List of Mining - Infrastructure Projects in QLD


WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). At Lorim Point. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Infrastructure (Bunding) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

BLACKWATER COMET PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Via, Blackwater, QLD 4717. Part of Comet CPP project. Coal Handling. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

DALRYMPLE BAY COAL TERMINAL - EXPANSION
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area for New development. Expansions to 60 million tonnes per annum. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Infrastructure (Bunding) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Raise Bore project at Via, Charters Towers, QLD 4820 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). A 150 metre raisebore, 2 metres approx. Angled. Click for more details...

ERNEST HENRY COPPER/GOLD MINE
Ernest Henry Copper/Gold Mine is currently at the Construction stage, valued at about $ 8000000 it is 35.5 km long x 9 m wide, running along a ridge route on the east of & parallel to Zingari Rd. The contract will include construction of road & associated drainage works. Precaste concrete culvert units for the latter will be supplied under a separate contract. Click for more details...

HAIL CREEK COAL PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Approx 35 km north west of, Nebo, QLD 4742 for New. 24 km of fencing. Click for more details...

ENTERPRISE COPPER MINE
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Mt Isa City Council Area for New development. A 710 m internal shaft from which the copper ore will be hoisted. The internal shaft sinking phase includes pre-project development and mullock removal from the exising Deep copper Mine. The internal shaft contract will include a raisebore, strip and line method, which involves drilling, stripping the shaft hole and concrete lining the 3.5 metre diameter shaft. The contract includes shaft development from 19B sub-level, which is the top of the internal shaft, to 31A sub-level, which is the bottom of the shaft. Skips at 30 level will hoist ore to 20 level, from where it will be transported to the surface using the existing shaft hoisting system. Once on the surface, the ore will undergo concentrating and smelting at the operation's smelting complex. Click for more details...

CRACOW GOLD PROJECT - RESOURCE
Operating Mine New project In The Banana Shire Council Area. Resource estimate is 3.6 Mt @ 10 gpt with reserves being 780,000 tonnes @ 12 gpt. Gold production for December Quarter 2006 was 29,000,000 tonnes @ 9.7 g/t for 8,400 ounces of Au. Development expenditure of $23 million for 2006/2007 includes a decline access to the sovereign shoot and towards the Empire and Sterling zones of mineralisation; decline development of the lower portion of Crown shoot and the lifting of the tailings storage facility. The recently discovered Kilkenny structure is located on the western side of this zone. Recent exploration at Cracow has been focused on drilling of Kilkenny, in addition to drilling on the Sovereign, Roses Pride and Empire shoots. Drilling of the Kilkenny structure defined two steeply plunging shoots of epithermal gold mineralisation. Gold is hosted within a lode structure similar to the Crown and Sovereign shoots. At June 2008, Newcrest calculated an Inferred Resource for Kilkenny (based on a cut off grade of 2.3 g/t gold) of 0.9 Mt at 7.1 g/t for 200,000 ounces. Click for more details...

PAJINGO GOLD OPERATIONS - VERA-NANCY
New project of Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project, Charters Towers, QLD 4820. A 1 + 1 year contract that is likely to include the decline, drilling access, diamond drilling and ventilation shaft. Click for more details...

MONTO MINERAL INDUSTRIAL MINERALS PROJECT - ILMENITE RESOURCE
Currently at the Construction stage In North Burnett Regional is a project estimated to be $ 50000000. This project Resource estimate in the measured category is Ilmenite 57,678 tonnes @ 5.2% for 3002 tonnes of mineral, Feldspar 5260 tonnes @ 12.3% for 647 tonnes, Apatite 5,950 tonnes @ 1.9% for 114 tonne and Titanomagnetic 57,678 tonnes @ 3.1% for 1,773 tonnes. Indicated Mineral resource is Ilmenite 21,334 tonnes @ 4.4% for 934 tonnes, Feldspar 12,740 tonnes @ 14.7% for 1870 tonnes, Apatite 12,050 tonnes @2.1% for 252 tonnes and Titanomagnetic 21,334 tonnes @ 2.2% for 477 tonnes. Inferred mineral resource is Feldspar 55,000 tonnes @ 12.3% for 6800 tonnes and Apatite 55,000 tonnes @ 1.9% for 1000 tonnes. Multi product operation producing feldspar, ilmenite, titano-magnetite and apatite. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - MINING/CRUSHING
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. The revised mine plan now incorporates the previous stage one and stage two. Click for more details...

OAKY CREEK COAL OPERATIONS - OAKY NO 1
Oaky creek via, Tieri, QLD 4709 Has Oaky Creek Coal Operations - Oaky No 1 currently at Construction stage. A change to thin-seam mining with the south-east extension will necessitate new longwall equipment and an upgrade of the trunk conveyor system. Trunk belt capacity is likely to be expanded from 3,500 tonnes per hour to 4,5000 tonnes per hour. Oaky Creek Coal collectively produces 7 million tonnes a year export coking coal from underground longwall operations. Expressions of Interest were sought for the services of a suitably experienced Contractor to provide the following services and works for the installation of an Underground Conveyor System: civil works; structural steel and fabrication works; installation of structure and belt; project management and supervision; electrical works. Click for more details...

RG TANNA COAL TERMINAL
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Gladstone Regional Council Area of State ownership. Construction of approx 382 m of steel framed wharf structure supported on 1200 mm dia steel piles with prestressed concrete decking & associated dolphin structures. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - MAIN ACCESS ROAD DESIGN
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Isaac Regional Council Area for New development. The Main Access Road - design contract is for Goonyella. Click for more details...

POITREL COAL MINE PROJECT - CREEK DIVERSION/LEVEE BANKS
A project in the QLD Within Isaac Regional. The proposal includes diversion of New Chum Creek to the east of the mine and levee banks along the flood plain of the Isaac River to the south and New Chum Creek to the east. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

ABBOT POINT COAL TERMINAL EXPANSION STAGE 3
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Abbot Point 25 km north west of, Bowen, QLD 4805 of Coal Terminal Expansion - Stage 3 type of New development. Expansion of terminal capacity from 15 mtpa to 50 mtpa. Key components of the stage 3 expansion will involve the construction of a second berth, a second rail loop and train dump facilities and associated second in loading conveyor. Installation of a new stockyard bund and two new stockpile rows. Up to three new stacker reclaimers and a new yard conveyor and transfer towers will be installed. A second outloading conveyor to the offshore berth, using the existing jetty structure will be installed. Installation of a second offshore berth and a second shiploader on the new berth. Lastly there will dredging work associated with the second berth and the dredge material will be disposed of on either land or sea. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - INLOADING CONVEYOR SYSTEM
Inloading Conveyor System project at Hay Point Road, Hay Point, QLD 4740 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Scope of work includes the supply and fabrication of new conveyors and rail unloading facilities, civil footings and supports for these conveyors and supply and installation of electrical work associated with these conveyors. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO SHIPLOADER
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Upgrade to Shiploader. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - STACKER RECLAIMER SR5 UPGRADE
Stacker Reclaimer Sr5 - Upgrade project at Hay Point Rd, Hay Point, QLD 4740 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Upgrade to existing Stacker reclaimer SR5. Work will mainly mechanical and electrical installation and maintenance. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - ONSHORE OUTLOADING CONVEYOR SYSTEM
Dalrymple Bay Coal Terminal Expansion - Onshore Outloading Conveyor System is currently at the Construction stage, valued at about $ 60000000 it is To fabricate and erect an Onshore Outloading Conveyor System. The conveyor will be one kilometre in length and will be constructed of fabricated steel. There will be a minor civil work component to the project involving concreting. All the mechanics have been supplied. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - RELOCATING/UPGRADING STACKER/RECLAIMER SR3
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at Hay Point Rd, Hay Point, QLD 4740. This type is Stacker/Reclaimer Sr3 - Relocate/Upgrade/Modify with Private ownership. Relocate, upgrade and modify stacker/reclaimer SR3 to SR6 location. The upgrade includes the supply of a new elevator conveyor as well as an upgrade of the electrical system. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE DAMS
Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Mackay Regional Council Area of Site Dams - Construction type. To construct two dams. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - HOSE & CABLE REELERS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Hose & Cable Reelers - Design/Construct/Supply type. To design, construct and supply hose and cable reelers for SR6 & RL2. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Infrastructure (Bunding). Various civil & concrete works for the mine site. Click for more details...

PORT OF TOWNSVILLE BERTH 8 & 10 UPGRADE & INNER HARBOUR EXPANSION PROJECT STAGE A
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) New project at ., Townsville, QLD 4810. This type is Berth Upgrade/Military & General Cargo Facility - Stage A with State ownership. Townsville Port Inner Harbour Expansion involves reconfiguration of the inner harbour to maximise the capacity of existing infrastructure & provide safe & secure harbour for the next generation of commercial, cruise & military ships. Cruise, Military & General Cargo Facility on existing Berth 10 at the Port. Includes development of Passenger Terminal with public spaces, new wharves & associated marine works & provision of services to the facility. Other TPIX projects may be included within the contract subject to availability of funding. New Ship loader to be constructed on Berth 8 & any augmentation works necessary to Berth 8 to facilitate construction of the new ship loader. The works include the design & documentation of - new elevated conveyors, gantries & transfer towers. Upgrading of existing vessel fendering on part of Berth 8. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

ABBOT POINT COAL TERMINAL X50 EXPANSION DS1 ABD IL1 STRUCTURAL MECHANICAL & ELECTRICAL WORKS
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. Rail Unloader (Dumpstation) 1 - including installation of principal supplied wagon vibrating system and vibrating feeders, extension of superstructure, modification to rail support beams, replacement of new steel hoppers and belt weighers, control room fit out. Inloading Conveyors C101/C102/C103 Upgrade - Modification to concrete pedestals and installation of concrete slabs. Strengthening works to existing elevated galleries, modification to existing transfer towers, installation of drive access platforms, modifications and upgrade to conveyor system. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

GEORGINA BASIN PHOSPHATE PROJECT - FERTILISER COMPLEX
Mining - Infrastructure (Slurry pipelines) project at MICA CREEK 10km south of, Gunpowder, QLD 4825 for New. Chemical processing including a 1600ktpa sulphuric acid plant, a 600ktpa phosphoric acid plant, a 1200ktpa Di/Mono Ammonium Phosphate (DAP/MAP) plant & a 30ktpa aluminium fluoride plant. Associated utilities & facilities. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

WIGGINS ISLAND COAL EXPORT TERMINAL (WICET) PROJECT STAGE 1 - OFFSHORE PLANT & INFRASTRUCTURE
Jetty/Wharf/Berth/Conveyors/Towers/Dolphins project at Golding Point, Wiggins Island, Gladstone, QLD 4680 In The Council Area Of Gladstone Regional of Private. Construction of a 1.8km long approach jetty & transfer tower platform, wharf, wharf conveyor including the drive & take up tower, berthing & mooring dolphins, ship access platforms, jetty conveyor & transfer tower. Click for more details...

NEWLANDS & GLENDEN ROADWORKS PROJECT
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Around, Glenden, QLD 4743. Roadworks associated with the Newlands Camp including internal roads & car park. Upgrade of Collinsville Elphinstone Road & the camp access intersection. Extension also of Hess Avenue & Gibb Street in Glenden. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

PEAK DOWNS COAL OPERATIONS - DYSART ROAD RELOCATION
A project in the QLD Within Isaac Regional. Relocation of a 16.4km section of Dysart Rd some 46-62km north of Dysart to allow for continued eastward expansion of the open cut pit. To include new bitumen sealing & association drainage. Relocation of existing fibre optic cable. Construction of a new at grade level rail crossing. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

APLNG LNG PLANT - ROAD MAINTENANCE SERVICES
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Gladstone Regional Council Area of Private ownership. For the provision of road maintenance services. Click for more details...

BARALABA NORTH JOINT VENTURE COAL PROJECT - MINE ACCESS & MINE HAUL ROADS
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Banana Shire Council Area for New development. Construction of mine access & mine haul roads. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE COMMUNICATIONS
Mining - Infrastructure (Computer & telecommunication system for mine, scada) project for New development. For the provision of a site communications system to include a permanent high frequency radio repeater station. Click for more details...