List of Mining - Infrastructure Projects in Queensland


LAKE LINDSAY COAL PROJECT - EARTHWORKS PACKAGE - ACCESS ROAD & DAMS & WATER MANAGEMENT ET AL
Private ownership Mining - Infrastructure (Bunding) project In The Isaac Regional Council Area for New development. Now includes prep for industrial area hardstand. Click for more details...

DALRYMPLE BAY COAL TERMINAL - EXPANSION
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Mackay Regional Council Area for New development. Expansions to 60 million tonnes per annum. Click for more details...

GOONYELLA/RIVERSIDE COAL OPERATIONS - BROADMEADOW
Underground Conveyors New project In The Isaac Regional Council Area. Coal Clearance Conveyors. The Drivers may be part of package. Ramp 4 (now renamed Broadmeadow) potential new underground off the highwall. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS
Raise Bore project at Via, Charters Towers, QLD 4820 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). A 150 metre raisebore, 2 metres approx. Angled. Click for more details...

CURRAGH NORTH COAL PROJECT - PISCES
New project of Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of, Blackwater, QLD 4717. The EIS proposes relocating the proposed haul road route to Curragh Coal mine 1.5-3km further east of MacKenzie River, a variation from the original Pisces project as proposed by Stanwell. The proposed haul road corridor is 25 km. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - UNDERGROUND MINING
Currently at the Construction stage In Charters Towers Regional is a project estimated to be $ 3400000. This project Company personnel are currently undertaking the preliminary development. Once the decline progresses into the ore zone, company personnel are likely to concentrate on production with assistance in further decline development likely to be undertaken by a contractor (to be repriced at a later date). Click for more details...

OAKY NORTH MINE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Central Highlands Regional Council Area for Subcontract development. For series of conveyors to transport coal from reclaimer to breaker to transfer station to stockpile. Conveyors include 2.3 km & 650 m approx lengths. Click for more details...

HAIL CREEK COAL PROJECT
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at Approx 35 km north west of, Nebo, QLD 4742 for New. 24 km of fencing. Click for more details...

LAKE LINDSAY COAL PROJECT - OVERLAND CONVEYOR
Conveyor - Overland New project In The Isaac Regional Council Area. Coal will be transported 25 km to German Creek preparation plant via overland conveyor or truck. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - MINING/CRUSHING
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. The revised mine plan now incorporates the previous stage one and stage two. Click for more details...

RG TANNA COAL TERMINAL
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project In The Gladstone Regional Council Area of State ownership. Construction of approx 382 m of steel framed wharf structure supported on 1200 mm dia steel piles with prestressed concrete decking & associated dolphin structures. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Surface Infrastructure project at via, Texas, QLD 4385 in the Mining - Infrastructure (Tailings, Dams, Water supply dams). Likely to be small scale infrastructure requirements, including demountables. Some demountables are already in place for administration of exploration project. Only 1-2 additional demountables likely to be required. Likely to be sourced locally. NO accommodation requirements, as the project is located only 7 km from Texas. Heap leach operation will require earthworks to prepare leach pads. Likely to be part of mining operation. Click for more details...

CHARTERS TOWERS CITY COUNCIL MINE SHAFT REPAIR PROJECT
Charters Towers City Council Mine Shaft Repair Project is currently at the Tenders & Building stage, valued at about $ 100000 it is Construction plant including backhoes, skid steer loaders, excavators (Min 30 tonne and 2 tonne), front end loaders in 3-5 cu m minimum, for the period 1/07/02 to 1/06/02. Click for more details...

POITREL COAL MINE PROJECT - CREEK DIVERSION/LEVEE BANKS
A project in the QLD Within Isaac Regional. The proposal includes diversion of New Chum Creek to the east of the mine and levee banks along the flood plain of the Isaac River to the south and New Chum Creek to the east. Click for more details...

POITREL COAL MINE PROJECT - SEDIMENT DAMS
Private ownership Mining - Infrastructure (Tailings, Dams, Water supply dams) project In The Isaac Regional Council Area for New development. The proposal includes a water management system, including sediment dams. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - UNDERGROUND MINING
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project at Via, Charters Towers, QLD 4820 of Underground Mining type of New development. Company personnel are currently undertaking development to the ore zone. A contract is likely to be repriced involving further development work. Company personnel will then concentrate on production. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

TWIN HILLS GOLD PROJECT - ROAD INTERSECTION
Twin Hills Gold Project - Road Intersection is currently at the Tenders & Building stage, valued at about $ 500000 it is Work comprises the construction of the intersection of Twin Hills operations access road and the Gregory Development road, which is 125 km north of Cleremont. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO SHIPLOADER
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Upgrade to Shiploader. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - PHASE 2/3
New project of Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project at Hay Point Rd, Hay Point, QLD 4740. Terminal expansion to increase capacity to 85 Mtpa. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - OUTLOADING SYSTEM OL3 OFFSHORE
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at Hay Point Rd, Hay Point, QLD 4740 for New. Outloading Systems OL3 offshore. Work comprises an extension of the existing jetty by 3.8 km to the new shiploader wharf, to be known as berth 4. The dredging work has been completed. Fabrication work for the jetty and wharf will include piles and headstocks. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - STACKER RECLAIMER SR5 UPGRADE
Stacker Reclaimer Sr5 - Upgrade project at Hay Point Rd, Hay Point, QLD 4740 in the Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling). Upgrade to existing Stacker reclaimer SR5. Work will mainly mechanical and electrical installation and maintenance. Click for more details...

DALRYMPLE BAY COAL TERMINAL - CONVEYOR UPGRADE
Private ownership Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area for New development. Upgrades to conveyors L 1, L2, L3 and L 4. The tender comprises upgrades to the belt feeder drivers BF5, BF6 and BF7. Click for more details...

ENSHAM CENTRAL UNDERGROUND COAL PROJECT
New project of Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at 40 km north east of, Emerald, QLD 4720. A project to extend Ensham's Life-Of-Mine by 20-30 years by expanding into underground mining. Operations at around 7.6 million tonnes per annum (Mt/y) expected initially to be bord & pillar. New surface facilities likely to include access roads, workshop & vehicle servicing facilities, administration building, accommodation camp, washplant, tailings dams, conveyors, coal stockpile areas, coal handling & preparation facilities, ventilation shafts & access boreholes. A new conveyor to connect the underground product coal stockpile to the existing conveyor serving the train loading bin. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - HOSE & CABLE REELERS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Mackay Regional Council Area of Hose & Cable Reelers - Design/Construct/Supply type. To design, construct and supply hose and cable reelers for SR6 & RL2. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - FINAL ROADWORKS STAGE 1
A project in the QLD Within Mackay Regional. Work to comprise repairing existing roads after major works are completed at the terminal. Final Site Wide Civil Works Stage 1. Click for more details...

KUNIOON COAL PROJECT - CONSULTANCY FOR COAL MINE INFRASTRUCTURE & OVERLAND CONVEYOR SYSTEM
A project in the QLD Within South Burnett Regional. Engineering consultancy for Kunioom mine infrastructure & overland conveyor. Click for more details...

LAKE LINDSAY COAL PROJECT - CIVIL WORKS FOR MINE SITE
Civil Works - For Mine Site project at Approx 25 km from, Middlemount, QLD 4746 in the Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls). Various civil & concrete works for the mine site. Click for more details...

CLONCURRY COPPER GOLD PROJECT - HAUL ROADS
Haul Roads project at 40km northeast of, Cloncurry, QLD 4824 In The Council Area Of Cloncurry Shire of Private. Haul roads to include from the Mount Margaret run-of-mine (ROM) pad area to the Monakoff & Monakoff East pits & ROM stockpile pads. An 8km haul road also to the nearby Ernest Henry Mine for ore processing. Click for more details...

CURTIS ISLAND LNG PLANT (QCLNG) PROJECT - SHIPPING FACILITIES
Curtis Island Lng Plant (Qclng) Project - Shipping Facilities is currently at the Construction stage, valued at about $ 60000000 it is The proposal covers the construction, operation and decommissioning of the LNG Marine Facilities on Curtis Island and the mainland. The facilities include, but are not limited to: a dedicated jetty containing specialised LNG loading facilities and LNG tanker berth(s) to transfer LNG; the jetty consisting of a driven-pile trestle structure, connected a berth(s) with mooring dolphins and breasting dolphins; the jetty will support loading facilities consisting of piping, utilities and loading arms; unloading arms located at the berth to unload imported butane for spiking the LNG; the jetty and berth(s) will be designed to accommodate LNG tankers up to "Q Max" size and will extend out to the 14-15 metre isobath to provide adequate under-keel clearance between the tankers hull and the sea bottom; construction docks to dispatch and receive heavy equipment, including pre-assembled process modules from ships directly or on barge vessels travelling between the mainland and Curtis Island; construction dock design may consist of a causeway or a trestle structure and may be temporary, for the period of construction of all three LNG trains and permanent Ferry Terminals at both the LNG Plant and on the mainland in order to transport construction and operations personnel. Temporary construction docks may remain and be utilised for passenger Ferry Terminal facilities. Due to the benign wave climate, a breakwater is not required. Click for more details...

ABBOT POINT COAL TERMINAL X25 & X50 EXPANSION SPARE DRIVE UNITS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project In The Whitsunday Regional Council Area of State ownership. The scope involves supply of seven conveyor drive units complete with gearbox, fluid coupling, motor and associated couplings mounted on a drive base. A number of drive types are involved, including: 2 x 400kW 3.3 kV, 2 x 560kW 3.3kV, 1 x 1100kW 3.3kV, 1 x 150kW 415V & 1 x 400kW 415V. Click for more details...

AURUKUN BAUXITE PROJECT ABBOT POINT COMMON USER INFRASTRUCTURE CORRIDOR
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Whitsunday Regional Council Area for New development. The project is to be undertaken in a number of stages, dependent on other industrial developments. the multi-user infrastructure corridor will initially include: facilities for bauxite and alumina transfer and caustic soda transfer. An infrastructure service road. Pipelines for transfer of seawater to and from the refinery and a access road for transportation of Pre-Assembled Modules (PAMs) from a dedicated unloading facility on the coast of the refinery. The conveyor, seawater and caustic pipelines will be located within a 20m wide corridor linking the refinery and port. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 - BERTH 3 & ONSHORE FACILITIES
A project in the QLD Within Mackay Regional. Construction of a new berth wharf (Berth 3) and shiploader (Shiploader 3/SL3). Construction of 2 new outloading trestle conveyors on a new offshore trestle complete with access roadway. Construction of offshore link conveyors to existing Berths 1 & 2 & the proposed Berth 3 from the new outloading trestle conveyors. Reclamation of land (9.4ha) to the northeast of the existing stockyard area to facilitate the construction of new onshore outloading systems. Construction of two new onshore outloading systems, associated transfer towers & surge bins to feed the new trestle conveyors, generally constructed on the newly reclaimed land area. Demolition & removal of the existing outloading conveyors, including demolition of the existing trestle & roadway structure. Demolition & removal of the 2 existing onshore outloading systems including conveyors, transfer towers & surge bins. Modification of existing stockyard conveyors to feed the new onshore outloading systems by extension of their head ends & construction of new transfer towers. Site infrastructure works to include roads, drainage systems, electrical & water services. Temporary load out facilities & laydown areas to be developed in the Hay Point Tug Harbour. Click for more details...

ABBOT POINT COAL TERMINAL X50 EXPANSION DS1 ABD IL1 STRUCTURAL MECHANICAL & ELECTRICAL WORKS
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. Rail Unloader (Dumpstation) 1 - including installation of principal supplied wagon vibrating system and vibrating feeders, extension of superstructure, modification to rail support beams, replacement of new steel hoppers and belt weighers, control room fit out. Inloading Conveyors C101/C102/C103 Upgrade - Modification to concrete pedestals and installation of concrete slabs. Strengthening works to existing elevated galleries, modification to existing transfer towers, installation of drive access platforms, modifications and upgrade to conveyor system. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining - Infrastructure (Wharfs, Piers, Port facilities, Piling, Dredging) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

OAKY CREEK COAL OPERATIONS - LABOUR HIRE CONTRACT
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Isaac Regional Council Area of Labour Hire Contract - For Gate Road Development type. A project based on June 2009 reserves of 137.7million tonnes (Mt) of coking coal for an estimated life-of-mine (LoM) of 32 years. Two longwall mining operations yield 11Mt of run-of-mine (ROM) coal annually. After processing through a coal preparation plant, product coal railed to either Dalrymple Bay or Gladstone for export by ship. Click for more details...

ROMA BRISBANE GAS PIPELINE UPGRADE - DALBY COMPRESSOR STATION
A project in the QLD Within Western Downs Regional. Part of a project to upgrade of the existing Roma Brisbane pipeline by 10% approx capacity & increased operating pressure. Installation at the Dalby Compressor Station of 2 additional 4570kW Centaur 50 solar gas turbine compressors along with inlet/exhaust systems, cooler units, fuel gas skids, pipework & valves. Associated works to include a diesel engine alternator for cold start up power, a bunded 6000l fuel store facility, oil store, control room, access road, car park & amenities. Click for more details...

MOUNT COLIN COPPER GOLD OPERATIONS EXPANSION
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at North of Barkly Hwy 50km west of, Cloncurry, QLD 4824 for New. A project located on the Mount Roseby station & based on a resource estimate (indicated, inferred) of 1.9 million tonnes (Mt) containing 50,000t of copper & 26,000 ounces (oz) of gold. Expansion of 130,000tpa open cut operations to 350,000tpa including progressing to new underground workings for an additional 7 year life-of-mine (LoM). Expansion over 18 months of the existing pit using excavators & dump trucks with ore trucked to run-of-mine (ROM) stockpiles prior to trucking by double or triple road trains for off-site processing at the Great Australian Operations Cloncurry. Once the pit is expanded (440m along strike x 220m wide x 170m deep), underground operations (open & backfilled longhole stoping) to commence via a portal to be located within the pit. Workings to include twin boom development jumbos, production drills & ventilation including auxiliary fans & vent ducting in working areas. Underground loaders (boggers) & haul trucks to bring ore from the decline to the surface. Upgrade of the 8.7km unsealed road from the Barkly Highway as well as internal haul & access roads. Water to be sourced from workings dewatering, a surface water management system & truck deliveries to site. Power to continue to be supplied by diesel generators with associated fuel storage. Some 80 operational staff expected to be bussed in from Cloncurry or Mt Isa. Click for more details...

DUGALD RIVER BASE METAL PROJECT - UNDERGROUND DEVELOPMENT CONTRACT
Declines New project In The Mt Isa City Council Area. A 2.5 year contract for underground development including construction of 2 exploration declines at a rate of 9000m a year. A workforce of 100 personnel expected. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - QUARRY MANAGEMENT & GRAVEL SUPPLY
Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project at West of WANDAON, east of TARA & west of, Chinchilla, QLD 4413 for New. A 3 year contract for management of a quarry stockpile & associated works to ensure continuous gravel supply. To include establishment of a quarry pit with access roads. Operate & maintain a surface crushing plant. Manage crushed & uncrushed ore stockpiles in various locations including blending & tramming of material. Click for more details...

LADY LORETTA BASE METALS OPERATIONS- ACCELERATED DEVELOPMENT
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Mt Isa City Council Area for New development. A project to increase ore production at Lady Loretta to 1.6 million tonnes (Mtpa) by developing the upper ore bodies independently of the deeper underground resources. To include larger ore handling facilities, increased mobile & fixed plant equipment with associated expanded ventilation system. Upgraded or expanded infrastructure including concrete batch plant, paste plant, warehouse, fuel farm & power station. Increased village accommodation & utility upgrades. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Conveyors, Stackers, Reclaimers, Materials handling) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Infrastructure (Tailings, Dams, Water supply dams) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...

CARMICHAEL COAL PROJECT - VENTILATION SHAFTS
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project at via the Gregory Developmental Rd 140km northwest of, Clermont, QLD 4721 for New. For the provision of Ventilation Shafts. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Infrastructure (Roads, Airstrips, Culverts, Retaining walls) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...