIA VALLEY OPERATIONS - CADIA HILL/RIDGEWAY
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Orange Council Area of Private ownership. Cadia Valley Operations is the amalgamation of the established Cadia Hill open cut mine and the Ridgeway Gold Mine, an underground sub-level mine. Cadia Valley Operations are seeking suitably qualified and experienced companies to undertake any or all of the following tasks: direct seeding of indigenous trees and shrubs (including site preparation and maintenance); production of tubestock for revegetation programmes; planting of tubestock (including site preparation and maintenance; weed control (in pastures, along roadsides, natural resource areas, noxious weeds etc); on site/local seed collection from indigenous grasses, shrubs and trees; hydromulching/hydroseeding/sprayseeding. Click for more details...

DARTBROOK COAL OPERATIONS - KAYUGA
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Muswellbrook Council Area of Reject Emplacement Works type. Tailings dewatering. Click for more details...

THE PEAK GOLD OPERATIONS
The Peak Gold Operations is currently at the Tenders & Building stage, valued at about $ 500000 it is Expressions of Interest are sought from suitably qualified businesses to transport bullion from the Peak Gold Mines Pty Ltd operations at Coba NSW to a nominated refinery in Perth WA. Parties interested in tendering for this work should provide a letter indicating your interest and providing documentary proof of the following: Proof of registration as a security company under the Security Industry Act, 1997; Proof of membership of and approved Security Institute: Company profile detailing qualifications of personnel, previous experience, insurance coverage, communications capability; Outline of transport proposal stating transportation options, use of subcontractors (Company Profile Required). Click for more details...

SECOND POND CREEK - OVERALL PROJECT
A project in the NSW Within The Hills Shire. Development of 3200 residential blocks, some to contain medium density housing. Master plan lodged with council along with additional rezoning. Project could contain up to 5000 dwellings. Area location: south of Scholfield Rd, north of Stanhope Parkway, west of Fyfe and east of Hambledon. Street address is yet to be determined. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
Pooncarie Mineral Sands Project - Ginkgo is currently at the Construction stage, valued at about $ 5000000 it is Includes construction of mine pit, tailings/water storage dam and overburden storage areas. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

HEBBURN NO 2 COLLIERY - HAULAGE OF COAL & ROADBASE MATERIALS
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Cessnock Council Area of Haulage Of Coal type. The haulage contract is for carting coal to Newcastle Port. Click for more details...

COAL STOCKPILE - KOORAGANG ISLAND
Coal Stockpile project at 240 Cormorant Rd, Kooragang Island, Newcastle, NSW 2300 In The Council Area Of Newcastle of Private. A 40,000 tonne coal stockpile. Click for more details...

THE PEAK GOLD OPERATIONS - NEW COBAR
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at Hillston Rd, Cobar, NSW 2835 of Mining Contract - Open-Cut type of New development. An open pit resource of 730,000 tonnes at 2.5 g/t gold. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS - E26/LIFT 2
Mining Contract - Underground project at 30 km north west of, Parkes, NSW 2870 in the Mining - Earthworks/Civil Engineering (Underground mining & crushing). A three year contract with 14 km of vertical development to move approx 1.6 million tonnes of ground including waste and ore. Click for more details...

NARRABRI SHIRE COUNCIL - QUARRY BLASTING
Mining - Earthworks/Civil Engineering (Drill & Blast) project at Quarry sites via, Narrabri, NSW 2390 of Quarry Blasting type of New development. Tenders invited from suitably licensed contractors with previous experience in quarry blasting works under a Full Service, Work-as-Ordered Contract. Click for more details...

BOGGABRI COAL PROJECT - HAULAGE OF ORE
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at 23 km north east of, Boggabri, NSW 2382 for New. Ore to be hauled 5 km to plant. Click for more details...

WILLOUGHBY PARK AMENITIES
Mining - Earthworks/Civil Engineering (Landscaping, revegetation) project at Warrane Road, Willoughby, NSW 2068 of Canteen/Changeroom - Altns type of Renovations, Refurbishments etc. development. Internal alterations to the Clive A Reid pavilion comprising of a new public toilet suitable for disabled persons, ramp along the rear, a shower recess and toilet cubicle. Additional planting to provide a visual buffer between the building and the residential properties. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

LIDDELL POWER STATION - PERIODIC PEST/WEED CONTROL
Periodic Pest/Weed Control project at Via, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the provision of services in the eradication and control of unwanted vegetation by herbicide spraying and or mechanical means and the control of spiders, fleas, cockroaches, ants, rats, mice, feral cats and other unwanted pests. Click for more details...

NSW DERELICT MINE PROGRAM - EXPRESSIONS OF INTEREST
Various Sites in New South Wales, ., NSW 2999 Has Nsw Derelict Mine Program - Expressions Of Interest currently at Planning stage. The developer is seeking expressions of interest from companies for a prequalification scheme for future work involved with the investigation and on-site rehabilitation/remediation of derelict mines in various regions throughout NSW. By entering into the prequalification scheme, successful companies will be given the opportunity to tender for consultancy work in the Derelict Mine Program. Consultancy work will include professional consultancies, fieldwork, sampling, preperation of plans of management, RAP's, sediment and erosion control plans, heritage, flora and fauna, archaeology for values under $30,000 to over $100,000. Click for more details...

NSW DERELICT MINE PROGRAM - EXPRESSIONS OF INTEREST
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Various Sites in New South Wales, ., NSW 2999 of Mine Rehabilitation type of New development. The developer is seeking expressions of interest from companies for a prequalification scheme for future work involved with the investigation and on-site rehabilitation/remediation of derelict mines in various regions throughout NSW. By entering into the pre-qualification scheme, successful companies will be given the opportunity to tender for rehabilitation contract work. Work will include Head contractor engaging and managing all trades. Task will involve but not limited to: modification/works on heritage items, structure modifications, pathways, minor civil modifications, building works, drainage modifications/management, sediment and erosion control works, landform works, revegetation, on-site soil remediation/management. Click for more details...

