CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

JUNDEE-NIMARY GOLD OPERATIONS
Approximately 40 km east southeast of, Wiluna, WA 6646 Has Jundee-Nimary Gold Operations currently at Construction stage. Contract to involve site clearance, general earthworks & associated services such as lighting. Design work completed. A gravel airstrip & apron area are required for new mine site. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 8 km east of, Collie, WA 6225 of Bulk Earthworks type of New development. Contract involves placement of waste dump & stockpile areas plus site levelling for new mine. Earthworks also required for rail line & site access roads. ((Tracklaying to be carried out by Westrail.)) Click for more details...

NELSON POINT - IRON
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Site facilities via, Port Hedland, WA 6721 for New. The project envisaged to expand the capacity of Nelson Point facilities from approximately 54mt of iron ore per year to approximately 64mt, needed to meet the increasing demand for handling and shipping of iron ore from Newman's Yandi mine and from the DRI/HBI plant. The expansion of facilities will include installation of a third ore dumper to take ore from iron ore trains and speed up the unloading process. Also, the Number 2 crushing and screening plant is to be upgraded at the railhead with new conveyors and related infrastructure. A new marshalling yard incorporating a continuous loop train assembly (to avoid bottlenecking) will be built on the southern side of the existing facility, while new passing loops are to be built on the Jimblebar spur line and the main Newman rail line. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

JAGUAR BASE METALS PROJECT - RESOURCE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Leonora Council Area of Private ownership. RC/DC drilling program will undertaken with the intention of doubling the announced resource estimate. Resource estimate of 1,600,000 Mt @ 3.07% Cu, 11.73% Zn, 0.72% Pb, 120 g/t Ag. A proposed underground mining development employing long-hole open stoping techniques. The resource is high-grade copper, zinc and silver. The current mine plan sees the initial development phase of the mine being conducted over an 18 month period. During this time the box cut, decline, main ventilation rise and associated infrastructure will be installed and commissioned. Mine life on the current mine reserves is 6 years, at a design throughput of 350000 tpa of ore. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

ENDEAVOUR BASE METALS OPERATIONS - ELURA
Mining - Infrastructure (Concrete Batching Plants) project at 40 km north west of, Cobar, NSW 2835 for New. Cement paste fill plant is planned to extend the life of the mine, with some reduction in cost per tonne. The paste fill plant will use plant tailings, Cockle Creek Black smelter sand and cement to fill the mined voids, allowing additional ore to be extracted. Click for more details...

SARAJI COAL MINE
Saraji Coal Mine is currently at the Construction stage, valued at about $ 200000 it is Unsealed back access road. Click for more details...

BLAIR ATHOL COAL OPERATIONS
22 km north west of, Clermont, QLD 4721 Has Blair Athol Coal Operations currently at Construction stage. Includes idlers and associated equipment. Click for more details...

TRITTON COPPER PROJECT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
South wast of, Morisset, NSW 2264 Has Cooranbong Colliery - Mandalong Mine Project currently at Construction stage. High capacity longwall belts. Main gate and main trunk conveyors. Click for more details...

OAKY CREEK COAL OPERATIONS - OAKY NO 1
Oaky creek via, Tieri, QLD 4709 Has Oaky Creek Coal Operations - Oaky No 1 currently at Construction stage. A change to thin-seam mining with the south-east extension will necessitate new longwall equipment and an upgrade of the trunk conveyor system. Trunk belt capacity is likely to be expanded from 3,500 tonnes per hour to 4,5000 tonnes per hour. Oaky Creek Coal collectively produces 7 million tonnes a year export coking coal from underground longwall operations. Expressions of Interest were sought for the services of a suitably experienced Contractor to provide the following services and works for the installation of an Underground Conveyor System: civil works; structural steel and fabrication works; installation of structure and belt; project management and supervision; electrical works. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

LIDDELL POWER STATION - FIRE PROTECTION
A project in the NSW Within Muswellbrook. The contract consists of four separable portions. Firstly under condenser fire protection for units 1 to 4. Secondly, Belt protection for 5AR and 5BR conveyors and associated work. Thirdly, Room protection for the decommissioned 1-2 plant control room. Fourthly, Performance testing of the station and Hunter Valley gas turbine pumpsets. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

ANGAS ZINC PROJECT - DOUBLE LINING FOR TAILINGS STORAGE FACILITY
A project in the SA Within Alexandrina. The double lining is for a 540,000 bcm sized Tailings Storage Facility. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - INFRASTRUCTURE
Infrastructure project at Near, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Area C Infrastructure Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

TWIN HILLS GOLD PROJECT - ROAD INTERSECTION
Twin Hills Gold Project - Road Intersection is currently at the Tenders & Building stage, valued at about $ 500000 it is Work comprises the construction of the intersection of Twin Hills operations access road and the Gregory Development road, which is 125 km north of Cleremont. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO CONVEYOR
Dalrymple Bay Coal Terminal Expansion - Upgrade To Conveyor is currently at the Construction stage, valued at about $ 6000000 it is Upgrade of an existing conveyor. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - PHASE 2/3
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740. Terminal expansion to increase capacity to 85 Mtpa. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELTING
Belting - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Belting. Approx.1750m of 900/1350mm wide by 4ply PN800 conveyor belting. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - CONVEYOR PULLEYS & IDLERS
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 500000. This project Supply of Conveyor Pulleys & Idlers. Approx.650 carriers idlers, 306 vee return idlers plus miscellaneous items. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINE DEVELOPMENT & ORE PRODUCTION WORK
Currently at the Construction stage In Lyell is a project estimated to be $ 10000000. This project Mine development to include decline & level of development at variable grades. This includes drill, blast, ground support, load, haul and dump of ore/waste. Ore production including drill, blast, load, haul and dump of stope ore. Crushing and conveying of the ore from the primary crusher to the skip loading station. The Developer intends to produce 2.85Mt of ore pre annum (+/- 10%) and 250 metres of development per month (+/-10%) for three years in underground development. Click for more details...

ARGYLE DIAMOND OPERATIONS - UNDERGROUND INFRASTRUCTURE CONTRACT
110 Km South South West of, Kununurra, WA 6743 Has Argyle Diamond Operations - Underground Infrastructure Contract currently at Construction stage. Work comprises 30 kilometres of underground development work with all the associated infrastructure needed for a block cave mine. More specifically the contractor will construct two underground crusher chambers, undertake vertical development and do initial cave draw production. As part of the underground expansion the existing tailings dam will be expanded. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

IRON ORE PAID GROWTH 4 PROJECT - CAR DUMPER WORK PACKAGE 4N08
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Newman Hub, Newman, WA 6753 for New. A new single rotating cell car dumper located inside of the main rail loop, north of the existing OB29 TLO. A trade approved train weighbridge will be installed on both sides of the Car Dumper. There is a receival hopper complete with an apron feeder 51FE010 below the car dumper. The feeder discharges to a reclaim conveyor that lifts the ore to the surface. The reclaim conveyor 51CV010 discharges to the surge stockpile stacker conveyor 51CV020. The surge stockpile stacker conveyor also received ore from the supply conveyor 41CV030 from the NHG/Bene supply. Thus, all the ore sources are discharged to the surge stockpile together. There is sample extraction at the head of the car dumper conveyor which includes a sample cutter, apron feeder and primary increment crusher (SPB lump size being too big to be handled by a modular sample station). The sample extraction will be linked to a new sample stations. The car dumper has dedicated dust extraction/scrubber and ventilation systems comprising ducting, fans, scrubbers and pumps. The key criteria for the Car Dumper and discharge are 27Mtpa, discharge rate is 6,500tph. Samples will be taken on a time based system. A lot is defined as one shuttle load. The final sample collection will be in buckets on carousels containing approximately 7.5kg per lot. The sample station will have divisions down to quaternary cutting for chemical sampling. Metallurgical samples can be collected as and when required. The sample station is of a single modular design similar to those for as stacked sampling. The key criteria for the SOB Sample Station has a design capacity of 27Mtpa. Surge Stockpile will receive ore from NHG No 2 Plant, the Bene Plant and the SOB Car Dumper. The stockpile comprises one pile, with a live capacity of 15,000 ton minimum. There is gravity reclaim from the stockpile through two draw-down hopper openings in the roof of the reclaim ton. The hoppers are each located over an apron feeder that discharges to the plant feed conveyor 51CV020. The stockpile live volumne and feeder capacities are sized to produce a smooth head feed to the screening/crushing process plant. There are dust suppression cannon around the stockpile as well as dust suppression sprays at the head of the stacking conveyor. High pressure water for the cannon will come from the stockyard high pressure distribution. The key criteria for the Surge Stockpile is 58Mtpa. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - THIRD PARTY QUALITY ASSURANCE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Third party review of quality assurance for fabrication and construction of the berth 5 ZPMC shiploader. Click for more details...

SINO IRON ORE PROJECT - SLURRY PIPELINE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The City Of Karratha Council Area for New development. Scope of works modified. The Company has decided on the development of a 25km slurry pipeline instead of an overland conveyor.. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - CIVIL INSTALLATION FOR UNDERGROUND HAULAGE CONVEYORS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Orange Council Area for New development. Civil installation is one of 3 packages for the haulage conveyors for underground development. Click for more details...

KUNIOON COAL PROJECT - CONSULTANCY FOR COAL MINE INFRASTRUCTURE & OVERLAND CONVEYOR SYSTEM
A project in the QLD Within South Burnett Regional. Engineering consultancy for Kunioom mine infrastructure & overland conveyor. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - WIRELESS BRIDGES
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of wireless bridges. Click for more details...

FRANCES CREEK IRON - EAST ARM STOCKPILE EXPANSION
Iron Ore Facility - Upgrade project at 830 Berrimah Rd East Arm, Darwin Mc, NT 0822 In The Council Area Of Darwin City of Private. Increase of stockpile capacity to 450,000 tonnes. Project to include supply of mobile radial stackers & supply & installation of a conveyor & a tripper (1500tph capacity). Click for more details...

ABBOT POINT COAL TERMINAL X25 & X50 EXPANSION SPARE DRIVE UNITS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whitsunday Regional Council Area of State ownership. The scope involves supply of seven conveyor drive units complete with gearbox, fluid coupling, motor and associated couplings mounted on a drive base. A number of drive types are involved, including: 2 x 400kW 3.3 kV, 2 x 560kW 3.3kV, 1 x 1100kW 3.3kV, 1 x 150kW 415V & 1 x 400kW 415V. Click for more details...

GOLDEN GROVE GOLD COPPER & BASE METALS OPERATIONS- TAILINGS DAM
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 50km south of, Yalgoo, WA 6635 of Tailings Dam type of New development. Proposed construction of an additional tailings dam to store more than 15 years worth of tailings. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT - POINT NELSON DREDGING
Dredging/Reclamation/Piling project at Nelson Point & Lumsden Point, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Dredging of 6 million cubic metres of material between Nelson & Burgess Points adjacent BHP Billiton's existing berths in Port Hedland Inner Harbour. To provide 2 new berth pockets & upgrade the existing departure channel & swing basin to accommodate vessels up to 250,000DWT. Spoil removed by a Backacter dredge to be placed offshore near the existing Spoil Ground I. Material removed by a Cutter Suction dredge to be sent by floating, submerged & onshore pipeline for placement in an area of over 200ha between Lumsden Point & the light industrial area of Wedgefield. Construction of a perimeter bund using 250,000cu m of fill for an initial 5m height then dredge material to be used to take it up to 9m. Construction also of a 60m approx wide corridor to carry 2 x 900mm diameter pipelines. Driving of marine piles for future wharf construction. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment including a wheel lathe to se Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - GRVE PIPE JOINING OPERATIONS
Grve Pipe Joining Operations project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of all necessary materials, consumables, labour, plant & equipment for GRVE pipe joining operations. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

FORTESCUE RIVER GAS PIPELINE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at From DBNGP to SOLOMON HUB 150km south of, Karratha, WA 6714 of Pipeline - Gas type of New development. Construction of a 16 inch diameter, 270km long, 64 TJ/day capacity pipeline from an Inlet Station on the Dampier to Bunbury Natural Gas Pipeline (DBNGP) compressor station 1 to a Delivery Station at TransAlta's 125MW power station at Fortescue Metal Group's Solomon Hub. To allow for conversion of the Solomon power station from diesel. Associated access track along the construction corridor & a temporary accommodation camp (demountable buildings, ablutions, laundry, food mess, wet mess/bar, recreation rooms) in the central portion. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE COMMUNICATIONS
Mining - Infrastructure (Computer & telecommunication system for mine, scada) project for New development. For the provision of a site communications system to include a permanent high frequency radio repeater station. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect