State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Earthworks/Civil Engineering Projects


ULAN/BAAL BONE COAL OPERATIONS
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Baal Bone site Mudgee Rd Cullen Bullen and Ulan site Cassilis Rd, Ulan, NSW 2850 for New. Includes field collection of all samples and data for all water, air and meteorological monitoring sites; analysis of all samples by an accredited laboratory; maintenance of all monitoring sites to meet the relevant standard; maintenance and upkeep of the monitoring programme including sampling, analysis, data management and reporting; and other environmental monitoring services as required. Click for more details...

FORRESTANIA NICKEL PROJECT - T ZERO/T1/T4/FLYING FOX - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Yilgarn Council Area of Private ownership. T Zero South indicated resource estimate is 36,500 tonnes @ 3.6% Ni for 1300 tonnes of Ni metal. Click for more details...

HAZELWOOD COAL OPERATIONS
A project in the VIC Within La Trobe. The upgrades will take place as part of the transfer to the West Field. Click for more details...

BETA HUNT NICKEL PROJECT
Resource - Nickel New project In The Coolgardie Council Area. The project includes a remnant resource at the Hunt nickel mine and the developed but un-mined Beta nickel project. Access to the mine is via a portal situated on the northern shoreline of Lake Lefroy, 5 km by road from the WMC nickel concentrator. The Hunt deposit is accessed by a 4 km decline and has remnant blocks available for mining. The Beta deposit is accessed via a 2 km decline developed from the base of the Hunt decline. The Beta deposit is partially developed but is otherwise unmined and requires only pumping and rehabilitation to recommence production in the first quarter of 2004. The acquisition of the project is via a sub-lease associated with agreements and rights in relation to the mining of nickel. Targets within the project area that have the potential to significantly increase the resource base have been identified. Click for more details...

RADIO HILL NICKEL PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The City Of Karratha Council Area of Resource - Nickel type. A resource estimate of 874,000 tonnes @ 0.7% nickel for 6000 tonnes of Ni, 1% copper for 8200 tonnes of Cu and 0.4% cobalt for 350 tonnes of cobalt. Infrastructure for development is already in existence including a decline, ventilation, dewatering facilities and power facilities. Production is expected to be 58,350 dmt of Ni and 23,830 dmt of Cu. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

MOUNT GIBSON IRON ORE PROJECT - STAGE 1
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at Approx 100 km north east of, Dalwallinu, WA 6609. This type is Mining Contract - Open-Cut with Private ownership. To mine approx 2 Mtpa of hematite ore. Includes crushing & screening. Click for more details...

GERMAN CREEK COAL OPERATIONS - GRASSTREE
Service Bore Hole Cables project at 25 KM south west of, Middlemount, QLD 4746 in the Mining - Earthworks/Civil Engineering (Drill & Blast). This contract has been split. See project ID: 4196428 reported this Issue Mining Report Planning Section, for remainder of contract to be retendered. Click for more details...

MUNGARI EAST GOLD PROJECT - FROGS LEG
Haulage Of Ore project at 20 km west of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. From site to toll milling facility, the Greenfields mill. Click for more details...

HAZELWOOD COAL MINE/POWER STATION - WEST FIELD
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project for New development. Part of ongoing approvals process for West Field expansion. Click for more details...

PAULSENS GOLD PROJECT
Mining Contract - Open-Cut project at Approx 186 km west of, Paraburdoo, WA 6754 In The Council Area Of Ashburton of Private. Pre-strip and earthmoving contract. Open pit equipment likely to be conventional truck and excavator fleet moving approximately 18.5 million bcm of waste and 3.3 million tonnes of ore. Click for more details...

YOGANUP 215 STRAND EXTENSION - MINERAL SANDS RESOURCE
Resource - Mineral Sands project at 11 Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 40,000 tonnes of Heavy Mineral Concentrate. Click for more details...

TELFER GOLD PROJECT
Telfer Gold Project is currently at the Construction stage, valued at about $ 88000000 it is Project scope consists of building a new process plant at the Telfer site which can handle a diverse range of ore sourced from both underground and open pit operations. The ore contains copper and gold. The plant is designed to handle two streams of ore. concentrate will be produced and filtered and then loaded onto trucks for transport to ship loading facilities at Port Hedland. Click for more details...

COPERNICUS NICKEL & COPPER JV PROJECT - OPEN CUT MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at East Kimberley area via, Halls Creek, WA 6770. This type is Open Cut Mining/Haulage with Private ownership. The resource estimate is 852,000 tonnes of ore. A haul road is to be constructed as well. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO
Pooncarie Mineral Sands Project - Ginkgo is currently at the Construction stage, valued at about $ 5000000 it is Includes construction of mine pit, tailings/water storage dam and overburden storage areas. Click for more details...

YEELIRRIE PROJECT
Currently at the Planning stage In Wiluna is a project estimated to be $ 5000000. This project Previous work has included trial mining, feasibility study, metallurgical testing & pilot processing plant. Resource estimated at 35mt averaging 1.5kg/t uranium pentoxide (52,500t uranium at approximately 2,500tpa). No immediate development plans are envisaged for this deposit which extends over 9 km, is up to 1.5 km wide & 7 m thick. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
A project in the VIC Within La Trobe. International Power Hazelwood proposes to extend the Hazelwood Mine beyond the existing mining licence boundary, to allow continuation of the company's coal supply for the commercial operating life of the power station. Includes the extension of the mining licence to access the western part of the Morwell seam, diversion and restoration of the Morwell River, diversion and restoration of Eel Hole and Wilderness Creeks, as well as deviation of the Strzelecki Highway. More specifically the Strzelecki Highway will be raligned up to 1000 metres west of current alignment. Seven kilometres of the Morwell River will be relocated and rebuilt on a new alignment. The river will taken out of the concrete pipe and returned to a natural riverline environment. The Yinnar Driffield road will be upgraded to accommodate over dimensional 9 traffic. Marrets road and Brodribb road will be closed for parts of the construction period. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS - E26/LIFT 2
Mining Contract - Underground project at 30 km north west of, Parkes, NSW 2870 in the Mining - Earthworks/Civil Engineering (Underground mining & crushing). A three year contract with 14 km of vertical development to move approx 1.6 million tonnes of ground including waste and ore. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - MINING/CRUSHING
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. The revised mine plan now incorporates the previous stage one and stage two. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY
Pre-Strip Contract New project In The Laverton Council Area. Mining will be shared between an owner-operated fleet & a contractor during the pre-strip & will thereafter be entirely owner-operated. Ore will be trucked 11 km to the Granny Smith plant. Click for more details...

MOUNT WELD RARE EARTHS PROJECT - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Laverton Council Area of Mining Contract - Opencut type. Work comprises the development of an initial pit 150 metres wide x 300 metres long x 65 metres deep, comprising 35 metres of overburden and 30 metres of ore zone. The total mining quantity of ore and waste is 2,890,800 BCM. Of this, 541,256 tonnes of high grade ore (318,230 BCM) is scheduled to be crushed and stockpiled at the site. Optional work that can be included in the contract include the construction of 8.8 km of haul roads to the site. Also the supply and operation of a comminution circuit, which may comprise a jaw crusher or potentially a trommel screen that is to produce 100%<100 mm HG CZ 15% moisture content ore product for stockpiling on load out stockpiles at a minimum annual rate of 137,000 wet tpa. Click for more details...

REWARD GOLD PROJECT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

GIDGEE GOLD PROJECT - KINGFISHER NORTH/EAGLES PEAK/SPECIMEN WELL/TOEDTER
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project for New development. Up to 6,000 metres of drilling is planned, approximately half of which will be diamond core. Drilling will test targets including Kingfisher North, the deep lode system at Swan Bitter North and shallow open pit resources at Eagles Peak, Specimen Well and Toedter. RAB and aircore drilling (5,854 metres) was completed during the March 2004 quarter at Specimen Well and Eagles Peak. Follow up drilling at Eagles Peak and Toedter planned for April was delayed due to lack of suitable rig availability. Click for more details...

GINGIN MINERAL SANDS PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Gingin Council Area of Resource - Mineral Sands type. Proved Ore Reserve of 8.3Mt at 16% contained Heavy Mineral. Click for more details...

GINGIN MINERAL SANDS PROJECT - PRESTRIP
Adjacent to Brand Highway, approximately three kilometres west north west of, Gingin, WA 6503 Has Gingin Mineral Sands Project - Prestrip currently at Construction stage. The prestrip earthworks will remove the overburden at the start of the project rather than over the life of the mine. Click for more details...

WOLFRAM CAMP PROJECT - TUNGSTEN MOLYBDENUM & BISMUTH RESOURCE
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Tablelands Regional Council Area for New development. Total resources in Wolfram Camp were increased by some 45% to 876,500 tonnes measured plus indicated @ 0.41% WO3 and 0.20%MoS2 and inferred is 211,500 tonnes @ 0.4%WO3 and 0.3%MoS2. Infrastructure to include processing plant, pipeline and electrical. Click for more details...

NSW DERELICT MINE PROGRAM - EXPRESSIONS OF INTEREST
Various Sites in New South Wales, ., NSW 2999 Has Nsw Derelict Mine Program - Expressions Of Interest currently at Planning stage. The developer is seeking expressions of interest from companies for a prequalification scheme for future work involved with the investigation and on-site rehabilitation/remediation of derelict mines in various regions throughout NSW. By entering into the prequalification scheme, successful companies will be given the opportunity to tender for consultancy work in the Derelict Mine Program. Consultancy work will include professional consultancies, fieldwork, sampling, preperation of plans of management, RAP's, sediment and erosion control plans, heritage, flora and fauna, archaeology for values under $30,000 to over $100,000. Click for more details...

JIMBLEBAR IRON ORE OPERATIONS - MINING CONTRACT
Open Cut Mining Contract project at 60 Km East of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Work will comprise drilling, blasting, mining, crushing and train loading operations. Click for more details...

GREATER GORGON GAS PROJECT - OPERATIONS - MARINE ENVIRONMENTAL QUALITY MANAGEMENT PLAN
A project in the WA Within Ashburton. For the provision of a marine environmental quality management plan. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - QUARANTINE & WRAPPING SERVICE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Quarantine/Wrapping Service type. For the provision of quarantine & wrapping service. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - PLANT & EQUIPMENT HIRE
Plant/Equipment Hire New project In The Ashburton Council Area. For the provision of plant & equipment hire. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - TRANSPORTATION & LOGISTICS - PERTH
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Based from, Perth, WA 6000. This type is Transportation/Logistics with Private ownership. For the provision of all necessary equipment, labour & material for the heavy haulage "Transport" operation of Precast Concrete material. Click for more details...

MOUNT OWEN COAL OPERATIONS - OPERATING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Continued operations of an open cut mine. To include specialised terrace mining using seam blasting techniques to work 0.4-0.9m thick seams at angles of 2-45 degrees up to 240m deep. Operation also of 7 mining fleets moving 40cubic m of waste & 8.5million tonnes (Mt) of run-of-mine (ROM) coal annually. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 4
Cockatoo Island Iron Ore Operations Stage 4 is currently at the Construction stage, valued at about $ 22000000 it is Continuation of open cut operations based on a resource estimate of 1.2 million tonnes (Mt). Construction of a 300m long extension to the existing onshore seawall to enclose a pit enlargement. Associated relocation of surface infrastructure. Click for more details...

SOUTH MIDDLEBACK RANGES IRON ORE OPERATIONS - MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Whyalla Council Area for New development. A 5 year mining contract. To include drill & blast, ore extraction, haulage & ancillary components. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

TALLERING PEAK IRON ORE OPERATIONS EXTENSION - T1
New project of Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at North northeast of, Mullewa, WA 6630. Extension of the 2-2.5 million tonnes per annum (Mtpa) operations at Tallering Peak mine by open pit working of the 1.4Mt T1 satellite deposit located 1km east of the T6 main pit which is nearing exhaustion. Hydraulic excavators & dump trucks to take ore to the existing plant for crushing & screening prior to trucking to the Ruvidini rail siding for export via Geraldton port. Click for more details...

WEST ANGELAS IRON ORE OPERATIONS - ACCESS ROAD UPGRADE
Excavation/Embankment Construction/Culverts/Pavement/Floodways project at via, Pannawonica, WA 6716 In The Council Area Of Ashburton of Private. Upgrade of the existing access road between the Great Northern Highway & West Angelas mine. To include 19,000cu m of excavation, 266,000cu m of embankment construction, 5,300m of culverts, 31km of bitumen sealed pavement plus installation of 2 floodways. Click for more details...

OLD PIRATE GOLD PROJECT - TRIAL MINING
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Central Desert Shire Council Area for New development. A project based on a Resource Estimate of 1.88 million tonnes at 11.96 g/t gold for 723 800 ounces gold. Trial mining will include the extraction of 10 000 tonnes of gold bearing material, installation of a pilot plant & tailings facility, associated site works & ground water extraction. Pilot plant will include 15tph gravity gold plant including crushers, coarse gold jig, ball mill Knelson gravity concentrator & tabling/gold room. Click for more details...

ROY HILL IRON ORE PROJECT - BULK EARTHWORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The East Pilbara Council Area of Private ownership. To undertake various earthworks, piping and associated works together with drill & blast operations. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

COYOTE GOLD OPERATIONS RECOMMENCEMENT
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Halls Creek Council Area of Mine - Recommencement type. A project at the Western Tanami gold operations to extend Coyote gold production after exhaustion of the Muttley Lode. Planning for further investigation of the Kavanagh Lode with a resource estimate (inferred) of 122,000t containing 100,000 ounces (oz) of gold. Refurbishment works include cleaning of screens, upgrading of conveyor belts, upgrade of leach tanks & general maintenance. Haulage road. Temporary accommodation buildings. Click for more details...

MOOLARBEN COAL OPERATIONS BLASTING SERVICES CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Drill & Blast) project In The Mid Western Regional Council Area for New development. Drill & blast contract including full down-the-hole services. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - BULK EARTHWORKS
40km SW of, Weipa, QLD 4874 Has Amrun (South Of Embley) Bauxite Project - Bulk Earthworks currently at Construction stage. For the provision of Bulk Earthworks package including the clearing, grubbing, mass earthworks & drainage & pavement development of eighteen (18) major facilities across twenty-four (24) separate construction areas on the South of Embley Project. The earthworks requirements are as follows: Clearing, grubbing & topsoil stripping at nominated areas at the Process Plant Site. Construction of an unlined 5 ML sedimentation pond. Construction of nine (9) sealed light vehicle roads. Construction of three (3) unsealed heavy vehicle roads. Construction of four (4) earthworks foundation pads for conveyors. Construction of seven (7) earthworks hardstand & building platforms. Construction of a 230ML, in ground water treatment/harvesting unlined pond. Construction of an earthen dump station ramp & reinforced earth wall designed for HV dump trucks to unload into the dump hopper. Clearing & topsoil stripping of the ROM stockpile area for ore to be dumped & rehandled by mine haul trucks. Construction of a stockpile pad & machine berms for the stacking & reclaiming of product bauxite including stockpile drainage to direct stockpile runoff to the north & south sedimentation ponds. Construction of a 110ML unlined sedimentation pond designed to treat runoff directed to the north from the product stockpile including inlet & outlet drainage works. Construction of a 120ML unlined sedimentation pond designed to treat runoff directed to the south from the product stockpile including inlet & outlet drainage works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect