List of Mining - Infrastructure Projects in NT


ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Infrastructure (Bunding) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

WOODCUTTERS BASE METALS MINE
Mine - Underground - Pumping Station Addition project In The Darwin City Council Area. One 22 kva substation required for dewatering of the underground mine. Contract to include installation of pipework, pumps & associated services. Project also involves 3 x 300 horsepower pumps. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Approx 200 km east of, Daly Waters, NT 0852 Has Merlin Diamond Project - Stage 1 currently at Construction stage. First ore is likely to be available from the pits during November 1998. Work on the tailings dam is expected to be completed within 10-11 weeks of commencement. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

MOUNT TODD GOLD MINE
Mine - Mechanical Package - Wet Plant - Installation - Phase 2 - Expansion project at 45 km northeast of, Pine Creek, NT 0847 In The Council Area Of Katherine Town of Private. It is envisaged this facility will utilise a combination of flotation/regrind/leach methods. Contract to provide structural steelwork & mechanical services. Click for more details...

BROWNS OXIDE PROJECT - NICKEL/COBALT/COPPER/LEAD RESOURCE
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - Nickel/Cobalt/Copper/Lead Resource currently at Construction stage. The ore is to be mined, crushed, ground and slurried on site. Ore will be processed in a onsite process plant and tailing will be stored in a onsite tailings dam. The in-ground oxide resource estimate for the Batchelor region projects has an estimated value at over 1 billion dollars. Measured resource is 18 million tonnes, indicated is 27 million tonnes and inferred is 37 million tonnes. Metals in the ground are lead at 1,865,000 tonnes, copper 622,000 tonnes, cobalt at 98,000 tonnes and nickel at 90,000 tonnes. There are also significant exploration prospects at Mount Fitch and Mount Burton. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Screening For Dam Walls For Tailings Dam project at Approx 200 km east of, Daly Waters, NT 0852 In The Council Area Of Darwin City of Private. Providing plant, equipment and services for screening materials for the dam walls. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Approx 200 km east of, Daly Waters, NT 0852 for Subcontract. Work on tailings dam expected to be completed within 10 - 11 weeks of commencement. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Katherine Town Council Area of Mine Access Road - Batten Creek Overflow Channel Floodway Repairs type. Install new culvert supplied by the Principal, reinstate embankment, reconstruct pavement, install new erosion protection works and undertake limited stream training works. Click for more details...

GOLF/TOLLIS - GOLD
A project in the NT Within Katherine Town. An indicated resource of 8.76mt grading 0.85gpt gold has now been estimated (oxide, transition & primary ores) for this area. These deposits are being considered as future feed for the heap leach circuit at the Company's Mt Todd plant. Additional zone of mineralisation also undergoing evaluation & is included in current pit optimisation studies (Golf & Tollis). It is envisaged the Golf pit will provide waste for a new tailings dam to be constructed nearby. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BATCHELOR MAGNESIUM PROJECT
Infrastructure project at Rum Jungle district 85 km south of, Darwin, NT 0800 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Following completion of the Stage one Feasibility study, locations were selected for each of the facilities necessary for development of the Project. All available technical data relating to each site was compiled and reviewed. Some further exploration drilling was carried out. Based on this review it has been concluded that the sites seem suitable for the assigned purpose. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARY WORKS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The East Arnhem Shire Council Area of Civil Works type. Preliminary works to include roads, laydown areas. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

TIWI ISLANDS MINERAL SAND PROJECT - OPERATING MINE
Tiwi Islands Mineral Sand Project - Operating Mine is currently at the Construction stage, valued at about $ 4500000 it is Resource estimate is 6,980,000 tonnes @ 4.4% HM. Reserves are 6,530,000 tonnes @ 4.5% HM and 87% VHM. Mine life is expected to be six years. Targeted annual production of 35,000 tonnes per annum. Dry mining is the method of mining adopted by the feasibility study. The development will use a front end loader operating in a dry environment loading a feeder to a conventional wet spiral concentrator. The concentrate will then be trucked to the Port Melville deep water port for shipment direct to China. An off take agreement has signed with Astron Limited to take all production from the mine. A 76 Km four wheel track has been upgraded. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - CIVILS/PRELIMINARYWORKS
Civil Works Packages project at At, Gove, NT 0880 In The Council Area Of East Arnhem Shire of Private. Various. Civil works likely to include a wharf. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CREEK MANGANESE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes co-ordinating a number of design and construction contracts for various components of the bulk loading infrastructure and for the co-ordination and resolution of any associated issues. Includes a rail bottom dump, road bottom dump, bulk materials storage area, shiploader and associated conveyor and internal road systems. Includes review of reports by Bootu Creek Resources and KBR. The facility will initially be used for Bootu Creek Manganese Project. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CREEK MANGANESE
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Includes co-ordinating a number of design and construction contracts for various components of the bulk loading infrastructure and for the co-ordination and resolution of any associated issues. Includes a rail bottom dump, road bottom dump, bulk materials storage area, shiploader and associated conveyor and internal road systems. Includes review of reports by Bootu Creek Resources and KBR. The facility will initially be used for Bootu Creek Manganese Project. Click for more details...

EAST ARM PORT BULK MATERIALS HANDLING FACILITY- BOOTU CK MANGANESE - DUMP STNS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Two dump stations. Road and rail dump facilities. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

DARWIN EAST ARM WHARF - BULK MATERIALS HANDLING INFRASTRUCTURE PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Darwin City Council Area of Private ownership. Expressions of interest are sought to design, procure and construct common user bulk materials handling facilities for the export of bulk ore. The package includes rail and road bottom dump facilities, including an associated conveyor system to a stockpile area and headworks and a ship loader and associated headworks. Click for more details...

DARWIN EAST ARM WHARF - FIRE PROTECTION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) New project at East Arm Wharf, Darwin, NT 0800. This type is Fire Protection-Design/Supply/Install/Commission Fire Fighting Equipment with Private ownership. Design, supply, install and commissioning of a fully operational wharf-based fire protection system for bulk liquid vessel loading and unloading operations. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - ELECTRICAL/INSTRUMENTATION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Gove Peninsula North West Arneham Land via, Gove, NT 0880. This type is Electrical/Instrumentation with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BROWNS OXIDE PROJECT - NEW TAILINGS FACILITY
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - New Tailings Facility currently at Construction stage. The Tailings Storage Facility associated with the approved BOP has been found to overly a zone of potentially economic mineralisation. To avoid sterilisation of this zone of mineralisation th Company intends to construct a new TSF to contain the tailing from ore processed from the Browns oxide deposit in a location immediately adjacent to the approved TSF location. The new TSF has been designed on the basis that it will store both tailing and potentially acid forming (PAF) waste rock from the deposit. Prepatory activities associated with the construction of the new TSF are: vegetation clearing and grubbing, topsoil stripping and stockpiling, levelling of the site and compaction of existing clayey soils. The construction of the TSF will involve: an internal lining of compacted clayey soil, comprising a number of layers of low permeability material. Material for this zone will be preferentially sourced from a borrow pit located within the storage area, a rockfill zone for the external empbankment, constructed using NAF pit waste material, an internal ramp to access the decant system, and a PAF bund. The PAF bund will provide a physical barrier between tailings and the PAF waste, and is required because the tailings level will be higher than PAF waste level in the early stages of construction. A protective rockfill layer place (loose) over the face of the Zone 1 layer to provide protection from erosion and evaporative drying. Click for more details...

FRANCES CREEK IRON PROJECT - TAILINGS STORAGE FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Katherine Town Council Area of Private ownership. The existing tailing dam/water settlement pond will receive minor modifications. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

GRANITES GOLD MINE - TAILING STORAGE FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Unincorporated North Council Area of Private ownership. The Bunker Hill pit will be use for tailings disposal. A 4km tailings deposition pipeline and a process water return line will be constructed between the processing mill and the pit. Storage dams will also be constructed to contain any accidental spillages. When the pit is filled and has settled, waste rock will be used to cap the pit. Click for more details...

EAST ARM PORT WHARF - REFERENCE ELECTRODE WELLS/SENSE CONNECTORS - STAGE 1
East Arm Port Wharf - Reference Electrode Wells/Sense Connectors - Stage 1 is currently at the Tenders & Building stage, valued at about $ 150000 it is Provision of (12) Reference Electrode Wells & Sense Connectors to Stage 1 Wharf, East Arm Port. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - EPC PRODUCT LOADING JETTY
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Blaydin Point via, Darwin, NT 0800 of Product Loading Jetty type of New development. The scope of work for this package includes the engineering, supply and installation of the product loading jetty trestle and platforms approximately 1.2km long including fenders, quick release hooks, catwalks, mooring and breasting dolphins and navigation aids. Work not included is the top side modules, jetty head superstructure, piping, loading arms, local electrical room, local instrument room, electrical and instrumentation installations. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - TEMPORARY ACCESS ROADS
Bonaparte Gas Pipeline Project - Temporary Access Roads is currently at the Construction stage, valued at about $ 1800000 it is For the provision of temporaty access roads along the pipeline route. Click for more details...

BONAPARTE GAS PIPELINE PROJECT - PERMANENT ACCESS ROADS
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at From Wadeye to Amadeus Basin, east of, Adelaide River, NT 0846. For the provision of permanent access roads. Click for more details...

PEKO MAGNETITE PROJECT - TAILINGS POND
Currently at the Early Planning stage In Barkly Shire is a project estimated to be $ 1000000. This project For the provision of a temporary tailings pond. Click for more details...

FRANCES CREEK IRON - EAST ARM STOCKPILE EXPANSION
Iron Ore Facility - Upgrade project at 830 Berrimah Rd East Arm, Darwin Mc, NT 0822 In The Council Area Of Darwin City of Private. Increase of stockpile capacity to 450,000 tonnes. Project to include supply of mobile radial stackers & supply & installation of a conveyor & a tripper (1500tph capacity). Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - MAIN CIVIL WORKS
Main Civil Works project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. The scope of work includes supply, install & warrant of asphalt roadworks. Manufacture, supply, install & warrant steel guardrails together with associated works to all construction zones. Supply & delivery of joint filler & accessories. Supply & delivery of manhole grates & lids. Supply delivery of concrete. Supply & delivery of denso tape. Supply & delivery of precast units/elements. Supply & delivery of UPVC pipe. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - P&C MODULE OFFLOADING FACILITIES
Module Offloading Facilities New project In The Darwin City Council Area. The scope of work for this package includes the supply of materials and the installation of the jetty platform and trestle portion of the Module Offloading Facility including fenders, catwalks, mooring and breasting dolphins and navigational aids. Work not included is the engineering and the causeway from the site to the jetty trestle platform. Click for more details...

GOVE BAUXITE OPERATIONS - SHIP LOADING UPGRADE
A project in the NT Within East Arnhem Shire. A project to improve dust control at the Alcan site near Nhulnbuy. Late 2010 in-house engineering studies underway into optimal solution. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

OLD PIRATE GOLD PROJECT - TRIAL MINING
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Central Desert Shire Council Area for New development. A project based on a Resource Estimate of 1.88 million tonnes at 11.96 g/t gold for 723 800 ounces gold. Trial mining will include the extraction of 10 000 tonnes of gold bearing material, installation of a pilot plant & tailings facility, associated site works & ground water extraction. Pilot plant will include 15tph gravity gold plant including crushers, coarse gold jig, ball mill Knelson gravity concentrator & tabling/gold room. Click for more details...

ICHTHYS GAS PROJECT- ONSHORE - TANK INSTALLATION CRANE HIRE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Darwin City Council Area for New development. A crane hire subcontract for the installation of 2 condensate storage tanks & a condensate buffer tank. To include dry hire of a 200t or 275t crawler crane with luffing boom as well as an 80t rough terrain crane. Click for more details...