State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mining - Infrastructure Projects in New South Wales


TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE BUILDINGS
Tasman Project - Mount Sugarloaf - Surface Buildings is currently at the Construction stage, valued at about $ 1000000 it is Administration, worker amenities and stores, workshop, bunded fuel area. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF - ACCESS ROAD
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 25 km west of, Newcastle, NSW 2300 for New. Construction of an access road . Click for more details...

TASMAN COAL PROJECT - MOUNT SUGARLOAF - ROAD UPGRADE (NO3)
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Newcastle Council Area for New development. Contract includes the round about on John Renshaw Drive. Click for more details...

NORTHPARKES COPPER/GOLD OPERATIONS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Parkes Council Area for New development. Northparkes Mines is a copper/gold producer near Parkes. The Company has work conducted on rates base contracts for the supply of daily services in various fields. Includes; provision of mobile machinery including (but not limited to) bobcat, backhoe, small trucks, small excavators, water cart as required; provision of labour for assistance with minor maintenance tasks; fencing etc as assistance to farming operations; civil and road repairs/maintenance as required. Click for more details...

TAHMOOR COLLIERY - TAHMOOR NORTH EXPANSION STAGE THREE/COAL PREPARATION PLANT
Tahmoor Colliery - Tahmoor North Expansion Stage Three/Coal Preparation Plant is currently at the Tenders & Building stage, valued at about $ 5000000 it is Part of proposed Tahmoor North expansion from 1.9 million tonnes ROM in 2002 rising to 3.2 million tonnes ROM by end 2004 of high quality coking coal. The project is currently scheduled for completion by early 2004 and will proceed in three stages. Expressions of interest are invited for supply of equipment for each stage of the project. Click for more details...

WEST CLIFF COLLIERY - OVERLAND CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Wedderburn Rd, Appin, NSW 2560 for New. The Overland Conveyor was to be over the 3 kilometres of rough terrain between the Appin and West Cliff Mines. Click for more details...

MOUNT OWEN COAL OPERATIONS
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) New project at Via, Singleton, NSW 2330. This type is Open Cut Mine - Production Increase with Private ownership. Includes proposal to increase Run of Mine (ROM) coal production at Mount Owen from 8Mtpa to 10Mtpa; extending mining operations at Mt Owen in the approved pit C area and the development of a shallow resource adjacent to the pit C area, referred to as the Eastern Rail Pit; developing an out of pit overburden dump known as the West Dump; continuing to operate a ROM receival facility. Click for more details...

HILLGROVE GOLD/ANTIMONY OPERATIONS - BRACKINS SPUR
Resource - Gold/Antimony project at Hillgrove, north east of, Armidale, NSW 2350 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). Mine output has increased by 30% over the previous quarter. This increase was principally from the Metz operation. Brackins Spur will provide an additional ore source during the September 2001 quarter. The output of this mine will be significantly lower in antimony than the ore currently mined, but will contain a higher gold grade. Click for more details...

ULAN COAL OPERATIONS - CONVEYORS
A project in the NSW Within Upper Hunter. The overland conveyor will be 2 km long and have 1400 t/h capacity. An underground truck conveyor will be upgraded and extended to a total length of 3.2 km. Also a new 4250 t/h stackout conveyor that is 1.6 km long will be installed and it will extend across an open cut haul road via culvert underpass to a 400,000 tonne overall hub stockpile. Click for more details...

MOUNT THORLEY WARKWORTH NO 1 COAL OPERATIONS
Mount Thorley Warkworth No 1 Coal Operations is currently at the Planning stage, valued at about $ 500000 it is Possible infrastructure requirements for extensions at Warkworth and possible integration with the adjacent Mount Thorley operations include the construction of a new conveyor for Warkworth Mine to Mount Thorley Operations and the Mount Thorley Coal Loader. Click for more details...

TASMAN PROJECT - MOUNT SUGARLOAF - SURFACE INFRASTRUCTURE - CONVEYORS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Includes conveyor and gantries and truckloader bins and bunded fuel tank area. Click for more details...

MOUNT OWEN COAL OPERATIONS - ROM RECEIVAL FACILITY
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Singleton Council Area for New development. Construction and operation of a ROM receival facility and haul roads to enable Mount Owen Mine to process ROM coal from Ravensworth East and Glendell mines. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

BAAL BONE COLLIERY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Series of underground main-gate conveyors for longwall mining. Total length, approx 10 kms. Includes 3 systems. Click for more details...

KOORAGANG COAL TERMINAL EXPANSION - STAGE 3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at At, Kooragang, NSW 2304 for Addition. Includes rail receival, stacking conveyor system, additional stockyard, additional reclaimer & reclaimer conveying system, additional ship loading conveying stream & ship loader. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Shaft Sinking - No 1 & No 2 project at South west of, Morisset, NSW 2264 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). Ventilation shafts - one 3 metre diameter, one 6 metre diameter (Raisebore). Two mine shafts from the surface to the West Wallarah seam at the the Mandalong project site located at Mandalong NSW. Click for more details...

RAVENSWORTH/NARAMA COAL OPERATIONS - RAVENSWORTH WEST - RESOURCE
Currently at the Construction stage In Singleton is a project estimated to be $ 30000000. This project The mine will produce coal at the rate of 1.0 to 1.5 million tonnes per year for six years. Development cost of $30 million are expected. The operation will share existing infrastructure and equipment with Ravenswood East. The Ravensworth/Narama complex, located in the Hunter Valley in New South Wales, includes the Ravensworth East operation, Ravensworth West mining tenements and Coal and Allied's share of the Narama operation. Click for more details...

ARDLETHAN TIN OPERATIONS - PREPARATION/TREATMENT EQUIPMENT SUPPLY
A project in the NSW Within Coolamon. Includes mobile preparation & treatment equipment to be located close to the excavator. Ore is placed in a stockpile & a loader working continuously will feed the ore into the feeder-hopper of the scrubber-trommel. More water will be added so that the undersize can be pumped through in-line jigs which will be located within boom of the trommel unit. Some tin concentrate will be recovered in the in-line pressure jigs. The finer tin particles will be picked up in a spiral plant. Click for more details...

CADIA HILL COPPER/GOLD OPERATIONS - RIDGEWAY
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at South of Orange and north of, Blayney, NSW 2799. Includes the engineering design for conveyor, crusher and underground services. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
South wast of, Morisset, NSW 2264 Has Cooranbong Colliery - Mandalong Mine Project currently at Construction stage. High capacity longwall belts. Main gate and main trunk conveyors. Click for more details...

ARDLETHAN TIN OPERATIONS - ERECTION/INSTALLATION PACKAGES
Erection/Installation Packages New project In The Coolamon Council Area. Packages include mechanical, structural, piping and electrical work for the processing area. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

BAYSWATER POWER STATION
At, Bayswater, NSW 2283 Has Bayswater Power Station currently at Construction stage. Installation of temperature monitoring sensors on pulley bearings and into the fluid coupling return lines of coal conveyors R1, R2, 3A and 3B. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

LIDDELL POWER STATION - FIRE PROTECTION
A project in the NSW Within Muswellbrook. The contract consists of four separable portions. Firstly under condenser fire protection for units 1 to 4. Secondly, Belt protection for 5AR and 5BR conveyors and associated work. Thirdly, Room protection for the decommissioned 1-2 plant control room. Fourthly, Performance testing of the station and Hunter Valley gas turbine pumpsets. Click for more details...

CAMDEN GAS PROJECT STAGE 2 - SUGARLOAF FARM EXTENSION
Resource - Coal Bed Methane project at Menangle Road, Gilead, NSW 2560 In The Council Area Of Campbelltown of Private. A two drilling programme will intersect the Bulli, Balgownie and Wongawilli coal seams. Development includes the construction and drilling of seven wells, the construction and operation of the gas gathering system and access roads, the connection of the wells to the stage 2 treatment plant and the operation and production of methane gas from the wells. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

LIDDELL POWER STATION - ANTIENE RAIL COAL UPLOADER
A project in the NSW Within Muswellbrook. Proposed development will include the construction of a new rail loop off the main northern rail line at Antiene, an uploading hopper and associated facilities. These facilities will include minor maintenance, fuel storage, and refuelling facilities. Also an overland conveyor to transport coal to the Bayswater power station will be constructed. The proposed development is designed to deliver 15 million tonnes of coal per year and is required to be operational by January 2007. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 REMAINING STAGES
Coal Terminal - Stage 3/2f project at Cormorant Rd (Lots 6-7 DP4015754 Lot 20 DP252325) Kooragang Island, Kooragang, NSW 2304 in the Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging). The main activities associated with the development of the Newcastle Infrastructure Group Coal Export Terminal would include: dredging of three berths in the south arm of the Hunter River to construct a serviceable port for the export of coal; reuse of dredged sands as preload and engineering fill for construction; disposal of unsuitable dredged sediments at sea in accordance with relevant sea dumping permits; construction of wharf facilities and ship loaders; construction of a Coal Storage Area including coal stockpiles, transfer stations, conveyors, stackers and reclaimers; remediation works including capping of selected areas of the existing Kooragang Island Waste Facility for the development of the rail spur and rail loops; construction of a rail spur and two rail loops, road/rail overpasses, unloading stations and connecting conveyors; installation of power supply, reticulation and control systems; development of access roads and internal roads; development of water management infrastructure including site drainage works, collection ponds and stockpile spray system; and construction of administration and workshop buildings.The plant capacity is designed for up to 66Mtpa, and will be built in 3 stages with the initial stage for 33Mtpa. The plant is to provide three services: (1) receival of coal by rail and stacking the coal out (2) storage and blending of coal in the stockyard, and (3) reclaiming coal and loading it onto ships. Click for more details...

MANGOOLA COAL PROJECT - STRUCTURAL STEEL & MECHANICAL FOR RAIL LOADING INFRASTRUCTURE
Rail Loading Infrastructure - Structural Steel/Mechanical New project In The Muswellbrook Council Area. For the provision of structural steel & mechanical works. Click for more details...

LIDDELL POWER STATION - EFFLUENT DISPOSAL SYSTEM/PIPELINE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at At, Liddell, NSW 2333. This type is Effluent Disposal System/Mine Conveyor Washdown Pipeline with Private ownership. The Contract shall be for all works associated with the construction of a new effluent disposal system from the Liddell Sewage Plant to the Liddell Ash Dam. The Contract also includes for the construction of a new mines conveyor washdown pipeline to M2/M1 transfer house. Click for more details...

CAMDEN GAS PROJECT - RAZORBACK WELLS - RESOURCE
Resource - Coal Bed Methane project at Finns Rd & Woodbridge Rd, Camden Park, NSW 2568 In The Council Area Of Wollondilly of Private. To construct nine coal seam gas wells including gas gathering systems and access roads. The wells will be connected to the Rosalind Park Gas Plant for production. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND - SURFACE CONVEYOR
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at North of, Ulan, NSW 2850 for New. For the provision of a surface conveyor to take mined coal to the new run-of-mine (ROM) hub stockpile complex. Trade packages as part of the Surface Coal Clearance System to include electrical works (supply, installation & commissioning of electrical components such as earthing, lightning protection, control equipment, lighting, cables, etc), mechanical works (fabrication, site installation & commissioning) & civil works (earthworks, foundations/footings, dressing, substation/switchroom pads). Click for more details...

