ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Infrastructure (Bunding) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY CRUSHER MINE RELOCATION PROJECT
Currently at the Planning stage In Murray is a project estimated to be $ 5000000. This project This project and ID 688584 last reported 32/03 Issue Mining Report Planning Section, are now to become one package. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS - BRACKINS SPUR
Resource - Gold/Antimony project at Hillgrove, north east of, Armidale, NSW 2350 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). Mine output has increased by 30% over the previous quarter. This increase was principally from the Metz operation. Brackins Spur will provide an additional ore source during the September 2001 quarter. The output of this mine will be significantly lower in antimony than the ore currently mined, but will contain a higher gold grade. Click for more details...

MOUNT TODD GOLD MINE
Mine - Mechanical Package - Wet Plant - Installation - Phase 2 - Expansion project at 45 km northeast of, Pine Creek, NT 0847 In The Council Area Of Katherine Town of Private. It is envisaged this facility will utilise a combination of flotation/regrind/leach methods. Contract to provide structural steelwork & mechanical services. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Raise Bore project at Via, Charters Towers, QLD 4820 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). A 150 metre raisebore, 2 metres approx. Angled. Click for more details...

MIDDLEBACK RANGES IRON ORE/WHYALLA OPERATIONS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whyalla Council Area for New development. The crushing & screening plants will be relocated from Whyalla in a move to reduce dust emissions by eliminating the large number of conveyor transfer points incorporated in the pellet plant (which includes the crushing & screening plants). Some infrastructure at the mine site will need to be modified/constructed. Click for more details...

HISMELT EXPANSION PROJECT
Earthworks/Civil Works New project In The Kwinana Council Area. Roadworks, drainage. Click for more details...

DAMPIER IRON ORE PORT OPERATIONS - PARKER POINT
Exansion Of Capacity New project In The City Of Karratha Council Area. An expansion of capacity from 74 Mtpa to 116 Mtpa. The focus of the upgrade is the Parker Point Terminal. The proposal includes the following: a new twin cell rotary car dumper and associated rail track; two new stackers and a new reclaimer: a new lump re-screening house; additional live blending stockpiles; relocation of bulk stockpiles; extension of the existing wharf to include a second berth and improved wharf access; upgrade of the existing shiploader at the new berth; creation of a seawall and land reclamation; and additional dust control measures. Click for more details...

FOSTERVILLE GOLD OPERATIONS
A project in the VIC Within Greater Bendigo. Design and supply of conveyors CV1 and CV2. Click for more details...

JAGUAR BASE METALS PROJECT - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Leonora Council Area of Private ownership. RC/DC drilling program will undertaken with the intention of doubling the announced resource estimate. Resource estimate of 1,600,000 Mt @ 3.07% Cu, 11.73% Zn, 0.72% Pb, 120 g/t Ag. A proposed underground mining development employing long-hole open stoping techniques. The resource is high-grade copper, zinc and silver. The current mine plan sees the initial development phase of the mine being conducted over an 18 month period. During this time the box cut, decline, main ventilation rise and associated infrastructure will be installed and commissioned. Mine life on the current mine reserves is 6 years, at a design throughput of 350000 tpa of ore. Click for more details...

DOUGLAS MINERAL SANDS PROJECT - ACAPULCO/BONDI/ECHO
A project in the VIC Within West Wimmera. A $270 million project to develop the Douglas mine, mineral separation plant and associated infrastructure. The project approved is larger than the original proposal. The initial capacity of the mineral separation plant has been almost doubled from 30 to 55 tonnes per hour. Click for more details...

GLENNIES CREEK COAL MINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Singleton Council Area of Private ownership. Glennies Creek produces high-fluidity coking coal. Production in 2003 was 1.1 million tonnes of coal. Click for more details...

WESTSIDE COAL OPERATIONS
Road Realignment & Road Works project at At, Wakefield, NSW 2278 In The Council Area Of Lake Macquarie of Private. Realignment of Wakefield Rd. Click for more details...

COSMOS NICKEL OPERATIONS - COSMOS DEEPS/ILLIAS
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project for New development. Ilias decline. Click for more details...

RG TANNA COAL TERMINAL
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Gladstone Regional Council Area of State ownership. Construction of approx 382 m of steel framed wharf structure supported on 1200 mm dia steel piles with prestressed concrete decking & associated dolphin structures. Click for more details...

HISMELT - FREMANTLE PORT STOCKPILE
A project in the WA Within Kwinana. A concrete stockpile pad and associated loadout facilities to export bulk products from the existing Hismelt plant. Includes a 270 metre reclaim conveyor, concrete pad, fixed hopper with apron feeder and new access road and bridge over reclaim conveyor. Click for more details...

LEFROY GOLD TAILINGS RETREATMENT PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Dorset Council Area of Private ownership. A project based on tailings on the Lefroy mining lease estimated at 140,000t containing 6000 ounces (oz) of gold. Recovery of material from the tailings dams for transport via local roads & highways to the existing Beaconsfield carbon-in-pulp (CIP) processing plant & subsequent underground disposal. To include construction of access roads, vegetation clearing, construction of new drainage channel/mound & a pond. Removal of tailings by loaders which will fill trucks for transport to Beaconsfield. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO CONVEYOR
Dalrymple Bay Coal Terminal Expansion - Upgrade To Conveyor is currently at the Construction stage, valued at about $ 6000000 it is Upgrade of an existing conveyor. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - PRECOATED STEEL PILES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Supply of precoated steel piles for extension of Berth 5 and Berth 6. Piles of 762 mm and 508 mm diameter. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - CONVEYORS R8 & S8
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Private ownership. To construct and supply conveyors for R8 and S8. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Various civil & concrete works for the mine site. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

RG TANNA COAL TERMINAL EXPANSION PROJECT
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at ., Gladstone, QLD 4680. Design, Fabrication and erection of an 80m X 10m span open sided awning. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - P&C MODULE OFFLOADING FACILITIES
Module Offloading Facilities New project In The Darwin City Council Area. The scope of work for this package includes the supply of materials and the installation of the jetty platform and trestle portion of the Module Offloading Facility including fenders, catwalks, mooring and breasting dolphins and navigational aids. Work not included is the engineering and the causeway from the site to the jetty trestle platform. Click for more details...

GOVE BAUXITE OPERATIONS - SHIP LOADING UPGRADE
A project in the NT Within East Arnhem Shire. A project to improve dust control at the Alcan site near Nhulnbuy. Late 2010 in-house engineering studies underway into optimal solution. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

CENTENNIAL COAL UNDERGROUND MOBILE FLEET 2011-15
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at various mines, ., NSW 2999 of Coal Mining & Handling Equipment type of New development. A project to purchase for various Western Coalfield & Hunter Region operations a mobile development suite for gateroad development, bord & pillar production operations as well as longwall equipment. To include continuous miners, coal clearance systems, breaker line supports, up to 5 feeder breakers, load haul dumps, roof bolters for road development & bord & pillar operations, rubber tyred vehicles, up to 50 shuttle cars, man transporters & specialised mining vehicles. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Mining - Infrastructure (Computer & telecommunication system for mine, scada) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - PAR PIPE TESTING & INTERNAL CLEANING
Par Internal Pipe Cleaning project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For pipe line cleaning, hydrostatic testing, drying, & purging lines with residual positive pressure of nitrogen. Click for more details...

ROY HILL IRON ORE PROJECT - PORT MARINE - QUICK RELEASE HOOKS
A project in the WA Within East Pilbara. For the provision of quick release hooks. Click for more details...

RIO TINTO PILBARA AUTOHAUL RAIL PROJECT ANCILLARY WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Pilbara region, ., WA 6999 for New. A staged project to develop driverless trains on the existing 1500km approx train network linking Pilbara mines with ports through development of centralised servers & onboard equipment fitted to existing trains. To also involve wayside development such as construction of signalling pads & equipment installation, trenching for the installation of new signal cables, construction of permanent access roads & ramps as well as storm water drainage, fencing & gates at level crossings. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - GRVE PIPE JOINING OPERATIONS
Grve Pipe Joining Operations project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of all necessary materials, consumables, labour, plant & equipment for GRVE pipe joining operations. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - STORAGE CONTAINERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area of Private ownership. For the provision of storage containers. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT HEDLAND INFRASTRUCTURE CONSTRUCTION
Lot 4 Clark St, Port Hedland, WA 6721 Has Roy Hill Iron Ore Project - Infrastructure - Port Hedland Infrastructure Construction currently at Construction stage. For the provision of infrastructure construction. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR SHIPLOADERS - DEMOLITION WORKS & CONVEYORS UPGRADE
Dismantling Shiploaders/Conveyors Upgrade project at Nelson Point, Port Hedland, WA 6721 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). Upgrade of a 2 conveyors followed by dismantling of a pair of decommissioned shiploaders. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - HAUL ROAD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. Bauxite will be hauled from the Bauxite Hills DSO Project mining area to the barge loading facility. Trucks will use internal roads connected to a main north-south haul road linking with the Mine Infrastructure Area (MIA) & barge loading facility. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Mobile Concrete Batch Plant New project In The Gladstone Regional Council Area. For the provision of mobilisation, installation, commissioning, operation & decommissioning of a mobile concrete batch plant to facilitate supply & delivery by the supplier of concrete & stabilised sand products for the project. QCLNG Charlie FCS Site: Mobile batch plant with minimum production capacity of 60m3/hour to supply concrete & stabilised sand products. Project sites, inclusive of the following: a. 1 off mobile concrete batch plant inclusive of full time batch plant operator. b. Supply of crib & ablution facilities. c. Mobile silo/s to suit project demand. d. Concrete agitator trucks inclusive of operators to suit project demand. e. 1 off front end loader. f. Provisional allowance for 1 off chiller should this be required to meet specifications. g. Mobile power generation to power plant. h. 1 off light vehicle. i. Supply & delivery of raw materials such as fly-ash, sand & aggregates to suit project demand. j. Water delivery & storage facilities to suit project demand. k. Aggregate bins & shade structure. l. Supply of fuel as required to run the plant. m. Information, communication & technology infrastructure & equipment required to effect normal business operations. Click for more details...

MATILDA GOLD MINE TAILINGS DAM
Currently at the Construction stage In Wiluna is a project estimated to be $ 100000000. This project Construction of tailings dam at Matilda Gold Mine. Click for more details...

TARCOOLA GOLD PROJECT - HAUL ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Far North Council Area of Haul Road Upgrade type. For the provision of the upgrade to the haul road. Click for more details...