MOUNT GIBSON IRON ORE PROJECT - STAGE 1
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at Approx 100 km north east of, Dalwallinu, WA 6609. This type is Mining Contract - Open-Cut with Private ownership. To mine approx 2 Mtpa of hematite ore. Includes crushing & screening. Click for more details...

PORT HEDLAND LNG PLANT
Via, Port Hedland, WA 6721 Has Port Hedland Lng Plant currently at Early Planning stage. The Kimberley Power proposal involved the establishment of an LNG Plant in Port Hedland and the supply of LNG as the primary fuel to be used in new gas fired power plants in each of the above towns. Click for more details...

COBURN MINERAL SANDS PROJECT - MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Shark Bay Council Area for New development. Mining will be carried out in a three stage process. Firstly top soil removed by scrappers and stockpiled for rehabilitation. Secondly, overburden removed by bucket wheel excavator and conveyed into the void left by mining of the ore. Lastly the ore mined by a second bucket wheel excavator is screened in the pit, mixed with water and pumped to the concentrator near the edge of the pit. Click for more details...

YOGANUP 215 STRAND EXTENSION - MINERAL SANDS RESOURCE
Resource - Mineral Sands project at 11 Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 40,000 tonnes of Heavy Mineral Concentrate. Click for more details...

NELSON POINT - IRON ORE
A project in the WA Within Port Hedland. Contract to provide freshwater recovery & thickener pile foundations for site operations. Service order arrangements to apply for this work which is due for completion 6 May 1996. Click for more details...

MIITEL PROJECT - NICKEL RESOURCE
New project of Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at Approx 4 km north of, Kambalda, WA 6442. An open pit operation producing 240 000 tonnes of ore per annum at an average of 2.7% Nickel. Miitel consists of a 1-in-7 decline from the surface, providing access to the ore body which is located at a depth of between 100 and 400 metres below the surface. The decline has a cross-sectional area allowing large-size diesel mining equipment to travel to the mining areas, and 40-tonne haulage trucks to bring ore to the surface. The ore body is mined using jumbo drilling machines to excavate level drives within the ore body, at vertical intervals of approximately 21 metres. Stoping of the ore proceeds upwards from these levels using the same jumbos, with manned and remote-controlled boggers used to extract the broken ore. The ore and then trucked to the mill by a local haulage contractor. Click for more details...

MOUNT IDA PROJECT - GOLD RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project at Via, Menzies, WA 6436 of Resource - Gold type of New development. Resource estimate for the Baldock, Meteor, Whinnen and Timoni ore bodies is 143,000 tonnes @ 24 g/t for 110,650 ounces of Au. Associated infrastructure includes camp, offices, refurbished shaft and mining equipment. Click for more details...

COPERNICUS NICKEL & COPPER JV PROJECT - OPEN CUT MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at East Kimberley area via, Halls Creek, WA 6770. This type is Open Cut Mining/Haulage with Private ownership. The resource estimate is 852,000 tonnes of ore. A haul road is to be constructed as well. Click for more details...

MOUNT KEITH NICKEL OPERATIONS - OPEN CUT MINING CONTRACT
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Wiluna Council Area for New development. Mining will be at the current rate of 95 million tonnes per annum. The depth of the pit will be eventually 600 metres. Click for more details...

MOUNT IDA PROJECT- BALDOCK - GOLD RESOURCE
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project In The Menzies Council Area of Minesite type. Measured resource estimate is 545,000 tonnes @ 32.8 g/t for 57,500 ounces of Au and inferred resource is 5800 tonnes @ 33.8 g/t for 6300 ounces of Au. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

DEPARTMENT OF MINERALS & ENERGY - WA - MURCHISON/CUE/RAVENSTHORPE/MT MAGNET
New project of Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project at Various sites, ., WA 6999. Survey being undertaken in South-West (Collie to Ravensthorpe), and in the Yalgoo area and Mount Magnet Sandstone & Gidgee areas. An earlier part of the survey was undertaken in the Murchison area (Cue to Meekatharra). Click for more details...

JAURDI HILLS OPERATIONS
Mining - Earthworks/Civil Engineering (Haulage Of Ore) New project at 40 km northwest of, Coolgardie, WA 6429. This type is Haulage Of Ore with Private ownership. From site to toll milling facilities at Greenfields mill (Barminco). Click for more details...

LORD HENRY & LORD NELSON GOLD PROJECT - PROCESSING OPTIONS
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project In The Sandstone Council Area of Processing - Options type. A decision has been made to have the ore hauled to another mill located 30 km away. Click for more details...

GINGIN MINERAL SANDS PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Gingin Council Area of Resource - Mineral Sands type. Proved Ore Reserve of 8.3Mt at 16% contained Heavy Mineral. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

WESTONIA GOLD PROJECT - ACCESS ROAD/EVAPORATION POND/EARTHWORKS
Currently at the Construction stage In Westonia is a project estimated to be $ 5000000. This project Earthworks will involve the construction of an access road, the construction and refurbishment of evaporation ponds and pit floor clean up. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Earthworks/Civil Engineering (Stockpile Management) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...


BODDINGTON GOLD MINE EXPANSION PROJECT - PRESTRIPPING MINING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at Pinjarra -Williams Rd, Boddington, WA 6390 for New. Development comprises the Wandoo North and South pits. Gold reserve for the mine is 11 Moz. Click for more details...

CLOVERDALE MINERAL SANDS PROJECT - RESOURCE
Resource - Mineral Sands project at 6Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 3.5 million tonnes @ 18% heavy mineral sands. Heavy Mineral Concentrate production will occur at 450,000 tonnes per year. Mining will be carried out by scrapers or truck and shovel excavating the ore and hauling it to the in pit hopper. The ore will be conveyed from the Hopper to the existing wet screening plant at Yoganup West and the concentrator at Yoganup. After processing the ore will be transported by truck to Capel for further processing. The mine will use the existing infrastructure at Yoganup and only an earthmoving contractors area will be installed at the mine site. The Yoganup West access road will be extended to Clovendale for equipment movement. After mining is complete the site will be rehabilitated. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Earthworks/Civil Engineering (Stockpile Management) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Earthworks/Civil Engineering (Drill & Blast). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Earthworks/Civil Engineering (Haulage Of Ore). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

MOUNT NEWMAN IRON ORE OPERATIONS - OREBODY 18 - MINING CONTRACT EXTENSION
Mining - Earthworks/Civil Engineering (Drill & Blast) project for New development. Provision of complete surface mining services including drill & blast, mining, crushing & on-site train loading. To include an increase in the level of production which will require an additional 50 approx employees. Contract extended by 3 years. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - QUARRY & PREPARATORY WORKS
Cape Lambert Port B (Clb) Development Stage 1 - Quarry & Preparatory Works is currently at the Construction stage, valued at about $ 5000000 it is Earthworks associated with a quarry development including preparatory work. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - QUARANTINE & WRAPPING SERVICE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Quarantine/Wrapping Service type. For the provision of quarantine & wrapping service. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - STEEL EMBEDMENTS
Greater Gorgon Gas Project - Civils & Underground Services - Steel Embedments is currently at the Construction stage, valued at about $ 500000 it is For the supply of steel embedments. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL CONCRETE & CIVIL WORKS
Wheatstone Development Project - Onshore - Osbl Concrete & Civil Works is currently at the Construction stage, valued at about $ 5000000 it is For the provision of OSBL concrete and civil works. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 4
Cockatoo Island Iron Ore Operations Stage 4 is currently at the Construction stage, valued at about $ 22000000 it is Continuation of open cut operations based on a resource estimate of 1.2 million tonnes (Mt). Construction of a 300m long extension to the existing onshore seawall to enclose a pit enlargement. Associated relocation of surface infrastructure. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Drill & Blast) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Earthworks/Civil Engineering (Drill & Blast) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 3 MINING CONTRACT
Mining - Earthworks/Civil Engineering (Haulage Of Ore) project for New development. A contract for open cut mining of remnant material from stage 3 operations & ship loading of direct shipping ore (DSO) at a rate of up to 1 million tonnes per annum (Mtpa). To cover all operational mining & civil infrastructure services including drill & blast, loading, haulage & processing of ore for direct shipping. To also include commissioning of a new crushing & screening facility. Click for more details...

WEST ANGELAS IRON ORE OPERATIONS - ACCESS ROAD UPGRADE
Excavation/Embankment Construction/Culverts/Pavement/Floodways project at via, Pannawonica, WA 6716 In The Council Area Of Ashburton of Private. Upgrade of the existing access road between the Great Northern Highway & West Angelas mine. To include 19,000cu m of excavation, 266,000cu m of embankment construction, 5,300m of culverts, 31km of bitumen sealed pavement plus installation of 2 floodways. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SEAWATER INTAKE SHAFT CONSTRUCTION
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Private ownership. For the construction of a seawater intake shaft. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CHEMICAL & ACID RESISTANT COATINGS
Currently at the Construction stage In Ashburton is a project estimated to be $ 5000000. This project For the provision of chemical & acid resistant coatings. Click for more details...

ROY HILL IRON ORE PROJECT - BULK EARTHWORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The East Pilbara Council Area of Private ownership. To undertake various earthworks, piping and associated works together with drill & blast operations. Click for more details...

JUNDEE GOLD OPERATIONS - DRILLING CONTRACT
Mining - Earthworks/Civil Engineering (Underground mining & crushing) project for New development. A 3 year contract extension at the 1.8 million tonnes per annum underground operations. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - MISCELLANEOUS SITE SERVICES
A project in the WA Within Various. For the provision of miscellaneous site services. Click for more details...

BLACK DIAMOND COAL MINE REHABILITATION
Mining - Earthworks/Civil Engineering (Rehabilitation, Environmental mgmt, Decontamination) project In The Collie Council Area of State ownership. A 4 stage approach to the rehabilitation of the Black Diamond Coal Mine. Initial work will focus on battering down the steep & unsafe southern lake pit wall, as well as subsequent revegetation work. Stage 1 - The formation of the Black Diamond Working Group. Stage 2 - A detailed site assessment to identify the type & degree of safety & environmental issues & possible solutions. Stage 3 - Undertaking of works to make the site safe & stable. Stage 4 - Site monitoring & further consultation. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - ROM PAD
Private ownership Mining - Earthworks/Civil Engineering (Stockpile Management) project In The Port Hedland Council Area for New development. For the provision of a ROM pad. Click for more details...