List of Mining - Earthworks/Civil Engineering Projects in Victoria


DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

HAZELWOOD COAL OPERATIONS
A project in the VIC Within La Trobe. The upgrades will take place as part of the transfer to the West Field. Click for more details...

LOY YANG A MINE/POWER STATION
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at At, Traralgon, VIC 3844 for New. Provision of suction dredging of silt from overburden retention ponds. Click for more details...

HAZELWOOD COAL MINE/POWER STATION - WEST FIELD
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project for New development. Part of ongoing approvals process for West Field expansion. Click for more details...

WIM 150 MINERAL SANDS PROJECT
A project in the VIC Within Horsham. The WIM 150 deposit contains approximately five million tonnes of zircon and preliminary analysis suggest that production of 140,000 tonnes of zircon per annum could be possible. The project is positioned near rail and other infrastructure. Click for more details...

DOUGLAS MINERAL SANDS PROJECT - ACAPULCO/BONDI/ECHO
A project in the VIC Within West Wimmera. A $270 million project to develop the Douglas mine, mineral separation plant and associated infrastructure. The project approved is larger than the original proposal. The initial capacity of the mineral separation plant has been almost doubled from 30 to 55 tonnes per hour. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
A project in the VIC Within La Trobe. International Power Hazelwood proposes to extend the Hazelwood Mine beyond the existing mining licence boundary, to allow continuation of the company's coal supply for the commercial operating life of the power station. Includes the extension of the mining licence to access the western part of the Morwell seam, diversion and restoration of the Morwell River, diversion and restoration of Eel Hole and Wilderness Creeks, as well as deviation of the Strzelecki Highway. More specifically the Strzelecki Highway will be raligned up to 1000 metres west of current alignment. Seven kilometres of the Morwell River will be relocated and rebuilt on a new alignment. The river will taken out of the concrete pipe and returned to a natural riverline environment. The Yinnar Driffield road will be upgraded to accommodate over dimensional 9 traffic. Marrets road and Brodribb road will be closed for parts of the construction period. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The La Trobe Council Area of Bulk Earthworks - Phase 1 type. Involves bulk earthworks removal for years 2002 to 2006 (10,000,000 + cubic metres). Includes T&S overburden removal and establishment of new mine outlet. Click for more details...

BALLARAT EAST GOLD PROJECT
Via, Ballarat, VIC 3350 Has Ballarat East Gold Project currently at Construction stage. Includes geotechnical drilling of ventilation shaft, drilling from surface to define resource cross sections on Sulieman and first chance lines, drilling targets from surface on Yarrowee Creek anticline. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

AUGUSTA GOLD PROJECT - EARTH WORKS/BOX CUT CONTRACT
Heathcote Nagambie Road, Bendigo, VIC 3550 Has Augusta Gold Project - Earth Works/Box Cut Contract currently at Construction stage. Development option is to construct an underground portal on C Lode where approximately 5000 tonnes of ore can be extracted. As part of the earthworks component the contractor will will construct an evaporation pond and do the creek diversion work. Click for more details...

MURRAY BASIN STAGE 2 SANDS PROJECT - HAULAGE OF ORE
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Mildura Council Area of Haulage Of Ore type. For haulage of ore to Hamilton for export through Port of Portland. Click for more details...

HAZELWOOD POWER SUCTION DREDGING OF ASH POND
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project In The La Trobe Council Area of Suction Dredging type. For the provision of suction dredging of ash from Hazelwood Ash Pond. Click for more details...