State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Infrastructure⊂category= Projects in NSW®ion= in region


TASMAN COAL PROJECT - MOUNT SUGARLOAF - ROAD UPGRADE (NO3)
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Newcastle Council Area for New development. Contract includes the round about on John Renshaw Drive. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Parkes Council Area for New development. Northparkes Mines is a copper/gold producer near Parkes. The Company has work conducted on rates base contracts for the supply of daily services in various fields. Includes; provision of mobile machinery including (but not limited to) bobcat, backhoe, small trucks, small excavators, water cart as required; provision of labour for assistance with minor maintenance tasks; fencing etc as assistance to farming operations; civil and road repairs/maintenance as required. Click for more details...

LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH EXPANSION STAGE THREE/COAL PREPARATION PLANT
Tahmoor Colliery - Tahmoor North Expansion Stage Three/Coal Preparation Plant is currently at the Tenders & Building stage, valued at about $ 5000000 it is Part of proposed Tahmoor North expansion from 1.9 million tonnes ROM in 2002 rising to 3.2 million tonnes ROM by end 2004 of high quality coking coal. The project is currently scheduled for completion by early 2004 and will proceed in three stages. Expressions of interest are invited for supply of equipment for each stage of the project. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

MOUNT THORLEY WARKWORTH NO 1 COAL OPERATIONS
Mount Thorley Warkworth No 1 Coal Operations is currently at the Planning stage, valued at about $ 500000 it is Possible infrastructure requirements for extensions at Warkworth and possible integration with the adjacent Mount Thorley operations include the construction of a new conveyor for Warkworth Mine to Mount Thorley Operations and the Mount Thorley Coal Loader. Click for more details...

BAYSWATER POWER STATION
Bayswater Power Station is currently at the Construction stage, valued at about $ 500000 it is Includes testing and calibration of belt weighers at Bayswater and Liddel Power Stations as and when directed by the Principal for a two year period with an option for a further two years. Click for more details...

MOUNT OWEN COAL OPERATIONS - ROM RECEIVAL FACILITY
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Singleton Council Area for New development. Construction and operation of a ROM receival facility and haul roads to enable Mount Owen Mine to process ROM coal from Ravensworth East and Glendell mines. Click for more details...

WERRIS CREEK COAL MINE - INFRASTRUCTURE
Werris Creek Coal Mine - Infrastructure is currently at the Planning stage, valued at about $ 1000000 it is Includes haul road, coal screening, crushing equipment and rail loadout area. Coal washery will be transferred from the former Gunnedah Colliery and will include conveyors, transfer towers and a 350 tonne capacity raw coal bin. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

GLENNIES CREEK COAL MINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Singleton Council Area of Private ownership. Glennies Creek produces high-fluidity coking coal. Production in 2003 was 1.1 million tonnes of coal. Click for more details...

KOORAGANG COAL TERMINAL EXPANSION - STAGE 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Kooragang, NSW 2304 for Addition. Includes rail receival, stacking conveyor system, additional stockyard, additional reclaimer & reclaimer conveying system, additional ship loading conveying stream & ship loader. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Lake Macquarie Council Area of Private ownership. Bridge across the Great Northern rail line and 3.5 km connection road to from a T-intersection with the existing Newstan haul road. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

TRITTON COPPER PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
South wast of, Morisset, NSW 2264 Has Cooranbong Colliery - Mandalong Mine Project currently at Construction stage. High capacity longwall belts. Main gate and main trunk conveyors. Click for more details...

NEWCASTLE SHIP LOADING FACILITY - STORAGE CAPACITY INCREASE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Newcastle Port, Newcastle, NSW 2300 of Increase In Storage Capacity type of New development. An increase in capacity to provide ability to handle project increasing mine concentrate output in NSW. Click for more details...

LIDDELL POWER STATION - FIRE PROTECTION
A project in the NSW Within Muswellbrook. The contract consists of four separable portions. Firstly under condenser fire protection for units 1 to 4. Secondly, Belt protection for 5AR and 5BR conveyors and associated work. Thirdly, Room protection for the decommissioned 1-2 plant control room. Fourthly, Performance testing of the station and Hunter Valley gas turbine pumpsets. Click for more details...

CAMDEN GAS PROJECT STAGE 2 - SUGARLOAF FARM EXTENSION
Resource - Coal Bed Methane project at Menangle Road, Gilead, NSW 2560 In The Council Area Of Campbelltown of Private. A two drilling programme will intersect the Bulli, Balgownie and Wongawilli coal seams. Development includes the construction and drilling of seven wells, the construction and operation of the gas gathering system and access roads, the connection of the wells to the stage 2 treatment plant and the operation and production of methane gas from the wells. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

KOORAGANG COAL TERMINAL STAGE 3 EXPANSION WORKS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at ., Kooragang, NSW 2304. This type is Coal Terminal Expansion with Private ownership. Expansion of terminal capacity from 89 mtpa to 102 mtpa. Development will involve a fourth stacking stream, a new stockpile pad, associated stacking conveyors and a new coal stacker. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

BENGALLA COAL OPERATIONS - ROM HOPPER RELOCATION CONSULTANCY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4 km west of, Muswellbrook, NSW 2333 of Consultancy - Rom Hopper Relocation type of New development. Tenders to include installation of the new ROM hopper and decommissioning the old one. Click for more details...

PEL-238 COONARAH/BOHENA COAL SEAM GAS JV - CIVIL WORKS FOR EVAPORATION POND
A project in the NSW Within Narrabri. Civil works for an evaporation pond. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND - SURFACE CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at North of, Ulan, NSW 2850 for New. For the provision of a surface conveyor to take mined coal to the new run-of-mine (ROM) hub stockpile complex. Trade packages as part of the Surface Coal Clearance System to include electrical works (supply, installation & commissioning of electrical components such as earthing, lightning protection, control equipment, lighting, cables, etc), mechanical works (fabrication, site installation & commissioning) & civil works (earthworks, foundations/footings, dressing, substation/switchroom pads). Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

ROCGLEN COAL PROJECT - ROAD DIVERSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of road diversion. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - CIVIL INSTALLATION FOR UNDERGROUND HAULAGE CONVEYORS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Orange Council Area for New development. Civil installation is one of 3 packages for the haulage conveyors for underground development. Click for more details...

BICKHAM COAL COMPANY - BULK SAMPLE EXCAVATION PROJECT - RAIL LOADING FACILITY UPGRADE
Currently at the Early Planning stage In Upper Hunter is a project estimated to be $ 10000000. This project For the provision of upgrade services for the rail loading facility. Scope of work not yet determined. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Infrastructure (Slurry pipelines) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - SHIP BERTHS
Part of lots 6, 7 & 20 Cormorant Rd (DP 4015754 & 252325), Newcastle, NSW 2300 Has Newcastle Coal Infrastructure Group Coal Terminal 3 - Ship Berths currently at Construction stage. For the provision of 2 new berths for terminal 3. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL RECLAIMER EXPANSION
Coal Reclaimers - Fabrication & Installation project at Curlew St, Kooragang, NSW 2304 In The Council Area Of Newcastle of Private. Fabrication & installation of new reclaimers. Part of the 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 Mtpa to a nominal 120 Mtpa. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL - PROJECT 145 RAIL DUMP STATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 210 Cormorant Rd, Kooragang Island via, Kooragang, NSW 2304 for New. A coal loading expansion project to include installation of a fourth rail dump station, additional track infrastructure & upgrades to existing bucket-wheel reclaimer machines & ship loading facilities. Click for more details...

CENTENNIAL COAL UNDERGROUND MOBILE FLEET 2011-15
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at various mines, ., NSW 2999 of Coal Mining & Handling Equipment type of New development. A project to purchase for various Western Coalfield & Hunter Region operations a mobile development suite for gateroad development, bord & pillar production operations as well as longwall equipment. To include continuous miners, coal clearance systems, breaker line supports, up to 5 feeder breakers, load haul dumps, roof bolters for road development & bord & pillar operations, rubber tyred vehicles, up to 50 shuttle cars, man transporters & specialised mining vehicles. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - SPRINGVALE SERVICES SITE UPGRADE
A project in the NSW Within Lithgow. A project to support western operations (Springvale, Angus Collieries) by upgrading the coal handling & distribution capacity at the central Springvale Coal Services site to 9.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. To include expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 Mtpa along with additional conveyors & transfer points. Increase of reject disposal capacity. Construction of a private haul road linking the site to the existing Angus Place-Mount Piper power station haul road. Continued integrated rehabilitation of the former Lambert Gully Mine also located on the coal services site. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect