List of Mining - Infrastructure Projects


WHIM CREEK COPPER PROJECT
Infrastructure project at Via, Whim Creek, WA 6718 In The Council Area Of City Of Karratha of Private. Crushing & stacking facilities, site layout, crusher area works. Surplus plant from Girilambone to be utilised. A conventional SX-EW operation. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

PILBARA TO GOLDFIELDS GAS TRANSMISSION
Private ownership Mining - Infrastructure (Slurry pipelines) project In The Various Council Area for New development. The 1,380 km gas pipeline will require two compressor stations to handle the initial capacity of about 70 tjs per day. Installation will follow the main pipelaying activity. Gas measuring equipment to also be installed at Yarraloola, Newman, Mt Keith, Leinster and Kalgoorlie. Click for more details...

MIDDLEBACK RANGES IRON ORE/WHYALLA OPERATIONS
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whyalla Council Area for New development. The crushing & screening plants will be relocated from Whyalla in a move to reduce dust emissions by eliminating the large number of conveyor transfer points incorporated in the pellet plant (which includes the crushing & screening plants). Some infrastructure at the mine site will need to be modified/constructed. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MINDY MINDY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at 60 km Northwest of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 44.8 Mt @ 55.2% Fe. The ore at Mindy Mindy will be directly shipped. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed will comprise a semi-mobile crusher; sealed haul road or overland conveyor system from crushing/screening plant to rail loading facility ; secondary crushers; iron ore product stockpile and train loading facilities; administrative and maintenance hub; connection to the proposed 132 kv transmission line to Newman with capcity upgrade at Newman or a 6 MW power station (to be provided and maintained by an external supplier); Mine dewatering pumps and pipeline; airstrip upgrade at Mindy Mindy and an Accommodation village. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - VENTILATION SHAFT
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project at Via, Charters Towers, QLD 4820 for New. Work comprises the installation of the primary ventilation shaft. This will involve the excavation of the 2.4 metre diameter 110 metre long shaft and the installation of a second exit method from the underground workings. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
8 km north west of, Newman, WA 6753 Has Yandicoogina Iron Ore Operations currently at Early Planning stage. Additional power and other infrastructure to complement the new port and mine requirements. Click for more details...

MIITEL NICKEL OPERATIONS - SOUTH MIITEL
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Coolgardie Council Area of Private ownership. An initial Probale Ore Reserve resource estimate of 376,000 tonnes @ 2.6% for 9,790 tonnes of nickel. Development work will comprise an extension to the existing Miitel decline and the excavation of a ventilation shaft to the surface. The mining method will be mechanised flat back cut and fill. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT - EXPANSION
Bhp Billiton Iron Ore Rapid Growth Project - Expansion is currently at the Construction stage, valued at about $ 150000000 it is An expansion of capacity at the Pilbara Iron ore operations from 100 million tonnes per annum to 110 Mtpa by late 2004. Includes additional rail and port capacity. The project will be completed on the back of infrastructure and equipment installed as part of Area C and Pace (Nelson Point) projects. BHP Billtions' Pilbara iron ore operations includes Mount Newman Iron ore Operations as well as Area C and the Nelson Point Ore Handling Facility. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH WEST - RESOURCE
Currently at the Construction stage In Singleton is a project estimated to be $ 30000000. This project The mine will produce coal at the rate of 1.0 to 1.5 million tonnes per year for six years. Development cost of $30 million are expected. The operation will share existing infrastructure and equipment with Ravenswood East. The Ravensworth/Narama complex, located in the Hunter Valley in New South Wales, includes the Ravensworth East operation, Ravensworth West mining tenements and Coal and Allied's share of the Narama operation. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

PARDOO IRON ORE PROJECT
Pardoo Iron Ore Project is currently at the Construction stage, valued at about $ 8300000 it is The project is based on an identified iron ore (hematite) resource of approximately 7.4Mt. The project proposes an ore production rate of 1.5 Mtpa, resulting in a mining life of 5 - 6 years. The project involves the open cut mining of eight small pits in five deposits to obtain direct-shipping quality iron ore. The ore will be crushed, screened and stockpiled on site prior to being loaded into rail trains for road haulage to the appropriate berth at Port Hedland. Ore will be stockpiled at the port until it is loaded onto ships for export to overseas customers. The major components of the Pardoo DSO Project are: minesite establishment, mining operations, product transport and export and decommissioning and closure. The minesite access road and temporary construction yard and administration area will be the first infrastructure constructed. The mining operations centre (MOC) will be located in the northern portion of the minesite and contains the following infrastructure: administration area including Atlas facilities, mining contractor's facilities, crushing and screening contractor's facilities, haulage contractors facilities, sewerage treatment and waste water storage, potable water storage, common parking area. The MOC will also contain a fuel storage and refuelling area, power station (diesel), crushing and screening plant, ROM ore pad and product stockpiling area, parking areas and portions of the access road and haul road, and combined contractor's laydown area. Haul roads will be constructed between the pits, waste rock dumps, stockpiles and ROM pad stockpile. Minor access roads will provide access to waste rock dumps and inspection points, dewatering equipment, water management structures, environmental discharge locations and other minesite management areas. The proposed mining operation will be a multiple, open pit mining operation, using conventional drill and blast and load and haul methods. Ore from the pits will be hauled directly to the ROM pad or temporarily stockpiled adjacent to the pits. The crushing and screening plant will provide primary and secondary crushing and screening. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - INLOADING CONVEYOR SYSTEM
Inloading Conveyor System project at Hay Point Road, Hay Point, QLD 4740 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Scope of work includes the supply and fabrication of new conveyors and rail unloading facilities, civil footings and supports for these conveyors and supply and installation of electrical work associated with these conveyors. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

DONALD MINERAL SANDS PROJECT - EPCM CONTRACT
Currently at the Construction stage In Buloke is a project estimated to be $ 2000000. This project Ccommissioning to include minerals processing, conveyors, water infrastructure, site buildings & power infrastructure. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - CAR DUMPER 1
Iron Ore Rapid Growth 3 Project - Port/Area C - Car Dumper 1 is currently at the Construction stage, valued at about $ 25500000 it is The supply of a twin cell rotary railcar dumper, positioning system and associated train holding devices. The system is capable of unloading 10,000 tons of ore per hour. Click for more details...

WINDIMURRA VANDIUM OPERATION - PROCESSING PLANT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 80 Km East South East of, Mount Magnet, WA 6638 for New. New equipment has been purchased for the plant and a tender has closed for a SAG Mill. The present plant infrastructure at the site is a 126m Rotary Gas Fired Kiln and cooler, Plant earthworks and Concrete, Crusher Area structure and ROM pad, Grinding Area Concrete and Footings, Beneficiation area including Rare Earth Magnetic Separators, Leach Vats, Leaching Area Concrete, Fusion Area, Fusion furnace, Flaking Wheel, Hot pan Conveyor, Packaging Plant, Process design and engineering, Tailings Dam, Road Works, Bore fields, Communication services, Building and Workshop equipment and Accommodation Village. The plant infrastructure, design and processing operations have been studied and improvements have been recommended. The design will look at power station configuration, upgrade of the material handling in parts of the plant which were found to be production bottlenecks. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

PROMINENT HILL GOLD COPPER PROJECT - BULK EARTHWORKS
A project in the SA Within Coober Pedy. Bulk Earthworks for Process Plant Earth works and Plant Roads. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - CONVEYORS R8 & S8
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Private ownership. To construct and supply conveyors for R8 and S8. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

