List of Mining - Earthworks/Civil Engineering Projects


MINING AREA C IRON ORE PROJECT - YANDI RAILROAD CIVIL WORKS
A project in the WA Within East Pilbara. Drill & blast services to enable the construction of 18 km of railway embankment, associated drainage works and maintenance roads on the civil works project. Click for more details...

MOUNT GIBSON IRON ORE PROJECT - STAGE 1
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Approx 100 km north east of, Dalwallinu, WA 6609 of Haulage Of Ore type of New development. To haul ore by road train to the port of Geraldton. Click for more details...

HAZELWOOD COAL MINE/POWER STATION - WEST FIELD
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project for New development. Part of ongoing approvals process for West Field expansion. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

YOGANUP 215 STRAND EXTENSION - MINERAL SANDS RESOURCE
Resource - Mineral Sands project at 11 Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 40,000 tonnes of Heavy Mineral Concentrate. Click for more details...

NELSON POINT - IRON ORE
A project in the WA Within Port Hedland. Contract to provide freshwater recovery & thickener pile foundations for site operations. Service order arrangements to apply for this work which is due for completion 6 May 1996. Click for more details...

ROLLESTON COAL PROJECT - STAGE TWO/STAGE THREE
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. First production will of one million tonnes approx is expected in late 2005. Stage two to 8 mtpa will require only the purchase of an additional second hand dragline and some minor mobile plant. The crushing and mine site infrastructure for stage one will be sized to handle 8 mtpa.Stage two production levels are expected in 2008. The mine is expected to have a 20 year plus life and has further expansion potential to 12mtpa with additional minor capital. Click for more details...

ROLLESTON COAL PROJECT
Resource - Coal project at 16 km west of, Rolleston, QLD 4702 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). A large low ash thermal coal deposit. Coal does not require washing. Initial production of 1 million tpa expected in late 2005, with pmpta export and 2 mtpa domestic production expected in 2008. the project has further expansion potential to 12 mtpa approx with minor additional capital. A low strip ratio, high productivity dragline will be used. Coal to be railed to the port of Gladstone. Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

MOUNT LYELL ACID DRAINAGE REMEDIATION PROGRAMME
Acid Mine Drainage Remediation project at Approx 2 km north of, Queenstown, TAS 7467 in the Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination). To utilise Australian Mining Investments SX six column technology to remove metals from 500,000 litres per hour of acid mine drainage. Click for more details...

MUNGARI EAST GOLD PROJECT - FROGS LEG
Currently at the Construction stage In Kalgoorlie-Boulder is a project estimated to be $ 2000000. This project Includes drill and blast. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
A project in the VIC Within La Trobe. International Power Hazelwood proposes to extend the Hazelwood Mine beyond the existing mining licence boundary, to allow continuation of the company's coal supply for the commercial operating life of the power station. Includes the extension of the mining licence to access the western part of the Morwell seam, diversion and restoration of the Morwell River, diversion and restoration of Eel Hole and Wilderness Creeks, as well as deviation of the Strzelecki Highway. More specifically the Strzelecki Highway will be raligned up to 1000 metres west of current alignment. Seven kilometres of the Morwell River will be relocated and rebuilt on a new alignment. The river will taken out of the concrete pipe and returned to a natural riverline environment. The Yinnar Driffield road will be upgraded to accommodate over dimensional 9 traffic. Marrets road and Brodribb road will be closed for parts of the construction period. Click for more details...

BALD HILL TANTALUM PROJECT
Mining - Earthworks/Civil Engineering (Drill & Blast) project In The Kalgoorlie-Boulder Council Area of Mining Contract - Open-Cut type. Includes drill and balst and haulage to mill. Click for more details...

CHARIOT GOLD PROJECT
Mining Contract - Open Cut New project In The Barkly Shire Council Area. For the greater part, Chariot will be an underground mine. An open pit will be excavated to a depth of 45 m from which a portal for a decline will be established to access the orebody. Click for more details...

MOORVALE COAL PROJECT
Mining Contract project at 10 km south of Copabella mine Bowen Basin via, Nebo, QLD 4742 In The Council Area Of Isaac Regional of Private. Life of mine contract. (Approximately 10 years based on current knowledge of the resource). Click for more details...

MINERVA COAL PROJECT - RAIL
Currently at the Construction stage In Central Highlands Regional is a project estimated to be $ 5000000. This project Coal to be railed on Emerald to Springsure rail link. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

MURRAY BASIN STAGE 2 SANDS PROJECT - HAULAGE OF ORE
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Mildura Council Area of Haulage Of Ore type. For haulage of ore to Hamilton for export through Port of Portland. Click for more details...

PROMINENT HILL GOLD/COPPER PROJECT - MINING CONTRACT
100 Km South East of, Coober Pedy, SA 5723 Has Prominent Hill Gold/Copper Project - Mining Contract currently at Construction stage. Work comprises the extraction of approximately 153 million cubic metres of overburden and waste, and 38 million tonnes of treatable ore over six years. The open pit is expected to be 1.2 kms wide, 1.4 kms long on the surface and 500 metres deep. Click for more details...

CLOVERDALE MINERAL SANDS PROJECT - RESOURCE
Resource - Mineral Sands project at 6Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 3.5 million tonnes @ 18% heavy mineral sands. Heavy Mineral Concentrate production will occur at 450,000 tonnes per year. Mining will be carried out by scrapers or truck and shovel excavating the ore and hauling it to the in pit hopper. The ore will be conveyed from the Hopper to the existing wet screening plant at Yoganup West and the concentrator at Yoganup. After processing the ore will be transported by truck to Capel for further processing. The mine will use the existing infrastructure at Yoganup and only an earthmoving contractors area will be installed at the mine site. The Yoganup West access road will be extended to Clovendale for equipment movement. After mining is complete the site will be rehabilitated. Click for more details...

SOUTH MIDDLEBACK RANGES MAGNETITE PROJECT - MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Mining will be 9 million tonnes per annum. Click for more details...

KAKADU NATIONAL PARK - URANIUM CONTAINMENT FACILITY
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Kakadu Park, Kakadu National Park, NT 0822 for New. Design a containment facility and undertake related planning work to manage former uranium mining and milling operations in Kakadu National Park. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

WALLARAH NO 2 UNDERGROUND COAL PROJECT - PRODUCT STOCKPILE
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Wyong Council Area of Product Stockpile type. For the provision of a 250,000 tonne product stockpile. Click for more details...

FLINDERS ZINC PROJECT
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Far North Council Area of Resource - Zinc type. A resource of 966 000 tpmmes at 31% zinc, containing almost 300 000 tonnes of zinc metal, has been estimated for the Flinders project and additional resources are expected from ongoing work. The project is a small scale mining operation involving the winning of ore using open cut mining methods. Topsoil and vegetation will be removed from areas of working and stockpiled for later use in restoration/rehabilitation activities. Ore block definition (grade control) will be carried out using a reverse circulation drill rig. Blasting of ore and waste will be reuqired from the surface to the base of pit. Material will be loaded and hauled from the pit using hydraulic excavators and dump trucks. Overburden and waste rock will be deposited in a waste rock dump, and ore grade rock will be transported to the pre-crushed ore stockpile at the Beltana Mine. The ore will be transported to Port Pirie for shipping to overseas markets. Site rehabilitation will be carried out on completion of mining and ore transport. This will include the grading windrows back over tracks or cleared areas, the reshaping and re profiling of the waste rock dump, covering the disturbed areas with available topsoil and re-establishing vegetation. The site will be fenced as a barrier to fauna and for public safety. Click for more details...

SNAPPER MINERAL SANDS PROJECT - OVERBURDEN REMOVAL
Currently at the Construction stage In Wentworth is a project estimated to be $ 5000000. This project Contract for initial overburden removal in the mineral sands project. Click for more details...

ANGAS ZINC PROJECT - CONCENTRATE HAULAGE
Angas Zinc Project - Concentrate Haulage is currently at the Construction stage, valued at about $ 3000000 it is For the haulage of concentrate from the Angas Zinc Mine. The site will produce on an annual basis approximately 80 000 tonnes of concentrate. Approximately 60 000 tonnes will be delivered to Port Adelaide and 20 000 tonnes will be delivered to Port Pirie. It is envisaged that task specific, covered concentrate side tippers or tail discharge trailers would be required; however it is unlikely that conventional grain handling trailers will be suitable. Self loading proposals will be considered. Click for more details...

NARRABRI SHIRE COUNCIL QUARRY BLASTING
Mining - Earthworks/Civil Engineering (Drill & Blast) project at ., Narrabri, NSW 2390 for New. Quarry Blasting Click for more details...

HAZELWOOD POWER SUCTION DREDGING OF ASH POND
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project In The La Trobe Council Area of Suction Dredging type. For the provision of suction dredging of ash from Hazelwood Ash Pond. Click for more details...

MOOLARBEN JOINT VENTURE COAL OPERATIONS - STAGE 1 ROM STOCKPILE
Mining - Earthworks/Civil Engineering (Stockpile Management) project at 40km northeast of, Mudgee, NSW 2850 for New. Construction of a 100,000tonne Run-of-Mine (ROM) stockpile for Stage 1 operations. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - STEEL EMBEDMENTS
Greater Gorgon Gas Project - Civils & Underground Services - Steel Embedments is currently at the Construction stage, valued at about $ 500000 it is For the supply of steel embedments. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - TRANSPORTATION & LOGISTICS - PERTH
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Based from, Perth, WA 6000. This type is Transportation/Logistics with Private ownership. For the provision of all necessary equipment, labour & material for the heavy haulage "Transport" operation of Precast Concrete material. Click for more details...

MOUNT OWEN COAL OPERATIONS - OPERATING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Continued operations of an open cut mine. To include specialised terrace mining using seam blasting techniques to work 0.4-0.9m thick seams at angles of 2-45 degrees up to 240m deep. Operation also of 7 mining fleets moving 40cubic m of waste & 8.5million tonnes (Mt) of run-of-mine (ROM) coal annually. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Earthworks/Civil Engineering (Earthworks/general civil). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - GROUNDING MATERIAL
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Grounding Material is currently at the Construction stage, valued at about $ 2500000 it is For the provision of grounding material. To include: earth cables, bars, connectors & terminals, tool kit, compression tool & dies). Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...


RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

NORTH KAMBALDA NICKEL OPERATIONS - OTTER JUAN/MACMAHON CLOSURE
Mine - Closure project at via, Kambalda, WA 6442 in the Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination). Closure of the mines at resource exhaustion. Click for more details...

MOUNT ISA MINES OPERATIONS - SILICA CONTRACT
Currently at the Tenders & Building stage In Mt Isa City is a project estimated to be $ 2000000. This project A 3 year contract for the supply of fine silica for smelter flux. Glencore to organise drill & blast in an area between no.5 tailings dam & 5/7 West Wall (ML 8058). Transportation of broken rock to a run-of-mine (ROM) pad prior to going to a designated processing site. Pre-screening if necessary prior to crushing, size separation through screening & if required washing. Haulage of the silica to the fine & coarse stockpiles near the lead smelter (Rowles Reserve) & copper smelter sites (Barnes Boulevard - North & South, Stacker). The contractor to supply primary & secondary crushers, mobile stack & screening plant conveyors as well as 45t excavators with bucket/hammer attachments, 980 wheel leaders, 25t dump trucks & a water truck, Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - ROM STOCKPILE
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Mapoon Shire Council Area of Rom Stockpile type. For the provision of a Run-of-Mine (ROM) stockpile area. Click for more details...