HUNTER VALLEY COAL OPERATIONS - HAULAGE CONTRACT
Haulage Contract - For Overburden/Tailings/Rejects project at 18 km north west of, Singleton, NSW 2330 in the Mining - Earthworks/Civil Engineering (Haulage Of Ore). 5 year contract for haulage of overburden, tailings & rejects from Hunter Valley Operations South & Hunter Valley Operations North. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

ROCGLEN COAL PROJECT - HAULAGE OF ORE
A project in the NSW Within Gunnedah. For the provision of haulage services for a 3 year period. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

SNAPPER MINERAL SANDS PROJECT - OVERBURDEN REMOVAL
Currently at the Construction stage In Wentworth is a project estimated to be $ 5000000. This project Contract for initial overburden removal in the mineral sands project. Click for more details...

CADIA HILL & RIDGEWAY GOLD MINES - WASTE ROCK DUMP EXPANSION
25 km south west of, Orange, NSW 2800 Has Cadia Hill & Ridgeway Gold Mines - Waste Rock Dump Expansion currently at Planning stage. Modification to consent is sought for the expansion of the South Waste Rock Dump by approximately 53 hectares to be south and east of the existing southern boundary. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

NARRABRI SHIRE COUNCIL QUARRY BLASTING
Mining - Earthworks/Civil Engineering (Drill & Blast) project at ., Narrabri, NSW 2390 for New. Quarry Blasting Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Earthworks/Civil Engineering (Stockpile Management) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

BOGGABRI COAL OPERATIONS - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project at 17km northeast of, Boggabri, NSW 2382 of Mining Contract - Open Cut type of New development. Open cut coal mine producing approx 1.5million tonnes (Mt) a year from the Merriown and Jeralong pits. Five year mining contract commencing at expiry of the current contract to include drill & blast services, mine planning & load & haul of both overburden & coal. Expansion plans to produce 2.5Mtpa early in 2011 & 4.3Mtpa by 2013 will require up to $114million investment in new equipment. Click for more details...

BOGGABRI COAL OPERATIONS - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at 17km northeast of, Boggabri, NSW 2382 of Mining Contract - Open Cut type of New development. Open cut coal mine producing approx 1.5million tonnes (Mt) a year from the Merriown and Jeralong pits. Five year mining contract commencing at expiry of the current contract to include drill & blast services, mine planning & load & haul of both overburden & coal. Expansion plans to produce 2.5Mtpa early in 2011 & 4.3Mtpa by 2013 will require up to $114million investment in new equipment. Click for more details...

BOGGABRI COAL OPERATIONS - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at 17km northeast of, Boggabri, NSW 2382 of Mining Contract - Open Cut type of New development. Open cut coal mine producing approx 1.5million tonnes (Mt) a year from the Merriown and Jeralong pits. Five year mining contract commencing at expiry of the current contract to include drill & blast services, mine planning & load & haul of both overburden & coal. Expansion plans to produce 2.5Mtpa early in 2011 & 4.3Mtpa by 2013 will require up to $114million investment in new equipment. Click for more details...

WONAWINTA SILVER LEAD ZINC PROJECT - MINING CONTRACT
Currently at the Construction stage In Cobar is a project estimated to be $ 10000000. This project Contract for a silver mine with a production forecast of 2.5million ounces (Moz) of silver a year. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

MOUNT OWEN COAL OPERATIONS - OPERATING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Continued operations of an open cut mine. To include specialised terrace mining using seam blasting techniques to work 0.4-0.9m thick seams at angles of 2-45 degrees up to 240m deep. Operation also of 7 mining fleets moving 40cubic m of waste & 8.5million tonnes (Mt) of run-of-mine (ROM) coal annually. Click for more details...

WHITE DAM GOLD OPERATIONS REGIONAL EXPANSION
Operating Mine - Expn project at 85km west of, Broken Hill, NSW 2880 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). A project in the environs of the operating White Dam gold mine which has a resource estimate of 6 million tonne (Mt) containing 188,000 ounces of gold (White Dam + Vertigo). Exploration amongst historic gold-copper mines to extend White Dam's mine life including at Vertigo & White Dam North. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - SPRINGVALE SERVICES SITE UPGRADE
A project in the NSW Within Lithgow. A project to support western operations (Springvale, Angus Collieries) by upgrading the coal handling & distribution capacity at the central Springvale Coal Services site to 9.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. To include expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 Mtpa along with additional conveyors & transfer points. Increase of reject disposal capacity. Construction of a private haul road linking the site to the existing Angus Place-Mount Piper power station haul road. Continued integrated rehabilitation of the former Lambert Gully Mine also located on the coal services site. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Earthworks/Civil Engineering (Stockpile Management) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

MOOLARBEN COAL OPERATIONS BLASTING SERVICES CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Drill & Blast) project In The Mid Western Regional Council Area for New development. Drill & blast contract including full down-the-hole services. Click for more details...

ASHTON COAL OPERATIONS BLASTING SERVICES CONTRACT
New England Hwy south of, Camberwell, NSW 2330 Has Ashton Coal Operations Blasting Services Contract currently at Construction stage. Downer Blasting Services with 3 year contract extension. Click for more details...

DURALIE COAL OPERATIONS BLASTING SERVICES CONTRACT
Currently at the Construction stage In Great Lakes is a project estimated to be $ 10000000. This project Drill & blast contract including full down-the-hole services. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect