List of Mining - Infrastructure Projects in NSW


LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

WEST CLIFF COLLIERY - OVERLAND CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Wedderburn Rd, Appin, NSW 2560 for New. The Overland Conveyor was to be over the 3 kilometres of rough terrain between the Appin and West Cliff Mines. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF
Mine Infrastructure New project In The Newcastle Council Area. Includes mine portal, conveyor, coal stockpile and truckloading area. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE INFRASTRUCTURE - CONVEYORS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes conveyor and gantries and truckloader bins and bunded fuel tank area. Click for more details...

MOUNT OWEN COAL OPERATIONS - ROM RECEIVAL FACILITY
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Singleton Council Area for New development. Construction and operation of a ROM receival facility and haul roads to enable Mount Owen Mine to process ROM coal from Ravensworth East and Glendell mines. Click for more details...

POONCARIE MINERAL SANDS PROJECT - GINKGO - RESOURCE
South of, Menindee, NSW 2879 Has Pooncarie Mineral Sands Project - Ginkgo - Resource currently at Construction stage. Resource at gingko as at mid 2004 Measured 162Mt ore 5,767 kt heavy minerals, Indicated 43Mt, 856kt heavy minerals. Road construction and a construction camp will be part of the development. Click for more details...

NORTHPARKES COPPER & GOLD OPERATIONS - E48 - RESOURCE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Parkes Council Area for New development. Development comprises a new underground mine which is 2 km north of the existing E26 underground mine. Mining operations will be conducted by rock caving and ore will be hoisted via an existing shaft. A new above ground conveyor to the existing processing plant will be constructed. Two new tailings storage facilities will be constructed for the residue. A major engineering and construction component of the project will be to set up the underground crusher chamber. Resource estimate is 22,600,000 tonnes @ 1.15% copper and 0.46 g/t gold containing 260,000 tonnes of copper and 334,000 ounces of gold. Mine is expected to produce 5.5 Mtpa and extended to 2017. Click for more details...

BAAL BONE COLLIERY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Series of underground main-gate conveyors for longwall mining. Total length, approx 10 kms. Includes 3 systems. Click for more details...

ENDEAVOUR BASE METALS OPERATIONS - ELURA
Mining - Infrastructure (Concrete Batching Plants) project at 40 km north west of, Cobar, NSW 2835 for New. Cement paste fill plant is planned to extend the life of the mine, with some reduction in cost per tonne. The paste fill plant will use plant tailings, Cockle Creek Black smelter sand and cement to fill the mined voids, allowing additional ore to be extracted. Click for more details...

KOORAGANG COAL TERMINAL EXPANSION - STAGE 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Kooragang, NSW 2304 for Addition. Includes rail receival, stacking conveyor system, additional stockyard, additional reclaimer & reclaimer conveying system, additional ship loading conveying stream & ship loader. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at South west of, Morisset, NSW 2264 for New. Underground conveyor Mandalong to Vales Point; Mandalong to Cooranbong; conveyor supporting longwall (trunk road belts etc). total package with three separable elements. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH EAST - RESOURCE
Approx 25 kms west of, Singleton, NSW 2330 Has Ravensworth/Narama Coal Operations - Ravensworth East - Resource currently at Construction stage. Current production of 2.0 million tonnes per annum will be increased to 2.5 million tonnes per annum. This will involve the dragline changing to a 7 day operation. Click for more details...

ARDLETHAN TIN OPERATIONS - PREPARATION/TREATMENT EQUIPMENT SUPPLY
A project in the NSW Within Coolamon. Includes mobile preparation & treatment equipment to be located close to the excavator. Ore is placed in a stockpile & a loader working continuously will feed the ore into the feeder-hopper of the scrubber-trommel. More water will be added so that the undersize can be pumped through in-line jigs which will be located within boom of the trommel unit. Some tin concentrate will be recovered in the in-line pressure jigs. The finer tin particles will be picked up in a spiral plant. Click for more details...

TRITTON COPPER PROJECT
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Tahmoor, NSW 2573 of Underground Conveyor - Upgrade type of New development. Refurbishing the underground route and installation of the new conveyor. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

WEST CLIFF COLLIERY
Upgrade Conveyor Belts & Drive Units project at Wedderburn Rd, Appin, NSW 2560 In The Council Area Of Wollondilly of Private. The drive units involved are numbers 1.11, 1.5 & 1.9. Click for more details...

BAYSWATER POWER STATION
At, Bayswater, NSW 2283 Has Bayswater Power Station currently at Construction stage. Installation of temperature monitoring sensors on pulley bearings and into the fluid coupling return lines of coal conveyors R1, R2, 3A and 3B. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

NORTHPARKES MINES - TAILINGS DAM EARTHWORKS
New project of Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Bogin Road Via, Parkes, NSW 2870. Project will involve the excavation, movement and placing of an estimated 600,000 cubic metres of clay and rock. Earthworks involving the raising the height of an existing tailings storage facility. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

DARTBROOK COAL OPERATION - STOCKPILE EXPANSION/TAILINGS FACILITY
Dartbrook Coal Operation - Stockpile Expansion/Tailings Facility is currently at the Planning stage, valued at about $ 10000000 it is Development comprises the construction of four new Run of mine coal stockpiles and the expansion of the existing emergency ROM coal stockpile at the Coal Handling and Preparation Plant. The expanded capacity will be 400,000 tonnes of coal. An underground tailings disposal facility in the Wynn Seam goaf area. The facility will have three components that include a tailings discharge line that is mainly underground, the Wynn Seam goaf disposal area and a new tailings return water system. Installation and operation of a Nitrogen Injection Plant above the Kayuga Seam mine workings. Click for more details...

MANGOOLA COAL PROJECT - WYBONG ROAD UPGRADE
Mangoola Coal Project - Wybong Road Upgrade is currently at the Construction stage, valued at about $ 2000000 it is For the upgrade of 7km of existing Wybong Road including widening, intersection enhancement & line marking. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

HUNTER VALLEY COAL OPERATIONS - RELOCATION OF WATER DAMS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Singleton Council Area for New development. Relocation of water fill point dams to new location. Click for more details...

BAYSWATER/LIDDELL POWER STATION - ROAD MAINTENANCE
Road Maintenance Services project at At, Liddell, NSW 2333 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Work comprises Maintenance of bitumen surfaced roads and car parks; Maintenance of unsealed roads and car parks; Construction of new roads and car parks; Maintenance of road shoulders and table drains; Maintenance of Asphaltic concrete road surfaces; Miscellaneous roadwork items including supply and installation of guide posts and guard railing, and road line marking; Repairs to Coal Plant Roads and Repairs to River Road. Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

MANGOOLA COAL PROJECT - NOISE WALLS FOR RAIL LOOP
Currently at the Planning stage In Muswellbrook is a project estimated to be $ 2000000. This project For the provision of noise walls to create a sound barrier around the rail loop. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - PIPING - SUPPLY & INSTALL FOR SURFACE FACILITIES INFRASTRUCTURE
Mining - Infrastructure (Slurry pipelines) project In The Orange Council Area of Private ownership. For the supply & installation of piping. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - OUTBOUND SYSTEM CIVIL STRUCTURAL MECHANICAL WORKS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Part of lots 6, 7, 20 Cormorant Rd DP 4015754 & 252325, Newcastle, NSW 2300. Design, Supply & Installation of Piled Foundations, Supply & Installation of Concrete Foundations, Shop Detailing, Supply, Fabrication, Painting, Off Site Pre-Assembly & Site Erection of Structural Steel and part supply & complete Mechanical Installation for the Outbound System comprising a 2000t Buffer Bin, two Belt Feeders, Sample Plant, two Transfer Houses, three Conveyors and two substation slabs for a 30Mtpa Coal Export Terminal. Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STACKING EXPANSION
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Curlew St, Kooragang, NSW 2304. Fabrication & installation of new stackers. Part of the 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 Mtpa to a nominal 120 Mtpa. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

NARRABRI UNDERGROUND JOINT VENTURE COAL OPERATIONS- STAGE 2 EXPANSION - VENTILATION SHAFT
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Narrabri Council Area for New development. Construction of a 5m diameter ventilation shaft with 3 fans. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

CENTENNIAL WESTERN COAL SERVICES - SPRINGVALE SERVICES SITE UPGRADE
A project in the NSW Within Lithgow. A project to support western operations (Springvale, Angus Collieries) by upgrading the coal handling & distribution capacity at the central Springvale Coal Services site to 9.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal. To include expansion of the coal washery involving installation of new plant adjacent the existing plant for an overall capacity of 7 Mtpa along with additional conveyors & transfer points. Increase of reject disposal capacity. Construction of a private haul road linking the site to the existing Angus Place-Mount Piper power station haul road. Continued integrated rehabilitation of the former Lambert Gully Mine also located on the coal services site. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MAULES CREEK COAL PROJECT - MINE INDUSTRIAL AREA
Maules Creek Coal Project - Mine Industrial Area is currently at the Construction stage, valued at about $ 75000000 it is Surface facilities at the Mine Infrastructure Area to include workshops, heavy & light vehicle refuelling & washing facilities as well as tyre jacking slabs. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL - RAIL FLYOVER
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304. This type is Rail Flyover - Stage 3 with Private ownership. A rail flyover to allow grade separated entry from the Kooragang Island Main Line to the spurs. Modification of the inbound track for the northern spur line. Realignments of the inbound western & outbound eastern tracks of the Kooragang Island main line. Associated ancillary infrastructure & relocation of some existing powerlines. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

MINERAL HILL COPPER GOLD OPERATIONS - SOUTHERN RESIDUE TAILINGS STORAGE FACILITY
New project of Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Via Melrose Dandaloo Rd, 65km north of, Condobolin, NSW 2877. For the provision of a Southern Residue Storage Facility to be constructed immediately adjacent to the southern face of the existing tailings storage facility & the western face of the existing waste rock emplacement. Click for more details...