State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Earthworks/Civil Engineering Projects


CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Earthworks/Civil Engineering (Haulage Of Ore). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

ULAN/BAAL BONE COAL OPERATIONS
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Baal Bone site Mudgee Rd Cullen Bullen and Ulan site Cassilis Rd, Ulan, NSW 2850 for New. Includes field collection of all samples and data for all water, air and meteorological monitoring sites; analysis of all samples by an accredited laboratory; maintenance of all monitoring sites to meet the relevant standard; maintenance and upkeep of the monitoring programme including sampling, analysis, data management and reporting; and other environmental monitoring services as required. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

HAZELWOOD COAL OPERATIONS
A project in the VIC Within La Trobe. The upgrades will take place as part of the transfer to the West Field. Click for more details...

MUNGARI EAST GOLD PROJECT - FROGS LEG
Haulage Of Ore project at 20 km west of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. From site to toll milling facility, the Greenfields mill. Click for more details...

BULONG PROJECT - JARVIS
Haulage Of Ore project at East of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. 45 km from site to processing facility. Click for more details...

LAKE LINDSAY COAL PROJECT - HAULAGE OF COAL
A project in the QLD Within Isaac Regional. 25 km to German Creek preparation plant. Click for more details...

ENVIRONMENTAL PROTECTION AGENCY - SOUTH AUSTRALIA
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project for New development. A review of the acid ISL mining process with regard to its environmental impact, with particular regard to: hydrogeology, groundwater management and impacts on aquifers; management of process liquids, spill response and clean up; surface disturbance, including vegetation clearance; waste management, recovery and disposal (both liquid and solid); issues relating to rehabilitation on cessation of operations (including aquifer and surface rehabilitation); international experience with its practical application; its current application in South Australian, including whether there are more appropriate leaching techniques for extraction of uranium from the ore; how existing proposals and operations in SA may be improved to reduce any risk to the environment. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS - E26/LIFT 2
Mining Contract - Underground project at 30 km north west of, Parkes, NSW 2870 in the Mining - Earthworks/Civil Engineering (Underground mining & crushing). A three year contract with 14 km of vertical development to move approx 1.6 million tonnes of ground including waste and ore. Click for more details...

GRANNY SMITH GOLD OPERATIONS - WALLABY
Pre-Strip Contract New project In The Laverton Council Area. Mining will be shared between an owner-operated fleet & a contractor during the pre-strip & will thereafter be entirely owner-operated. Ore will be trucked 11 km to the Granny Smith plant. Click for more details...

JAURDI HILLS OPERATIONS
Mining - Earthworks/Civil Engineering (Haulage Of Ore) New project at 40 km northwest of, Coolgardie, WA 6429. This type is Haulage Of Ore with Private ownership. From site to toll milling facilities at Greenfields mill (Barminco). Click for more details...

CHARTERS TOWERS CITY COUNCIL MINE SHAFT REPAIR PROJECT
Charters Towers City Council Mine Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 100000 it is Construction plant including backhoes, skid steer loaders, excavators (Min 30 tonne and 2 tonne), front end loaders in 3-5 cu m minimum, for the period 1/07/02 to 1/06/02. Click for more details...

MOORVALE COAL PROJECT
Mining Contract project at 10 km south of Copabella mine Bowen Basin via, Nebo, QLD 4742 In The Council Area Of Isaac Regional of Private. Life of mine contract. (Approximately 10 years based on current knowledge of the resource). Click for more details...

NEWLANDS WOLLOMBI NO2 COAL OPERATIONS EXPANSION PROJECT
13 km west of, Glenden, QLD 4743 Has Newlands Wollombi No2 Coal Operations Expansion Project currently at Construction stage. Development into the western portion (77ha approx) of Wollombi Open Cut Mine mining lease (ML4761). Production is expected to be up to 2.5 million tonnes of coking coal per annum of Run of Mine (ROM) coal for nominal annual average of 1.9 Mtpa product coal. It is proposed to use an excavator and truck fleet combined with a dragline to produce high grade, medium volatile steaming coal & premium coking coal for the export market. Development to involve open cut mining, clearing of vegetation, topsoil removal and replacement, overburden stockpiling, coal extraction and final rehabilitation of disturbed areas. Coal is to be processed at the existing Newland's Coal Handling and Preparation plant and transported 200km via rail to the Abbot Point Bulkcoal Terminal for export. Click for more details...

JAGUAR BASE METALS PROJECT - SITE PREPARATION WORKS/BOX CUT MINING CONTRACT
A project in the WA Within Leonora. Development comprises the movement of 1 million cubic metres of material over five months. Work will involve site clearing, mining the box cut, construction of haul roads, initial processing plant earthworks, and tailings dams construction. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

KOOLAN ISLAND PROJECT - MINING/CRUSHING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Derby-W Kimberley Council Area for New development. Approximately 61 million bcm of ore and waste will be mined in the five year contract. Click for more details...

PROMINENT HILL GOLD/COPPER PROJECT - MINING CONTRACT
100 Km South East of, Coober Pedy, SA 5723 Has Prominent Hill Gold/Copper Project - Mining Contract currently at Construction stage. Work comprises the extraction of approximately 153 million cubic metres of overburden and waste, and 38 million tonnes of treatable ore over six years. The open pit is expected to be 1.2 kms wide, 1.4 kms long on the surface and 500 metres deep. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Earthworks/Civil Engineering (Stockpile Management) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

CHINESE SOUTH EXTENDED & MOTTRAMS GOLD MINE PROJECT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project at Doulgas Station, Stuart Hwy, 12km North of Hayes Creek Wayside Inn, via, Pine Creek, NT 0847 for New. The company proposes to recommence gold mining operations. Mining is proposed to commence on two deposits within this area. The proposed mining development consists of two open cut pits and will employ conventional open cut excavation methods. No mineral processing will occur on these sites. The ore will be transported by road, approximately 62km south-east, for processing. The major components of the proposed Chinese South Extended and Mottrams development include: construction of two open cut mines, pit dewatering, water storage and management, stockpiling of ore, construction of access and haul roads; and construction of two waste rock storage facilites. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Earthworks/Civil Engineering (Stockpile Management) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

HAZELWOOD POWER SUCTION DREDGING OF ASH POND
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project In The La Trobe Council Area of Suction Dredging type. For the provision of suction dredging of ash from Hazelwood Ash Pond. Click for more details...

MOUNT NEWMAN IRON ORE OPERATIONS - OREBODY 18 - MINING CONTRACT EXTENSION
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Provision of complete surface mining services including drill & blast, mining, crushing & on-site train loading. To include an increase in the level of production which will require an additional 50 approx employees. Contract extended by 3 years. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Earthworks/Civil Engineering (Stockpile Management). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 4
Cockatoo Island Iron Ore Operations Stage 4 is currently at the Construction stage, valued at about $ 22000000 it is Continuation of open cut operations based on a resource estimate of 1.2 million tonnes (Mt). Construction of a 300m long extension to the existing onshore seawall to enclose a pit enlargement. Associated relocation of surface infrastructure. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

BRISBANE CITY COUNCIL QUARRY BLASTING & DRILLING SERVICES
Drilling/Blasting/Materials Supply New project In The Brisbane City Council Area. A contract for drilling and/or blasting and/or supply of materials at 2 quarries. Click for more details...

PAYNES FIND GOLD OPERATIONS RECOMMENCEMENT - PROCESSING PLANT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Perth Council Area of Private ownership. Plant to produce eluvial/alluvial gold, from small scale open cast workings, utilising its existing alluvial gravity circuit plant with mill & knudsen concentrator. The plant is capable of processing at a rate of 50 tonnes/hour, current expectations are targetting the processing of approximately 9,000 tonnes per month with an average head grade based on historical results of between 0.3 to 0.5 grams per tonne. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS CRUSHER CIRCUIT CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Roper Gulf Shire Council Area for New development. One year extension of the contract to operate the crusher circuit including feeding from the run-of-mine (ROM) stockpile. Covers the primary, secondary & tertiary crushing plants & mobile equipment. Click for more details...

ROY HILL IRON ORE PROJECT - BULK EARTHWORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The East Pilbara Council Area of Private ownership. To undertake various earthworks, piping and associated works together with drill & blast operations. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Earthworks/Civil Engineering (Stockpile Management) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

YARRABEE COAL OPERATIONS BLASTING SERVICES CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project at Near, Blackwater, QLD 4717 for New. Drill & blast contract including full down-the-hole services. Click for more details...

CAROSUE DAM GOLD OPERATIONS - BLASTING SERVICES CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project at 80 km south of, Laverton, WA 6440 for New. Drill & blast contract including full down-the-hole services & product supply. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINING CONTRACT
Mining Contract - Underground project at 2km northeast of, Queenstown, TAS 7467 In The Council Area Of West Coast of Private. Three year development & production mining contract. To include advancing decline development 3600m per annum & producing 2.47 million tonnes per annum (Mtpa) of ore. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

MINE SPECIALIST CONSULTANCY PANEL SERVICES
A project in the SA Within Various. Tenders to join a consultancy panel for the provision of specialty mining services over various projects. Areas of expertise to include geotechnical, geochemistry, landform/performance post closure & cover design. Click for more details...

COSMO GOLD OPERATIONS - MINING SERVICES CONTRACT
New project of Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at 130km southeast of, Darwin, NT 0800. A 2 year contract for the provision of mill feed ore from the underground mine. To include development, mining & associated works. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

CARINA IRON ORE PROJECT - DRILL & BLAST
52km North Northeast of, Koolyanobbing, WA 6427 Has Carina Iron Ore Project - Drill & Blast currently at Construction stage. For the provision of drill & blast operations for 2 years using REICHdrill drill rig products. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - DETAILED EARTHWORKS & CONCRETE WORKS
Wheatstone Development Project - Onshore & Infrastructure - Pindan - Detailed Earthworks & Concrete Works is currently at the Construction stage, valued at about $ 1000000 it is For the provision of detailed earthworks & concrete works to 50 modular house lots. Estimated 2500m3 of earthworks & 1900m3 of concrete over a 40 week period. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

YANDI OXBOW PROJECT (YOP) - BULK EARTHWORKS/CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For bulk earthworks & civil works to sustain current production at the Yandi Mine. To include construction of a 4.5km haul road, construction of a heavy vehicle bridge over the existing railway, over 700,000cm of embankment construction, over 3200 lineal metres of culverts & upgrades, re-routing & extensions to existing light vehicle access roads. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - ROM STOCKPILE
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Mapoon Shire Council Area of Rom Stockpile type. For the provision of a Run-of-Mine (ROM) stockpile area. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect