State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Infrastructure Projects


WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). At Lorim Point. Click for more details...

HUNTLY BAUXITE OPERATIONS - MCCOY CRUSHER MINE RELOCATION PROJECT
Currently at the Planning stage In Murray is a project estimated to be $ 5000000. This project This project and ID 688584 last reported 32/03 Issue Mining Report Planning Section, are now to become one package. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Approx 200 km east of, Daly Waters, NT 0852 Has Merlin Diamond Project - Stage 1 currently at Construction stage. First ore is likely to be available from the pits during November 1998. Work on the tailings dam is expected to be completed within 10-11 weeks of commencement. Click for more details...

IRON ORE PROCESSING PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Finucane Island to, Port Hedland, WA 6721. This type is Cross Harbour Tunnel/Conveyor - Design & Construction with Private ownership. Construction of a tunnel & conveyor belt under the Port Hedland Harbour to cart ore from the Nelson Point project to stockpiles on Finucane Island. The project involves boring a 1,160 m long concrete-lined tunnel under the harbour. Approximately 600 m of the tunnel will be under the sea bed. The 4.3 m wide bore will house a 1.8 m wide conveyor initially capable of moving 4,000 tonnes of lump ore per hour (full capacity of 10,000 tph). From mid 1997, the Finucane end of the conveyor will link with an overland conveyor to feed iron ore to the proposed $900 million HBI plant to be located on the Boodarie site approximately 7.2 km south of Finucane Island. The tunnel will contain an accessway and services such as lighting, drainage, ventilation and fire protection. To minimise the risk of airborne dust arising from the handling process, the facility will include water sprays and the tunnels entry portals will be covered. A 20 month construction schedule is envisaged, with the main tunnelling process expected to be undertaken during winter 1996. It will be constructed using a purpose-built Earth Pressure Balanced tunnel boring machine and supported with bolted pre-cast reinforced concrete segments. It will commence near Utah Point, just south of the Finucane Island berth and emerge behind the Nelson Point A berth. The conveyor will then be fitted and linked to existing loading conveyors and expected to be operational by February 1997. The sub-sea tunnel will serve to increase the capacity of the Nelson Point loading facility by carrying ore to the Finucane shiploader, as well as directly supplying fine iron ore from Nelson Point to the DRI/HBI plant at Boodarie. Click for more details...

ARGYLE DIAMOND OPERATIONS
Road/Pipework & Tailings Dam project at Mine site via, Argyle, WA 6239 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Construction of a gravel road of about 4.2 km in length is required. Contract to include laying of approximately 6 km of polyethylane pipe some of which is to lie parallel to the new road. Project now incorporates some tailings dam foundations, general earthworks & embankments. Click for more details...

PARKESTON POWER STATION
A project in the WA Within Kalgoorlie-Boulder. A 200mm spur line extending over 8 km is required to connect the new power station with the Pilbara-Goldfields pipeline. This pipe will be buried in a 400mm trench with a minimum of 750mm of cover. Construction period of 3 months is envisaged for this project. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 8 km east of, Collie, WA 6225 of Bulk Earthworks type of New development. Contract involves placement of waste dump & stockpile areas plus site levelling for new mine. Earthworks also required for rail line & site access roads. ((Tracklaying to be carried out by Westrail.)) Click for more details...

BROKEN HILL MINE BASE METAL OPERATIONS - NORTH MINE EXTENSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Broken Hill Council Area of Resource - Base Metals type. Resource estimate is 4.2 Million tonnes @ 11.2% Zn, 13.7% Pb and 214 g/t Ag. Likely to include two open cut pits, a waste rock emplacement, a haul road, facilities, stockpiling and crushing areas and associated infrastructure. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Screening For Dam Walls For Tailings Dam project at Approx 200 km east of, Daly Waters, NT 0852 In The Council Area Of Darwin City of Private. Providing plant, equipment and services for screening materials for the dam walls. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

KOORAGANG COAL TERMINAL EXPANSION - STAGE 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Kooragang, NSW 2304 for Addition. Includes rail receival, stacking conveyor system, additional stockyard, additional reclaimer & reclaimer conveying system, additional ship loading conveying stream & ship loader. Click for more details...

GOLF/TOLLIS - GOLD
A project in the NT Within Katherine Town. An indicated resource of 8.76mt grading 0.85gpt gold has now been estimated (oxide, transition & primary ores) for this area. These deposits are being considered as future feed for the heap leach circuit at the Company's Mt Todd plant. Additional zone of mineralisation also undergoing evaluation & is included in current pit optimisation studies (Golf & Tollis). It is envisaged the Golf pit will provide waste for a new tailings dam to be constructed nearby. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Lake Macquarie Council Area of Private ownership. Bridge across the Great Northern rail line and 3.5 km connection road to from a T-intersection with the existing Newstan haul road. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH WEST - RESOURCE
Currently at the Construction stage In Singleton is a project estimated to be $ 30000000. This project The mine will produce coal at the rate of 1.0 to 1.5 million tonnes per year for six years. Development cost of $30 million are expected. The operation will share existing infrastructure and equipment with Ravenswood East. The Ravensworth/Narama complex, located in the Hunter Valley in New South Wales, includes the Ravensworth East operation, Ravensworth West mining tenements and Coal and Allied's share of the Narama operation. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - UNDERGROUND DEVELOPMENT
A project in the WA Within City Of Greater Geraldon - Mullewa. Investigation of a decline from the base of the Central pit, allowing Central & West lodes to be mined concurrently. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Port Facilities - Upgrades New project In The Port Hedland Council Area. Upgrades of existing facilities. Part of a proposed additional expansion to 145Mtpa. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - SHIPLOADERS/STACKERS/RECLAIMERS
Pilbara Iron Ore & Infrastructure Project - Shiploaders/Stackers/Reclaimers is currently at the Construction stage, valued at about $ 62500000 it is The design, manufacture and construction of a shiploader, stacker and reclaimer. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - PORT HEDLAND PORT FACILITIES
Currently at the Construction stage In Port Hedland is a project estimated to be $ 689700000. This project Port facilities comprise a stockyard at 2.5 Mt capacity. Materials handling facility comprising a Train unloader, 22 Conveyors and transfer points, Rescreening plant , two Stackers (8000 tph each), a Reclaimer (10,000 tph), two 300,000 tonne stock piles and a bulk stockpile area. The Materials handling facility will use a rotary car dumping cell to simultaneously tip two ore carriages. Iron ore from each wagon will be dumped into individual surge hoppers and then onto conveyors located at the base of the structure which will deliver the ore through an upward sloping tunnel to the nearby stockpiling area. In order to house the the Train Loader a 22 metre high concrete vault will be constructed to allow ore carriages to be tipped in an efficient manner. Extensive excavation work will be required because approxiamtely 18 metres is below existing ground surface. An associated ramp and conveyor system will be constructed. During excavation construction a significant ammount of dewatering will be required. Port development will include a proposed 750m long single wharf, a Shiploader (10,000 tph), 3.3 million cubic metres of dredging with ongoing maintenance dredging, shipping berth to allow for two 250,000 DWT vessels to be berthed. One berth includes wharf and shiploader. The other includes a berth only. Supporting infrastructure includes a shift office, control room and amenities, wharf amenities, package treatment plant and substations. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CREEK MANGANESE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes co-ordinating a number of design and construction contracts for various components of the bulk loading infrastructure and for the co-ordination and resolution of any associated issues. Includes a rail bottom dump, road bottom dump, bulk materials storage area, shiploader and associated conveyor and internal road systems. Includes review of reports by Bootu Creek Resources and KBR. The facility will initially be used for Bootu Creek Manganese Project. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

NEW BENDIGO GOLD PROJECT - ACCESS ROAD/CAR PARK
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 133 North Belmont Road, Eaglehawk, VIC 3556. Construction of an access road and car park. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

ANGAS ZINC PROJECT - DOUBLE LINING FOR TAILINGS STORAGE FACILITY
A project in the SA Within Alexandrina. The double lining is for a 540,000 bcm sized Tailings Storage Facility. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - CAR DUMPER 1
Iron Ore Rapid Growth 3 Project - Port/Area C - Car Dumper 1 is currently at the Construction stage, valued at about $ 25500000 it is The supply of a twin cell rotary railcar dumper, positioning system and associated train holding devices. The system is capable of unloading 10,000 tons of ore per hour. Click for more details...

COBURN MINERAL SANDS PROJECT - ACCESS ROAD CONTRACT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Shark Bay Council Area of Access Road type. To construct a 50 km length access from the North West Central Highway to the mine site. Click for more details...

DAWSON COMPLEX COAL PROJECT - CONVEYING SYSTEM
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at North west of, Theodore, QLD 4719. This type is Coal Conveying System with Private ownership. To supply two cable belt conveyors at 10 km and 16 km in length, both with horizontal curves and multiple drives. The conveying system will transport ROM coal at a rate of 2400 tons per hour to the newly constructed coal handling preperation plant. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELTING
Belting - Supply Of project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Private. Supply of Belting. Approx.1750m of 900/1350mm wide by 4ply PN800 conveyor belting. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - FINUCANE ISLAND PORT UPGRADE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Eastern Yard, Finucane Island, Finucane Island, WA 6721 for New. Development will comprise the development of new stockpiles and associated infrastructure in the Eastern Yard. The Car Dumper will be upgraded at Nelson Point. New infrastructure includes a stacker with a berm including rails and supports, stacker feed conveyor, transfer station conveyor, transfer station, water service pipelines and hydrants, dust suppression water cannons for stockpiles. Building infrastructure include administration offices, workshop offices, workshops, warehouse and a car park in a single facility at the Northern End of Finucane Island. Demolition work includes the existing office and workshops to make way for the new stockpiles row and the partial demolition of conveyors used at the Nelson Point Plant No 1 and Plant No 2. Click for more details...

IRON ORE PAID GROWTH 4 PROJECT - CAR DUMPER WORK PACKAGE 4N08
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Newman Hub, Newman, WA 6753 for New. A new single rotating cell car dumper located inside of the main rail loop, north of the existing OB29 TLO. A trade approved train weighbridge will be installed on both sides of the Car Dumper. There is a receival hopper complete with an apron feeder 51FE010 below the car dumper. The feeder discharges to a reclaim conveyor that lifts the ore to the surface. The reclaim conveyor 51CV010 discharges to the surge stockpile stacker conveyor 51CV020. The surge stockpile stacker conveyor also received ore from the supply conveyor 41CV030 from the NHG/Bene supply. Thus, all the ore sources are discharged to the surge stockpile together. There is sample extraction at the head of the car dumper conveyor which includes a sample cutter, apron feeder and primary increment crusher (SPB lump size being too big to be handled by a modular sample station). The sample extraction will be linked to a new sample stations. The car dumper has dedicated dust extraction/scrubber and ventilation systems comprising ducting, fans, scrubbers and pumps. The key criteria for the Car Dumper and discharge are 27Mtpa, discharge rate is 6,500tph. Samples will be taken on a time based system. A lot is defined as one shuttle load. The final sample collection will be in buckets on carousels containing approximately 7.5kg per lot. The sample station will have divisions down to quaternary cutting for chemical sampling. Metallurgical samples can be collected as and when required. The sample station is of a single modular design similar to those for as stacked sampling. The key criteria for the SOB Sample Station has a design capacity of 27Mtpa. Surge Stockpile will receive ore from NHG No 2 Plant, the Bene Plant and the SOB Car Dumper. The stockpile comprises one pile, with a live capacity of 15,000 ton minimum. There is gravity reclaim from the stockpile through two draw-down hopper openings in the roof of the reclaim ton. The hoppers are each located over an apron feeder that discharges to the plant feed conveyor 51CV020. The stockpile live volumne and feeder capacities are sized to produce a smooth head feed to the screening/crushing process plant. There are dust suppression cannon around the stockpile as well as dust suppression sprays at the head of the stacking conveyor. High pressure water for the cannon will come from the stockyard high pressure distribution. The key criteria for the Surge Stockpile is 58Mtpa. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Steel Tube Piling Package - For Berth Facility project at Port Hedland Port, Gilbert St, Port Hedland, WA 6721 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). Provision of steel tube package for construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Click for more details...

PLUTO LNG PROJECT - JETTY BERTH
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The City Of Karratha Council Area of Jetty Berth type. For the construction of a 300m long approach jetty. The LNG jetty berth will include a 38m x 50m platform, four breasting dolphins, six mooring dolphins and navigational aids. Click for more details...

PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities. Click for more details...

BLUEWATERS POWERSTATION COAL HANDLING PLANT CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Collie Council Area of Plant Conveyor type. Unit 2 Coal Handling Plan Conveyor structure to be developed. Click for more details...

BHP BILLITON PORT HEDLAND INNER HARBOUR EXPANSION
Berths/Shiploader/Car Dumper/Conveyor/Rail Works project at Finucane Island via, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Port expansion as part of project to increase iron ore capacity to 220million tonnes per annum (Mtpa). To include 2 new berths & shiploaders, a car dumper (No. 5), connecting conveyors & associated rail works. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Infrastructure (Computer & telecommunication system for mine, scada) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

WIGGINS ISLAND COAL EXPORT TERMINAL (WICET) PROJECT STAGE 1 - OFFSHORE PLANT & INFRASTRUCTURE
Jetty/Wharf/Berth/Conveyors/Towers/Dolphins project at Golding Point, Wiggins Island, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 1.8km long approach jetty & transfer tower platform, wharf, wharf conveyor including the drive & take up tower, berthing & mooring dolphins, ship access platforms, jetty conveyor & transfer tower. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

RENSION BELL TIN OPERATIONS - MINING CONTRACT
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) New project at 15km northeast of, Zeehan, TAS 7469. This type is Decline Development/Underground Mining with Private ownership. A 3 year contract for underground mining. To include decline development of 6000m a year for 700,000tpa ore production. To utilise 3 development jumbos, 2 longhole rigs, 4 boggers & 3 trucks. Workforce of 130 personnel. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE COMMUNICATIONS
Mining - Infrastructure (Computer & telecommunication system for mine, scada) project for New development. For the provision of a site communications system to include a permanent high frequency radio repeater station. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect