State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Earthworks/Civil Engineering Projects


HAIL CREEK COAL PROJECT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Package to include:Cranage for Dragline House Structure; 3 x 1 ton Electric Chain Hoist; 2 x 2 ton Wire Rope Winches; 2 x 303.75inch Double Girder Bridges; 1 x 186 inch Girder Bridge; and 2 x Electric Powered Under-hung Trolley Hoist. Click for more details...

KUNWARARA MAGNESITE OPERATIONS - KG2 EXTN
A project in the QLD Within Rockhampton Regional. Installation of a new crushing and screening circuit. Click for more details...

MOUNT MORGAN MINE REHABILITATION PROJECT
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project for New development. RoadTek is the Principal Contactor for a Mine Rehabilitation Project at Mount Morgan. The following packages are attached to this project:- (1) dredging; (2) earthmoving; (3) quarrying; (4) landscaping; (5) demolition; and (6) small tool & plant hire. Click for more details...

HAZELWOOD COAL OPERATIONS
A project in the VIC Within La Trobe. The upgrades will take place as part of the transfer to the West Field. Click for more details...

KAMBALDA WEST PROJECT - SPARGOVILLE 5A
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project for New development. A small nickel resource of 40,000 to 50,000 tonnes. The proposed mining project will produce three separte ore types with the upper and lower transitional ores transported to regional milling facility for toll treatment. The small quantity of oxide ore will be stockpiled until larger tonnages are available. Click for more details...

BULONG PROJECT - JARVIS
Haulage Of Ore project at East of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. 45 km from site to processing facility. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - RESOURCE
Mine - Lead Carbonate project at 30 km west of, Wiluna, WA 6646 In The Council Area Of Wiluna of Private. Tailings storage facility completed. Prestripping of mine in progress. Phase two includes the capital intensive refinery and is expected to be producing lead metal of 99.95 per cent purity at a capital cost of $40. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

ZEEHAN SLAG DUMP BASE METALS RESOURCE
Mining - Earthworks/Civil Engineering (Haulage Of Ore) New project at Near, Zeehan, TAS 7469. This type is Resource - Base Metals with Private ownership. The Zeehan slag dump contains residue material from lead smelting over 100 years ago. It includes 450,000 tonnes of material grading 13.4% zinc, 1.7% lead, 54g/t silver and 50g/t iridium. It is located approx 90 km southwest of the Hellyer metals project by road. Click for more details...

MOUNT KEITH NICKEL OPERATIONS - OPEN CUT MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Wiluna Council Area for New development. Mining will be at the current rate of 95 million tonnes per annum. The depth of the pit will be eventually 600 metres. Click for more details...

TASMANIA MINE DECOMMISSIONING
5 West St, Beaconsfield, TAS 7270 Has Tasmania Mine Decommissioning currently at Construction stage. A project for the decommissioning & rehabilitation of the Tasmania (formerly Beaconsfield) Mine. To include depositing of tailings in underground shafts to prior to their closure. Closure of tailings dams. Clean up of the Wetlands water filtration area. Ongoing monitoring for several years. Click for more details...

DOUGLAS MINERAL SANDS PROJECT - ACAPULCO/BONDI/ECHO
A project in the VIC Within West Wimmera. A $270 million project to develop the Douglas mine, mineral separation plant and associated infrastructure. The project approved is larger than the original proposal. The initial capacity of the mineral separation plant has been almost doubled from 30 to 55 tonnes per hour. Click for more details...

COAL STOCKPILE - KOORAGANG ISLAND
Coal Stockpile project at 240 Cormorant Rd, Kooragang Island, Newcastle, NSW 2300 In The Council Area Of Newcastle of Private. A 40,000 tonne coal stockpile. Click for more details...

GOONDICUM CRATER PROJECT
Haulage project at From project site near Monto to, Dinmore, QLD 4303 In The Council Area Of Ipswich City. Over 200 tonnes of feldspar to be trucked to the washing plant at Dinmore, Ipswich. Click for more details...

COSMOS NICKEL OPERATIONS - COSMOS DEEPS/ILLIAS
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Ilias decline. Click for more details...

MOORVALE COAL PROJECT
Mining Contract project at 10 km south of Copabella mine Bowen Basin via, Nebo, QLD 4742 In The Council Area Of Isaac Regional of Private. Life of mine contract. (Approximately 10 years based on current knowledge of the resource). Click for more details...

BARALABA COAL PROJECT
New project of Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at 155 km west of Gladstone at, Baralaba, QLD 4702. Mining, haulage, haul roads. Click for more details...

NEWLANDS WOLLOMBI NO2 COAL OPERATIONS EXPANSION PROJECT
13 km west of, Glenden, QLD 4743 Has Newlands Wollombi No2 Coal Operations Expansion Project currently at Construction stage. Development into the western portion (77ha approx) of Wollombi Open Cut Mine mining lease (ML4761). Production is expected to be up to 2.5 million tonnes of coking coal per annum of Run of Mine (ROM) coal for nominal annual average of 1.9 Mtpa product coal. It is proposed to use an excavator and truck fleet combined with a dragline to produce high grade, medium volatile steaming coal & premium coking coal for the export market. Development to involve open cut mining, clearing of vegetation, topsoil removal and replacement, overburden stockpiling, coal extraction and final rehabilitation of disturbed areas. Coal is to be processed at the existing Newland's Coal Handling and Preparation plant and transported 200km via rail to the Abbot Point Bulkcoal Terminal for export. Click for more details...

LANFRANCHI NICKEL PROJECT - WINNER - RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. Indicated resource estimate for Winner was 111,551 tonnes @ 6.16% Ni for 6879 tonnes of nickel. The reserve resource is 144,003 tonnes @ 4.26% Ni containing 6139 tonnes of nickel. Click for more details...

WESTONIA GOLD PROJECT - ACCESS ROAD/EVAPORATION POND/EARTHWORKS
Currently at the Construction stage In Westonia is a project estimated to be $ 5000000. This project Earthworks will involve the construction of an access road, the construction and refurbishment of evaporation ponds and pit floor clean up. Click for more details...

LIDDELL POWER STATION - PERIODIC PEST/WEED CONTROL
Periodic Pest/Weed Control project at Via, Liddell, NSW 2333 In The Council Area Of Muswellbrook of Private. Work comprises the provision of services in the eradication and control of unwanted vegetation by herbicide spraying and or mechanical means and the control of spiders, fleas, cockroaches, ants, rats, mice, feral cats and other unwanted pests. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

HUNTER VALLEY COAL OPERATIONS - HAULAGE CONTRACT
Haulage Contract - For Overburden/Tailings/Rejects project at 18 km north west of, Singleton, NSW 2330 in the Mining - Earthworks/Civil Engineering (Haulage Of Ore). 5 year contract for haulage of overburden, tailings & rejects from Hunter Valley Operations South & Hunter Valley Operations North. Click for more details...

OAKY CREEK COAL OPERATIONS - STOCKPILE MANAGEMENT CONTRACT
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Central Highlands Regional Council Area of Private ownership. Contract comprises the installation of a pit to plant stockpile management and mine reconciliation system. The system will provide detailed material tracking, inverntory, stockpiling, blending and grade control. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Earthworks/Civil Engineering (Haulage Of Ore). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

CAMEBY DOWNS COAL PROJECT - MINING CONTRACT - OPEN CUT
Mining Contract - Open Cut - Stage 1 project at 17km northeast of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. Mining will commence in the northeast corner of the site & progress in a westerly & southwesterly direction using strip mining methods at a rate of 1.8Mtpa. Initial activities to include clearing vegetation, topsoil stripping & stockpiling, overburden removal from the initial area to be mined & storage of the overburden in permanent overburden dumps. Coal extraction using excavators & trucks & progressive rehabilitation of overburden emplacement areas. Construction of surface water management structures to manage the quality and quantity of surface waters on the site including diversions, drains & sediment control dams. Storage of coal rejects & tailings in an appropriately designed & engineered Tailings Dam. Loading of coal product into a dedicated rail loading facility for transport off-site to the Port of Brisbane. McMahon's stage1 contract includes planning, mine development, waste stripping, coal mining, coal preparation & train loading. Click for more details...

FLINDERS ZINC PROJECT
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Far North Council Area of Resource - Zinc type. A resource of 966 000 tpmmes at 31% zinc, containing almost 300 000 tonnes of zinc metal, has been estimated for the Flinders project and additional resources are expected from ongoing work. The project is a small scale mining operation involving the winning of ore using open cut mining methods. Topsoil and vegetation will be removed from areas of working and stockpiled for later use in restoration/rehabilitation activities. Ore block definition (grade control) will be carried out using a reverse circulation drill rig. Blasting of ore and waste will be reuqired from the surface to the base of pit. Material will be loaded and hauled from the pit using hydraulic excavators and dump trucks. Overburden and waste rock will be deposited in a waste rock dump, and ore grade rock will be transported to the pre-crushed ore stockpile at the Beltana Mine. The ore will be transported to Port Pirie for shipping to overseas markets. Site rehabilitation will be carried out on completion of mining and ore transport. This will include the grading windrows back over tracks or cleared areas, the reshaping and re profiling of the waste rock dump, covering the disturbed areas with available topsoil and re-establishing vegetation. The site will be fenced as a barrier to fauna and for public safety. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - MINING CONTRACT
Peculiar Knob Iron Ore Project - Mining Contract is currently at the Construction stage, valued at about $ 285000000 it is A mining services contract for export at a rate of 3.3million tonnes per annum (Mtpa) over 70 months. To include drilling, blasting, loading & haulage of ore & waste material. Over 100 people expected to be employed once full production reached. Click for more details...

PEKO MAGNETITE PROJECT - TOPSOIL REMOVAL
New project of Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at 10 km from, Tennant Creek, NT 0862. Topsoil removal for 5 hours per day for 12 months using a 22m scraper. Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - RAIL SPUR LINE
Rail Spur Line New project In The East Pilbara Council Area. A project to extend the existing Lang Hancock Railway. Construction of a 52km spur line from the new Hope Downs 4 mine to south of the existing Hope Downs 1 Mine to provide connection to rail & port infrastructure. Associated rail bridges over the Weeli Wolli & Coondiner Creeks. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - ANCHOR BOLTS SUPPLY
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For the supply of anchor bolts. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MOUNT ISA MINES NO.7 TAILINGS DAM EXTENSION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Mt Isa City Council Area for New development. Increase in No. 7 tailings dam capacity by raising external walls. To include 5/7 East Embankment & Toe Berm (26,070sq m fill), the 5/7 West Embankment & Toe Berm (59,250sq m fill) & the West Embankment (21,100sq m fill). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For the supply of grating & cast in angle. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

MOOLARBEN COAL OPERATIONS BLASTING SERVICES CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Drill & Blast) project In The Mid Western Regional Council Area for New development. Drill & blast contract including full down-the-hole services. Click for more details...

MINERVA COAL OPERATIONS BLASTING SERVICES CONTRACT
Minerva Coal Operations Blasting Services Contract is currently at the Construction stage, valued at about $ 10000000 it is Drill & blast contract including full down-the-hole services & product supply. Click for more details...

JUNDEE GOLD OPERATIONS - DRILLING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. A 3 year contract extension at the 1.8 million tonnes per annum underground operations. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

NORTH KAMBALDA NICKEL OPERATIONS - OTTER JUAN/MACMAHON CLOSURE
Mine - Closure project at via, Kambalda, WA 6442 in the Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination). Closure of the mines at resource exhaustion. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY SHUTDOWN
Gove Peninsula North West Arnhem Land via, Gove, NT 0880 Has Alcan Gove Bauxite Operations - Refinery Shutdown currently at Construction stage. Phased shutdown of refinery in order to suspend production. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

CARINA IRON ORE PROJECT - DRILL & BLAST
52km North Northeast of, Koolyanobbing, WA 6427 Has Carina Iron Ore Project - Drill & Blast currently at Construction stage. For the provision of drill & blast operations for 2 years using REICHdrill drill rig products. Click for more details...

CHRISTMAS ISLAND PHOSPHATE PROJECT
Asbestos Removal - For Mine Site New project In The Christmas Island Council Area. For the provision of asbestos removal at the Christmas Island Phosphate Mine. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...

BLACK DIAMOND COAL MINE REHABILITATION
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Collie Council Area of State ownership. A 4 stage approach to the rehabilitation of the Black Diamond Coal Mine. Initial work will focus on battering down the steep & unsafe southern lake pit wall, as well as subsequent revegetation work. Stage 1 - The formation of the Black Diamond Working Group. Stage 2 - A detailed site assessment to identify the type & degree of safety & environmental issues & possible solutions. Stage 3 - Undertaking of works to make the site safe & stable. Stage 4 - Site monitoring & further consultation. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect