AVEBURY NICKEL PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at West of, Zeehan, TAS 7469 of Decline Development type of New development. The decline tunnel has a length in excess of 1,200metres and will access the upper sections of the Viking deposit. Detailed drilling will be carried out from the decline to evaluate the nickel mineralisation. The decline will also provide access to the higher grade upper sections for any early production. Click for more details...

AVEBURY NICKEL PROJECT - ACCESS ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Trial Harbour Road, Zeehan, TAS 7469 for New. Stage one involves the realignment of approximately 2.5 kilometres of gravel road, extensive earthworks and embankment works. Stage 2 involves the realignment of approximately 5.5 kms of gravel road, extensive earthworks and embankment works. Click for more details...

PRINCESS CREEK TAILINGS DAM - MOUNT LYELL
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Lyell Council Area for New development. The dam is a zoned earth/rock fill embankment, with current height of 42 metres. The planned lift is 5 metres, requiring excavation, movement and placement of approximately 230,000 cubic metres of clay and rock. Other components include excavation of a spillway, embankment and spillway foundation works, construction of roads, installation of decant structure and rehabilitation of exhausted borrow pits. Click for more details...

LEFROY GOLD TAILINGS RETREATMENT PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Dorset Council Area of Private ownership. A project based on tailings on the Lefroy mining lease estimated at 140,000t containing 6000 ounces (oz) of gold. Recovery of material from the tailings dams for transport via local roads & highways to the existing Beaconsfield carbon-in-pulp (CIP) processing plant & subsequent underground disposal. To include construction of access roads, vegetation clearing, construction of new drainage channel/mound & a pond. Removal of tailings by loaders which will fill trucks for transport to Beaconsfield. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - STORM WATER RETENTION POND
Storm Water Retention Pond project at Near, Grassy, TAS 7256 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). For the provision of storm water retention pond. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - INTERNAL ROADS & PAVEMENTS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of internal roads & pavements. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - HAUL ROAD
Haul Road project at Near, Grassy, TAS 7256 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). For the provision of a haul road. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

MOUNT LYELL COPPER GOLD OPERATIONS - UNDERGROUND MINE DEVELOPMENT & ORE PRODUCTION WORK
Currently at the Construction stage In Lyell is a project estimated to be $ 10000000. This project Mine development to include decline & level of development at variable grades. This includes drill, blast, ground support, load, haul and dump of ore/waste. Ore production including drill, blast, load, haul and dump of stope ore. Crushing and conveying of the ore from the primary crusher to the skip loading station. The Developer intends to produce 2.85Mt of ore pre annum (+/- 10%) and 250 metres of development per month (+/-10%) for three years in underground development. Click for more details...

SAVAGE RIVER MAGNETITE OPERATIONS - SOUTH DEPOSIT TAILINGS STORAGE FACILITY
Currently at the Construction stage In Waratah-Wynyard is a project estimated to be $ 28000000. This project Construction of a new Tailings Storage Facility (TSF) in Main Creek south of the existing tailings dam as part of the proposed extension of workings to the South Deposit. To comprise a downstream rock filter face formed from alkaline rock to provide neutralisation of any overflow to Main Creek. Upstream a permanent water reservoir used to store tailings from the Savage River mining operation under water, neutralise historic tailings seepage (B Dump, Old Tailings Dam) & store hydroxide sludges formed by the neutralisation reactions & which will eventually be capped. Click for more details...

RENSION BELL TIN OPERATIONS - MINING CONTRACT
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) New project at 15km northeast of, Zeehan, TAS 7469. This type is Decline Development/Underground Mining with Private ownership. A 3 year contract for underground mining. To include decline development of 6000m a year for 700,000tpa ore production. To utilise 3 development jumbos, 2 longhole rigs, 4 boggers & 3 trucks. Workforce of 130 personnel. Click for more details...