PORT WARATAH COAL SERVICES - KOORAGANG TERMINAL STAGE 3 EXPANSION (3EXP)
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Newcastle Council Area of Coal Loading Facilities- Expansion type. The 3EXP project to expand capacity of Stage 3 of Kooragang Terminal from 77 million tonnes per annum (Mtpa) to a nominal 120 Mtpa. At early 2010 the 2 reclaimers were at the pre-commissioning stage. The K7 berth dredging component was incorporated into an NCIG project. Stockpile Pads C & D were each yet to be extended 1500m in length to their maximum 3km. Click for more details...

LIDDELL POWER STATION - ASH DAM CIVIL MAINTENANCE WORK
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at At, Liddell, NSW 2333 of Ash Dam Civil Maintenance Work type of New development. The work will include the construction of new earth fill embankments and raising of existing embankments at the Liddell Ash Dam. The work required involves maintenance and minor modification of existing earthworks, including earthfill embankments and slurry channels at Liddell Ash Dam. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - SHIP BERTHS
Part of lots 6, 7 & 20 Cormorant Rd (DP 4015754 & 252325), Newcastle, NSW 2300 Has Newcastle Coal Infrastructure Group Coal Terminal 3 - Ship Berths currently at Construction stage. For the provision of 2 new berths for terminal 3. Click for more details...

NEWCASTLE COAL INFRASTRUCTURE GROUP COAL TERMINAL 3 - OUTBOUND SYSTEM CIVIL STRUCTURAL MECHANICAL WORKS
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Part of lots 6, 7, 20 Cormorant Rd DP 4015754 & 252325, Newcastle, NSW 2300. Design, Supply & Installation of Piled Foundations, Supply & Installation of Concrete Foundations, Shop Detailing, Supply, Fabrication, Painting, Off Site Pre-Assembly & Site Erection of Structural Steel and part supply & complete Mechanical Installation for the Outbound System comprising a 2000t Buffer Bin, two Belt Feeders, Sample Plant, two Transfer Houses, three Conveyors and two substation slabs for a 30Mtpa Coal Export Terminal. Click for more details...

WEST CLIFF COLLIERY WASHERY UPGRADE
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 4km southeast of, Appin, NSW 2560. Upgrade of the West Cliff Washery over the life of the Bulli Seam Operations Project to handle up to 105Mtpa throughput. To include installation of new components such as rotary breaker & screen house, coarse & fine coal storage bins, triple roll crusher, small coal circuit modules (eg desliming screens, primary & secondary cyclones, centrifuges), flotation cells & a teetered bed separator, coal & tailings thickeners, belt filters & tailings presses. Replacement of the existing Baum jig with a dense medium drum. Upgrades of existing conveyor systems, piping, pumps, sumps, safety & auxiliary systems. Upgrades of power supply systems to provide additional capacity & back up supply. Click for more details...

NARRABRI UNDERGROUND JOINT VENTURE COAL OPERATIONS- STAGE 2 EXPANSION - VENTILATION SHAFT
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Narrabri Council Area for New development. Construction of a 5m diameter ventilation shaft with 3 fans. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Infrastructure (Tailings, Dams, Water supply dams) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

MAULES CREEK COAL PROJECT - MINE INDUSTRIAL AREA
Maules Creek Coal Project - Mine Industrial Area is currently at the Construction stage, valued at about $ 75000000 it is Surface facilities at the Mine Infrastructure Area to include workshops, heavy & light vehicle refuelling & washing facilities as well as tyre jacking slabs. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

THE MAC ACCOMMODATION CENTRE BOGGABRI STAGE 1
Mining - Infrastructure (Tailings, Dams, Water supply dams) New project at 262 Carloola Rd, Boggabri, NSW 2382. This type is Accommodation Modules/Administration/Kitchen/Dining/Laundry/Civils/Reservoir with Private ownership. Construction of stage 1 of an accommodation village to provide 328 rooms & laundry facilities in prefabricated modules. Construction also of an office/administration building & a kitchen/dining building with concrete floors & metal walls & roofs. Civil works package expected to include bulk earthworks, roadworks, stormwater & construction of an 8ML reservoir. Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect