List of Mining - Infrastructure Projects


KWINANA ALUMINA REFINERY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area of Runoff Water Storage Pond type. Total storage capacity of 2.5GL of which 0.5GL is available for emergency mud storage. Final impounded surface 21 hectares approx. The main purpose is to store high quality process water. The pond will also be available for excessive rainfall runoff and emergency mud storage. Liner will be clay in conjunction with a geosynthetic membrane. Clay to be excavated and trucked from Alcoa's clay reserves at Wellard/Baldivis. Click for more details...

WHIM CREEK COPPER PROJECT
Infrastructure project at Via, Whim Creek, WA 6718 In The Council Area Of City Of Karratha of Private. Crushing & stacking facilities, site layout, crusher area works. Surplus plant from Girilambone to be utilised. A conventional SX-EW operation. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

NELSON POINT - IRON ORE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Port area via, Port Hedland, WA 6721 for Renovations, Refurbishments etc.. Extensive modifications will be required to the P12 conveyor prior to the installation of a new stacker (under construction in Perth). Work mainly involves civils & structural/mechanical services. Click for more details...

ARGYLE DIAMOND OPERATIONS
Road/Pipework & Tailings Dam project at Mine site via, Argyle, WA 6239 in the Mining - Infrastructure (Slurry pipelines). Construction of a gravel road of about 4.2 km in length is required. Contract to include laying of approximately 6 km of polyethylane pipe some of which is to lie parallel to the new road. Project now incorporates some tailings dam foundations, general earthworks & embankments. Click for more details...

EWINGTON 2 COAL OPERATIONS
8 km east of, Collie, WA 6225 Has Ewington 2 Coal Operations currently at Construction stage. Conveyor belts (Apex), drives (Flenders), pulleys & idlers (Pit Top) required for several electrical/mechanical packages associated with new coal handling facilities. Belt scrapers to be provided by Dyna Engineering (Osborne Park, WA). Click for more details...

NELSON POINT/FINUCANE ISLAND - IRON ORE
Operations - Tunnel Conveyor - Mechanical/Structural Package project at Finucane Island to, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Contract to provide conveyor belt/system under the Pt Hedland harbour. Project designed to cart ore from Nelson Point to Finucane Island stockpiles. Conveyor expected to be 1.8m wide with capacity to move 4,000tph lump ore with full capacity of 10,000tph (ore) envisaged. This conveyor is to link up with the overland system during first half of 1997. Click for more details...

ULAN COAL OPERATIONS - CONVEYORS
A project in the NSW Within Upper Hunter. The overland conveyor will be 2 km long and have 1400 t/h capacity. An underground truck conveyor will be upgraded and extended to a total length of 3.2 km. Also a new 4250 t/h stackout conveyor that is 1.6 km long will be installed and it will extend across an open cut haul road via culvert underpass to a 400,000 tonne overall hub stockpile. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

MIDDLEBACK RANGES IRON ORE/WHYALLA OPERATIONS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whyalla Council Area for New development. The crushing & screening plants will be relocated from Whyalla in a move to reduce dust emissions by eliminating the large number of conveyor transfer points incorporated in the pellet plant (which includes the crushing & screening plants). Some infrastructure at the mine site will need to be modified/constructed. Click for more details...

KOOLYANOBBING IRON ORE EXPANSION PROJECT
Koolyanobbing Iron Ore Expansion Project is currently at the Construction stage, valued at about $ 320000000 it is The proposal is comprised of the following main components: mining areas which include open cut mine pits, overburden landform and general operational areas. A haul road of approximately 10.7km length is required for the transport of the excavated ore from the mine to existing processing facilities at Koolyanobbing. A gravel pit will also be required for construction of the haul road. The haul road will traverse parallel to the southern side of the Mt Jackson Range and connect to an existing haul road that leads to Koolyanobbing. Click for more details...

MIITEL NICKEL OPERATIONS - SOUTH MIITEL
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Coolgardie Council Area of Private ownership. An initial Probale Ore Reserve resource estimate of 376,000 tonnes @ 2.6% for 9,790 tonnes of nickel. Development work will comprise an extension to the existing Miitel decline and the excavation of a ventilation shaft to the surface. The mining method will be mechanised flat back cut and fill. Click for more details...

PORT OF BROOME
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Broome Council Area of Southern Wharf - Extn type. Proposed to extend wharf south of access jetty by 148 m to increase number of berths by 80%. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Katherine Town Council Area of Mine Access Road - Batten Creek Overflow Channel Floodway Repairs type. Install new culvert supplied by the Principal, reinstate embankment, reconstruct pavement, install new erosion protection works and undertake limited stream training works. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Kwinana Council Area for Subcontract development. This electrical subcontract package includes electrical services for the infrastructure of the tailings work. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES - FIMISTON GOLD OPNS TAILINGS
Consultancy On Tailings Storage Facility Performance & Proposed Height Increase project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. The Fimiston 1 review report concluded that the proposal is technically feasible, subject to additional studies of seepage interception and embankment design. Some environmental damage from seepage (tree stress/loss) has been identified. Some design modifications and a more targeted groundwater management plan are likely to be required. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

BAYSWATER POWER STATION
At, Bayswater, NSW 2283 Has Bayswater Power Station currently at Construction stage. Installation of temperature monitoring sensors on pulley bearings and into the fluid coupling return lines of coal conveyors R1, R2, 3A and 3B. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET - CONSTRUCTION CONTRACT
Construction Contract For Plant New project In The Whyalla Council Area. Construction contract will include benefication facilities, a slurry pipeline, conversion of the pellet plant, construction of a desulphuriation plant and the upgrade of storage and handling facilities. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

FIMISTON GOLD MINE OPERATIONS EXTENSION STAGE 3
Gold Mine Expansion project at Goldfields Highway Via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Development will comprise the expansion of the open pit, waste rock dumps and Tailings Storage Facility (TSF). The open pit expansion known as the Golden Pike Cutback will be widened and deepened to approx 670 metres and therby extending the life of the mine until 2017. The Golden Pike Cutback is estimated to hold 2 million ounces of gold. There a number of options for tailings disposal. Option preferred is to heighten the level of the two existing TSF from 30 metres to 40 metres. Other options include recommissioning the Kaltails TSF or constructing Fiminsto 3 TSF. This would cover an area of 150 hectares and would comprise associated infrastructure such as roads and recant ponds. Associated infrastructure include the realignment of the environmental noise bund, extension of the loopline railway. Click for more details...

BENAMBRA MINE REHABILITATION PROJECT - STAGE 3 - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Alpine Council Area for New development. Three main areas of the mine require rehabilitation. They are the Core Farm, Plant Site and the Tailings Dam. Development comprises excavating and removing material to one or more nominated locations, removing all refuse material from site; excavating, emptying, removing and disposing of waste oil tanks, excavating and removing hydrocarbon contaminated soil from site, neutralising all acid waters contained in storage tanks, transporting treated water for disposal into the tailings dam, demolishing sheds and concrete structures, demolishing (crushing to 50mm max) above ground concrete structures and stockpile for reuse, cracking heavy concrete foundations (drill, punch or crack), re-levelling tailings using a dredge, strengthening dam wall and construction of a spillway, dam works involving the movement and or placement of a round 25,000 cubic metres of material, surfacing ripping nominated areas and removal of disused access roads, road rehabilitation (1.5 Km) and upgrading (2.5 Km), water monitoring and installation of monitoring system. Click for more details...

DAMPIER IRON ORE PORT UPGRADE PROJECT
Port Expansion Phase B New project In The City Of Karratha Council Area. Expansion of port capacity from 116 Mtpa to 140 Mtpa of iron ore. Presently construction works for the previous expansion to 95 Mtpa will be completed by December 2005. A proposal to expand to 120 Mtpa is before State Government authorities at present but does not involve any new construction, only utilising existing infrastructure at Parker Point. Expansion to 140 Mtpa will involve significant new construction work. Development options include upgrading the Parker Point and East Intercourse Island operations and the development of a new greenfields site. Infrastructure required for the expansion includes new car dumpers, screen house replacement, stackers and reclaimers, stockpiles, conveyors, ship loaders and berth works. Click for more details...

MOUNT NEWMAN IRON ORE OPERATIONS - OREBODY 25 EXTENSION - RESOURCE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at 8 Km North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Development comprises increasing ore production from approximately 7 Mtpa to 8 Mtpa. Mining will continue and be extended in Pits 1 and 3 into approved areas and in the case of Pit 3 below the water table. Overburden Storage Areas (OSA) and low grade ore stockpiles will be extended as well the progressive development of new OSA's and the placement of overburden in existing and new mined out pits. Haul roads and light vehicle access roads will be constructed to open pits, OSA's and mine infrastructure. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Infrastructure (Concrete Batching Plants) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

CLOVERDALE MINERAL SANDS PROJECT - RESOURCE
Resource - Mineral Sands project at 6Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 3.5 million tonnes @ 18% heavy mineral sands. Heavy Mineral Concentrate production will occur at 450,000 tonnes per year. Mining will be carried out by scrapers or truck and shovel excavating the ore and hauling it to the in pit hopper. The ore will be conveyed from the Hopper to the existing wet screening plant at Yoganup West and the concentrator at Yoganup. After processing the ore will be transported by truck to Capel for further processing. The mine will use the existing infrastructure at Yoganup and only an earthmoving contractors area will be installed at the mine site. The Yoganup West access road will be extended to Clovendale for equipment movement. After mining is complete the site will be rehabilitated. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE DAMS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Mackay Regional Council Area of Site Dams - Construction type. To construct two dams. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - TRANSPORTABLE SUBSTATIONS CONTROL
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Newman Hub, Newman, WA 6753 of Transportable Substations/Control - Supply Of type of New development. For the supply of transportable substations, control. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - OUTBOUND SYSTEM CIVIL STRUCTURAL MECHANICAL WORKS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Part of lots 6, 7, 20 Cormorant Rd DP 4015754 & 252325, Newcastle, NSW 2300. Design, Supply & Installation of Piled Foundations, Supply & Installation of Concrete Foundations, Shop Detailing, Supply, Fabrication, Painting, Off Site Pre-Assembly & Site Erection of Structural Steel and part supply & complete Mechanical Installation for the Outbound System comprising a 2000t Buffer Bin, two Belt Feeders, Sample Plant, two Transfer Houses, three Conveyors and two substation slabs for a 30Mtpa Coal Export Terminal. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - CRUSHING FACILITIES & OVERLAND CONVEYORS
A project in the WA Within East Pilbara. For the provision of primary and secondry crushing facilites including overland conveyors. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at via Lincoln Hwy 55km south of, Whyalla, SA 5600. Extension of OneSteel's current mining & export operations through the North SMR (Southern Middleback Range) Development project. Construction in an area between existing rail corridor & mine pit on MPL51 of a new train loading facility serviced by a mobile crushing plant. To include a new rail spur line & siding & a short interconnecting haul road to the Iron Knight pit. Expansion over second half of 2009 of the existing Iron Knight mine pit by further cutting back & increase of associated waste rock dump areas. Construction around 2011/2012 of the new Iron Chieftain pit to the east of Iron Knight. Construction afterwards of a new haul road between the two pits. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - GRE - HANDRAIL & GRATING
Private ownership Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Ashburton Council Area for New development. For the provision of GRE handrail & grating. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - NORTHERN RAIL
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Port Hedland Council Area of Private ownership. It is proposed to develop a railway of approximately 320km to transport iron ore from the Roy Hill 1 mine to facilities at Port Hedland and the proposed Boodarie multiuser stockyard area which is to be vested in the PHPA (Port Hedland Port Authority). The railway proposal includes: a marshalling yard (with associated workshops and maintenance facilities storage and laydown areas, rail welding yard), passing loops and sidings, construction water bores and 'turkeys nest' dams, borrow and ballast areas for construction material, communications cable, towers and signalling system, construciton works accommodation camps and amenities for workers, access roads and construction power supplies. Five train sets will be required to transport 55 Mtpa, with each train consisting of two diesel electric locomotives and 232 iron ore wagons. When spares are included, this will entail a fleet of 17 locomotives and 1790 wagons. Fuel supply trains will require one additional AC locomotive and 12 tanker cars. An unsealed, at-grade access road will run adjacent to and generally parallel to the proposed railway for its entire length, for the purposes of railway access and maintenance. The road pavement width will be approximately 9m wide. Seven sidings are expected to be required along the entire length of the railway to allow trains travelling in opposite directions to pass. Additional sidings called "back-tracks" will be provided on the back to eh passing sidings along the alignment as required to allow removal of 'bad-order' wagons (mechanical fault). Road crossings will be at grade or grade separated in accordance with the requirements of Main Roads of Western Australia. Level crossings on access roads will be protected with signs that comply with this standard. To preserve current land uses in a way that is compatible with the proposed railway, fencing and/or controls will need to be installed at occupational rail crossings, vehicle the paths, livestock grids and in other areas where access requires controlling or restricting. Watercourses crossings will consist of culverts or bridges. Culverts will be used in preference to bridges. For bridges, to provide a simple and efficient method of construction, the design of the rail bridges will be standardised for fast construction requiring a minimum quantity of in situ concrete. The span length proposed is 25m. The construction methodology will be to at 25m intervals drive circular steel pier columns as a "trestle" consisting of three members with the two outer members raking and the central pier column vertical. A heavy hardstand granular pavement is required for installation of piled substructure over the full length of each bridge primarily to provide safe, stable access for heavy plant and equipment. The width of the hardstand on both the upstream and downstream sides of the piers will be approximately 20m, ie a total fo 40m wide. Hardstand will remain in service until superstructure units are placed by heavy cranage. Prefabricated steel headstocks will be lifted into place by a crane and site welded to the pier columns. Decks will consist of prefabricated composite girders or steel through girder construction. The marshalling yard will be adjacent to the main line and will incorporate 10 rail tracks. The site is expected to accommodate a rolling-stock workshop and washdown bay, locomotive provisioning hall, rail infrastructure yard, diesel fuel storage, electrical substation, communications tower, administration building, car parks, potable and wastewater treatment units and fire-water storage and access roads. The rolling stock workshop will be a single storey building with a heavy duty concrete slab, overhead travelling cranes, high pressure water wash-down facilities and various pieces of maintenance equipment including a wheel lathe to se Click for more details...

JEEBROPILLY COAL TO LIQUIDS PLANT
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Ipswich City Council Area for New development. Construction of a proof of concept coal to liquids (CTL) plant at the existing Jeebropilly Coal Mine site. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - WET ORE PROCESSOR SMP
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The East Pilbara Council Area of Structural/Mechanical/Piping - For Wet Ore Processor type. Contract for the provision of structural, mechanical & piping engineering services for a 15 million tonnes per annum (Mtpa) wet ore processor to accommodate 220t capacity haul trucks. To include primary & secondary crushing & screening, waste fines thickening & discharge return lines, stockpiling of lump & fines product, reclaiming & train loadout. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

DUGALD RIVER BASE METAL PROJECT - UNDERGROUND DEVELOPMENT CONTRACT
Declines New project In The Mt Isa City Council Area. A 2.5 year contract for underground development including construction of 2 exploration declines at a rate of 9000m a year. A workforce of 100 personnel expected. Click for more details...

GREATER GORGON GAS PROJECT - CARBON DIOXIDE INJECTION PIPELINE & WELL SITE - SATELLITE COMMUNICATIONS
New project of Mining - Infrastructure (Computer & telecommunication system for mine, scada) project at On, Barrow Island, WA 6712. For the provision of satellite communications. Click for more details...

LUCKY BAY COMMON USER EXPORT FACILITY STAGE 1
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Stage 1 - A rectangular dock & loading dock & acoustic enclosure also housing the crane loader & the barge. A hardstand of approx 2.5 ha in size (to be constructed in two stages). A haul road extending from the hardstand to the north-west to meet an existing unformed public road. Ancillary structures including an office, undercover vehicle storage & fuel storage. Employee amenities & car park. Stormwater detention U& sedimentation basin. Associated structures. Buffer Storage Facility. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

NAMMULDI BWT MINE EXPANSION PROJECT - ROAD MAINTENANCE & MISCELLANEOUS EARTHWORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of road maintenance & miscellaneous earthworks. Click for more details...

TARCOOLA GOLD PROJECT - HAUL ROAD UPGRADE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Far North Council Area of Haul Road Upgrade type. For the provision of the upgrade to the haul road. Click for more details...