BICKHAM COAL COMPANY - BULK SAMPLE EXCAVATION PROJECT - RAIL LOADING FACILITY UPGRADE
Currently at the Early Planning stage In Upper Hunter is a project estimated to be $ 10000000. This project For the provision of upgrade services for the rail loading facility. Scope of work not yet determined. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Steel Tube Piling Package - For Berth Facility project at Port Hedland Port, Gilbert St, Port Hedland, WA 6721 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Provision of steel tube package for construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - INFILTRATION BASIN
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 28 km east of, Ouyen, VIC 3490. This type is Infiltration Basin with Private ownership. For the provision of an infiltration basin to filter storm water runoff. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

ABBOT POINT COAL TERMINAL X50 EXPANSION DS1 ABD IL1 STRUCTURAL MECHANICAL & ELECTRICAL WORKS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Rail Unloader (Dumpstation) 1 - including installation of principal supplied wagon vibrating system and vibrating feeders, extension of superstructure, modification to rail support beams, replacement of new steel hoppers and belt weighers, control room fit out. Inloading Conveyors C101/C102/C103 Upgrade - Modification to concrete pedestals and installation of concrete slabs. Strengthening works to existing elevated galleries, modification to existing transfer towers, installation of drive access platforms, modifications and upgrade to conveyor system. Click for more details...

PROMINENT HILL COPPER GOLD OPERATIONS - UNDERGROUND EXTENSION PROJECT - DECLINE
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Coober Pedy Council Area for New development. A 6 year, life-of-mine contract. To include construction of a decline from the existing open pit to allow evaluation drilling of the Main Underground & Western Deposits as well as mining access to the Western Copper deposit. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

OAKY CREEK COAL OPERATIONS - LONGWALL PROJECT STAGE 4
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. A project to increase production over 5 years by expanding into additional sections of the mine tenement. To include a new longwall mining system & associated development suite. Expansion of the existing coal handling & preparation plant (CHPP). Upgrade of the electrical system. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - PAR PIPE TESTING & INTERNAL CLEANING
Par Internal Pipe Cleaning project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For pipe line cleaning, hydrostatic testing, drying, & purging lines with residual positive pressure of nitrogen. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - GRVE PIPE JOINING OPERATIONS
Grve Pipe Joining Operations project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of all necessary materials, consumables, labour, plant & equipment for GRVE pipe joining operations. Click for more details...

GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT HEDLAND INFRASTRUCTURE CONSTRUCTION
Lot 4 Clark St, Port Hedland, WA 6721 Has Roy Hill Iron Ore Project - Infrastructure - Port Hedland Infrastructure Construction currently at Construction stage. For the provision of infrastructure construction. Click for more details...

MOUNT ISA MINES OPERATIONS - SILICA CONTRACT
Currently at the Tenders & Building stage In Mt Isa City is a project estimated to be $ 2000000. This project A 3 year contract for the supply of fine silica for smelter flux. Glencore to organise drill & blast in an area between no.5 tailings dam & 5/7 West Wall (ML 8058). Transportation of broken rock to a run-of-mine (ROM) pad prior to going to a designated processing site. Pre-screening if necessary prior to crushing, size separation through screening & if required washing. Haulage of the silica to the fine & coarse stockpiles near the lead smelter (Rowles Reserve) & copper smelter sites (Barnes Boulevard - North & South, Stacker). The contractor to supply primary & secondary crushers, mobile stack & screening plant conveyors as well as 45t excavators with bucket/hammer attachments, 980 wheel leaders, 25t dump trucks & a water truck, Click for more details...

SHELL PRELUDE GAS FIELD PRODUCT - FLNG - OPERATIONS & MAINTENANCE - TELECOMMUNICATION MANPOWER & MAINTENANCE SUPPORT
Mining - Infrastructure (Computer & telecommunication system for mine, scada) project In The Broome Council Area of Private ownership. Provision to supply Telecommunications Manpower & Maintenance Support for the Prelude FLNG facility when it commences operations. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - ACCESS ROAD
120km South of, Port Hedland, WA 6721 Has Pilgangoora Lithium-Tantalum Project - Access Road currently at Construction stage. For the provision of an access road. Click for more details...